Subcontracting Material with challan from customer

Hi,
I have one new requirement, we will get the material from customer along with subcontracting challan and material  after making of the finish material we have to bill the customer with labour charges only  all material will be supplied by the vendor.
  Second is same requirement   but in second case we want to use some of our raw materials  then we can make the finish material as per customer requirement and we have to bill for that.
How to map those scenario in SAP.
regards,
zafar

Hi,
Follow the below mentioned process for Inbound Subcontracting OR Contract Manufacturing;
1. MM01 - Create those materials under UNBW material type as Non-Valuated material
2. CS01- BOM for FG using Components
3. MIGO - Receive component materials using movement type "501"
4. VA01 - Create Sales Order for the FG
5. CO01 - Production order for FG
6. CO11N - Operation Confirmation
7. MIGO - GI of components against Order using Mvmt Type 261 (Here also issue materials used internally by you)
8. MIGO - GR of FG against Order using Mvmt Type 101
9. VL01N - Delivery and PGI of FG against Sales Order
10. VF01 - Billing Document (In Billing Document, create 2 condition types in Pricing Procedure, one for Service Charges and Other for Material Charges - used internally)

Similar Messages

  • Stock relevant inspection lot with return from customer

    Dear Gurus,
    What settings should I make so that when I make a sales order return from customer, I get a stock relevant inspection lot. What is available for me now is these 2 options:
    1. To activate insp. type 06, and upon return, the stock will fall in the returns logic in the storage location, and an inspection lot will be created, but it is not stock relevant.
    2. To activate insp. type 05, the stock will fall in the returns logic in the storage location, after that transfer from return to quality using mvt type 457, upon this transfer a stock relevant inp. lot is created.
    Both solutions are not suitable for me because for the first option I do not have a stock relevant inp. lot, and for the second option, I loose the refernce to which customer this lot is relevant, and this information is very important for the process.
    Regards,
    MaX

    Hi MaX,
    Well I would suggest to with 1st method as this is standard practice.
    No doubt you can have option to inward the material for customer returns directly in to quality inspection also. Follow the following steps.
    1.     Assign inspection type 05 in material master
    2.     Deactivate inspection type 06
    3.     Go To transaction VOV6
    4.     Double click on appropriate schedule line category that you are using for your return process
    5.     Change movement type there to 655. i.e. returns to quality inspection stock
    6.     Run a cycle. As a result of this stock will be posted to QI with stock relevant  inspection lot
    7.     You can record results and post stock with UD as in normal case of GR.
    8.     Do not forget to check the effect of accounting and controlling document for this movement with your FI consultant.
    Regards,
    Anand Rao

  • Dispaly material with key field customer based on tax classification

    Hello all,
    Material is classified based on tax classification as products and goods.I need to dispaly these of either for some customers.
    Client is saying me to use the table MLAN(Tax Classification for material).
    Can anybody suggest me how can i pull the material part/service part(matnr)  from the table (MLAN) based on tax classification(TAXKM) with key field customer(KUNNR) when this table does not have customer has key field in it.
    Thank you,
    Sirisha

    Hello all/Brad,
    Requirement is , i need to add and dispaly material data in a column with heading as  tax classification  in ALV Report for the customer.
    Ex:  Customer 11094 brings material 336047-B21(Product)
          Customer 10973 brings material LDMSPMAP-M (Service)
    Material is classified as per the tax classification  as Product and Service. If tax classification is 1 then it is Product and if the tax classification is 2 then it is Service.
    So i'm trying to pull the material(Product/Service) based on tax classification with customer as key field.
    Customer is coming from customer master data.
    So i have used MARA table which has all three fields (Customer,Material,Tax classification) to get the required information but the table does not have test data for customer.So i told my client to update mara table with customer and tax classification data.
    But  my client told me to use MLAN table  because they have updated the data in this table.But unfortunately this table doesn't have customer field to pull the data.
    So that is the reason, i put the above question in the forum.
    PLease help me in solving this issue.
    Thank you,
    Sirisha

