Direct production\ collective order cancellation

i have a problem while dealing with collective order network schenario.
i have 2 levels of collective order network e.g. A is parent order and B is child order.
now as soon as i confirm the sub\child B order the header material for taht perticular order has 101 and 261 movement automatically,
i.e. as soon as 101 is done for child order's(B) header material which is a non stockable material is also gets consumed(261) for header order\ parent order A.
but while confirming the header order A, the header material of order B(which is non stockable material) is not there in goods movement screen.
now while cancelling the orders A i don't have order B's header material in component list so that perticular material will not be cancelled so no 262 for that material.
now when i try to cancel order B i get an error for order B's header material that deficit of sales order stock.
how to deal with such problem?
and i also want to know something about collective orders and special procurement key 52 with respect to order confirmation and cancellation..
Edited by: Anil Jonnalagadda on May 23, 2008 3:38 PM

Now the Reply for the Application of Collective Order
Normally we have a Header Item Fert and Child items Halbs
For Example If a BOM for a Fert contains 5 Halb materials and below some ROH
Here what happens in discrete scenario 6 production orders can be created 1 for Fert and 5 for Halb
so as a usual practive we have Release the Halb orders, GI for ROH , Confirmation of Halbs,GR for Halbs,.... then
similar thing for Fert
Now as the Halb is inhouse item and manufacturing parellely, the process of Relasing ,confirming ,GR are difficult process, you want to control through the Header Material
So we want
1) If i release the Fert Material the Bom Assy components (inhouse) below with collective order setting has to Relases Automatically
2) If i confirm the Fert Material the the Bom Assy components (inhouse) below with collective order setting has to Confired Automatically
3) The GR has to takes place automatically for Halb items(without any document) you can't see the stock of halb also it will always show "0"
4) For the ROH below Halb a reservation will be generated those you can control manually or through Backflush
So the setting required is
Fert item keep Procurement =E
For the bom halb items where you want collective order keep Procurement =E and special Procurement =52
it will work
thanks
Prabakaran K
Edited by: prabakaran k on May 23, 2008 4:00 PM

Similar Messages

  • Costs and Inventory posings in Direct Production / Collective order

    We are trying to implement direct production though collective orders functionalty at our client.
    We are using the right special procurement keys, order types (with collective order flag turned on) etc.  I am able to generate the collective order tree and also see that the scheduling is working as expected.
    However, when I post confirmation of child orders, I am  not seeing any goods movements in the leading orders.  Also, I donot see anycost in the leading order as well.   Has anyone come across this issue ?  Any thoughts / ideas willbe helpful?

    Hi,
    For the order type which you're using, go to OPJH & in the section Cost Controlling tick the check box which says Coll. order with goods movement
    Create a new collective order & carry out your cycle. I would suggest do a test in your sandbox first.
    Hope it clarifies.
    Regards,
    Vivek

  • Production collective order serial number

    Hello guys,
    Could anyone please help me in finding  serial number of a parent collective order(production order) from a collective order(production order) number(AUFNR).
    All I'm trying is to print serial number from parent collective order in a child order. In child order I only get parent order number not serial number.
    Please let me know about a function or routine to read serial number.
    Regards,
    Ahmad

    Read the serial number from tables afko , objk and  ser05.
    Regards,
    Ahmad

  • Regarding direct production

    Dear all,
    I have checked in help portal regarding direct production,
    Can anybody explain with example how to process it.
    Because in help portal it has mention goods issue and receipt not necessary.
    Then how the material will take in MRP?
    Difference between direct production & collective order?
    Regards
    Rajasekaran

