How to trigger creation of collective orders

Hi,
How to trigger the creation of Collective orders.
regards

Hi,
Collective Orders
Use
In a collective order, planned orders or production orders are linked to one another over several production levels. Each order in the collective order has its own order number. If subassemblies are produced directly for superior orders within a production process, without physically entering the warehouse, it is useful to have a representation via collective orders.
The components for which separate production orders are created in the collective order are called directly produced components (see Creating Collective Orders)
Prerequisites
A collective order cannot be created for components that have one of the following indicators set:
· Co-product
· By-product
· Alternative item with strategy 2
· Alternative item with usage probability 0
· Discontinued
· Follow-up material
· Intra material
Features
Collective orders offer the following advantages:
· Integrated view of a production process
Collective orders make it possible to represent different levels of the production process together in the system. The production process can be viewed as an integrated whole.
· Separate order number for every order
Every level in a collective order represents a separate production order/planned order. Every production order/planned order has its own order number. This enables you to process the entire collective order, a subtree in the collective order or an individual order.
· No placements in storage or removals from storage between production levels
Within a collective order stock movements only take place for the leading order (that is, the order that is at the highest production level) and not for directly produced components. This makes it easier to maintain the collective order in comparison with several individual orders. A further advantage is a more realistic representation of the costs of the production process, since subordinate orders can be directly assigned and settled to superior orders.
· Business functions simultaneously for several orders
Certain business transactions can be carried out simultaneously for several orders. Releasing an order that belongs to a collective order has the effect that all the hierarchically subordinate orders are released simultaneously.
· Automatic change to dependent orders
Changes to an order automatically affect dependent orders / components affecting orders. For example, if you change the order quantity in an order then
¡ the relevant quantity changes are automatically made to dependent orders
¡ the requirements quantity of the directly produced component is automatically changed.
In the collective order, you also have the option of manufacturing directly produced material in a different plant to the planning plant.
· Set status in leading order
If you make changes in subordinate orders that have an affect on the status, then the system sets the corresponding status in the order header of the leading order in the collective order as follows:
u2013 CFCO Confirmation in collective order
u2013 GMCO Goods movements in collective order
u2013 RLNE Release taken place in network
In this way you are informed about changes in the whole collective order.
· Reading master data
You can copy the routing data and BOM data to the order again. You can find more information in Read master data.
Example
You want to produce a pump. The BOM for the pump contains a pressure regulating valve and a spiral casing. You want to enter these two components in separate production orders, but you do not want them to be posted to stock.
You set the special procurement type to direct production in the material master record for the pressure regulating valve and the spiral casing, so that production occurs using a collective order.
When you create a production order for the pump, a collective order is automatically created, which contains subordinate production orders for the pressure regulating valve and the spiral casing.
Creation of Collective Orders
Use
Collective orders are only created if the special procurement type is set to direct production in the components for which the separate production orders are to be created (materials planning area in the material master).
In the standard system, 52 is the special procurement type for direct production (that is, for components that are produced within a collective order).
To create a collective order, you must use an order type with internal number assignment.
Hope this helps.
Regards,
Tejas

Similar Messages

  • Trigger Points in Collective Orders

    Hi
    Need a help. I am working with collective orders and my requirement..the order should be released automatically once the previous linked order is confirmed.
    Could you pl let me know " How can i use the trigger point functionlity in the same. I have worked with the Trigger points where next operation is released after the previos is confirmed but tht is in one routing .
    Thanks in advance

    You can setup external job (maintain variant in co41) to release the order automatically once the previous order confirms.

