Dragging multiple media clips into vertically stacked tracks in the timeline? Is it possible?

Hoping that some Adobe Premiere Guru might be able to lend some insight into what seemingly should be a fairly simple thing to accomplish... but despite scouring the web, I can't seem to find a peep of a solution for it.
My neighbor (whom, incidentally, I convinced to go with Premiere CS5.5 as his NLE of choice in the wake of the FCPX uncertainty) is working on a "reality-style" project where they have a massive amount of cameras running simultaniouisly for hour upon hours on end. Think Big Brother House style.
Essentially for each hour of the footage, he is creating a project in which all the multiple camera footage (MOV) from that hour is listed/linked over in the project panel. For example, for HOUR ONE he has the footage from all 20 cameras (or whatever) for hour one listed there.
BASICALLY what he wants to be able to do is grab ALL the footage from those various cameras AT ONCE, DRAG them over to the timeline and when he drops them there, the video (and, inversely, the audio) clips STACK vertically, one on top of the other, each one taking its own track in the timeline.
Currently, of course, when he does this the footage arranges itself in the timeline end to end. In the case of my HOUR ONE, 20 CAMERA example, this basically creates a 20 hour long clip, as oppossed to a one hour clip with 20 tracks, stacked one on top of the other.
As near as we can tell, there's no keyboard shortcut to make this happen. I VAGUELY recall being able to do this in FCP (maybe?) so I'll be stunned and more than just a little bit disappointed to if there isn't SOME way to pull this off in Premeire.
Does anybody have any idea if this mode of automatically dropping clips into the timeline as stacked tracks is possible? It will, quite literally, save him hours and hours of work if he can figure out the secret. And I won't feel quite so guilty for having turned him onto Premiere for this specific project!
And if anyone knows for a fact this is NOT possible, that would be great to know as well. At least we can put the notion to bed one way or another.
Thanks in advance.
Regards, Michael

You can do this with the make multi-camera source sequence command in Premiere Pro CS6 (note that this was posted before CS6 was launched):
Mark the clips
Select the clips
Choose Clip > Create Multi-Camera Source Sequence
Choose the style of synchronization and click OK
Right click on Multi-Camera source sequence and choose > Open in Timeline.
Clips are now stacked up inside of a sequence
More here: http://helpx.adobe.com/content/help/en/premiere-pro/using/editing-multi-camera-sequences1. html#source_sequence_for_multi_camera_editing

Similar Messages

  • Drag select audio tracks to the timeline

    I have several clips I will be adding to the timeline that have 4 audio tracks. I only want the first audio track to go to the timeline. How do I do this?

    Disconnect the connectors for the other tracks on the timeline...on the left side.  You will need to load the clip into the Viewer first.

  • Is it possible so zoom vertically the track in the timeline? Or only horizontally?

    Hi people!
    Is it possible, in garageband '11, to zoom vertically the tracks in the timeline? Or only horizontally?
    Cause in logic pro I know that I zoom either in and out regions in the timeline... But in garageband I'm able only to make an horizontal zoom... Enlarge vertically the tracks could help me a lot when work with the automation curves.
    Thanks lot,
    Peace

    FranzFromFar wrote:
    Is it possible, in garageband '11, to zoom vertically the tracks in the timeline? Or only horizontally?
    only horizontally, though the editor can be stretched vertically:
    http://www.bulletsandbones.com/GB/Tutorials.html#bsqstretchingeditorpane
    (Let the page FULLY load. The link to your answer is at the top of your screen)

  • Every time I import an .fcpxml file into Final Cut Pro X, the timeline doesn't get imported

    So I had exported an .fcpxml file from one machine, which i had to format. So, after formatting the machine, each time I import the .fcpxml file into Final Cut Pro X, The timeline remains empty

    Use MPEG Streamclip from Squared 5 (free software) to convert the media to something like ProRes 422, then import into FCP X.
    MPEG Streamclip can cope with many codecs.
    Andy

  • How to unglue clips that are stuck together in the timeline

    I've looked everywhere, I'm sure it's there but I can not find how to "unglue" clips that are stuck together in the timeline.  NOT break apart clip items, but get rid of those pesky things that attach the different levels of video together.  And BTW what the heck are those little claws called?
    Thank you so very very much in advance!    