    Hi,
    It is way of linking Production orders of HALB to FERT within same BOM & provide addtional functionality like goods issue( Not goods receipt) on HALB production order not needed . If you have BOM of FERT with atleast one subassembly(HALB) & if you define procurement type E & spl proc type 52 for HALB, HALB production order is linked to FERT production order. Lot sizing procedure is ignored for HALB & qty of both production order will  be same.
    In addtion , if you select 'Collective order with Goods movement' in OPJH,  Goods issue of HALB to FERT production order is posted automatically when Goods receipt on HALB production order is done.
    It addresses requirement of having seperate production order for HALB( for tracking ) , but since it is consumed /used for higher level assembly(Doesn't go to Store/WH) , no need to remember to good issue to higher production order.
    It is way of reducing transactions on shop floor
    If you define HALB as phantom, all of pain above is not needed
    Hope ite helps,
    Jatin

  • Direct production in collective order network, automatic 261...

    hi all,
    i have a problem in a schenario with collective order network.
    i have order B part of collective order network of order A. and material of order B has special procurement key 52 maintained in it. and colletive order of goods movement is selected in order type setting of order B.
    now the problem is when i confirm the order B, its header material automatically gets issued to order A (as per the settings that is fine.. ).
    but when i canel \ reverse the order A, i can not see 262 for material of order B which was issued automatically....??? why so?
    and if i try to revrse order B,  it stucs in COGI with the error of deficit of sales order quantity (or unrestricted quantity)....
    can somebody tell me how to sollve this? how to get 262 of the header material of order B?
    best regards,
    Maulin
    Edited by: Maulin Munshi on Jun 17, 2009 8:27 AM

    If you're doing the confirmation of parent order (leading order) at header level (meaning you use CO15) then you can only confirm that particular order and not any child order. If you want the child orders to be confirmed also after completely confirming you'd have to change the control key of last operation of routing in leading material as milestone and use CO11 or CO11N and just confirm the last operation, it will automatically confirm all the operations in the leading order and all the sub orders (child orders). I don't think your OPKI setting will solve the issue.
    Production orders that belong to collective orders are generally confirmed like normal production orders. However, you should note the following:
        When you carry out a confirmation at header or suboperation level, you can only confirm the order concerned.
        When you confirm at operation level, you can confirm operations for all orders as long as you work with milestone operations or progress confirmations.
        When there is a confirmation in the collective order, the system sets the status CFCO (release occurred in network) at the header level of the leading order in the collective order.
    If you want to read more than what I mentioned, you go to this link

  • Cancellation of collective order.

    Hi PP gurus,
    While cancelling collective orders, all the input materials for main and sub orders were returned back (with 262 movt.)
    and output on the main WO also cancelled (with 102 movt.)
    But the output material of the sub orders were not cancelled .for sub order material 102 movt type is not shoeing in document.
    In that case variance it will be huge as no input material will be consumed to get the output for the sub orders.
    Thanks

    Hi venugopal,
    Thanks for u r response.
    but it is not allowing to delete from sub order level.
    for that sub order item Special procurement Key 52 is there.
    how to do the process.
    the problem is  movement type 102 is not updating for sub order material.
    Thanks

  • Error at production order cancellation .

    Dear all ,
    I have posted same issue before this but due to technical problem i am not able to see your replies .
    So plz reply me again for the error at the time of production order cancellation .
    Production order has been confirmed for operation no 0010 , but some reason i want to cancel that . at the time of cancellation error is showing that .
    *enter only one true account .*
    Plz reply me again

    Hi
    If you have confirmed in CO11N, you should do cancellation in co13.
    you might have given by mistake the production order number in confirmation field.
    But you should input the production order number in the filed "order".
    Pl chk this .
    Regards
    YMREDDY

  • Goods receipt in collective order

    Hi Experts,
                     In collective order situation, for the the child order, after confirmation the stock of SFG is not increasing automatically. Subsequently, after confirmation of parent order, in the material tab the SFG withdrawn quantity is showing up as zero. How to ensure that consumption of SFG occurs in the parent order ?
    regards

    SM,
    Please refer the below thread,
    Re: direct production
    In case of collective order scenario the goods movement of the child items are hypothetical, i.e. it is for document purpose.
    The stock doesn't get built up if you go for confirmation with auto GR.
    Rather as soon as you confirm the last operation or you go for the order confirmation the goods receipt on the child order & goods issue on the parent order happens simultaneously.
    Hope this helps you.
    SmanS

