Deadline monitoring in preventive maintenance plan scheduling

Dear Experts,
we are having only single cycle time based & performance based preventive maintenance plans. The individual plans are weekly, monthly or based on specific counter readings. Now i want to schedule it automatically through IP30. since there are plans with different units like days or hours how can i schedule it through IP30? is it possible to run separate IP30 for counter based single cycle plans? Is it ok if I run the program on every midnight? I am confused on the scheduling through IP30. please give me the clarity...Please do the needful.
Thanks & best regards,
Praveen

Praveen,
Yes you can run IP30 with single cycle plans.
As IP30 can run for many hours (dependent upon number of plans) it is best to schedule the IP30 job at a time when there are fewest users on-line e.g. midnight on Saturday or Sunday. The timing is very much dependent upon your organisation.
[Here|http://www.sapfans.com/forums/viewtopic.php?f=7&t=316910] is some good background info.
It should be someones responsibility in your organisation to review the scheduling log after every IP30 run
PeteA

Similar Messages

  • Preventive maintenance plan scheduling

    Hi gurus,
    I want to schedule maintenance plan for a past date by start of cycle field.
    But it gives error when I enter a past dateand save it.
    Error message is about key date of task list is a new date according to start of cycle.
    Regards,
    Aktolga

    No operations can be determined for plan 295 and item 465 for this date
    Message no. IP710
    Diagnosis
    There are no operations for the calculated planned date.
    At least one task list assigned to a maintenance item for the maintenance plan had not yet been created in the system or was not valid on the calculated planned date or the required start date 26.07.2010 for the order.
    The start date of the order is therefore always before the planned date of the call if you work with a preliminary buffer in the maintenance package of the maintenance strategy.
    You cannot call the maintenance plan on this date.
    Edited by: aktolga on Apr 27, 2011 10:17 AM

  • Maintenance Planning & Scheduling of calibration order

    Hi
    I have to schedule calibration inspection of a few equipments in such a way that system automatically create inspection lot & calibration order daily.
    Whether user enter calibration result or not, inspection lots in future should be created automaticallly.
    I created a single cycle plan using IP41 and start the schedule using IP10, the system created first inspection lot automaticaly but always require me go to to scheduling and save the plan again if I want to create next inspection lots. How can I configure/set the system in such a way that it creates inspection lots/calibration order automaticaly
    Plz also tell after taking usage decision of inspection lot whether I need to do some act on calibration order such as technical completion or business completion.
    Thanks in advance

    Dear Chris,
             In maintenance plan go to Maintenance plan scheduling parameter & put Schedule Period '360' Days in sub screen under Call control parameter.
    Then Go to IP10and make automatically scheduling it will make plan for whole yera.
    Regards... Rakesh Saxena

  • PP workcenter blocking by PM preventive Maintenance Plan

    Hi Friends and Experts,
    Giving the system cond "0" in Task list header data is not showing any impact on PP work center, i mean that PP work center is not getting loaded. This is working only when i mention 0 in the the header data of maint order.
    Can we know whether a workcenter is planned for preventive maintenance on any sunday or holiday in advance before the maintenance order is created.
    can any body throw some light.
    Regards
    guru

    Hi Sankar,
    Mentioning the PP work center in your Equipment Master & mentioning 0 in task list header of that equipment. So that when Maintenance Guy will create a Maintenance plan & assign the relevant task list to that plan, then immediately after scheduling you will be able to see the forthcoming dates when your PP workcenter is blocked for maintenance.
    Regards,

  • BAPI for Maintenance Plan Scheduling with EHP5

    Hello.
    In documentation for LOG_EAM_CI_4 mentioned that: [API functions have been developed for the scheduling of maintenance plans. These APIs provide the same functions as transaction IP10: the creation of maintenance calls or the changing of existing maintenance calls|http://help.sap.com/erp2005_ehp_05/helpdata/EN/33/46AC67364447A3BA2F4EFA65B8C014/frameset.htm].
    We have activated EHP5 and all LOG_EAM_CI* business functions in our system, but still can't find this "magic" BAPI.
    Does anybody know its name?
    BR,
    Pavel
    Edited by: Pavel Nedvijaev on Nov 7, 2011 5:37 PM

    Maheswaran.K thanks for your reply, but as i wrote above we have activated all LOG_EAM_CI* including LOG_EAM_CI_3.
    Version of software components SAP_APPL, EA-APPL is 605 as it needed.

