Derivation Strategy for PO retention Scenario

Dear Expert,
Dystem is showing an error Document line item 000 contains no clearing information when we try to post invoice in MIRO for retention PO.
Can you please suggest the appropriate derivation strategy for PO retention case ?
What should be the commitment item for retention GL account ?
If we use it as real commitment item for Retention GL account, it will post to other Commitment item which will not depict the correct result of Fund utilization.
Regards,
Prad Pat

Dear Eli,
We have implemented notes 2097766 on Dev client as part of program error but issue still remained. So  as per note 171883 we have customized the message FICUSTOM100  9 (from error to warning) in transaction OBA5 for online posting. Now there is no error and document posted succesfully. Also we have also posted all payments including retention amount, system shows correct payment history in the FM documents.
Do we need to implement note 2097766 as the program error mention in this note ?
Regards,
Prad Pat

Similar Messages

  • Define Derivation Strategy for Reassignment

    Dear All!
    I have created the  derivation  strategy for Reassignment with tthe option of derivation rule
    <b>Source Fields</b>
    SOURCE_FUND
    SOURCE_FUNDS_CENTER
    BCS_BUDGET_CATEGORY
    NUMBER
    <b>Target Fields</b>
    TARGET_FUND
    TARGET_FUNDS_CENTER
    PERCENTAGE
    the abover derivation assigned to FM &  maitain Rule value in the following way.
    <b> Source Filed</b>
    SOURCE_FUND : 11000
    SOURCE_FUNDS_CENTER: 89000
    BCS_BUDGET_CATEGORY: 9F
    NUMBER : 1
    <b>Target Field</b>
    TARGET_FUND : 11000
    TARGET_FUNDS_CENTER: 55000
    PERCENTAGE: 30%
    b] Source Filed</b>
    SOURCE_FUND : 11000
    SOURCE_FUNDS_CENTER: 89000
    BCS_BUDGET_CATEGORY: 9F
    NUMBER : 2
    <b>Target Field</b>
    TARGET_FUND : 11000
    TARGET_FUNDS_CENTER: 44000
    PERCENTAGE: 70 %
    As I carryforward the residual budget, system only consider the 30 & 70% , create line item with that percentage. but can not read the traget fund center. system pick the source fund center 89000 instead of 44000 & 55000
    please advise why not system pick the target fund center, it only consider the %.
    Thanks

    Solved

  • Derivation strategy for each regional office

    Hi All,
    We activated Budget Availability control at Head Quarters. One of regional office is not having budget so they dont want budget control. If i am not entering budget in FMBB transaction then system throwing error for regional office. How i can do control exception for particular regional office. We are maintaining one company code for all Regional offices.
    Regards,
    sree

    Hello,
    Is ot possible for you to identify the regional office based on the budget address?
    If yes, you should create a specific tolerance profile without any AVC control (100% tolerance, no warning, no error message) ; in addition to the tolerance profile you already defined with controls.
    You can use a derivation strategy for tolerance profiles ( target field as TOLPROF) : if the posting is done for the regional office, the derivation strategy for tolerance profile will call the tolerance profile without any control and no messages will be sent to the user.
    I hop it helps.
    Helene

  • Define Derivation Strategy for Control Objects - Value Not Transport

    I created Rules Value in Define Derivation Strategy for Control Objects (SPRO). Then, I perform the below steps for Transport the Request to other client.
    1. Select Derivation Strategy name, Table View > Transport
    2. Select Request Number
    3. Click Include in Request, then save
    4. Go to the Steps in Logical Order, Extras > Transport
    5. Select Request Number and back to SPRO screen
    After SCC1, there is only Derivation Strategy Name appeared but the rules value (Steps in Logical Order) is not appeared.
    How can I transport the Rule Value?
    Regards
    Ton

    Hi,
    When you are in the derivation transaction and select to transport it, the system asks you whether you want the values to be transported as well. If you choose 'yes' your change request will include this information.
    Regards,
    Eli

  • Derivation Strategy for billing types - Post activation in KE4W

    Dear Friends,
    I recently activated KE4W for billing types S2, Credit Notes & Debit notes.
    This is for restricting the COGS flow to CO for these billing types.
    Now when i am releasing the sales document to accounting - Its asking to maintain derivation strategy.... KEDR for all the billing types.
    From my previous implementations i have never maintained KEDR for billing types... as it is suppose to be on a standard derivation strategy.
    How can i go about resolving this.
    Do i at all need to maintain KEDR for billing types.. or is this error because of something else..
    Thanks in advance
    Vikrant Sood.