  • CS Repair at Plant with Collection from Customer and Quotation

    I'd like to incorporate the creation of a quotation with a pick up and repair from customer process. But am encoutering a few obstacles. Can anyone suggest a process to incorporate what I'm trying to do? :
    1.     IW51 Create notification
    2.     IW52 Create repair (sales) order from notification (Sales Order type YDAS) allowing receipt into plant and delivery back to customer of material.
    3.     VL01N Receive material against sales order in a Returns delivery (Delivery type YDLR)
    4.     Generate Service Order from Repair Sales Order (Order type SM03) , strip and inspect the material.
    5.       Record Time and Materials to be used IW32 and generate planned costs.     
    At this point I'd like to generate a quotation in DP80 for approval but get an error:
    "Quotation creation only relevant for revenue bearing service orders"
    OK. So if you change order type SM03 to allow this then you can't do step 4  i.e. Generate Service Order from Repair Sales Order (Order type SM03).
    I can get round this by creating a service order with order type SM02 and then create a quotation from DP80 before returning to step 4 and completing the process below but this is not ideal!
    6.     Confirm Operations IW42
    7.     Technically complete order IW32
    8.     Send equipment back to customer VL01N with order type YDLF
    9.     Collate Time and material used on repair order DP90
    10.     Create billing document VF01

    Use best practice scenarion H77

  • Setting for issue subcontract material with ME2O

    Hi,
    In our system presently we are issueing all the material to subcontract with MB1B movement type 541,  I wan tto knowthe settings and process of issue the material with ME2O, what settings are needed this is to control some that we can see the issue qunaity against that PO to the vendor.
    regards,
    zafar

    Hi,
      I have created a Subcontract PO now in ME2O I can see that POthen I select the PO number and click on Post goods issue,  but system is giving error message
    Please select header line(s) or reservation(s)
    Message no. ME152
    but which is the this header line or reservation i have not found reservation number in ME2O screen in our system.
    regards,
    zafar

  • Service Oriented workflow with items from customer

    Dear Friends,
    In SAP Business One how to handle the Service oriented workflow, which contains items from the customers? E.g. Electronic items repairing.

    Hi,
    Step1:Create a item master in the name of service,decide whether it has to be maintained as inventory item or not from the companys accounting person.
    Step2:You can use AR invoice(Item type) where you can include the items used for repairing along with the service item created in the above step1.
    Maintaining Inventory of the items (for repairing) received from the customer as well as the items required for the repairing jobs
    Step3:As you have mentioned that the you are maintaining the item received from the customer,confirm with companys accounting person whether it also has to be maintained as inventory item or not.
    Step4:You can use goods receipt for getting the items from the customer
    Note:Its depends upon your requirement whether to use sales bom or not as suggested by one of the forum member

  • How can I have a call with someone from Customer Support if I live in Costa Rica? I have forgotten the answers to my security questions and basically I can't buy anything on iTunes. I do not have a rescue email account otherwise I won't be writing here.

    I have been trying to fix this by myself but I gave up! I don't remember the answers I provided before. Tried to have a call with apple support but it seems that this is not an option if you live in Costa Rica. How am I supposed to spend the credit I have in my apple account?
    Thank you... Pura vida!

    As Costa Rica isn't on this page : http://support.apple.com/kb/HT5699
    then try contacting Support via this form and explain that you've forgotten your answers, don't have a rescue email address, and your country isn't on the HT5699 page and see how they reply : https://ssl.apple.com/emea/support/itunes/contact.html
    When they've been reset you can then use the steps half-way down this page to add a rescue email address for potential future use : http://support.apple.com/kb/HT5312 .

  • Performance View with data from Custom Rule

    Hello again everybody,
    so we created a vbscript which measures time needed for a specific process inside a program.
    Now we made a rule for getting this data inside SCOM. Alerting and Health-Monitoring works fine.
    For example, we made "if TimeNeeded>5" critical Health state, works like a charm.
    But now, we want to view the data (the script runs every 30 seconds) inside a Performance view.
    - We checked if the rule works as intended. Check
    - Set the rule to "Performance Collection". Check
    - Set the right target group. Check
    - Override for specific target. Check
    - Created a perf.monitor "collected by specific rules" (added our rule) with right targeting. Check
    But the performance-view keeps unpopulated.
    What now?

    I exported the MP as XML file but the rule is not in there, only references.
    But thats not the point anyway, the rule is working.
    The only thing missing is to grab the data the script returns (via oAPI propertybag) and show it in a view. Thats all
    Maybe the question was not clear enough:
    Our script returns a value every 30 seconds, for example 6, then 4, then 8, then 10 and so on...
    All we want now is to show these values in a Performance-View.
    Graphical example:
    10|                            X
    08|                     X
    06|         X
    04|               X                              X
    02|                                    X
    00|
    I guess you now know what I mean.
    This Article
    corelan.be/index.php/2008/04/16/using-customnon-performance-counter-data-to-build-graphs-in-operations-manager-2007
    is EXACTLY what I want and what I did.
    But my Performance-View refuses to show
    ANYTHING...
    Whats the problem?

