Document attachment to BOM and has to be viewed in Production Order too.

HI! Friends
Can any body give the detailed procedure for attachment of Drawing Doc to BOM and it should be viewed
in Production Order, the idea is before production it should be viewed.
Thanks & Regards
MDSFR

Dear MDSFR,
I'm not sure whether the system will disply the document directly in the production order,but you can check the list of
documents in the production order in the document overview and assuming the documents are created with a proper document
type and attached in the BOM of the product(production order header material) as document items with category "D".
Check these links,
Re: How to attach document to production order?
Attaching documents in BOM item list in production orders
Regards
Mangalraj.S

Similar Messages

  • Mass Download documents related to BOM and/or BOM items

    Hi All,
    Is anyone aware of a mass download functionality of all the documents realted to a BOM - i.e all documents items of a BOM and documents attached to BOM items(part numbers).
    Thanks
    Raj

    Hi Mangesh,
    Yes, that is exactly it. The requirement is for mass downloading all the original drawings linked to all the components of a BOM to a local drive or to an ftp site.
    One possible way , i thought of, could be to use a program DMS_RELOCATE_CONTENT which as I understand relocates all the originals realated to a list of DIRs to another location. Of course, this means that we need compile a list of components related to a BOM using CS12 or similar program and get a list of parts that has drawing attached to it. Subsequently, use this list to compile DMS_RELOCATE_CONTENT. Not sure, if this is a correct way or if there is any other simple way of achieving this.
    Thanks
    Raj

  • My Pro Tools program was damaged by the Creative Cloud system. I was invited to install and try the Cloud,but it did me a great dis-service and has set me back in Production and personal time trying to get my pro Tools working again. I am really disappoin

    My Pro Tools program was damaged by the Creative Cloud system.
    I was invited to install and try the Cloud,but it did me a great dis-service and has set me back in Production and personal time trying to get my pro Tools working again. I am really disappointed and would like you to advise me how to restore my program to its working state. I am in a traumatic state since I have Artistes life work being processed in the Pro Tools 9 Program. Help! Help! Please.Ps. I tried reinstalling the software from the Disc....Still NOT working.

    Creative Cloud chat support (all Creative Cloud customer service issues)
    http://helpx.adobe.com/x-productkb/global/service-ccm.html

  • We want the Engg BOM ( usage 2 ) to be exploded in Production Order.

    Hi Gurus,
    We want the Engg BOM ( usage 2 ) to be exploded in Production Order.
    Please let us how this could be done.
    Regards,
    Ram

    Dear Ram,
    1.Check what selection ID is maintained in OPPQ for the plant for BOM selection.
    2.For this selection ID set the first priority to Engg BOM for BOM usage - 2 in OS31.
    Check with this and revert back.
    Regards
    Mangalraj.S

  • ATP check and Check against planning for a production order

    Hi
        When I create a production order for some orders it is ATP check and for some orders it is showing 2 in type avail check is check against planning in coois screen. Because of this orders are gettign released even though BOM material is out of stock.Can I know in which situations the orders will come under the second scenario. I always want the orders should be in ATP check
    regards,
    PradeepM.

    Hi,
    If you want only ATP check, then in MRP-3 view of the mtl master change the checking group to the same value as the one which you find to be following the ATP check.
    However before making this change do consult your colleagues in other domains, as this will impact all places where Av. check is done.
    Hope it clarifies.
    Regards,
    Vivek

  • Not able to see material and operation overview as tab in production order

    Hello Friends,
    While creating the production order by T.C CO01, after giving the material code , production plant and order type, system took me inside it.There i am not able to see component overview, operation overview as tab.Whereas in menu option Goto - overview - component , i can see there.But i want this things as tab in screen where we give qty and dates.
    So guys do you know where to do configuration for it.
    Thanking you guys in ad

    Dear Jitendra,
    In Production Order you will find Component and Operation screen under two different icons (not tab) production Header screen.
    - For Component Overview it is something like Balance or on pressing F6 you will branch to Component overview Screen.You will find it just after Hat icon
    - And for Operation over view it looks like ladder or on pressing F5 you will branch directly to operation screen.you will find this icon just after Component overview Icon.