    HI,
    normally KE4W (reset CO-PA value fields) does not require any KEDR-steps.
    I suggest to make a test derivation within KEDR to identify the step(s) where the message occurs.
    Maybe also T-Code KECM is helpful (Overview of derivation, characteristic derivation) to see if the billing type is used as a key field,...
    Best regards, Christian

  • Derivation Strategy for Budget Addresses

    Hi, we are using budget structure and have created a derivation strategy rule to define the assignments of posting addresses to budget
    addresses. May I know what is the table names where all rule values are stored so that we can extract all the information stored to be use in customised program. Is there any function module that can be use to extract all the maintain values? Please assist. Thanks. Vincent

    Hi,
    The tables are dynamic, i.e. they are created with a generation of the rule. You can view the name of the tables by going to the derivation strategy transaction, then Menu - Extras - Overview. You will see all the relevant tables. There is no standard function to extract the values from these tables, but you can easily create your own.
    Regards,
    Eli

  • Entry payment request derivation strategy  BL Account

    Hello FM experts,
    When I try to post an entry payment request the system shows me an error message which informs that I have to customize the derivation strategy BL account. I don´t know why I have to customize that customizing point because I already have customized the account determination for request and the systems seems that is working properly because it shows me the G/L account.
    ok, I have customized the derivation  strategy for BL account concerning budget ledger as the systems indicates me in the error message as this way:
    Value type 54 and 60, commitment item and the general ledger account.
    So at this moment I have customized the account determination for request and the derivation in the budgetary ledger. (transactions F850  and FMBLEXT)
    The system does not work properly again and the error message is the same.
    Note: I have activated the variant for budgetary level as 20: Spain.
    Thank you very much in advance for all your help.
    Ruben  Lopez

    Hello Mar,
    This is the message:
    Falta entrada Customizing p.ledger presupuestario                                                                               
    Nº mensaje: FMBLEXT001                                                                               
    Diagnóstico                                                                               
    Las parametrizaciones Customizing no se han definido correctamente.                                                                               
    Actividades en el sistema                                                                               
    El proceso se detiene.                                                                               
    Procedimiento                                                                               
    Verifique las parametrizaciones para la operación de contabilización en
        la actividad IMG Definir estrategia de derivación para cuentas LP.    
    IN ENGLISH:
    Customizing entry missing for Budgetary Ledger                                                                               
    Message no. FMBLEXT001                                                                               
    Diagnosis                                                                               
    Customizing settings have not been properly defined.                                                                               
    System Response                                                                               
    Processing stops.                                                                               
    Procedure                                                                               
    Revise the Customizing for the posting process in the IMG activity
        Define Derivation Strategy for BL Accounts.                       
    Thank you Mar for your time and effor.
    Ruben

  • Long-term  retention backup strategy for Oracle 10g

    Hello,
    I need design a Archivelog, Level 0 and Level 1 long-term retention backup strategy for Oracle 10g, It must be based in Rman with tapes.
    ¿Somebody could tell me what it's the best option to configure long-term retention backups in Oracle?, "CONFIGURE RETENTION POLICY TO RECOVERY WINDOW OF 1825 DAYS;" It's posibble ?
    Regards and thanks in advance