  • How to trigger creation of collective orders

    Hi,
    How to trigger the creation of Collective orders.
    regards

    Hi,
    Collective Orders
    Use
    In a collective order, planned orders or production orders are linked to one another over several production levels. Each order in the collective order has its own order number. If subassemblies are produced directly for superior orders within a production process, without physically entering the warehouse, it is useful to have a representation via collective orders.
    The components for which separate production orders are created in the collective order are called directly produced components (see Creating Collective Orders)
    Prerequisites
    A collective order cannot be created for components that have one of the following indicators set:
    · Co-product
    · By-product
    · Alternative item with strategy 2
    · Alternative item with usage probability 0
    · Discontinued
    · Follow-up material
    · Intra material
    Features
    Collective orders offer the following advantages:
    · Integrated view of a production process
    Collective orders make it possible to represent different levels of the production process together in the system. The production process can be viewed as an integrated whole.
    · Separate order number for every order
    Every level in a collective order represents a separate production order/planned order. Every production order/planned order has its own order number. This enables you to process the entire collective order, a subtree in the collective order or an individual order.
    · No placements in storage or removals from storage between production levels
    Within a collective order stock movements only take place for the leading order (that is, the order that is at the highest production level) and not for directly produced components. This makes it easier to maintain the collective order in comparison with several individual orders. A further advantage is a more realistic representation of the costs of the production process, since subordinate orders can be directly assigned and settled to superior orders.
    · Business functions simultaneously for several orders
    Certain business transactions can be carried out simultaneously for several orders. Releasing an order that belongs to a collective order has the effect that all the hierarchically subordinate orders are released simultaneously.
    · Automatic change to dependent orders
    Changes to an order automatically affect dependent orders / components affecting orders. For example, if you change the order quantity in an order then
    ¡ the relevant quantity changes are automatically made to dependent orders
    ¡ the requirements quantity of the directly produced component is automatically changed.
    In the collective order, you also have the option of manufacturing directly produced material in a different plant to the planning plant.
    · Set status in leading order
    If you make changes in subordinate orders that have an affect on the status, then the system sets the corresponding status in the order header of the leading order in the collective order as follows:
    u2013 CFCO Confirmation in collective order
    u2013 GMCO Goods movements in collective order
    u2013 RLNE Release taken place in network
    In this way you are informed about changes in the whole collective order.
    · Reading master data
    You can copy the routing data and BOM data to the order again. You can find more information in Read master data.
    Example
    You want to produce a pump. The BOM for the pump contains a pressure regulating valve and a spiral casing. You want to enter these two components in separate production orders, but you do not want them to be posted to stock.
    You set the special procurement type to direct production in the material master record for the pressure regulating valve and the spiral casing, so that production occurs using a collective order.
    When you create a production order for the pump, a collective order is automatically created, which contains subordinate production orders for the pressure regulating valve and the spiral casing.
    Creation of Collective Orders
    Use
    Collective orders are only created if the special procurement type is set to direct production in the components for which the separate production orders are to be created (materials planning area in the material master).
    In the standard system, 52 is the special procurement type for direct production (that is, for components that are produced within a collective order).
    To create a collective order, you must use an order type with internal number assignment.
    Hope this helps.
    Regards,
    Tejas

  • MRP for collective order

    Dear experts:
           I met a problem of Collective order.
           My scenario is :   Fert (A) -- Halb (a) -- ROH ( b) .  Set special procurment 52 in mrp2 of material a.
           suppose material "a" has stock 30pcs,  now when i creat a Plan order for "A" 100pcs,
           and then run MRP,system generate a plan order "a" 100pcs directly,
           not consider the stock of a (30pcs). 
            my question is how to setting, then i can get the result :  Plan order "a"  is 70pcs.
            And also how to setting when scenario is creating Production order.
            Thanks in advance.