  • How to trigger an Idoc from Sales order creation and change

    We are trying to trigger Idoc from sales order creation and change we have done following setting mentioned below:
    Follow the below steps:
    1. Go to NACE transaction
    2. Select V1 application and select OUTPUT TYPES
    3. Select the required output type and double click on Processing routines.
    4. Enter Medium as DISTRIBUTION ALE, Program as RSNASTED and Routine as ALE_PROCESSING.
    5. Save it.
    message type ORDERSP in the distribution model (BD64).
    Follow the below steps to configure the condition records:
    1. Go to NACE
    2. Select V1 application and select CONDITION RECORDS
    3. Select the requred output type and click on Condition records
    4. Selection screen will be displayed.
    5. Go for execution. In that screen enter the selection criteria. For eg Condition record is based on Sales document type. Then
    Sales doc type = OR
    Funt = SP
    Partner = blank. It means there is no restriction on partner numbers.
    Medium = A
    date/time = 4
    Lan = EN.
    Note: partner is left blank means, the sales order of type OR can be send to all partners.
    6. Save it.
    We also done ALE configuration.
    We are facing problem that from VA02 "No output has been selected for printing Message no. V1102"
    Kindly suggest the solution.
    Regards,
    Sharad Dixit

    Hi ,
    Please check the total error description and diagnosis as below :
    InVa02 enter SO  go to extras->output->Header->edit.You can find a table with all the triggered output types. Choose the output type BA00 with medium Distribution ALE and go for 'Processing log'. It will show you the error description.
    Please paste the diagnosis .
    Thanks and Regards,
    P.Bharadwaj

  • How to trigger workflow from changes in Sales Order in CRM?

    Hi Experts,
    I want to trigger event at the time of saving the changes in sales order (TCODE- CRMD_ORDER).
    I have found one BO - BUS2000115 but it is getting triggered only after new creation of sales order.And there is no BO available when we change the sales order.For this reason I have created one customize event in BO(BUS2000115).
    Now my question is How should I link this customize event so that it will trigger after saving the changes ?
    I have seen SWEC transaction but was not able to find anything to link this customize event.
    Please help ....!!!
    Good response will be rewarded.
    Thanks
    Snehasish Das
    Edited by: Snehasish Das on Feb 14, 2008 2:31 PM

    In SWEC, actually you link the change document object to a Business object and its corresponding event , to which workflow should react to.
    If yo udo not find the entry then, yo unedd to create one with finding out the respective chage documnet object.
    Hope that helps.
    Regds,
    Akshay

  • HOW TO CONTROL ON CREATION OF SALES ORDER WITH REFERENCE TO EARLIER SO?

    Dear All,
    I want to contol on creation of Sales order with reference to earlier SO?  While creation of sales order our enduser are creating sales order with reference to earlier month SO which I want to restrict. Recently I made changes in sales order like payment terms is grayed, system will atomatically pick pay terms from customer master.Now I am getting correct data also but enduser is using old SO no while creating new SO and old payment data is reflecting in fbl5n.
    I want to restrict enduser while creating new SO with ref. to old SO. Only for returns they should be able to use Billing refrence. Pl. suggest how to control the with reference to ealier SO.
    Nikhil

    Nikhil Deshpande,
          If you dont want allow create a sales order in referent to other one, just delete the copy control between these sales order type, so when the user tries to create a SO in reference to other one a message is displayed that is not possible.
    Thanks,
    Mariano.

  • How to re-trigger BA00 after sales order has been rescheduled

    Dear Gurus,
    Could you please kindly advise how I could re-trigger BA00 after sales order has been rescheduled?
    The scenario is following:
    When the sales order was completed, the order confirmation output has been sent to the customer. But later, when the ATP confirmed quantity was changed or order was rescheduled, the committed delivery date has been changed. It caused confusion, because in the order confirmation letter we sent to customer, there is a different date.
    I'd like to also trigger BA00 to resend the order confirmation, but I checked the output routine, it only checks if the order is completed or not. Shall I ask ABAPer to add additional logic in the routine or there is other easier way to re-trigger BA00?
    Many thanks in advance!

    Have you allowed multiple issue for BA00 output type? In that case, you can manually trigger it from VA02. If you are trying to have it sent automatically, then add the logic into the routine.

  • How we can block creation of PM order from non released notification

    Hi ,
    how we can block creation of PM order from notification if notification is not released.
    Regards
    AM

    Hi Luke and Maheshwaran ,
    thanx for your reply.
    One more thing the option 2 has not been suggested by some users in the thread mentioned by Maheshwaran.
    Can I still use BS22 or option 1 is the best one.
    REgards
    AM

  • How do we Prevent Creation of Production Orders for Phantom materials.