  • From Custom / To Custom passes

    Hi all,
    I just did write a small java class that I want to use as a "From Custom" pass. It's compiled (without error) and in the classpath of the running dispatcher. However I still get
    "Exception running class  - Exception:java.util.NoSuchElementException" when starting the job.
    It's a very simple class, just importing (and extending) the FromASCII pass so it should have everything necessary.
    Does anyone have a clue how to deal with the From Custom / To Custom passes in detail?
    thank you for any hint,
    Tobias (from University of Basel)

    Hello Tobias,
    I wrote a blog about that:
    /people/domink.trui/blog/2008/11/17/how-to-use-custom-classes-in-the-sap-netweaver-identity-management
    Best regards
    Dominik Trui

  • Big props to AMANDA from Customer Relations + Ipad 2 fiasco

    I, like many others here, are quite unhappy with Verizon and how we have been treated since our "purchased, non-purchased, not received" Ipad 2.  I think it sucks that Verizon has an $800 interest free loan from me for the last 3 weeks and can't tell me where/when my Ipad 2 will ship.
    Not to mention the way I have been treated by my local Verizon Wireless store in PA, both on the phone and in person.  I have been given the run-around at the store and all they can say is "I"m sorry, you were told the wrong thing, I can't help you".  Promises of ship dates, tracking numbers, etc.  Not good at all.
    A BRIGHT SPOT IN MY VERIZON HELL!!!!  I had the good fortune to get in touch with Amanda from Customer Relations yesterday.  She was patient, listened to me vent, did some checking on her own and provided some feedback.  She even says she will follow up with me on Monday to see if there is any new news on my order.
    I know what you're thinking...."yea, sure she's going to follow up.  Sure she is checking on things".  You know what?  I'm giving her the benefit of the doubt and look forward to speaking with her.  Verizon should be proud to have her in the Customer Relations position and do hope they realize that.  So Verizon management types who have screwed up this Ipad 2 thing royally, know that AMANDA in customer relations is doing an awesome job!

    We appreciate the valuable time you have taken to write about your experience. I understand how frustrating this has been. In the future if you would like to give positive/negative praise to an employee, use the Contact Us link at the top of vzw.com to send us an email. This way we can pull up your account and get the rep's info to forward to leadership. For your convenience, we will be sending you a message to gather the details needed to forward your kudos to Amanda. 
    Thank you 

  • Challan Material is Different from Material Document Message No. : 8I 572..

    Dear All,
    Good afternoon. In my company, after version upgrade from ECC5.0 to ECC6.0, facing one peculiar issue i.e in MIGO for subcontract order : When I enter challan number for reference in pop-up, We are getting the below error
    "Challan Material is Different from Material Document Message No. : 8I 572..."
    Creation of preliminary activites before migo in one user login and if i try migo for the same in same login, no errors reported. but if I do the MIGO from different user login, i have noticed with above error and vice versa.
    For this as a abaper, if I debug for trouble shooting from MIGO, no error noticed from any logins for the same activity.
    Kindly help us.
    Arunachalam S

    Dear Hema,
    Thanks for your reply.
    As you mentioned, every thing has been checked and found okey.
    The observation is with same authorization, User A can able to inward the sub-contracting material but User B coud'nt do so and noticed error of  "Challan Material is Different from Material Document Message No. : 8I 572.."
    Even thought,the input information for the both logins are same.
    have a nice day.
    Arunachalam S

  • Reversing subcontracted finished goods that came from customer returns.

    Dear Gurus,
    I have a scenario where the finished goods that came from subcontracting needs to be reversed back to its components without reversing the subcontracting charges. How to process this scenario in SAP.
    The subcontracting job is packing. The individual materials will be sent to vendor and vendor will return the packed finished product. The packed material will then be sold. The materials that came back as customer returns due to quality reasons is unpacked and reverted back to its components.
    How to process this reverting of the packed finished goods back to its components in SAP.
    I understand one thing that reversal of subcontracting GR without reversing the subcontracting charges is not possible and it is not a proper procedure. I am unable to trace a way to process this using other indivdual movement types too.
    Kindly suggest and Thanks in advance.
    Thanks & Regards,
    Pradeep Kumar . S
    Edited by: pradeep.spk on Oct 24, 2011 7:14 AM