    You can't move tracks. Everything in the timeline has to be connected to the primary storyline at some point. Each clip that's connected can be connected individually so it's free floating and the connection point can be moved anywhere you want, or the clips can be strung togother and connected at a single point. You can Opt-Cmd-click to change the connection to a new location, but it has to be connected somehow.

  • Stretching tracks on the timeline using keyboard.

    How can I stretch audio & video tracks on the timeline without scrolling at the scrollbars?
    With other words is there a shortcut on the keyboard?
    Thanks,
    Tim

    Hi Tim,
    If you mean, stretch or squeeze the timeline, then Stretch is APPLE , and Squeeze is APPLE . It stretches or squeezes the timeline around the position line. much easier for me.
    hope that helps,
    steve

  • My connected audio only clips moved from below to above the timeline. What happened? How do I get them below the timeline again?

    My connected audio only clips moved from below to above the timeline. What happened? And how do I get them below the timeline again?

    Repeatedly crashes. What I ended up doing was using a backup Final Cut Projects file and jettisoning this one with the glitch. Luckily, nada much lost. I've had a couple of these weird glitches happen in the Timeline, esp. when dealing with compound audio-only clips & some fx's and rather than spending mega time trying to fix the problem, I bail and start again, and try to be more methodical in my approach.

  • Switching on a some track in the timeline

    Hi, all.
    Does somebody know how to activate specific track in the timeline (for editing etc), that playhedad didn't have changes on that timeline.
    normally, that would enable a track, you must necessary click it with mouse on it but as you do it, playhead position was changed to position where you press mouse button.
    how to overcome that moment.
    Can't find it in help.
    Thanks.

    Rightly I should have selected the option in the original post 'I have this question too'. But, I did not do it because I did not understand the question in the first place. After reading your reply and the glee with which it was acknowledged, I realized that I too had this 'problem'.
    Thanks Tom.

  • Moving a clip UP or DOWN several tracks in the timeline to REVEAL additional tracks

    One thing I've always wondered but never asked here is if there's a way in Premiere to drag a clip up (or down) tracks and force the timeline to scroll up with the clip? In FCP as well as in Premiere, if you drag a clip within the timeline to the left or right beyond what is currently showing on the timeline, the timeline scrolls to the left or right almost like when you drag an app on your phone from one screen to the next...go to the edge and the page scrolls with you. But in Premiere (unlike FCP), if you try to move a clip up or down to a track that's outside of what is currently showing on the timeline, the timeline does not scroll up or down to show the additional tracks. Is there a preference or another way to enable this?
    Many of my projects have 8 or 9 video and audio tracks BUT usually only around 4 or 5 video and audio tracks are showing at a time. If I needed to drag a clip from track #1 to track #8 I'd have to drag it up to an open area, drop it, scroll up (or down for audio) and then drag again to the open track #8. In FCP, the timeline would scroll up or down just like it does when you force a clip all the way left or all the way to the right.
    Using a shortcut to move a track up or down does not work because it overwrites everything in its path and that's not what I want to do here. I'm hoping there's a preferece or some other way to enable this in Premiere.
    Thanks!

    I'm not aware of any user preference for this.
    But, for situations like that, you can always temporarily fullscreen the sequence with the ` key, which will give you plenty of real estate to see everything, make the move, then restore back to normal with another tap of the ` key.

  • Why do selections from waveforms insert into a multi track at the 14 hour mark?

    Currently having an issue on Audition (Creative Cloud) where every time I highlight a section from a waveform and send it to a multi track, it inserts it at around the 14 hour mark, making my original timeline of around 5 minutes a pain to work on. Even with an edit undo, the timeline still remains at a stupid length making navigating very difficult.
    Any suggestions on how I can solve this? I've worked on other versions of Audition before and never had this issue.

    Audition has the ability to import files into the Mulitrack at the Timecode specified within the file header. You can turn this option off in the Preferences/Multitrack page by unticking "Use embedded timecode when inserting clips into Multitrack".