    Dear Experts;
    We have some materials which are Phantoms.
    We have set "special procurement type" as 50 in MRP2 and "Strategy Group" as 59 in MRP3
    These are non stchable items, but have BOMS.
    We dont create orders for them, however at the mement the system allows order creation. How do we prevent creation of production orders for these items in the system.
    Thanks in Advance
    Richard.

    Dear Richard,
    Check using this BADI - WORKORDER_UPDATE using method IN_UPDATE or Release by including a check if MATNR and for
    WERKS combination if SOBSL = 50 from table MARC,then do not allow to save.
    Check whether this works or else you have to set a plant specific status using OMS4  for not allowing production order
    creation and assign this value in the material master of the phantom assemblies.
    Check and revert
    Regards
    Mangalraj.S

  • !How to find out follow up activities created during creation of an Order??

    Hi Gurus,
    I want to find out the number of follow up activities created during creation of an Order??
    Is there any BAPI or Function Module which can detrmine the number of follow up activities after creation / saving an Order..
    Please Reply fast.
    Thanks
    Pranay

    Hi Pranav,
    I am confident this will solve your problem:
    <b>Step 1.</b>
    Enter the guid of the current order into function module
    CRM_DOC_FLOW_READ_DB.
    Code:
    DATA : t_doc_links TYPE crmt_doc_flow_db_wrkt,
               v_guid TYPE crmt_object_guid.
    v_guid = <guid of the order from table crmd_orderadm_h>
    CALL FUNCTION 'CRM_DOC_FLOW_READ_DB'
                  EXPORTING
                    iv_header_guid = v_guid
                  IMPORTING
                    et_doc_links   = t_doc_links
                  EXCEPTIONS
                    error_occurred = 1
                    OTHERS         = 2.
    <b>Step2.</b>
    Now loop through the returned table ie t_doc_links.
    Records which fulfill the following criteria are
    the follow up records.
      reltype    = 'VONA'
      objtype_b  = 'BUS2000126'
      objkey_b   =  v_temp
      roletype_b = 'NACHFOLGER'
      roletype_a = 'VORGAENGER'.
    <b>Step:3</b>
    Now Count the records which fulfill the above creteria.
    This count represent the number of followups created.
    <b>REWARD THE ANSWER WITH FULL 10 POINTS IF UR PROBLEM IS SOLVED.</b>
    thanks,
    ashish.

  • How to switch on/off the creation of internal order at item level

    Dear experts,
    When create service order in CRM, is there any way to control the creation of internal order at item level?
    For certain item category, the cost should be distributed to R/3 Back End system, but for others it should never be transferred.
    Please advise, thanks in advance.

    Hi Yukun,
    We are also struggling with the same problem.
    did you find any correct solution to the problem by now.
    However one setting in backend r/3 is that of controlling scenario-- just check whether the controlilng scenario is set with the level 'transaction'
    i guess if you set it to transcation and at the next level you create for a particular transaction type you need to create a controlling scenario then i guess the problem will be solved.. we tried tthe same settings however we are unable to find the result to the problem.
    if you find something important do write back...
    hope that your problem is solved...
    and ours also...
    surendra

  • Prevent creation of production order in case of missing parts

    Hi,
    Even in OPJH I have maintained no creation of order in case of missing parts, when i create a production order from planned order and I know the Bom components are not avialable in stock then also system allows to create. Pls guide on how to pevent creation of order.
    Regards.

    Dear,
    If my understanding is correct then the settings in OPJK for business function 1 - availability check during order creation even if
    the value is set as 3 for collective conversion,this works during partial conversion of planned order into production/process
    order or during collective conversion of planned orders into production orders.
    But however the setting in OPJK for business functionality 2 - during order release checks and if
    there are any missing parts means the order cant be released for the value 3 set for release material.
    Just check this link also,
    Re: Avalability Check
    Regards
    Mangalraj.S

  • Sending Order Number via IDOC upon creation of Sales Order

    Hi Experts,
    I have a requirement where i receive an order from an external system to SAP as an IDOC.
    Upon arrival, i have to create the Order in SAP and send the Order Number back to the external system in the form of IDOC.
    How can i accomplish this? Kindly share your expertise on this with me.
    Thanks in advance.
    Regards,
    Keerthi

