CS Repair at Plant with Collection from Customer and Quotation

I'd like to incorporate the creation of a quotation with a pick up and repair from customer process. But am encoutering a few obstacles. Can anyone suggest a process to incorporate what I'm trying to do? :
1.     IW51 Create notification
2.     IW52 Create repair (sales) order from notification (Sales Order type YDAS) allowing receipt into plant and delivery back to customer of material.
3.     VL01N Receive material against sales order in a Returns delivery (Delivery type YDLR)
4.     Generate Service Order from Repair Sales Order (Order type SM03) , strip and inspect the material.
5.       Record Time and Materials to be used IW32 and generate planned costs.     
At this point I'd like to generate a quotation in DP80 for approval but get an error:
"Quotation creation only relevant for revenue bearing service orders"
OK. So if you change order type SM03 to allow this then you can't do step 4  i.e. Generate Service Order from Repair Sales Order (Order type SM03).
I can get round this by creating a service order with order type SM02 and then create a quotation from DP80 before returning to step 4 and completing the process below but this is not ideal!
6.     Confirm Operations IW42
7.     Technically complete order IW32
8.     Send equipment back to customer VL01N with order type YDLF
9.     Collate Time and material used on repair order DP90
10.     Create billing document VF01

Use best practice scenarion H77

Similar Messages

  • How to create automatic creation of BP from customer and vendor master data

    Hi gurus,
    can any one tell how to create automatic creation of BP from customer and vendor master data.
    Please give me the steps.
    Thanks
    Sasikanth.

    HI,
    Goto SPRO\ Cross application components \ Master data synchronization \ Synchronization control.
    Assign account groups of customer and vendors to respective BP grouping. This setting is enough to create BP in background while creating customer / vendor. But the fields groups are very much important, ensure mandatory fields should be sync.
    rgds,
    Srini

  • Payment terms based on specific dist.channel, division and Plant but not from customer master.

    Dear All
    I have a requirement,
    Generally payments terms from customer master will flow to sales order. but here my requirement is to get a different payment terms based on specific distribution channel, division, customer  and plant those are there in sales order but not from customer master. is there any user exit or functional module to fulfill this requirement, or any other suggestion appreciated.
    Thanks,
    Reddy

    This Problem you can solve without user exit too.
    The Customer master data itself can solve the problem.
    You can maitain diffrent Payment Term as per the sales area (Dist.Ch+Div+S.org) of customer master.
    and each sales are wise u can change the plant also.
    You just need to set your logic with the combination of sales are and plant. And need to assign which payment term should determine to sales order.
    If you are rasing sales order with X sales area relavent to that payment term will trigger.
    Hope above logic will work, otherwise you can go with user exit.

  • Stock relevant inspection lot with return from customer

    Dear Gurus,
    What settings should I make so that when I make a sales order return from customer, I get a stock relevant inspection lot. What is available for me now is these 2 options:
    1. To activate insp. type 06, and upon return, the stock will fall in the returns logic in the storage location, and an inspection lot will be created, but it is not stock relevant.
    2. To activate insp. type 05, the stock will fall in the returns logic in the storage location, after that transfer from return to quality using mvt type 457, upon this transfer a stock relevant inp. lot is created.
    Both solutions are not suitable for me because for the first option I do not have a stock relevant inp. lot, and for the second option, I loose the refernce to which customer this lot is relevant, and this information is very important for the process.
    Regards,
    MaX

    Hi MaX,
    Well I would suggest to with 1st method as this is standard practice.
    No doubt you can have option to inward the material for customer returns directly in to quality inspection also. Follow the following steps.
    1.     Assign inspection type 05 in material master
    2.     Deactivate inspection type 06
    3.     Go To transaction VOV6
    4.     Double click on appropriate schedule line category that you are using for your return process
    5.     Change movement type there to 655. i.e. returns to quality inspection stock
    6.     Run a cycle. As a result of this stock will be posted to QI with stock relevant  inspection lot
    7.     You can record results and post stock with UD as in normal case of GR.
    8.     Do not forget to check the effect of accounting and controlling document for this movement with your FI consultant.
    Regards,
    Anand Rao

  • Subcontracting Material with challan from customer

    Hi,
    I have one new requirement, we will get the material from customer along with subcontracting challan and material  after making of the finish material we have to bill the customer with labour charges only  all material will be supplied by the vendor.
      Second is same requirement   but in second case we want to use some of our raw materials  then we can make the finish material as per customer requirement and we have to bill for that.
    How to map those scenario in SAP.
    regards,
    zafar