  • HOW YOU GET IMOVIE TO SELECT/TRIM ALL THE TRACKS IN THE TIMELINE?

    trying to burn dvd of my vacation and imported the clips from the camera into imovie. worked great. i imported my audio into garageband to add some filters, compression and eq, and imported it back into imovie as a separate track. then, i muted the origional audio track from the camera. still great. now, i need to trim some clips because idvd says my movie too long to burn on a single-layer disc. not great, *****! so, then i went back to imovie and trimmed a clip and now the audio that is after the trimmed track is totally out of sync. really really *****!!!! it turns out that imovie only trimmed the video and left my second audio track alone. WHY??? ***!!! does anyone know how to trim clips so that imovie trims all the tracks? do you hold down 'shift' or 'option' or something??? there must be a way to do it. HELP!!! god, i hope i can burn this disc sometime in 2007.

    yea, thanks matt but i thought of that. if i do that i have to do my whole idvd project over again. i dont think i have enuff sanity left for that. i have a really complicated idvd project thats totally done. i think im just gonna burn it to a DLdisc instead.
    but hey, maybe you can help me with this question:
    i made a disk image of my vacation in maui, which is 1 hour 43 mins & chose the 'best quality' option. it has lots of violent ocean footage w/lots of motion, crazy colors, rainbows etc. its taken from a canon alura dv cam & looked awesome in imovie. my imovie project is roughly 23gb. when i watched the 4gb disk image that idvd created in DVD Player, it looked really blocky especially in the water/ocean scenes. like a bad divx rip from 1997, haha. im not happy with it at all. i kinda thought about how idvd would get 23gb compressed down to 4gb and worried about how it would look. well, my worring paid off cause it looks like crap.
    then, i looked at the project info window in idvd. if i select 'best performance' the capacity changed from 3.6gb to 6gb, whoa??? uh, that doesnt make sense. \ im gonna try to encode it using this 'best performance' that they speak of, and see if it helps. i just want my movie to look good and ill do anything, ill use a dvdisc if i have to! why spend hours making a perfect imovie/garageband/idvd project if your source footage looks like dog poop in the final stage. im assuming it will look better when i select this 'best performance' thingie because common sense and logic tell me 6gb is bigger than 3.6.
    then i got really CRAZZIIEE and looked at the 4gb idvd image next to 1 of my source .dv files in vlc player. vlc player says my disk image is getting about 4-6,000kb/s fluctuating, BUT my .dv file is 30,000kb/s sustained!!! how do i get 30,000kb/s sustained on my dvd??? wow, that would be great!!! prob not possible with my luck? my dvd player will explode into flames when i try to play it, right? also, how can i get the quailty higher? idvd is only going to use 6gb of a dual-layer disc, why if it has the capacity to hold 9gb? any help would be greatly appreciated!!! i thought about dvd studio pro but i would only try that if it will import my idvd theme perfectly, cause im not doing all that crap again. if im stuck with a 9gb dldisc that only used 6 gb, at least thats better than 3.6gb. ill settle for that if i have to.
    mahalo,
    jarett

  • My clips have a yellow line on the timeline sequence. Does this affect my video quality output if I don't render?

    I use Adobe CS 6 to edit and I use Sony NX 3 to record. Every time I import my clips. It has a yellow line on the timeline sequence, even when I make new clip from the sequence.. My question is, does this affect my video quality output if i did not render the yellow line out? Please someone help me

    Please see this link for more info about red and yellow bars - http://blogs.adobe.com/premierepro/2011/02/red-yellow-and-green-render-bars.html
    If you shoot 1080p, you will likely have better results going to DVD than if you start with 1080i. It's hard enough downscaling with decent quality, then if you add in interlacing issues...
    When exporting from Premiere to create a DVD, choose "MPEG-2 DVD" as the format, and then choose a preset such as "NTSC Widescreen Progressive".
    There is a checkbox at bottom of export window for "Max Render Quality"  - use that for best downscaling results.
    Use 2-Pass VBR encoding. Use a bitrate calculator to determine best bitrate for length of movie, or quick option is 560/minutes = bitrate. But don't exceed 8.0 on shorter movies. I typically round down a little for safety margin, such as 560/120 = 4.6, encode at 4.5 and no worries.
    The export will result in TWO files, .m2v video and .wav audio, import both into Encore for authoring. Encore will convert the .wav to Dolby AC3, reducing file size. Video should NOT get transcoded. And as others said, don't expect HD quality when viewing a DVD...definitely not HD video any longer. But do be sure to use an upscaling player, this makes all the difference. If you run a yellow composite cable from DVD to TV, it will look horrible. Use HDMI with upscaling DVD/Blu-ray player for improved result.
    Good luck
    Jeff Pulera
    Safe Harbor Computers

  • Why do the thumbnails in a clip need to repeat themselves in the timeline?