    Hi Gary,
    Now when the Order is posted in SAP, i need a method which will automatically trigger the Outbound IDOC from SAP rather than me doing so manually.
    Is there a way i can track the creation of the Order in SAP and somehow configure SAP to trigger the Outbound IDOC with the Order number automatically?
    Thanks in advance,
    Keerthi

  • How to configure rescheduling for sale order quantities

    kindly explain how to configure rescheduling for sale order quantities that are created last month. kindly explain. i am in urgent.
    regards,
    g.v.shivakkumar

    Hi,
    Short text
    Rescheduling sales and stock transfer documents: by material
    Description
    The 'Rescheduling' program (SDV03V02) processes sales document items that are contained in the item directory for the material. It takes into consideration open items and schedule lines from stock transfer items, stock transfer scheduling agreements and purchase order requests (items only), referred to hereafter as stock transfer documents, for the materials.
    All sales documents for the material that are still open are selected. This means that the material index must be activated for at least all sales document types, whose items may have requirements. All stock transfer documents or items for the material that are still open are also selected. Open in this case means for example, that there is no deletion indicator, that the item from a stock transfer purchase order request cannot be labeled as completed or that the quantity delivered and posted to goods issue for the item in a stock transfer purchase order is the same as the amount ordered. An availability check can only be carried out if a checking rule is assigned to the document type - if this is not the case, the document or document item is not checked.
    Checking rule 'A' is used as a basis for rescheduling sales orders (exceptions to this are rush orders  they use checking rule B, and orders with individual customer stock; they use checking rule AE). Stock transfer documents use the checking rule that is assigned in Customizing for Purchasing. It is important that the scope of checks is consistent for both the stock transfer documents and the sales documents and that they do not exclude each other, as this can lead to incorrect test results. An example of an incorrect setting would be: The scope of check for checking rule 'A' checks delivery schedules for stock transfer purchase orders and stock transfer purchase requests, however the scope of check for the checking rule for the stock transport scheduling agreement does not.
    The items and schedule lines found in the selection are sorted according to 'Priorities' - document category, delivery priority, creation date of the item or schedule line (for stock transfer purchase orders and delivery plans) entered on the selection screen or according to the schedule line date of the earliest schedule line with order quantity, document number and item number and then transferred to the availability check. Priority 1 is highest priority and priority 5 the lowest. Stock transfer purchase order requests are sorted after stock transfer purchase orders and scheduling agreements, as they are less binding. This means that when you have identical sort criteria such as delivery dates, the stock transfer purchase order item is checked first and then the item from the stock transfer purchase order request.
    The preset option 'Unconfirmed documents required' only carries out rescheduling for materials for which there is at least one unconfirmed transaction.
    You can use the parameters 'Sorting criteria delivery date' to define whether sorting is carried out with the order quantity after the creation date of the item or the delivery date of the earliest schedule line.
    If you mark the 'Simulation' field, the checked documents are not saved. Instead a results list is generated and saved. However, the availability check for the corresponding documents continues as if saving has taken place already, that is, that the simulated list corresponds to the actual one.
    Under 'Options' on the selection screen, specify whether sales documents and/or stock transfer documents should be processed. For stock transfer documents you can enter whether stock transfer purchase orders and scheduling agreements should be processed at item or schedule line level:
    Processing at item level:
    All open schedule lines for the item are read and collected, then transferred to the availability check. To sort and prioritize documents, you do not need each individual schedule line. It is sufficient to have the item or data from the first schedule line. All open schedule lines for the item are processed and checked.
    Example of processing at item level:
    Sorting: Date (Delivery date first schedule line) - Document number - Document item
    Doc. cat. Doc. number  Doc. item  Doc. schedule line  Delivery date PO        4500000012      10               0001              26.01. PO        4500000012      10               0002              26.02. PO        4500000025      20               0001              28.01. PO        4500000025      20               0002              02.02.
    You can see that the second schedule line for document 4500000025/20 from 02.02 was processed after the second schedule line for document 4500000012/10 from 26.02. This is because all open schedule lines for an item are read and processed. The first schedule line from 4500000012/10 has the earliest delivery date, therefore it has priority.
    Processing at schedule line level:
    Each open schedule line for an item is entered in document sorting in accordance with the values entered under 'Priorities'. The availability check is carried out for each individual schedule line.
    Example for processing at schedule line level:
    Sorting: Date (delivery date first schedule line) - document number -document item
    Doc. cat.    Doc. number  Doc. item  Doc. sched. line  Del. date PO           4500000012    10             0001           26.01. PO           4500000025    20             0001           28.01. PO           4500000025    20             0002           02.02. PO           4500000012    10             0002           26.02.