    Hi,
    Follow the below mentioned process for Inbound Subcontracting OR Contract Manufacturing;
    1. MM01 - Create those materials under UNBW material type as Non-Valuated material
    2. CS01- BOM for FG using Components
    3. MIGO - Receive component materials using movement type "501"
    4. VA01 - Create Sales Order for the FG
    5. CO01 - Production order for FG
    6. CO11N - Operation Confirmation
    7. MIGO - GI of components against Order using Mvmt Type 261 (Here also issue materials used internally by you)
    8. MIGO - GR of FG against Order using Mvmt Type 101
    9. VL01N - Delivery and PGI of FG against Sales Order
    10. VF01 - Billing Document (In Billing Document, create 2 condition types in Pricing Procedure, one for Service Charges and Other for Material Charges - used internally)

  • New business scenario for reapir from customer and sending them to vendor.

    Hello team,
                          We have a scenario where we need to configure in the system -
    We  recieve a material from my customer for repair.We need to send this to my vendor who will repair  it and send them back to Us. On this we  recieve revenue from the customer and pay i pay half amount my vendor for the service.
    We are following above scenario in SAP as
    In the first step
    The production team create a serviece order in IW31 for the material that need to send to the vendor, which was recieved from the customer. When service order is created in the back end a Purchase requisition is created.
    In next step we  created a  PO w.r.f to the above PR and  we need to send this  to vendor on subcontracting so that we can track the material from him after the repair.
    The problem is --- When PR is created automatically during serviece order creation (iw31) we are unable to create Po with Item category L (subcontracting) because PR is not created with L.We are even unable to change L in  PR since it is created automatically at the background.We ried to change the field at document type in spro. But no luck.
    Pls let us know is there any other business process where we can handle this situation or any technical help to change the PR.
    Regards,
    L.chaitanya.

    Hi,
    please work out in this way...
    It can be done Using PM02 and PM03 control keys. Select the operation row select the External button in the bottom u will find Sub con check box u can click it .The prerequisities are create a material BOM in the bom as L item select a row and click the item which will be near to the header cap 2nd tab status/long text click it .Mat. Provision Ind select Lor X if it is not available go to IMG setting.Plant maintenance ->Master Data in Plant Maintenance and Customer Service->Bills of Material->Item Data->Define Material Provision Indicators, K&L will be standrad create S Rework Material,XRework Material from Subcontrmake a tick mark in Recursivity of Subcontracting Component and save it . while creating the material to the operation to be assigned from bom then in the component select the row go to the general button in the bottom then Mat. Prov. Ind will be there select rework material the system allows you to proceed further . save the order then check the PR it will be Account assignment will be F and Item categeory will be L selected automatically.
    Then create PO then do MB1b (prerequsitie the material should have stock)using PO reference( movement type 541) the it will be moved to the vendor stock (check with mmbe)
    Aganist PO Material sent to the vendor .While doing Goods Recipt do with MB01with movement type 101, now u can check the stock in mmbe it will be in storage location...
    Kuber

  • Excisable and Non Excisable plants for the same customer and same material

    Hi All,
    We have a customer who purchases the SAME goods from two different plants, one plant is Excisable and another plant is Non Excisable. So sales area of the customer is same for both the plants. When customer buys from Excisable plant Excise Duties should applicable and when the same customer buys from Non Excisable plant Excise Duties should not be applicable. If I maintain the Excise indicator as 1 in customer's J1ID then Excise Duties are applicable for the customer from wherever he buys the goods.(If he buys the goods from Excisable and Non Excisable plants Excise Duties are flowing).
    So, my query is: if the customer buys from non-Excisable plant, Excise Duties should not flow.
    So I am planning to create a new sales org for Non Excisable plant, then the sales area of the customer will change.
    Is there any other way to over come this issue? Plz guide me.
    Thanx&Regards,
    RAMU

    Dear Ramu
    My suggestion is creating a new sales organization is not  required just to fulfill this excise requirement.
    Let us assume you have two plants
    -  1000 is excisable and
    -  2000 is non excisable
    for material ABC
    Now go to J1ID, select the tab "Material and Chapter ID combination"  and maintain the excise tax indicator for plant 1000 only.
    By doing so, while creating sale order, you input the delivering plant and based on the settings you maintained in J1ID, excise duty will be determined in that sale order.
    thanks
    G. Lakshmipathi