    Hello;
    RECOVERY WINDOW is an integer so yes its possible. Does it make sense?
    Later My bad, this is Oracle 11 only ( the gavinsoorma link ) . Getting harder and harder to think about 10. Don't think I would use RECOVERY WINDOW.
    I would let the tape backup system handle the retention of your rman backups.
    Using crosscheck and delete expired commands you can keep the catalog current with the available backups on tape.
    Oracle 10
    Keeping a Long-Term Backup: Example
    http://docs.oracle.com/cd/B19306_01/backup.102/b14191/rcmbackp.htm#i1006840
    http://web.njit.edu/info/oracle/DOC/backup.102/b14191/advmaint005.htm
    Oracle 11
    If you want to keep 5 years worth of backups I might just use KEEP specific date using the UNTIL TIME clause :
    keep until time 'sysdate+1825'More info :
    RMAN KEEP FOREVER, KEEP UNTIL TIME and FORCE commands
    http://gavinsoorma.com/2010/04/rman-keep-forever-keep-until-time-and-force-commands/
    Best Regards
    mseberg
    Edited by: mseberg on Dec 4, 2012 7:20 AM

  • Want to change my existing Release strategy for - PR, PO & Service Entry

    Hallow Experts ,
    Here i have a requirement to change the existing Release strategy for Purchase Requisitions, Purchase Order and Service Entry sheet. Already There are unreleased Purchase Requisitions and Purchase Orders in Production system with the existing Release strategy.
    1. My Query is Before making change in Existing release strategy, should I need to release all PR and PO with unreleased status.
    2. In PO scenario is like this, we have 4 purchacing groups and 4 document types(ZLOC,ZIMP,ZSER,NB) in release strategy, we need to add one more purchasing group that is to be aplicable to my  service PO(ZSER) only . so should I need to creat another stretegy for the same, or I can add in the same strategy
    thanks in advance.
    regards
    vb

    Dear Vikrant,
    1. My Query is Before making change in Existing release strategy, should I need to release all PR and PO with unreleased status.
    Sol:  Not  Required but , doing it is recomandaed
    2. In PO scenario is like this, we have 4 purchacing groups and 4 document types(ZLOC,ZIMP,ZSER,NB) in release strategy, we need to add one more purchasing group that is to be aplicable to my service PO(ZSER) only . so should I need to creat another stretegy for the same, or I can add in the same strategy
    thanks in advance.
    Sol: No Only thing you have to  do is that   go to your class 32 and   chek what is the charaterstic define for the purchasing group  copy it
    2 Now go to  Tr.code: CT04, give that charaterstic and go to change mode and give the additional Purchasing group there, and save it
    3 Now go to Release strategy where you want to add that Purchasing group, go to classification tab and tik that new purchase group ,  that  group will now in fact of release Strategy

  • Patch strategy for ECC6 in SAP NW2004s environment

    Hi Experts,
    Our SAPNW04s landscape consists of ECC6, BI 7.0, EP7.0 , SRM, XI, Solution Manager systems.  We are drafting patch upgrade strategy for the ECC6 system & have 2 options:
    Option 1: Apply patches only in ECC6 & not in other components.
    Option 2: Patch ECC6 together with other components like SRM, BI, EP etc.
    Option 2 will make things complicated but for Option 1 below are the 2 concerns/questions raised:
    1. Option 1 will lead to doing UAT twice for Business Processes which have a tight integration with ECC6, for ex. UAT for data extraction needs to be done after applying patches both in the ECC6 & the BI systems. This will lead to arrange for more user resources.
    2. Due to the tight integration between ECC6 & other components applying patches alone in the ECC6 might lead to other systems like BI, EP,SRM, XI etc at a lower level & they might not be able to connect to ECC6 or work properly with ECC6.
    Can somebody share how they are managing the ECC6 patches upgrade in a big NW2004s environment with other components present, are the ECC6 patches done standalone & other systems like EP, BI follow their own different time schedules for patching or ECC6, BI, EP are recommended to be done together.
    Are there any best practices recommendations from SAP on the same?.  Can somebody share the blueprint or any strategy document they are using.
    Thanks,
    Abhishek

    Hi Abhishek,
    For the reasons you outline in 2, it is recommended to patch entire business scenarios (i.e. business processess that are coupled integrated across systems) together.  Rather than go into a full discussin here, I recommend you see my paper [How To Design a SAP NetWeaver - Based System Landscape |https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/50a9952d-15cc-2a10-84a9-fd9184f35366].
    Best Regards,
    Matt

  • Release Strategy for contracts.