    Dear R.Brahmankar:
          Fert A :        M0      Individual/coll.  "blank"
            Halb a:       M0  ,  special procurement:  52  , idual/coll.  "blank",     stock 30pcs
               ROH b:   PD.
      Now , I creat a Plan order for "A" :100pcs, and Run MD41,  
      result is:    material  "a",   plan order :  100 pcs.
      but what I expectation result is :   material  "a",   plan order :  70 pcs.  for I already have 30pcs stock  of material "a".
      how should i do. Thanks

  • Direct Production - Fixed quantity in BOM

    Dear PP Gurus,
    Need your expert on this question, we have a direct production in a Pharma process. The scenario is that we have a fixed loss quantity in the mixing which we setup in the filling BOM.
    With the direct production, each requirement is pegged to a planned order. There will be two planned order.
    So, one planned order is the actual requirement order and the other is the for the fixed quantity for mixing process.
    Is it possible to consolidate the two planned order quantity in one process order and the additional planned order,can it be delete automatically by MRP run or some method?
    Appreciate for any feedback
    Thanks & Regards
    Pooja.

    Dear Girish,
    In the Mixing material wiht a master data with a special procurement key = 52 (Direct Production) in te material master and select the collective order. = 2 in the MRP 4
    In Mixing, there is a fixed loss of the certain quantity wen the solution passto te next Filling process. In the Filling process, BOM, there a fixed quantity indicate.
    So, usng the Direct Production, the mixing material will be proposed two planned order with different segment.
    The other remain te same.
    By consolidating the fixed quantity and order quantity in one process order, but the fixed quantity planned order is not going to deleted when you run MRP.
    So, the question is there a way to handle this requiremen with the order and fixed quatity, can be consolidate and the additional planned order to be deleted (or manual deletion )
    Appreciate yur assitance
    Regards
    Bee Lee

  • Collective order - manuell booking

    Hello all!
    Is there a way to use collective orders without automatic booking, but with manual booking.
    We like the idea of the linked production orders and the way it is handled. Our problem is,
    that we need the semi-finished goods on stock. So we have to book them with MIGO.
    Is there any other way to link the production orders and do physical bookings (like in every
    standard production order)?
    Thankful for all help,
    Barbara

    Hi,
    In a collective order, goods movements (GI & GR) are usually not required for assemblies that are directly produced.
    When u do the confirmation for Lower level order, Produed assemblies will be issued to Higher level order directly, so manual goods issue not possible for assemblies to Higher level order.
    U can confirm this, with Higher level order cost analysis after the confirmation of lower level order.
    So need not issue the produced assembly to higher level order using the MB1A.
    Only thing u have to activate Collective order with goods movements object  box for Order type at OPJH .
    For Lower level order (Assembly order ) good issue for procured components of assembly can be done using MB1A with MVt type 261.
    Dependencies :
    For collective orders without automatic goods movements you must take organizational measures to ensure that the WIP calculation and the settlement of orders are each carried out twice. You cannot carry out a variance calculation for collective orders without automatic goods movements. You cannot carry out a standard cost calculation for a collective order without automatic goods movements.
    You can find detailed information on collective orders in the document Cost object accounting -> Order-related Product Controlling.
    Thanks,
    Mohit

  • Collective order processing

    I have gone through the threads in w.r.t collective order and direct production. the sap help (IDES too) and the ERP documentation. I still cannot trigger get a process order to be directly created for the subcomponent when I convert the parent planned order (superior planned order).
    My BOM structure is the standard FERT-HALB-ROH.
    I have setup sp proc key 52 for the halb, BOM and recipe are valid and they are linked to a prod ver. I see a DEP req for the FERT material in the HALB's MD04 screen after I run MRP for the FERT.
    I know this setup works for production order. I am however trying with "process orders" since this is required for a PI based inventory. Is this possible?