  • Upgraded to TimeCapsule and now issues with AirPrint from iPhone and iPad

    Okay.  I bought a HP 210a air print printer.  It was working great with my Linksys router and my iPad and iPhone worked with it perfectly.  Since that time I have recently bought a new new 2TB Time Capsule and just recently set it up.  The old router is no longer hooked up.  Since switching over to the new router, nothing prints from the iPhone or iPad.  So here are the details and I am hoping I am just missing a step:
    1.  I think it is important to point this part out.  After setting up the new router, and before discovering any of this, I turned on the HP printer.  Upon doing so, the printer informed me a software update was available from HP so I downloaded it and it appeared everything was fine.
    2.  After the update, I tried printing and nothing.  Duh, the printer was still looking for the old router.  I ran the built in HP wireless setup wizard on the printer and it pointed to the new router fine.  I tested the connection using the test feature on the printer, and it printed a report that all was fine and that it was now pointed at the Time Capsule, great signal, etc...
    3.  I went to my iPhone and iPad, made sure they were pointed at the same network as the printer, and once again the printer appeared on each device as an AirPrint printer.  Great I thought, so printed a  test a page from each device.  Both pages printed.  Now here is where it gets weird.
    4.  I tried to print a second document from the iPad and iPhone, nothing.  I tried a picture.  Nothing.  It still shows eveything setup correctly, the HP shows as the AirPrint printer and connected, but no matter what I do, it nothing is printing from either device.  I've tried resetting my network settings on the iPhone and iPad and pointing to the network again, re-running the HP setup Wizard on the printer.  They all show that everything is fine.  The iPhone and iPad connect to the network fine, both show the printer when I go to print.  However, after I hit the "print" button on either device, it shows like the document is being sent but NOTHING happens on the HP.  It is very frustrating. 
    The WiFi is working fine, I can surf, email, etc... so the router is working properly.  So what am I missing?  Could the HP update somehow have caused the problem?  I have to believe that between the update and the new router that somewhere I am missing a step.  Any help is greatly appreciated. 

    If that doesn't work, try power cycling your router, printer, and your iPad/iPhone in that order. To do this, follow these steps:
    Unplug the router and printer from the power and shut off the i-devices. Let them sit for about 30 seconds and then plug just the router in.
    Once the router is completely back online (usually takes about 30-60 seconds) plug the printer in. Wait until it is back on its home screen.
    Turn the i-devices on.
    Try to print again.
    Let me know if this helps!
    If I have solved your issue, please feel free to provide kudos and make sure you mark this thread as solution provided!
    Although I work for HP, my posts and replies are my own opinion and not those of HP.

  • BUPA creation from customer and Vendor Master data in R/3 - Urgent!!

    Hello All,
    Firstly I am posting this query in this group to figure out a way to achieve this functionality of integration and moving Business Partners.
    <u>Requirement: </u>On creation of every Customer or Vendor in R/3 we need to create a Business Partner in cProject, I have been told this could be achieved with the ALE functionality,
    My guess would be to for every customer or vendor created in R/3 by User-exit create Business Partners by organization in R/3 and through ALE or BAPI create the same BP's in cProjects, I really need help in getting this solved,
    Please advice me if I am missing something.
    Thanks
    Praveen Kumar

    HI,
    Goto SPRO\ Cross application components \ Master data synchronization \ Synchronization control.
    Assign account groups of customer and vendors to respective BP grouping. This setting is enough to create BP in background while creating customer / vendor. But the fields groups are very much important, ensure mandatory fields should be sync.
    rgds,
    Srini

  • Data Modeler: Problems with importin from DDL and Designer

    I have a few problems with importing models from Designer and DDL:
    1. Can I import spatial indexes from Designer or DDL file? An index does appear in the model but it doesn’t seem to be a spatial index. When trying to import from database, the index doesn’t appear in the model at all.
    2. Is it possible to import sdo_geometry data types from DDL file? I haven’t succeeded with it, instead the column's data type appears unknown.
    3. Sometimes import from DDL files (that are generated with DM) failed with nothing appearing to the model. I haven’t figured out why that happens. I didn’t receive any error message, the model just opened empty.
    4. DM doesn’t seem to recognize public synonym creation from DDL. View log gives the following message:
    <<<<< Not Recognized >>>>>
    CREATE PUBLIC SYNONYM TABLE1
    FOR TABLE1
    5. Sequences lose their properties when importing from Designer. They only have a name but but start with, increment by and min/max values are empty in DM. Importin from DDL works fine.
    I’m using data modeler version 2.0.0 build 584

    Hi Alex,
    There is newer version of Data Modeler (3.0 EA2) and it is free
    You can download it from here
    http://www.oracle.com/technetwork/developer-tools/datamodeler/ea2-downloads-185792.html
    Regards
    Edited by: Dimitar Slavov on Dec 9, 2010 2:15 AM

  • One plant with ML active status and another plant without ML active status

    We have one ML active plant under the company code X. We need to create another new plant under the same Company code  but we don't want to activate Material Ledger for the same as all the material in this plant are of consumable nature and maintained at Price control "V". Can we do that? Please give your advice.
    Mukesh

    Hi Mukesh
    usually, this is not recommended by SAP... I read this in one of the notes, I dont have the note now...
    However, if you are not going to have any stock transfers from the ML Active Plant to the ML Not active plant - you can think of it
    But, as far as I know, this is not recommended by SAP, Though technically it is possible
    br, Ajay M

  • Service Oriented workflow with items from customer

    Dear Friends,
    In SAP Business One how to handle the Service oriented workflow, which contains items from the customers? E.g. Electronic items repairing.

