Error in first step of workflow

Hello,
There is an error in the execution of the first task (decision) of our wf: "Impossible to execute object ZBUS2081 method POPUPRESPONSABLE".
Before this happened, we made a change in a table called TWFDB (I have a couple of posts about it, it relates to transaction OAWD), in order to launch the workflow. And it seemed to work, because at least the wf was started.
I would like to know, first, if the source of the problem has to do with this table, and second, what changes should be made to it. The only field we changed was TWFDB-TASK, where we wrote the wf template (WS9000016). By the way, what is the purpose of field TWFDSB-TASK2?
Here is the register that was modified:
MANDT        400       
NCITYPE      ZFIIINVOIC
PRCTP                  
OBJECT       BUS2081   
METHOD       CREATE    
PARAMETER              
ACTIVE       X         
TASK         WS90000016
TASK2        TS00007869
Only TASK was modified. The rest of the fields were left unchanged.
Can somebody provide any hint? I would appreciate it,
Thank you,
Ivson

Make sure you have the following steps in order in your process chain.
1.Start Process Variant.
2.Delete Indexes step.
3.Load data.
4.Create Indexes.
5.Roll up (if required)
6.Compression(if required)
7.Completion job.
8.PSA deletion(if required)
I process chain should allways start with a start Process variant step.
Thanks,
Uma Srinivasa Rao

Similar Messages

  • First Step in Workflow Verification

    Hi,
    I did the workflow configuration by using SWU3 successfully. For initial testing, i did Start Verification Workflow and i got the intial workitme in my SAP inbox. The i selected First step in Workflow Verification in my SAP inbox, but in the next sceen it was not displaying the Use Decision Steps (Immediatley and Later). It was showing blank screen. This is happening for all workflows (selected standard workflows for testing purpose). Initial workitem is displaying in my SAP inbox abd after executing nothing is displaying in the second screen. My understanding is becuase of authorization to execute the work item.
    If any one faces the same problem, please share with me.
    Regards,
    Steve

    Hi,
    Check your container object and see the Decisions are alloted are not?
    Standard Program - It will go to another user. it wont come to you.
    Regards,
    Nandha

  • Error in First step of Process Chain

    Hi everybody,
    i have created a process chain with a start process (direct scheduling) to InfoPackage to load into InfoCube-so delete indexes and generate indexes were automatically inserted becoz of default chain option.
    i have checked the chain-- the message was chain is ok but when i activated the chain it gave a error message job-delete index cannot be scheduled return code-8. In addition to this, i checked the status of indexes and DB statastics at cube level and it's showing green light. Further to that, when i checked sytem log, it is displaying
    "> illegal values in step one....the Job_submit was not defined
    properly..???"
    Any inputs to this topic highly appriciated.
    Thanks and Regards,
    ~Sapins

    Make sure you have the following steps in order in your process chain.
    1.Start Process Variant.
    2.Delete Indexes step.
    3.Load data.
    4.Create Indexes.
    5.Roll up (if required)
    6.Compression(if required)
    7.Completion job.
    8.PSA deletion(if required)
    I process chain should allways start with a start Process variant step.
    Thanks,
    Uma Srinivasa Rao

  • Execution interrupted msg in workflow first step

    Hi all,
    Am getting a Message (in the message text tab) in workflow log (detail section). The very first step of workflow is an activity to "instantiate employee" details. Its been used in mostly all workflows. It was working fine in development. But now in quality, everyone workflow is in "ready" state at first step and in the msg tab, am getting a msg stated : "Execution interrupted". Could anyone tell me what could be the reason for the same?
    Thanks in advance.