  • Preventive Maintenance Planning - change call date of future calls

    Hello,
    we are using time based maintenance plans to schedule our maintenance obligations towards customers. After creating the plan and scheduling (IP10) we get the scheduled calls proposed by the system.
    Now we want to use IP10 or IP19 to move those planned call dates that are in the future without releasing the predecssor calls but it gives us an error: "Maintenance plan 16.04.2009: Predecessor to still on hold".
    Does anyone know if there is a way around this?
    Thanks,
    Tobias

    Hi Tobias
    As per your query... you cannot move the call dates which are in the future. First you have to skip the cal which are before the future cal date. then only you can do...
    - Pithan

  • Preventive Maintenance Plan Material requirement forecast

    Is there any way I get to know what whether the materials included in Tasklist of maintenance plan are  available or not , Just like forecasting or material requirement planning.
    Regards,

    I dont think this is possible. You may have to extend the standard simulation program for scheduling to include the Components. You will also have to call the material availability check FM to analyse the demand for the required date.
    Even then there is no guarantee for material availability when the Order is actually called.
    Regards
    Narasimhan

  • Change of preventive maintenance plan

    Hi All,
    My scenario is,
    1)I create maintenance strategy for preventive strategy plan.
    2)assign that   strategy to task list
    3) create one maintenance plan
    After some time i want to add one more package to  both  strategy  as well as in task list.
    can these changes reflect in my maintenance plan created before?
    Regards,
    Bhanu Pradeep

    Hi Bhanu,
                    what you are saying is not possible for what all dates the documents are generated, but once the changes have been done then the orders generated after that can have the changes.
    Hope it helps you.
    Regards,
    Yawar Khan

  • Preventive maintenance plan along with operations with frequency

    Hi gurus,
       I want tables or T code which can give me Preventive maint plan along with operations with frequency as a list view.
    I tried ip19, ip24 but results are not satisfactory to me.
    Can anyone suggest me the answer.
    Regards,
    Yogesh

    Hi Bartlomiej
          Do you have any solution for this?

  • Preventive maintenance plan

    Hello Experts!
    I have one question. I want to fill one filed in operation when order is created. Scenario.
    1. I create meintenance plan with task list.
    2. Then I schedule this plan with automation creation of orders. So when proper day come new order is created. But when this order is created I want to add value in user field for operations in this order. Is there any possibility to do this?

    hi
    i don't think so you have option to add in iw32
    -ashok

  • Problem regarding scheduling of maintenance plan

    Dear Sap Gurus,
    I am facing the problem during the scheduling of maintenancepan thruough IP10 follwing error is coming
    "Planned date for maintenance plan 124 was scheduled for 00.00.0000"
    Planned date for maintenance plan 124 was scheduled for 00.00.0000
    Message no. IP889
    Diagnosis
    During scheduling of the maintenance plan, the planned date was set to 00.00.0000.
    This error can occur, if, for example, the cycle for the planned schedule is too big (offset) means that the planned date is actually after the 31.12.9999.
    Procedure
    Check the master data of the maintenance plan to ensure that no date is calculated after the 31.12.9999.
    If necessary, check the counters used and the annual performance.
    I explore all the things in SPRO also also check the setting parameter for the plan but i didnt get any breakthrough for my above problem.Plz guide me whats the exactly problem with scheduling of of maintenance plan.
    points are sure
    Regards
    Rakesh

    Summary
    Symptom:
    In the scheduling of a multiple counter plan, the system
    1. generates message IP889 "Planned date for maintenance plan &1 was scheduled for 00.00.0000" or
    2. terminates with CONVT_NO_NUMBER.
    Other terms
    Scheduling, IP10, IP30, maintenance plan scheduling, maintenance plan, multiple counter, BADI IPRM_MCP_SCHE_CHANGE, CONVT_NO_NUMBER, SAPLIWP2, LIWP2F19, MCP_PREPARE_RESCH_CALLED_CALLS, LV_ABNUM
    Reason and Prerequisites
    This problem is caused by a program error.
    Solution:
    Implement the attached source code corrections.

  • Single Maintenance plan creation for multiple equipemnts with different cyc

    Dear Experts,
    I had a following scenario to map in PM module. can anybody guide me to map this process?
    we had no.of equipments under one functional location and will go through preventive maintenance on yearly basis. For this, i will create the single cycle yearly maintenance plan which comprices of maintenance items, which is fine. out of these equipments some of the equipments will go for routine maintenance like quarterly, half-yearly, tri-quarterly. user want to club these scenarios also in single preventive maintenance plan. when we scdule this plan, system has to deliver monthly orders and as well as yearly orders from single preventive maintenance plan.
    Thanks & Regards,
    Krishna

    Hi Krishna Murthy,
    It can be acheived in the following Manner.
    Create a Strategy say "Test" with Packages 1M, 2M,Q,H,Y packages.
    Create 5(say) Equipment Task Lista for each of the 5 Equipment at that FL.
    1st Task List will have Operations related to say Monthly(1M), Quartely(Q), yearly (Y)
    2nd Task List will have Operations related to say Monthly(1M), Quartely(H), yearly (Y)
    And so on... as per Business Requirement.
    Now create a Maintenance Plan with 5 maintenance Items with respective Task Lits.
    Now Schedule the Plan and give the Last Completion date as the Yearly package (A date one year less than the day you wanetd the yearly plan).
    Then check the calls.
    Regards
    MLN Prasad

  • Maintenance plans for Backward counter

    Is it possible for having a preventive maintenance plan for a measurement point that counts backwards?
    Your inputs on this will be appreciated!