    Hi gurus,
    Good day,.
    Please help on this.
    We have a release strat for Contract. It is working fine when a contract is created, but when several changes were made on the Quantity, release srtat are not being triggered.
    Example.
    Contact created with qty 1000 --> release status is blocked. Then release it in ME35.
    After releasing, quantity was updated to 1200--> release status is blocked. Then release it in ME35.
    After releasing, quantity was updated to 1100--> release strategy was not triggered. Status was released.
    what is the standard functionality for this? Should the decrease in quantity will trigger release strategy or not?
    Thank you.

    Dear Acel,
    The example you given was working just fine and correct.
    a)Contact created with qty 1000 --> release status is blocked. Then release it in ME35.
    b)After releasing, quantity was updated to 1200--> release status is blocked. Then release it in ME35.
    c)After releasing, quantity was updated to 1100--> release strategy was not triggered. Status was released.
    -> The release strategy will only be reset if the total net value for the contract was higher the previous
    value but not lower.
    As your example, quantity was updated to 1200, then it will reset when changing from 1000
    to 1200. However when it was decrease to 1100, then it will not reset anymore as you had
    release it for a quantity of 1200, then the total net value should higher than the current qty = 1100.
    In system, it always assume if you had approved for the total value of the higher 1 before, then
    it should be fine for the lower total net value for your management and therefore not need to re-approve
    again for redundancy job. This was very logic in common business scenario in many companies.
    However, like in your example , if you had define a different release strategy for a value that met the
    the 1100 quantity, it will redermine the different release strategy. For example:
    USD 1 for every quantity = 1
    Then your contract will be USD 1000 for quantity = 1000, USD 1100 for quantity = 1100 and
    USD 1200 for quantity = 1200.
    Release strategy A for 1000 , characteristics from USD 1000- lower than 1100
    Release strategy B for 1100 , characteristics from USD 1100- lower than 1200
    Release strategy C for 1200 , characteristics from USD 1200 onwards
    Then if you change the quantity from 1200 to 1100, it will redetermine the release
    strategy B which means from Release strategy C to Release strategy B. If you
    only had Release strategy C that had a characteristics from 1000-1200, then
    it will keep the Release strategy C as released and it won't be reset unless
    if you had change it and the condition of the total net value was higher than any value
    before.
    Hope this will explain the logic.
    Ian Wong

  • Adding Partner field in Derivation Strategy

    Hello Sapians,
    I am trying add the Partner field (Forwarding Agent) to the derivation Strategy from the Invoice and not from the Sales Order.
    I was able to find the Forwarding Agent field in PAPARTNER Table. So I created the field in KEA5, update the structure of Operating Concern with this field.
    But I am looking for the table (not VBPA) which has the Invoice details where I can add that in the Derviation Strategy. Do we have any table?
    Please let me know if I need to use the enhancement to acheive this (Could you please give the steps to do this?).
    Thank you,
    -Harter.

    Hi Ajay,
    Couple of questions
    1. How do I identify which field (table) has this value (Forwarding agent), so that I can create the WWXXX field. I found SPDNR from PAPARTNER table but I am not sure if that is the right table and the right field to create Characteristic on this field. So could you please tell me what is process to find the right table where the Forwarding Agent value is updated in the billing documents?
    2. I could not find the KDAUF field in the enhancement Source fields but I was able to find the ARTNR field, my question is why we have to make ARTNR as Source field and the WWXXX or SPDNR (in this case) will be Target field? Does that need to be other way round? Sorry for my ignorance.
    Thank you for all your help.
    -Harter.