    Hi,
       I am slso getting the same error message " Execution Interrupted SWF 611 " while executing standard workflow .
    Kindly guide me to resolve this . What type of customizing should be maintained in SWU3 to overcome this error .
    Thanks and Regards,
    S.Sivakumar

  • Regarding runtime error ehile execution of Mail step in workflow

    Hi all when i execute mail step in workflow i am getting following error-
    SQL error in the database when accesing a table.
    How to correct the error
       Database error text........: "SQL system error. MSGID= Job=038082/DEV05/WP02"
       Internal call code.........: "[RSQL/INSR/ARFCSDATA ]"
       Please check the entries in the system log (Transaction SM21).
       If the error occures in a non-modified SAP program, you may be able to
       find an interim solution in an SAP Note.
       If you have access to SAP Notes, carry out a search with the following
       keywords:
       "DBIF_RSQL_SQL_ERROR" "CX_SY_OPEN_SQL_DB"
       "SAPLARFC" or "LARFCU03"
       "END_TRANSACTION_NONE_LOCAL_UPD"
       If you cannot solve the problem yourself and want to send an error
       notification to SAP, include the following information:
       1. The description of the current problem (short dump)
          To save the description, choose "System->List->Save->Local File
       (Unconverted)".
       2. Corresponding system log
          Display the system log by calling transaction SM21.
          Restrict the time interval to 10 minutes before and five minutes
       after the short dump. Then choose "System->List->Save->Local File
       (Unconverted)".
       3. If the problem occurs in a problem of your own or a modified SAP
       program: The source code of the program
          In the editor, choose "Utilities->More
    Please guide.
    Thanks.

    Hi Sanjay,
    Firstly are you using Send mail Activity or are u calling Fm SO_DOCUMENT_SEND_API1.
    Well  I suppose u are calling the FM, in that case just check the data that you are fetching before calling this FM. This error is related to sql query so check your select statements used before sending mail.
    Hope this helps.

  • Workflows error on any step using a rule but then re-start ok via SWPR

    Hi all,
    I have transported some workflows from SAP 4.6C (where they work ok) to SAP ECC 6.0 where I'm having the following problem -
    All the workflows go into error at the first step they encounter which uses a rule in the agent assignment.
    The workflows can all be restarted and complete successfully when they are re-started via SWPR.
    Any suggestions on how to fix this ?
    Thanks
      John

    The error message from the workflow log is ...
    <b>Message Text         Error when processing node '0000000017' (ParForEach index 000000)
    Exception            8987]
    </b>
    The problem only occurs when I create the object (e.g. invoice) under a particular username. I was always re-starting via SWPR under another username which completed the workflow successfully so I think the problem is just to do with authorisations.  I will look into this some more.
    Thanks anyway
    - John

  • Workflow stuck at the very first step

    Hi,
    The workflow is started and its stuck at the first step
    this is the very first workflow created in the client
    are there any standard background jobs that should be started for the workflow to proceed ?
    thank you

    hi,
    as venugopal suggested, check whether the event was triggered and then check whether the WF has actually started or not. you can check this using transaction SWEL or SWI1.
    if the event was triggered but WF hasnt started then you might not have activated the event linkage. this can be done in the "basic data" of the WF in the "start events" tab.
    Since you have mentioned that "The workflow is started and its stuck at the first step", probably the WF has started.
    can you specify the error message that you are getting?
    what is the fisrt step in your WF?
    give some details.

  • Workflow error in fork step, process control, wait event

    I am using fork step in workflow which has 2 parallel branches. In 1st branch i have a user decision step followed by a task for posting PO document in case of approval. In the 2nd branch of fork step I have a wait step to wait for an event followed by the same task for posting document with a process control step after that in the end to cancel the workitem(workitem generated by user decision step in the 1st branch of fork). I created the event by using a custom BOR object.
    After the fork step is triggered, i have both a wait event running and workitem generated. When i raise the wait event from SWUE by entering the event, object key etc it works fine i.e., the workitem in the other branch is set of logically deleted and workflow ends.
    But if the wait event is triggered from the program i.e., using FM SWW_WI_CREATE_VIA_EVENT, both get an error message in workflow log(SWIA). The message is: Error when executing the binding between work item 000000XXXXXX and flow item 000000XXXXXX where workitem number is the workitem id of the posting document task and flow item id is the workflow parent id

    hi,
    message is self explanatory.
    Activate the event trace SWELS, then do the event with SWUE and within your program (als please use SAP_WAPI function modules).
    Now compare the 2 events in SWEL to see what the differences are .
    Kind regards, Rob Dielemans

  • Workflow Error In Foreground Step?

