Easy Cost Planning: Calculation Row (Business Process) in Cost Model Derivation Rule

Hi All,
The Requirement:
Using the Cost Model I am able to do up to Sub-Total Value.  I tried with Calculation Row (Business Process) in the Cost Model Derivation Rule, but could not succeed. 
I tried with Base Planning Object, but the formulas are different for other scenarios.  Which require 5 to 6 Base Planning Objects are required to be created to get the total amount for a single line item, in the construction project there will be more than 10,000 line items and it is very difficult to maintain the data and also it is time consuming.
Can you suggest me, how to map the requirement?
Best Regards,
K. Rajendra Prasad Rao

You need to check the following for the material cost to appear in network costing:
1. Check whether costing variant is assigned to the network or not.
2. Check whether costing relevancy indicator is checked in material component assigned to the network.
3.  If costing variant exists, check the valuation variant and strategy sequence for material valuation.
4. Go to the material master and see whether price is mentioned  or not.
I would suggest you to use Network costing, Also note network costing are recorded in Co version '0' so if you have maintained your ECP for '0' version, there is a chance of both the costing getting added up.
Edited by: Ahmed Rifaee on Mar 28, 2010 10:10 PM

Similar Messages

  • Planing primary cost elements on statistical business process

    Hello, dear collegues.
    I need plan primary cost elemet on statistical business process.
    How i can do it?
    In transaction CP06 i see error "Business process 1310-100 is statistical - transaction is not allowed".
    thank you for attention

    Hi Su
    It seems that SAP says that cost elements with category 90 can't be planned.
    check the following link.
    pl assign points if suggestions are useful.
    http://help.sap.com/erp2005_ehp_02/helpdata/en/08/5144dd43b511d182b30000e829fbfe/frameset.htm
    regards,
    Suraj

  • Having variations of same business process, How to model?

    Customer has several variations of the same business process. How to model them in Solution manager's project implementation tools? I actually created this same question in 'Business process expert' forum, so please read the whole story there and earn your points there.
    Having variations of same business process, How to model?
    Best regards,
    Kimmo

    Hi Kimmo,
    I wouldn't use process steps to refine processes. This is incompatible to SAP implementation content coming from BPR (Business Process Repository). But a good idea would be to copy the main business process e.g. "Sales order processing" into two new processes on the same level, e.g. "Sales order processing by manual input" (variation1) or "Sales order processing by incoming interface" (variation2). Then you can use the Compare Button on the variations to see if any changes have been on the main business process and copy them to the variations. This minimizes the effort to keep track of changes after creating the variations. When you run transaction SA_PROJECT_UPGRADE on that project these changes even get flagged. Mostly this function is used to upgrade against BPR or a template project but it works also for copies inside a project e.g. to model variations.
    Regards
    Andreas

  • Easy Cost Planning (SAP) in Tender Process

    Hi All,
    I am using SAP ECC 6.0 EHP 4. I wanted to know if Easy Cost Planning in SAP PS can be used to cost a project initially while Tendering process.Or is there any other tcodes in SAP for tender process? I created Costing Models for most of the possible processes in a civil project and included the labour cost,equipment cost and material cost in it.By this way can we proceed implementing SAP in our tendering department.Looking forward for your valuable replies.

    Hi ,
    SAP has easycost planning objects available to cater to it. Process starts with inquiry.
    1) Create inquiry for customer request. Define service material in material field in VA11
    2) Create Project copying closest executed in part ( you have said 70% is engineered fresh, then project is 30 % correct at the time of copying)
    3) Amend project to add/chnage/delete components & network activities. Add miilestone payment you wish to propose in quotation.
    5) Add project no in inquiry (Accoutn assignment in Line item )
    4) Use DP81 traxn to create quotation.Easy-cost planning need to be configured to calculate price( Cost+ mark up scenario possible) There are possibilites to pull as many deatils as you wish in quotation ( As line items) from project structure. It is possible to list major assemblies that will be delivered to customer( Make- To - Order variations). It is also possible to replace Service item used in inquiry with 'Material masters' of FERT & itemization in Quotation. Milestone dates from project will be copied you can propose % billing arrangement at each date to customer.
    5) Able to revise quotation seamlessly & resond to customer changes/addtioal request. Revised quotation reflects your ability understand customer request & changes are seamlessly reflected in qty,  total price & dates.
    6) Upon confirmation of Sale, Sales order can be created copying quotation. All hard work/ iteration of commnucation with customer , need not be defined in system again. Order Acknowledgement will reflect agreements with customer.
    SAP E C & O best practice has few more addtion for Civil project ... how to measure % completion based on Mortar used & daily output of cement mixing. That will help,
    Regards,
    Jatin

  • Cost model derivation rules error

    Hey PS upgraders,
    We are upgrading 4.6c to 6.0. When I m uploading the cost model from 4.6c to 6.0 thru CKCM , derivation rules are missing in 6.0.
    Does any one come across this kind of issue in 6.0.
    Thanks,
    Krishna Reddy
    Edited by: krishna.gujju on Jun 17, 2010 11:59 PM

    Hi guys,
    any idea!