    Here you can see that each schedule line was sorted according to its delivery date. Note that this type of processing requires more runtime due to the individual checks and more frequent saving.
    The results of rescheduling are saved, as long as the program was not started in simulation mode. When calling up from the 'Sales' area menu or when directly starting via the development environment, the iniator is informed via a dialog box that he has just started a process that changes data. He can then decide whether or not he wants to continue.
    Checking procedure for stock transfer documents:
    An availability check of stock transfer documents in rescheduling is carried out in accordance with the check carried out when manually creating a document. If, however, the required quantity for a schedule line is not available on a particular date and will not be ready until later, new schedule lines are created for the stock transfer purchase orders and scheduling agreements, containing the relevant data. New items are created in this case for stock transfer purchase order requirements. The total sum of schedule line quantities for a processed schedule line corresponds to the schedule line quantity of the original schedule line.
    First example: Using a stock transfer purchase order item with a schedule line:
    a) Status of item before rescheduling run:
    Del. date  PO quantity   Confirmed quant  Confirmed del. date 23.07.      50 items       0 items              -
    ==> This now affects the stock/requirement situation:
        - Goods issue is posted for the material in the delivering plant on the 23.07.
        - A purchase order of 10 items was created for the material in the delivering plant. Delivery is expected on the 29.07.
    b) Status of stock transfer purchase order item after rescheduling run:
    Del. date PO quantity   Confirmed quant   Confirmed del. date 23.07.     40 items      40 items            23.07. 29.07.     10 items      10 items            29.07.
    ==> The first schedule line was changed in accordance with the results of the rescheduling availability check. Only 40 of the 50 original items could be delivered on the 23.07. Therefore, a new schedule line is created for the rest on the 29.07. for 10 confirmed items.
    Second example: Same output situation as the above example.
    ==> There is now a change in the requirement/stock situation:
    A purchase order for 10 items is created for the material in the delivering plant. Delivery is expected on the 29.07. A further purchase shows another 40 planned items on the 30.07.
       Status of stock transfer purchase order item after rescheduling run:
    Del. date PO quantity  Confirmed quant  Confirmed del. date 29.07.     10 items       10 items          29.07. 30.07.     40 items       40 items          30.07.
    ==> The first schedule line was changed in accordance with the result of the availability check for rescheduling. The original delivery date is set to the date confirmed in the ATP check. A new schedule line is created for the remaining 40 items, that are available on the 30.07.
    Note:
    Any set fixed delivery date and quantity indicators and creation indicators for schedule lines or items are 'inherited' by newly created schedule lines. Assuming that the original schedule line was fixed in the above example (since it is created manually), this indicator is also set for the newly created schedule line.
    If shipping scheduling is activated for a stock transfer document type, this is also implemented for newly created schedule lines, with the exception of route schedule determination. This means that in the current version of the program no route schedule has been determined for a schedule line containing a route schedule for which new schedule lines may need to be created.
    The results of the run are issued in the form of a list, which is also saved, so that the results can be controlled at a later date. This is done using the function 'Evaluate rescheduling', but it is only a good idea to do this after the first rescheduling has taken place. You can restrict selection requirements but these can however affect the runtime. You can use this function to analyze the saved list until the next rescheduling run, which writes over the result. If you start rescheduling in the background, a spool file with the result list referred to will be created in the corresponding setting. You can see this in spool management.
    Output
    A list of changed documents, a list of documents in which an error occurred during processing and as a result were not changed, can be called up via the menu 'Edit - Error log'. If in a subsequent evaluation a restricted selection is carried out, a note appears at the end of the list to say that not all document items are displayed.
    You can set the scope of the list under the menu option 'List' in the list display. You can view improvements, deteriorations and the whole list. Before the documents can be included in one or either of the restricted lists, the date or quantity has to have changed so that the item can be contained in both the list of improved or deteriorated documents.
    You can use the interface for changing transactions and the order list to navigate. Use 'Back' to exit the list and 'New selection' to return to the selection screen.
    Recommendation
    You should only start this program occasionally and use very restricted selectin criteria during working hours as it requires enormous system resources.
    Note
    The columns for 'New date' and 'New confirmed qty' only contain entries if the dates or quantities have changed.
    As the system only runs the change check (dates/quantities) per line in the original list, an item whose backlog has increased in the list of improvements. This occurs, for example, if the whole quantity can be delivered at once but at a later date. In this situation, the system determines an increase for the line when it compares quantities.
    Regards,
    Amrish Purohit