    Hi,
    Step1:Create a item master in the name of service,decide whether it has to be maintained as inventory item or not from the companys accounting person.
    Step2:You can use AR invoice(Item type) where you can include the items used for repairing along with the service item created in the above step1.
    Maintaining Inventory of the items (for repairing) received from the customer as well as the items required for the repairing jobs
    Step3:As you have mentioned that the you are maintaining the item received from the customer,confirm with companys accounting person whether it also has to be maintained as inventory item or not.
    Step4:You can use goods receipt for getting the items from the customer
    Note:Its depends upon your requirement whether to use sales bom or not as suggested by one of the forum member

  • Excise Duty Not to be Collected from Customer

    Dear All,
    I require help in a scenario, wherein company has already paid excise duty
    to produce the goods but does not collect it from the customer for any
    footwear pair which has been priced less than 250 Rs.
    The company wants excise to appear in the sales invoice so that excise
    invoice can be captured.
    Require your suggestion in configuring this scenario.
    Thanks and Regards
    Adithya

    You have not indicated what will happen if the price is above INR 250.00.
    If the requirement is excise should not be collected only if the value is below INR 250.00, then, through standard it is not possible.  Through exit you can control this.  On the other hand, if you dont want to debit the customer for excise duty irrespective of invoice value, then set the excise condition type as statistical, so that excise invoice can also be generated.
    G. Lakshmipathi

  • How JAVA works with collection from function

    All,
    I have a DB function which returns object collection of values. Could someone please tell me how java talks with the function and get the value?
    Thanks

    This is database function. my question is how java get those values from the function.
    Could you please post some sample code also?
    CREATE OR REPLACE
    Type T_PREO_RoleINFO is Object
    ROLE_ID NUMBER(10),
    ROLE_NAME VARCHAR2(20))
    CREATE OR REPLACE
    TYPE T_RoleInfo IS TABLE OF PREORDER.
    T_PREO_RoleINFO
    Function F_GetUserRole(Userid in number)
    return T_RoleInfo as
    V_Role T_RoleInfo;
    begin
         select T_PREO_RoleINFO(PREO_Role.ROLE_ID,PREO_Role.ROLE_NAME)
         BULK COLLECT INTO V_Role
         from preorder.PREO_Role, preorder.PREO_User_Role
         where PREO_Role.Role_id = PREO_User_Role.Role_id
         and PREO_User_Role.user_id = userid;
         return V_Role;
    end;

  • Performance View with data from Custom Rule

    Hello again everybody,
    so we created a vbscript which measures time needed for a specific process inside a program.
    Now we made a rule for getting this data inside SCOM. Alerting and Health-Monitoring works fine.
    For example, we made "if TimeNeeded>5" critical Health state, works like a charm.
    But now, we want to view the data (the script runs every 30 seconds) inside a Performance view.
    - We checked if the rule works as intended. Check
    - Set the rule to "Performance Collection". Check
    - Set the right target group. Check
    - Override for specific target. Check
    - Created a perf.monitor "collected by specific rules" (added our rule) with right targeting. Check
    But the performance-view keeps unpopulated.
    What now?

    I exported the MP as XML file but the rule is not in there, only references.
    But thats not the point anyway, the rule is working.
    The only thing missing is to grab the data the script returns (via oAPI propertybag) and show it in a view. Thats all
    Maybe the question was not clear enough:
    Our script returns a value every 30 seconds, for example 6, then 4, then 8, then 10 and so on...
    All we want now is to show these values in a Performance-View.
    Graphical example:
    10|                            X
    08|                     X
    06|         X
    04|               X                              X
    02|                                    X
    00|
    I guess you now know what I mean.
    This Article
    corelan.be/index.php/2008/04/16/using-customnon-performance-counter-data-to-build-graphs-in-operations-manager-2007
    is EXACTLY what I want and what I did.
    But my Performance-View refuses to show
    ANYTHING...
    Whats the problem?

Maybe you are looking for