  • Industry Business Process Frameworks and Models

    After I did some preliminary research on reference models, can anyone tell me how to use these models and still utilize (leverage) SAP's Process Map?"

    Hi,
    The Solution Composer is an ideal tool for planning, defining, documenting, and communicating your business solution requirements. The Solution Composer contains more than 50 Solution Map and more than 300 Business Scenario Map templates.
    This offline PC tool supports the development of Solution Maps and Business Scenario Maps by providing functionality that allows you to:
    Modify and create Solution Maps and Business Scenario Maps
    Assign business goals and objectives, products, key performance indicator (KPI) definitions, user-defined properties, and attached documents to Solution Maps
    Assign role information, business documents, and other attached documents to the Business Scenario Maps
    Link the elements of the Solution Maps and Business Scenario Maps to produce your own in-house and inter-enterprise solution
    Export the Solution Maps and Business Scenario Maps into HTML and PowerPoint slide format
    Thanks and Regards,
    Naveen Dasari.

  • Easy Cost Planning -Costing has already been completed. No changes possible

    Hi,
    I am in Easy Cost Planning tool and i would like to remove some items or add in some items.
    The system is giving a message that "Costing has already been completed. No changes possible"
    May i know where did we complete the costing(Transaction code?) such that no changes are possible on East Cost Planning tool anymore?
    Thank you.

    Hi,
    Check the Costing Model in CKCM and do changes as per your requirement.
    Now Use this costing Model in CJ20N while cost planning for wbse. you can change cost plan here also as per wbse specific requirement.
    regards,
    Hari

  • Planning Process of Costing Sheets - Standard Cost Estimate

    Can some one please explain which planning values costing sheets will pickup when processing standard cost estimate
    Thanks.

    For frozen standard cost (both legal frozen standard and profit center standard), maintaining planning costing sheets are used
    KZZ2 (Percentage Overhead Type/Plant) and
    KZM2 (Quantity Overhead Type/Plant)
    Both [' will pickup when processing standard cost estimate']
    The prerequisites are first check the following:
    MM03 - check material standard price
    CS03 - check material BOM
    CA23 - check Rate Routing
    KP27/KP26 - check/update Production Activity Type Price

  • Missing iviews for Personnel Cost Planning and Simulation

    Hi,  We are implementing "Personnel Cost Planning and Simulation" in R/3 version 5(mySAP ERP). At present we have the following Business packs in our Enterprise Portal Server. 60.1.5 and 60.1.1(mySAP ERP 2004). We uploaded both the BP's in our test environment to make sure we get all the iveiws that we need.
    SAP presentation has all the iviews, But we are unable to locate/identify under MSS the iviews for "Web Based Detail Planning for Line Managers",  "Detail Planning:  Detail Costs per Cost Object" and so forth for Personnel Cost Planning and Simulation component.
    We researched other BP's such as 50.4.5 and 50.3.9 but in vain.
    We truly appreciate if some can guide us to get these iviews.

    Finally I got the answer and thought I can share this with you all.....
    For Personnel Cost Planning and Simulation, SAP has not delivered mss iViews, but SAP has realized the detail planning pages for the line manager and the personnel cost planner by using the Business Server Page (BSP) "hrhcp_planning".
    You can find the description of it's usage in the online documentation under the following path:
    Human Resources>Personnel Management>Personnel Cost Planning and Simulation-->Personnel Cost Planning and Simulation Flow -->Creating Personnel Cost Plans
    --> Providing Detail Planning for Line Managers
    --> Detail Planning by Line Managers
    --> Detail Planning by the Personnel Cost Planner
    If you wish to use the detail planning page in an mss environment, you can integrate the BSP as an external service into the manager's portal. Otherwise, you can also use it, by providing the URL to the managers.