    Thanks for your reply Nishant but the problem is subcontracting charges should not be cancelled. The packing job done by vendor was paid and it is irrevokable.
    The Finished goods returned from customer should be reduced from inventory and its components should be added back so that we can scrap the defective components and do our further processing using the good components.
    The requirement is how to process the reduction of the finished goods from inventory and add the components back to inventory in SAP.
    Thanks in advance.
    Edited by: pradeep.spk on Oct 24, 2011 10:51 AM

  • Scenario of Import P.O from same material get money from vendor and custome

    Hi Experts,
    My client is procuring certain material Quantity 10 by Import, As when he recieve the 10 Quantity material he founds 8 Quantity is to be Okay and the other 2 founds to be damaged, As it is import material he cannot return it to import vendor, in this situation he takes the photocopy of the 2 damaged material and get debits from vendor without actual returning to import vendor apart from this the damaged goods he sells for lower price.
    So from the same material he gets the money double time one from Vendor and other from Customer.
    How to MAP this Scenario in SAP ?
    Plaese advice.
    Best Regards
    Javeed Ahamed

    Hi Javeed,
    Are u using QM module?  If u are using, u can activate quality inspection for this material.  You can do 101 movement for total qty i.e. 10 nos.
    Then in usage decision, you can accept 8 nos and reject and scrap 2 nos. 
    If u are not using QM module, u can still post 101 movement for 10 numbers.  Then you can screap 2 nos with movement type 551.
    Hope this will resolve ur problem.
    Award points if found useful

  • Excess material from customer return - Free

    Dear Guru,
    We have the following scenario and need your expertise. 
    -We created a Sales order with qty of 100bags.
    -Performed D/O with 100bag to customer.
    -The customer had use only 98bags and returned the balance of 2 bags.(this is based on work/usage consumption report from customer as the work is done at the remote location)
    -We proceed to issue credit note for the 2bags of the return.
    -However, upon the physical stock arrived at our warehouse, we discovered that the actual quantity is actually 5bags.(customer don't wants the excess of 3bags as the job is completed.)
    Question: How can we stock in the (extra 3bags) into our inventory from the point in SD or MM?  (Note: we are not allowed to use MIGO with movment 501 or 511 due to traceability issue.)
    Thanks in advance.
    Edited by: Chin Wah Chai on Aug 24, 2010 10:29 AM

    Create return sales order for 5 bags with reference to old invoice no,receive material to unrestricted stock using PGR,
    raise credit memo.

  • Challan material is different from material document----Message no. 8I572

    Hi,
    I am getting the following error in subcontracting process when reconciling through J1IFQ.
    Challan material is different from material document----Message no. 8I572
    After P.O. creation and issued the materials through 541 and created a subcontract challan 57f4 and G.R has been done when reconciling through J1IFQ i am getting the above mentioned error.
    Thanks,
    Kiran Bodla

    Hi,
    In spro --> taxon goods movemnt > indiac> business transaction --> subcontrcating --> maintain movement type grp
    here miantain
    0002     101
    0002     542
    0002     543     O
    Hope help U !
    Regards,
    Pardeep Malik

Maybe you are looking for

  • What is the best way to work with Word documents in The InDesign CS4???

    I work in Microsoft Word 2007 and all my documents have *.doc format. What is the best way to work with Word documents in InDesign CS4??? David Blatner says to avoid copying and pasting text from Word instead of placing it (Ctrl+D). How about pasting

  • Windows 8/8.1: Printer Offline Problems

    Windows 8/8.1: Printer Offline Problems Are you getting an error that your network or wireless printer is offline when you try to print? When you print to your network printer, does it fail, and when you check the printer status it says Offline? Do y

  • Problem with Adobe Acobat that came with CS6

    Sad that one cannot seem to get FREE support for what really appears to be an adobe problem.  Periodically i download a reader update.  The Adobe Acrobat that came with CS6 quits working. I have to uninstall and reinstall.  Why?  Seems like when you

  • Order of a playlist

    I have several playlists. They are arranged in order by the singer or band. For example, all Stevie Wonder songs are together in that playlist, and all Beatles songs are together in that same playlist. I must have hit the wrong button, because on one

  • Color manager bug in illustrator cs5

    i try to change objects colors via the color manager with a cmyk code for the new color. the color of layers i changed already changes while i'm changing the other layers. It takes 5-6 time before the right color stay. why? is it a bug? i would like