    Dear colleague,
    Which transaction do you use?
    The conversion should be possible.
    Please use COR7 and COR8.
    we usually recommend not to use PPBICOR8 for collective orders,
    because the program flow logic is different from planned order
    conversions that do not result in a collective order. For example,
    in dialog mode, you usually receive the collective order overview,
    in batch input mode (PPBICOR8 is a batch input for COR7), you don't.
    PPBICOR8 cannot distinguish between collective orders and non-collective
    orders when the batch input is set up for the planned order conversion -
    at this point, it is not known if the resulting order will be a
    collective order. This is why PPBICOR8 should not be used for
    collective orders.
    Please apply the attached note 974946 to suppress the pop-up.
    If the issue persists, please open a new OSS message with this issue,
    thanks and best regards

  • Collective Order good moviement 101 - 261 ( sub - order )

    Dear gurus,
    i inserted in the HALB component the special procurement (52) and the Type procurement = E
    I created a production order for the Material Fert and the system create a collective order .
    Order 0001 for the FERT material and the order 0002 for the HALB material.
    When we confim the order 0002 the system don't create a good moviment 101 for the HALB component  and the MD04 don't exist . In the production order 0002 the issue quantity is 5 pz but we don't see the stock in the MD04.
    I need to have the moviment 101 for the sub order . 
    How i can have this situation of good moviment ? You can tell me the example of movimentation for the collective order ?
    Where we can find the information of this collective order ?
    Thanks a lot
    Daniele Pistilli
    PP TEAM

    Dear,
    Within a collective order stock movements only take place for the leading order (that is, the order that is at the highest production level) and not for directly produced components. This makes it easier to maintain the collective order in comparison with several individual orders. A further advantage is a more realistic representation of the costs of the production process, since subordinate orders can be directly assigned and settled to superior orders
    Hope this will help you.
    Regards,
    Pavan

  • Business scenario for collective orders

    Hello folks,
    Can somebody explain the business scenario associated with collective orders? why we need collective orders? what is the business requirement that calls for collective orders?
    Regards,
    Sravan Kumar

    You may create several production orders from several planned orders, provided that the planned orders exist in the same plant and belong to the same MRP controller. This is called collective order conversion.
    A collective order is a linking together of planned orders or production orders over several manufacturing levels.
    Every production order has its own routing and order number.
    When you are in the collective order structure, you can edit an individual order, a subtree, or the entire collective order.
    Goods movements are not required for sub-assemblies. The material is passed on directly to the next
    order up.
    The special procurement key determines whether direct production is involved.
    Since no goods movements are required for sub-assemblies, this means that you have less data to maintain. Goods movements are only required for the leading order and for components whose special procurement key does not stipulate that direct production should be used.
    Changes to dates and quantities affect all related orders.
    The actual costs of the production process are more realistic because they are not influenced by the
    predefined price in the material master.
    Master Data.
    Special procurement key "52" on MRP 2 view
    Individual Collective Flag MRP4 view
    Bills of material and routings at each assembly level
    Any structure possible

Maybe you are looking for

  • How to create an exponential measure in RPD?

    Dear Experts, I'm using OBIEE 10.1.3.4.1 version. I have a requirement to create the following logical measure in Administration Tool (RPD). M = exp( a + bt), where a = Constant, b=Constant and t=Calendar Time , exp=exponential. Kindly let me know is

  • C# Proxy Classes from SAP WSDL files

    We are trying to generate proxy classes for SAP eSOA web services using C# and Visual Studio 2005. When we try to run Microsoft's proxy class generation utility, WSDL.exe, errors are generated that attribute incorrect syntax to the SAP WSDL file: > M

  • How does one get rid of Sendori advertisments?

    10 second ads show up on the right hand side of screen. Also get a lot of surveys.

  • Reading of the Labview SubVIs when opening a VI increases in reading time in enermous steps

    The reading of SubVIs when opening a VI takes longer everyday.Doubled to one hour over night!!!!!! Is there any temp folder that can be removed, any test VI for checking reading algortihms or anything else to check this? We are using Labview 2009 It

  • Deltas with flat-files

    Hello BW Pals, If I can choose to execute a full update, an init or a delta update within my InfoPackage, what is the purpose of the "Update Mode" drop-down box on the Datasource tab of my InfoSource.  I'm not really sure what the options are for. (A