  • Custom collection order in publish service

    In my publish service i have a problem. There is some collections which named by date of some period, and they update periodically (create new/delete old ). I need to sort them by descending, but they always sorted by ascending (it does not depens of collection creation date)
    As example:
    There are 2 collections: "2014-01-01" , "2014-01-02" (exact order) when I create new collection (newer date)  "2014-01-03"  it always creates below by sort order, but  if i create "2013-12-30"  it will be created  higher
    How I can set my custom order ?

    I assume you are referring to the sort order of the collection names in the
    publish panel, not the images within the collections? If so I don't believe
    we can control this and it always sorts alphabetically.
    Matt

  • Collective Orders with GR & GI for sub-ordinate orders

    Hello,
    I am lookng for collective Orders where superior order and sub-ordinate ordes can be tagged together and at the sametime, I would like to GR for sub-ordinate Order which trigger Auto GI to superior Order. this feature is not available in collective orders.
    why I am looking for GR execution is that GR quantity changes for sub-ordinate order from one order to another order always. it needs to be actual.
    any work acound to satisfy this requirement?
    Thanks
    JK

    Hi JK,
    I have a doubt that whether this would be a business requirement. Say as per the BoM if there are 3 levels the last level was expected to be produced as 100 UoM but after production run the yield was 98 UoM or 105 UoM then how system will undertsand that it should post the GI of level 3 SFG2 as yield produced from the last Production/ Process order. But at the same time you need to do subsequent adjustment at SFG1 level also.
    This is highly dynamic situation thats why when you have multiple level of BoM and at each stage the chances of yield variation is high then its always better to create Production/ Process order of superordinate level of BoM when the lower level are produced, confirmed and available in the stock.
    Regards,
    Shoyeb

Maybe you are looking for

  • Get the filename from a directory and insert into a table

    Hi, I have a requirement, i need to read the file name from a Linux directory and get that file name into a variable, After that i need to insert that file name into a table. EX: let their is a file1.txt in abc directory , and i read that "file name"

  • Problem Removing MailBox Role

    Hi, I have two mailbox servers in exchange 2013 and I am maintaining DAG on both servers. I recently added a new mailbox server in my environment. Now I have 3 mailbox servers. But the third mailbox server does not have any DAG nor it is the member o

  • Doubt regarding sender file content  conversion

    Hi Experts This is my source XML structure, how to define Sender file adapter (Content Conversion)  and filed lenths: COMMIT_I 1, STUDENT 12, ID_TYPE 6, ID_NUMBER 60, VALID_FROM 8,VALID_TO 8 <?xml version="1.0" encoding="UTF-8"?> <ns0:IDENTIFICATION_

  • ABAP Run time error when display the Customs Export declarations

    Hi, I'm receiving ABAP Run time error when display the Customs Exp. Declarations Under SAP Customs Processing -> Customs Processing - Import / Export -> Monitoring. Error messaging point to Function Module - /SAPSLL/CUHD_LOAD_SELECTION. While debuggi

  • What is the chipset in M93 - many questions

    Hi, Could you give me the following specifications: What model of integrated video card with two Displays ports? What is the chipset? What location for memory? What are the supported memory frequencies? (I wish to 2x8 GB) What type of PCI-E 16x? The