  • Retention Scenario

    Hi
    Here we hv a scenario as Retention.
    Client will order a service to vendor for Rs. 10000/- in this the retention amount is 10% that is Rs 1000/- is the retention money.
    In the PO we need to mention that. Client will pay to vendor upto Rs 9000/- the retention money he will pay to vendor once the vendor complete the full service.
    At the time of MIRO it should want to trigger to FI person. The retnetion money will given to vendor as the last payment.
    How can me make this?
    Vijay

    Hi,
    Retention Payment can be processed based on the payment terms on the following
    Vendor Master
    Purchase order
    Invoice
    If we select Payment terms for the retention Payment It will automaticaly trigger while doing the payment.payment will be done Either fully or partialy,all based on payment terms.
    Thanks

  • WHAT IS BEST STRATEGY FOR RMAN BACKUP CONFIGURATION

    Hi all,
    my database size is 50GB I want TAKe WEEKLY FULL BACKUP AND INCREMENTAL BACKUP
    WITHOUT RECOVERY CATALOG.by follwing commands
    weekly full database backup
    run
    backup as compressed backupset
    incremental level=0
    device type disk
    tag "weekly_database"
    format '/sw/weekly_database_%d_t%t_c%c_s%s_p%p'
    database;
    I want do CONFIGURE RMAN BY FOLLWING stragtegy
    CONFIGURE RETENTION POLICY TO REDUNDANCY window of 14 days.
    CONFIGURE BACKUP OPTIMIZATION OFF;
    CONFIGURE CONTROLFILE AUTOBACKUP ON;
    CONFIGURE CONTROLFILE AUTOBACKUP FORMAT FOR DEVICE TYPE DISK TO
    '\SW\AUTOCFILE_'%F';
    and other is by default
    sql>alter system set control_file_record_keep_time=15 days;
    os--aix6 and for two database 10g2 and 11g2
    what is best configuration strategy for rman backup.AND BACKUP WITH RECOVERY CATALOG OR WITHOUT RECOVERY CATALOG
    PLEASE TELL ME
    Edited by: afzal on Feb 26, 2011 1:45 AM

    For simply two databases, there really wouldn't be a need for a recovery catalog. You can still restore/recover without a controlfile and without a recovery catalog.
    From this:
    afzal wrote:
    CONFIGURE RETENTION POLICY TO REDUNDANCY window of 14 days.I am assuming you want to keep two weeks worth of backups, therefore these:
    alter system set control_file_record_keep_time=15 days;
    CONFIGURE RETENTION POLICY TO REDUNDANCY window of 14 daysShould be:
    RMAN> sql 'alter system set control_file_record_keep_time=22';
    RMAN> CONFIGURE RETENTION POLICY TO RECOVERY WINDOW OF 14;22 would give you that extra layer of protection for instances when a problem occurs with a backup and you want to ensure that data doesn't get aged out.

  • How to have  make to stock strategy for configurable items

    Dear Frndz,
    My client would like to have make to stock strategy for their configurable items, pls help me out with the step by step procedure of the same.
    Regards,
    Srini

    Hi
    K-Mat Creation steps
    1) Create Char in CT04 with assignment of Control indicators and Char values
    2) Create Class in CL02 with type 300 and assign the Char to it
    3) Assign this class to Material in Classification view in MM02
    4) Create Configuration Profile in CU41 and Main Profiles for PP & SD relevancy
    5) Assign Constraints and Procedures to Each Profile as per the rules required by design or Business
    6) Create a Configurable Material (Mat type - KMAT) with Classification,Sales,MRP,Accounting views and   Planning stg 25
    7) Create A Super BOM(for K-mat) and assign all the comp with Proper Selection & Pre conditions
    8)Create Super Routing(For K-mat) and Assign all operations with Proper Selection
    Material Variant(MV) Creation Steps(Material variants are the stockable items in VC Scenario)
    1) Create a MV with Material type FERT and Stg 10 or 40 (Classification view not essential)
    2) Assign the K-mat material to this MV in Basic data - 2 view in Cross Plant CM field and click on Configure variant tab to select the fixed char value combination for this MV. Do the same steps in MRP-III view
    By this way u can make the stock of configure items
    Regards
    Brahmaji