  • Business Process Set up -  Begineer Questtion

    In our company we are planning to implement business process and monitoring in coming months. I am from the basis admin group and would like to know from the system side what need to be done to implement the Business process  in SLM.
    What my understanding is that Business Analysts create type of work flow using these Process to create a model of the business process . Once these work flow are created for each business process  ,IT can setup alerts on these process in order to timely react to the situation if some issue occur in any flow.
    This what i am looking from experienced folks who have  implemented this in there company.
    1. A more detailed information on this process from a Basis Admin point of view
    2. What is required from System side to make SLM ready to implement Business Process
    3. Any Document  or guide can someone provide when they had setup the environment or point to the URL
    4. Any other information which one can think of someone who is beginner to understand this concept
    Thanks

    Hi ,
    Please go thru the below link which is really helpful.
    http://sapbpctutorials.blogspot.com/2011/04/how-to-setup-business-process-flow-e.html
    Regards,
    Sanjeev

  • Query- Personnel Cost Planning-Immediate Help required

    Hi,
    I have a query.
    I am trying to Assign Percentage to Cost Item ( Personnel cost Planning)- Bonus which is a dependent cost item to Direct Cost Item-Base Salary but when I run the
    T. Code:- PHCPADMN the Bonus Percentage is not getting reflected and if I run the report-Plan data it is not showing any calculation of percentage.
    Kindly any immediate help is highly appreciable as I need to resolve it ASAP.
    Regards,
    Happy

    Hi Soniya
    I think you should look into following links:
    help.sap.com/printdocu/core/Print46c/en/data/pdf/PACMCP/PACMCP.pdf
    help.sap.com/saphelp_46c/helpdata/en/fd/45a4f79d6411d189b60000e829fbbd/content.htm
    Thanks
    Yash

  • Hide cost plan

    Hi Experts,
    As per business requirement,
    I need to hide Hierarchy cost plan to all business users and even PM, I can achieve by blocking standard reports, but I hope the cost plan will appear in PPB in cj20n.
    Is there any option to hide cost plan in PPB.
    Thanks

    Hi,
    You can hide the Cost plan in PPB by Field Selection.
    Go to Options > Tab Table Area. In field selection Gantt Chart.Click on Field Selection Gantt Chart Button.
    List will populate you can hide Plan Cost from there.
    Or
    Go to Configuration > Information System > Technical Project Reports > Define Profiles for Displayed fields.
    Define your own Profile and also hide field Cost Plan.
    Same Profile you can select in PPB in Opitons > Tab Table Area
    Regards,
    Nitin

  • T.Code Personnel Cost Planning

    What are the T.Code important for Personnel Cost Planning
    Kind Regards

    Hi Sanew2,
    PCP t-codes:
    PHCPADCO     Post Cost Planning Data to CO
    PHCPADMN     Manage Cost Planning Data
    PHCPCLCO     Display Original Document (Cluster)
    PHCPCLPL     Display Plan Data (Cluster)
    PHCPDCDL     Delete Infotype Data
    PHCPDCEM     Collect Cost Planning Data: Employee
    PHCPDCOO     Collect Cost Planning Data: OrgObj
    PHCPDCPY     Manage Data from Payroll
    PHCPDCUI     Maintain Data Basis
    PHCPDETL     Detailed planning
    PHCPDETLC     Detail Planning Cent.Pers.Respons.
    PHCPISCO     Display Original Documents
    PHCPISCP     Compare Personnel Cost Plans
    PHCPISDT     Display Plan Data Changes
    PHCPISPL     Display Plan Data
    PHCPPRMV     Delete Plan (All Information)
    PHCPPRUN     Execute Planning Run
    PHCPRELS     Release plan
    PHCPSLG1     Application Log Pers. Cost Planning
    Cheers,
    Donnie

  • Executing Personal cost plan run

    Hi ECM Gurus,
    We are to do budgeting through PCP, we have created our own data collection methods to load IT0666 and when we tried to Execute the Planning Run for the Period 01/01/2011 - 12/31/2011 we are expecting the same value to roll up to the org units as in IT0666. But for the New Hires after 01/01/2011 system is prorating the budget value from IT0666 whereas we have already stored prorated value for each employees in IT066.
    Can any one please guide me on how to avoid  the proration during Manage Cost Plan PHCPADMN.
    Thanks.

    All planning data that you generate in a defined period for a specific planning scenario based on a specific data basis.
    A personnel cost plan allows you to define all information that is necessary for generating planning data such as planning scenario, planning period, and data source. By performing cost planning runs you fill the personnel cost plan with data.

  • Change cost planning after copying to different CO version

    Hi,
    I have done network cost planning through project builder, after completing this I copied my cost planning to different CO version. Now I'm not able to change values of second CO version. I can see the figures in reports, but not able to change using CJR2 or CJ40 transactions.
    Thanks

    Hi,
    Full authorization is provided to the user, and the required fiscal year too is configured in second CO version. This is not solved the problem!
    If my understanding is correct, only version 0 can have network costing, all others will have either cost element based or WBS element based cost planning.
    Now, when a network costing is copied to another CO version, the destination version can't hold cost planning in the form of network costing then what type costing second version would be having and how one can modify the value and quantity in that version?
    Thanks