    Hi all,
    I have developed workflow in which i am using ZCASH  BOR object to trigger the WF.
    i have used it in WF and Its working fine.but now i want to rename the ZCASH to ZABC.
    I have done it but the problem is in foreground step and in the method with Dialog.
    I have one task(foreground) in which i am calling that dialog method ZDISPLAY of new BOR ZABC.
    When i triggered the WF rest of the background steps are working fine.
    the problem is WF goes to error at ZDISPLAY step.It is showing in log that
    ZCASH->ZDISPLAY method is not defined.
    but there is no ref to old BOR object ZCASH.
    I have checked binding also.it fine.
    Thanks,
    Arpita

    Thanks........
    I have tried this in test wf its working fine..
    Is this because of this is a foreground task?because all other background steps are working fine.
    the workflow generates a Wi and whenever agebt tries to execute the WI it throws an error.
    Thanks.
    Arpita

  • Processing workflow reject on first step

    Hi all,
    May i know how to process reject code when workflow reject happens on the very first step.
    I understood that if happens on the second step, we should process the reject code on the entry event of the first step, but may i know how it happens on the first step?
    thanks

    Review/Edit Revision, or Review/New Revision types of workflow steps provides an option, but not necessity to modify the content (the current, or a new revision). Therefore, yes, it is possible to have a Review/Edit Revision step with zero reviewers. It will forward processing the next step (note that you could define Entry, Update, or Exit event scripts for this step, so a "zero reviewers" step can serve as a fork).
    On the other hand, it is not possible to jump to a Review step after rejection. From whatever reason it follows the design that rejection expects the content item to be changed, which cannot be done in a Review step. Another (IMHO illogical) design aspect of REJECT is that it does not execute the Exit event.
    Having asked the first question, yes, you could place an arbitrary zero reviewers Review/Edit Revision step in front of a Review step to achieve that REJECT returns to the Review step (it will return the the Review/Edit Revision, but follow immediately to Review).

  • During receipt validation; the first step ie, adding the files generated by asn1c tool causes errors.. especially with the

    During receipt validation; the first step ie, adding the files generated by asn1c tool causes errors.. especially with the #include statements
    --No such directory or file..
    Why this is happening??

    I am adding one more thing..
    Do we need to mention any linkage or frameworks or such while we are adding a .c file to
    Cocoa Mac OS Project

  • Workflow Error Message: System Account - The Workflow could not set Content Approval Status

    This is the first time I try an approval workflow. I am using a template in MS Word and assigned an approval workflow to it. The approval workflow is only going to one person in this case.
    When I start the work flow the following 3 error messages show up:
    Workflow Error Message: System Account - The Workflow could not set Content Approval Status. Enable content moderation for this list and run the workflow again.
    Workflow Error Message: System Account - The e-mail message cannot be sent. Make sure the e-mail has a valid recipient.
    Workflow Error Message: System Account - The e-mail message cannot be sent. Make sure the outgoing e-mail settings for the server are configured correctly.
    Thank you for your kind guidance.

    Hi,
    For the first error: Did you set Content Approval in the workflow?  If so, see if you have it in the versioning settings of the list settings.
    For the second error: double check your recipient is set up as being valid.  Did you type in the email address or is it referring to a people picker field?  also, make sure that in the workflow for the email that you actually populated it in the
    To: field.
    for the third error: I suspect that either your farm is not configured for email.  Or, this error is a knock on from the second error.  If you get the second error rectified it may clear this error.  If not then double check the email settings
    for your farm.
    Johnathan Lightfoot