  • Target cost and actual cost not picking in production order

    Hello,
    The target cost and actual cost is not updating in production order when I display it in CO03 in cost analysis.
    Even though we have maintained planned price in KP26.
    Please suggest how it can be populated.
    Best Regards,
    Tapan

    Hi Tapan
    For Target cost
    1. Your std cost must be released before Goods Receipt
    2. There must be goods receipt posted on the prod order
    3. You must calculate variances in KKS1/2
    For Actual Cost
    1. Post Goods receipt and Goods issues
    2. See if any mat movements are pending in COGI
    3. Ensure that operation is confirmed in PP and no entry is lying in COFC
    Regards
    Ajay M

  • Storage location and Batch updation for components in Production Order.

    Hi Friends,
    After creating Production Order,need to update components with Storage Location(RESBD-LGORT) and Batch(RESBD-CHARG).
    Plese any one can help me by providing FM/BAPI for the same(Update Component level)
    Points will be rewarded.
    Thanks,
    Prb.

    Hi Prathap,
    Path - OCHA
    Condition type,access sequence, strategy type,
    Work on automatic batch determination. Assign standard search procedure to order type dependent parameter, check against manual entry.
    Make sort sequence for material by CU 70, tick ascending order, Then assign component in COB1, enter selection values and sort sequence. In finish product material master set automatic batch determination.
    System will copy the required material with batch & storage location, also check against manual entry.
    I think it will solve your problem.
    Regards,
    Suhas

  • How to find document attached to user and Company code?

    Hi all,
    Requirement: Select a list of Business documents ( Sales order/PO....) created or changed by <b>specific users</b> which belong to a <b>Specific Company code</b>.
    ie,To develop a report which lists the Documents created/updated/changed based on specified date and users.
    I think we can find from CDHDR & CDPOS  tables.  But i need to filter these documents or pick documents based on a Specific Company code.
    ie.,from the list of records obtained from CDHDR table....how to filter these documents based on Company code......
    valuable inputs needed.
    Thanks,
    Subba

    Hi
    Most of the application document Heade tables(VBAK,EKKO etc ) will have the field CRETAED by  like ERNAM. and all these tables will have BUKRS field also in them
    So compnay code wise User created documents list you will get.
    Only problem is the Changed/Modified list by user with related Company code.
    Anyhow you will get the User who changed the documents from CDPOS table.
    But for linkthem to Company code I feel You need the
    help of HR related Tables .
    with the UNAME which you get from CDPOS table go to PA0105 infotype and get the PERNR linked with that user.
    And get the attached BUKRS Company code from PA0001 infotype.
    Hope this will solve your problem.
    reward points if useful
    regards
    Anji

  • Materials/Production Order/Document Status Report

    Hello All,
    I am trying to create a report that gives the following
    Production Number
    Material Number on Production Order
    Document Number on Material (DRAW-DOKNR)
    Document Status (TDWST-STABK)
    I tried creating this in a join and have the tables for Doc Number and Docu Number on Material but I can't seem to find a match between the part number on the Production Order and the Document Number.
    What table has the parts on a production order?
    Thanks,
    Linda

    OK I have the Production Order and the attached BOM now all I need to do is add the DRAW and TDWST - unfortunately they don't have similar keys to do a join with what I just created. When I try to join with MARC it doesn't pull anything - doesn't like that join.
    In order to get the Production Order and it'e related BOM use the following:
    I created a join between tables AUFK and RESB
    Output of the query looks like the following:
    Order Type: AUFK-AUART
    Order Number: AUFK-AUFNR
    Plant: AUFK-WERKS
    Material Number: RESB-MATNR
    BOM Number: RESB-POSNR
    In Order to get it into BOM Order all you do is sort on RESB-POSNR