    I'm confused about something.  When I drop a clip into the timeline, if I want the video and audio to show then the thumbnail for the clip basically repeats itself for the length of the clip in the timeline.  In FCP 7 when a clip is dropped in the timeline there is one thumbnail on the left and then just the length of the clip.
    It is very hard to see clip separation in the timeline if it's a constanst stream of thumbnails - anyway to turn this off???

    Tom, you seem a little negative - just an observation from someone who is knew to this board.  I'm just trying to get an understanding of a new application.  I of course, am only working from my knowledge of FCP 7.  I've worked in FCP since 2002 so I'm very aware of FCP 7.  I'm not trying to make FCP X into 7 but I am wondering how some of the SIMPLE things that were able to be achieved in FCP 7 seem so complex (and maybe not even possible) in FCP X...
    The thumbnails don't NEED to repeat themselves, it's silly.  I've played with the settings at the lightswitch and none of them controls the amount of thumbnails that are displayed.  Having all those thumbnails makes it VERY hard to see clip separation.  If you call that trying to fit FCP X into FCP 7 then so be it, but it seems pretty logical to me to ask for this option...
    Hope you're having a lovely day!

  • What do clips with diagonal stripes mean in the timeline???

    If you look at the two video clips labeled "R21" in my timeline, you can see that there they have diagonal lines through them. Can anyone tell me what that means?
    I don't think they're offline because otherwise I would see the usual multi-lingual notice in the program monitor window indicating "offline"
    Thank you in advance.

    Hi Kevin,
    Haven't had any issues with out of sync clips. What seems strange is the the monitor window is black yet the clip isn't disabled. And I don't believe it's offline. But do you know what a clip with diagonal stripes through it means in Premiere? I've looked elsewhere online, even in Premiere's help section and haven't found out what this means. Thank you very much for your help.

  • Sync multiple video clips with one audio track

    I'm an FCPX noob, trying to sync some clips.  I recorded a 1.5 hour concert with a DSLR along with an audio track using a separate digital recorder.  I have seven video clips, all in sequence (stopping and restarting the camera because of clip length limitations) and one long audio track in WAV format.  The audio track is longer than the combined video clips, and there are some short dead spaces in between the video clips when I turned off/on.  Now I'm trying to sync them but when I do, the video clips get stacked together with lots of overlap.
    I made a test with 3 minute video and audio clips and had no problem.  But when I try to do the whole event, I get a jumbled mess.
    I could cut the audio into pieces and sync each piece with its corresponding video, but that seems to defeat the sync process, as well as being a lot of work.  And, wouldn't I end up with lots of overlap anyway, since my audio clips would have to be longer than my video clips?
    Am I missing an easier way to do this, or a way to arrange things better?  I can't imagine the problems with several cameras and several audio tracks; my project is actually pretty simple, since it is very linear.
    Any suggestions?  Thanks--

    BobFromIN wrote:
    Sorry to take so long getting back to you.  Thank you for this advice, but I'm not sure I'm doing it correctly.  Is there a way to set the angle on all of the clips at the same time? 
    Yes. Select all the clips you want in the browser, and then in the inspector fill in the camera angle with the value you want. This can be just about anything, it does not have to be a number. I prefer to name  it something meaningful, like "wide" or something.

Maybe you are looking for

  • Internet Access from Inside to Outside ASA 5510 ver 9.1

    Hi everyone, I need help setting up an ASA 5510 to allow all traffic going from the inside to outside so I can get internet access through it. I have worked on this for days and I have finally got traffic moving between my router and my ASA, but that

  • Bootmgr missing

    After i press power button, monitor still blank and there are some text "bootmgr missing" "press ctrl+alt+del to restart". I am doing "press ctrl+alt+del" but this is not working. How to fix this problem? Help me please...

  • Can I use AVG anti virous with the new download

    I run AVG free anti-virus , with some new Firefox upgrades the AVG got disabled or just wouldn't work

  • AirPort Base Station

    I am about to set up a network in a new home. I am confused by the AirPort Base Station/Extreme: do these replace the need for a router, and if not, what is the benfit of these above a standard wireless router like a NetGear for example?

  • Inherited a older Mac Mini, Need info on reinstalled of the OS

    Greetings all. I was recently donated my first Mac, a Mac Mini A1103. It came to me with a bad hard drive, which I have replaced. My question is: how can I acquire (legally) the factory discs to reinstall the operating system? Thank you in advance.