  • Error in transformation step

    Hi all,
    In my requirement i have a BPM with the following steps
    start->Rx->Send<>Tranform>Send->end
    first send step is synchronous and it is sending req to a website and receiving response through http receiver channel.
    second send step is asynchronous , sending response received from website to a file server through file receiver channel.
    i have a transformation step ,where i am doing transformation between the structure in receive step and the structure in second send step,
    can i do that?
    can we do transformation between any async abstract structures that we define for BPM?
    BPM is showing error in transformation step, i dont know whats the error is and how to see the error and rectify the problem
    plz help
    regards
    jhansi

    <b>-Check the Transformation Step in BPM, weather it has correct source and target abstract interfaces or not.
    - Check the Message Mapping and interface Mapping manually from the Test Tab in IR.
    -Check the status of the Error of BPM in SXI_CACHEIntegration ProcessyourBPM. Code should be 0..if something else it is showming means it has an Error.
    -Check the Test data you are using to test your interface.
    - Check Webservice sending the correct response or it is failing at the time of response..may be because of WS is not running properly or server is down.</b>
    Thanks
    Farooq.

  • Calling Transaction through User Decision step in workflow

    Hi all,
    Pls help me calling a transaction through User Decision step in workflow. I have attached two buttons to my User decision and the one of the outcomes to a task where I am calling the transaction through a method of BOR. But the problem is I am unable to see the transaction when I press the button on my User Decision at test run.
    Can you ppl let me know how can I achieve this?
    Pls reply ASAP...
    Thanks
    Sangharsh

    Hello Sangharsh ,
    Please Check the paramater of of the method which you define.
    e.g. I define CALL_TCODE_CJ03 method
          which have the parameters FLAG,ProjectDefinition,WBSElement2,User
          with export, import checkbox.            
    Pass the paratmeres in programs
    e.g.
    BEGIN_METHOD CALL_TCODE_CJ03 CHANGING CONTAINER.                      
    DATA:                                                          
          FLAG(1),                                                        
          PROJECTDEFINITION TYPE PROJ-PSPID,                              
          WBSELEMENT2 TYPE PRPS-POSID,                                    
          USER TYPE USR21-BNAME.                                                                               
    SWC_GET_ELEMENT CONTAINER 'FLAG' FLAG.                              
      SWC_GET_ELEMENT CONTAINER 'ProjectDefinition' PROJECTDEFINITION.    
      SWC_GET_ELEMENT CONTAINER 'WBSElement2' WBSELEMENT2.                
      SWC_GET_ELEMENT CONTAINER 'User' USER.                                                                               
    GET PARAMETER ID 'PSP' FIELD PROJECTDEFINITION.                       
      GET PARAMETER ID 'PRO' FIELD WBSELEMENT2.                                                                               
    SET PARAMETER ID 'PSP' FIELD PROJECTDEFINITION.                       
      SET PARAMETER ID 'PRO' FIELD WBSELEMENT2.                             
      CALL TRANSACTION 'CJ03' AND SKIP FIRST SCREEN.                                                                               
    SWC_SET_ELEMENT CONTAINER 'FLAG' FLAG.                              
      SWC_SET_ELEMENT CONTAINER 'ProjectDefinition' PROJECTDEFINITION.    
      SWC_SET_ELEMENT CONTAINER 'WBSElement2' WBSELEMENT2.    SWC_SET_ELEMENT CONTAINER 'User' USER. 
    END_METHOD.
    I hope it will help you.
    ***Assigning points is the way to say thanks in SDN.***
    Minaxi Shah