  • Copying Documents Object Links attached to BOM Headers & Items in Prod Ord

    Dear Gurus,
    I've created a BOM for an assembly. This BOM has document assignments at 3 places -
    1. BOM Header level (in BOM Header overview - Document Assignment tab)
    2. BOM Item level (in BOM Item: All Data - Document Assignment tab)
    3. Document assigned as a BOM Item with Item Category D (in BOM General ITem overview - Document tab)
    When I create the Production Order for this assembly, only the document that is assigned as a BOM Item with Item Category D (point#3 above) is copied into the order.
    I'm not able to view the document links for the documents as described in points 1 and 2 above.
    The necessary configurations in Production Scheduling Profile have been done for integration with DMS.
    I need to know if there is a way (probably through some user exit, BADI or by implementing some SAP Note), the object links for documents attached to BOM Header and BOM Items can also be transferred to a Production Order.
    Please help me out in resolving this issue as it is a very critical requirement of the client.
    With Regards,
    Nitin

    Hi Niraj,
    If you follow following path in the Production Order Header. click on the Document Overview (SHIFT+F7) Button
    You could be able to see the Links for Material Master attached Documents. there is a Button for BOM origin documents. I tried but it didnt worked. I hope it works for you. If it works for you. Please let me know.
    Regards,
    Ravi S Bijjala

  • Changes documents for BOM and Routing

    How Can I find the change documents for a BOM and routing?

    Change Documents For BOM
    CS80 - Material BOM
    CV80 - Document Structure
    IB80 - Equipment BOM
    IB81 - Functional Location BOM
    CS81 - Standard BOM
    CS82 - Order BOM
    CS83 - WBS BOM
    Change Documents for Routings
    CA60 - Task List Changes
    CA61 - Routing
    CA62 - Reference Operation Set
    CA63 - Rate Routing
    CA64 - Reference Rate Routing
    Hope the above may help you.

  • Document link to BOM

    Hi All
             How can I attach a drawings to BOM and then how it will be linked with production order?
           Where I have to attach the instructions to the users for production and how?
    Thanks in Advance.

    Dear Madhan,
    For attaching a drawing in BOM
    Go to BOM-Item Overview screen in CS02 Transcation
    In the Item Category select "D"-Drawings,System will take you to Item:General data screen,there you have to give the doc no,doc type
    Prior to this drawings/documents should be available,Hope you know how to create a document,Tcode is CV01n
    The drawings which are attached to the BOM will not have link to the production order
    Whereas the drawings attached to the material master will have a link to the production order
    In the production order documents(Instructions) can also be attached as PRT in the routing
    Hope the understanding is clear,reward points if useful
    Regards,
    SVP

  • Need help ---  Changing mode of a document attached to an Opportunity

    Hi...
    I am new to CRM...
    I am working in web UI.
    I have a requirement where i need to open up a document attached , in the non editable mode...
    In order to make a field non editable, all i have to do is, make rv_disabled of that field true in get_p method of the field.
    Is that the same approach for the documents?
    In which method should i make it non editable ?
    Helpful answers would be rewarded...
    Thanks...

    Hi..this thread remains closed as it has been solved,,,
    Thanks...

  • BOM explosion where first BOM alternative has deletion flag

    Hi,
    I got the following very basic scenario:
    One FERT material has two BOM alternatives (alternative 1 and 2). Both of them are valid in terms of date, status and lot size. When a production order is created by CO01 the system will pick automatically alternative 1 (which is ok for me). BUT if this BOM alternative 1 gets a deletion flag (on BOM alternative header) I would expect that the system would automatically pick alternative 2 (it is the "next" suitable alternative). But the systems says there is no valid BOM available.
    Only if I really delete alternative 1 (so I cannot see it anymore in CS02), the system would pick alternative 2 (because it is now the really first one available - no version in front with only deletion flag). But in terms of documentation I cannot delete the alternatives.
    Maybe somebody could explain that to me or had a similar problem...
    BR and thanks in advance.
    Christian

    Hi Guys,
    many thanks for your suggestions. Setting the status to inactive did the trick. Obviously the deletion flag is not enough at this point.
    Just to clarify - production version of course would be an option but that did not work with the following:
    I have 6 different routings for this FERT and the user has to choose when the production order is created. That works basically fine when the order is created with CO01 (popup for selection of production version based on MRP4 setting). BUT when a planned order is converted directly from MD04 into a production order the system would automatically pick production version 1 (no matter what setting in MRP4 view). If there are no production version the user would get at least a popup for choosing a routing. But this would maybe an additional thread in the forum
    Thanks
    Christian

Maybe you are looking for