    Help !
    I am looking for help with Counters and Timers and using them with a Maintenance Plan. We have about 10 count down timers mounted in one of our facilities. These timers are tied to the machine and measures the time until a mini or major PM will occur. These count down timers were previously used with the old CMMS system to assist in the scheduling of maintenance activities. We have recently converted them from the old CMMS to SAP PM but I am struggling with getting the count down timers to work in SAP. These timers are reset at 5000 hrs and as the machine operates, time is removed from the timer. A technician periodically reports these times to the system for scheduling purposes.
    I have created the Measurement Point for a Functional Location.
    I have identified that it is a counter.
    I have it identified that it Counts Backwards.
    When I try to assign this measurement point to a Maintenance Plan, I get the error "Only counters that run forwards can be entered"
    How can I use the countdown timers to create pre configured (PM) work orders?
    Thanks in advance.

  • Preventive maintenance for equipments installed in plant area

    Dear experts,
    I want to implement Preventive maintenance for equipments installed in plant area.
    Requirement is that i should be able to create a maintenance plan & schedul it as per the due dates. Maintenance order should get created. This order can be linked to the service contract item for which service entry sheet is created & released.
    I want a control on service entry sheet creation if the order is not settled or the related inspection lot which is generated is not confirmed.
    Please give advice ,how to proceed.
    Regards
    Vivek Deshpande

    Hi Vivek,
    Not sure on clearly what u need .. but have a look at some of the plans and examples of their usage for better idea ..
    1. Types : Time Based or Performance Based
    2. Single Cycle Plan [Time Based] : Ex u2013 Maintenance of a Vehicle every 03 months
    3.Single Cycle Plan [Performance Based] :Ex- Maintenance of a Vehicle every                                1000KM .
    4.Strategy Cycle Plan [Time Based] : Ex- Maintenance of a Vehicle every 03                                            months, 06 months etc.
    5.Strategy Cycle Plan [Performance Based Plans] : Ex u2013Maintenance of Vehicle                                                                          every 1000km , 2000km etc.
    6.Multiple Cycle Plan with single cycle set [Time or Performance Based] : Ex u2013                                                    Maintenance of a vehicle every 3months or                                  500km
    7.Multiple Cycle Plan with Multiple Cycle Sets [Time of Performance Based] : Ex- Maintenance of a Vehicle every 3months or 500km and 6months or 1000km
    8. The above given are explained with callobject as Maintenance Order. For getting inspection Lot then you can use order type PM05 calibration order in your Maintenance Plan and MO gets created as per the plan cycle and inspection lot gets created once u release the MO ..
    9. If you want MP related to service items then create MP with service procurement as Maintenance plan category in IP41 .. for remaining you can put MO as Maintenance plan category  .. for details refer to SAP Help ..
    regards
    pushpa

  • PM & PP integration during preventive maintenance

    Dear Experts,
    Once maintenance dept . will schedule preventive maintenance plan for a machine for a year , is it possible to block production order or to show capacity load in CM29 on the maintenance date?? I have assigned PP work center in the equipment & also put system condiiton as zero in maintenance plan & also in task list. Frequency of the maintenance plan is 1 month.Request your help on this.Thanks in advance.
    rgds
    rajib

    Hi,
    Let clear one thing that  the Equipement is work center for the PP and for Plant maintenance it is equipment only.When creating order or plan some maintenance work on that equipement which workcenter for the PP. In PP module ther is standard functionality Capacity planning of work center in Routing when your maintenance work is going on that equipement then work center capacity get reduced due to your maintenace work which will reflect in PP capacity planning. according that reduced capacity planning production order release.there is no std functinality that you can intimate the PP that your work center is in maintenance not use it. it will reflect in capacity planning of PP routing.According that reduced capacity PP plan the production scheduling.and Production work will get adjusted or deayed according available capicity of PP work center.
    Regards,
    Rakesh

Maybe you are looking for

  • Dynamic table columns...

    hi there, i have a table on my webdynpro with several columns displaying values in EUR with 2 decimals. now my customer wants to be able to switch between EUR and Thousand-EUR. When Thousand-EUR is displayed ther should be no decimals visible anymore

  • WONT TURN ON

    my macbook was working fine around midnight last night when i put it to sleep, but then around 8am this morning, i opened it and the gray screen came up, but before the password entry box came up, it went back to sleep. this happened multiple times.

  • Help in fine tuning this query

    My query id this, select a.event_id,a.document_id from sample_transaction a where exists (select 1 from sample_transaction b where b.event_id <> a.event_id and b.document_id = a.document_id ); The execution plan is like this, SELECT STATEMENT Cost =

  • A question about Encore CS4 Authoring Mode.

    How does Encore CS4 "Authoring Mode", DVD or BLU-RAY, in the projects panel affect the workflow? It seems that no matter what mode you select, you can still choose to author either a dvd or blu-ray disc in the "Build" panel.

  • Computer sleeps while iTunes is playing

    Just like the title says, my Mac goes to sleep even when iTunes is playing.  This is pretty ludicrous.  Is there anyway to prevent this other than changing my power savings settings to never let my Mac go to sleep?  I don't want to do that, I want my