  • Error in Fork Step causing issue in generating next work items

    All,
    We have ECC 6.0 with the following SP:
    SAP_BASIS     700     0012     SAPKB70012     SAP Basis Component
    SAP_ABA                     700     0012     SAPKA70012     Cross-Application Component
    I have this strange issue. In one of my custom workflows, i am using a Fork step with 02/ 02 necessary outcomes. In branch 1, i am sending a mail to a user's e-mail id. In branch 2, i have 3 activity steps for another user. Step 1 is to display an invoice and step 2 is a user decision to apprve/deny this invoice.
    I know that during runtime, at the Fork step, the work item for branch 1 and the 1st work item for activity step 1 in branch 2 get generated almost simultaneously(though with some small time difference). This is OK. But the issue is, when the sendmail in branch 1 errors out due to some error, and when step 1 is finished successfully by another user, the work item for 2nd activity step in branch 2 is not getting created.
    As i understand, in the Fork, the 2 branches, execution should be independent of each other, that means, the work item creation and execution of branch 1 and 3 steps in branch 2 should be happening independently. But, this doesn't seem to be the case.
    I understand when the sendmail in branch failed, the wflow is set to 'Error' Status.But there is already an open workitem for step 1 of branch 2. When this workitem is completed successfully, I expect the work item for 2nd step should get generated.But this is not happening. But, when i restart the whole workflow using SWPR, it generates the witem for 2nd step in branch 2. And still the wflow is in 'Error' status.
    When the user finishes the 2nd workitem of branch 2, the next work item for 3rd step is not getting generated. Instead i needed to restart the whole wflow again and this time, it generated the 3rd witem in ranch 2.
    To my understanding, when a Fork is there, if i specify 02/02 outcomes necessary, these 2 branches should go in parallel, both creation and execution of workitems, until they are joined. And at this point, if the whole Fork step is successful, then workflow will proceed further with steps below the Fork. Shouldn't this be the case ?
    Anybody had similar issue? Pl share your thoughts on this. I'd really appreciate if somebody can clarify whats going on in the above case and how to fix this.
    Thank you in advance
    Regards,
    venu
    Edited by: Venugopal Jogi on Jun 10, 2009 5:58 PM

    Hi Arghadip,
    Thanks for your reply. You said
    "When a Workflow goes into error the processing should stop whether it is in same branch or in different.".
    If this is correct, then as i explained earlier, when i restart the workflow without fixing the errored branch, then also, the next work item should not be created..Right ? But, it is. I didn't fix the errored branch but simply restarted the workflow. Then it created the witem for 2nd step, in the branch 2 that is not errored.
    How can this be, the branch 1 is still in ERROR status only. So, can you pl clarify if something else might be going on here.
    Also, fixing the issue is fine. But, the SendMail step in branch 1 is just an information only and per business requirement, this should not be holding up the approval process. And if we don't process the invoice in time, just because of some informational mail errored out, this will not be a feasible solution to the client,Right ? That's the whole reason i am using Fork step, so that they both proceed parallelly (independently).
    If step 1 is a pre-requisite for step 2, then it makes sense to fix error in step 1 so that we can proceed with step 2.
    Any other thoughts on this.....
    Regards,
    venu

Maybe you are looking for

  • How to initialize the setup table for GTMuFF08Global Trade ManagementuFF09?

    hi experts, I can find the datasource of GTM like 2LIS_46_SCL, 2LIS_46_ITM with rsa6. But when I use rsa3 to do test it, nothing found. I try to initialize the setup table, but I can not find it under SBIW. Please help me, many thanks.  Brgds/steve

  • Variant Help

    Dear BW fans, we are trying to write an ABAP program which should have a variant with two variable - one to input a cube name and the other to switch the data source from sem-bps mode to bw mode. How should we write the select-options statement and h

  • Table Cell Editor - Link To Action UI

    Hi, I have a Table UI element in the first view and i need that the first column should have Link To Action UI as the cell editor. For this the requirment is that Context Attribute Type should be Boolean. please let me know why this is so. Also i wan

  • Serious WiFi issue (Consistently dropping signal)

    Hello All, Thank you for hearing my issue and possibly offering suggestions. I have a 27inch iMac that is about 2 years old, and recently as I am browsing the web my internet stops working. I have tried re-setting my router, my modem, etc. Nothing wo

  • Refund for inadvertant purchase of App

    My autistic son downloaded a Sygic navigation app for the iPAD. He chose it on the back of another purchase and confirmation was not requested. He is a 7yo and we have no use for the application. Please authorise refund.  Thank you