Extend task list for new planning plant

Hi Gurus,
I have 40 task lists for a planning plant 1000. I want to extend them for a new planning plant 2000. Is there any method to do it without usnig BDC or LSMW?
Regards,
VM

Hello VM,
No it is not possible to simply extend the Task list.
You can copy the same for different planning plant. But if it is not so much necessary, Make other as Maintenance Plant rather than Planning plant.
Regards
Naveen

Similar Messages

  • Plant Maintenance - Linkage between Task List and Maintenance Plan

    Sir,
    In Plant Maintenance, I have an equipment for which there are 9 maintenance activities that have to be performed every year. Out of these 4 activities will be carried out every month. 1 activity will be carried out during the months of February, June and October. 5 activities will be carried out only in the month of December.
    I need to create Task List for all these activities and subsequently create Maintenance Plans for all these Task Lists.
    Can I group all the 4 activites which will be carried out every month into one single Task List, with separate operation nos and time against each activity?. I don't know whether it is correct or not.
    If I use the above method I can create 3 Task Lists for this particular equipment with same Group no and 3 Group Counters.
    How to create Maintenance Plan for the above scenario?.
    Eventhough, 4 activites are carried out every month and they have been grouped into a single Task List (Group counter 1) and if these activites are carried out on different dates within a month how can I create Maintenance Plan and subsequently create a Maintenance Order?.
    I need some help in this regard. A detailed reply will be helpful.
    Can anyone throw some light in this regard.
    Regards,
    R. Vijayakumar

    you need to create one task list with a maintenance strategy with packages and hierarchy to outline the work requirements i.e. some tasks to be carried out 3 monthly some 4 monthly etc, and also if common tasks appear in 3 monthly package vs 4 monthly package then to suppress the duplicating task
    you would then define a strategy based maintenance plan and run it to get the respective maintenance orders

  • No valid task list for material ""  plant "" for selection criteria

    I am getting the following error while creating a production order:
    No valid task list for material ""  plant "" for selection criteria
    Does anyone know how to fix this?
    thanks,
    Scott

    Dear,
    1. Check in Order type dependent parameter - OPL8, select your Plant & Order type. In this check the task list, it should be N. then selection priority in OPJF settings
    2. Chek the routing valid from date for this material by CA02. The production order start date must be between valid date.
    3)Kindly check the routing header.Whether it is for usage 1 and Release status '4'
    4) Task list we maintain in OP8B please check and come back.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 19, 2008 9:57 AM

  • Change Request Management  "There is no task list for this project"

    Hello!
    I would like to use the functionality of CharM in SOLMAN 4.0.
    When I enter the Tcode /n/tmwflow/proj I receive the waring/error "There is no task list for this project" (/TMWFLOW/TRACK_N114)
    If I create my own task list via Task list --> create
    I get the warning "You cannot change task lists in the SAP namespace"
    What are the steps to define task list for my project?
    Do I need to configure SPRO ... --> Extended Configuration --> Schedule Manager?
    The second warning I get: "NO CTS projects created yet" or
    "The Solution Manager project does not have an active CTS project yet".
    How can these warnings/errors be corrected?
    Thank you very much!
    regards

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

  • Common task list for cliant lavel

    Dear all,
    In my case we have 20 nos of plants in our group . but we want to make one common  general task list for all group .
    so any body suggest me how can be done .
    Raghav

    Hello,
    Please refer the thread [General tasklist across all plants.;
    Regards,
    Rakesh

  • Task List - Create New Form for Subtasks

    Hi, Is this possible to create a new form for SubTasks in SharePoint 2013 task List
    probably using Infopath. Out of Box, Sharepoint opens datasheet view to add the subtask for a main task. just want to know whether it is possible.
    Any help will be highly appreciated
    Ram Sharma

    Hi Ram,
    Per my understanding, you want to create a New Form for creating sub tasks.
    By default, the subtasks can only be created in the datasheet view, which means that there are some fields of a task cannot be filled in when subtask created, what’s
    more, there is no OOTB feature can meet this requirement.
    Actually, a subtask is also a normal task, the difference is that it can be connected with the parent task through a property “ParentID”. Let’s say if there is a task
    with “ID” 1, then the “ParentID” of its subtasks will be “1;#1”.
    Thus, as a workaround, you can create a custom New Form page with the extra “ParentID” field to be filled in. After submitting, a new task will be created, because
    the “ParentID” has a value which points to another task, this new task will be a subtask now. This can be done with Client Object Model programmatically.
    About how to work with Client Object Model:
    JavaScript Client Object Model
    http://msdn.microsoft.com/en-us/library/office/hh185006(v=office.14).aspx
    More information about JavaScript Client Object Model:
    How to: Create, Update, and Delete List Items Using JavaScript
    http://msdn.microsoft.com/en-us/library/office/hh185011(v=office.14).aspx  
    Common Programming Tasks in the JavaScript Object Model
    http://msdn.microsoft.com/en-us/library/office/hh185015(v=office.14).aspx
    Best regards
    Patrick Liang
    TechNet Community Support

  • Task List for RCA

    Hi Experts: I stuck into some issues while installation of the SolMan and configuring the RCA.
    I like to start fresh with the installation- We are installing SolMan EHP SP 20 and Oracle- I am using the instalaltion guide in the service market place. But I am looking for step by step task list in sequence. And any lesson learnt while implementing will be help.
    Can you pls provide me with Steps for Installation and Configuration of RCA functionality- which includes all the Java and ABAP stack monitoring which includes- Trace, Workload, DB Cokpit, Host Analysis etc . We plan to install the Willy and BMC Appsight.
    Appreciate your help.
    Regards
    Bob C

    Bob,
    Here is my experience in config RCA.
    Read all documents from [http://service.sap.com/diagnostics]
    Install Solman with latest SPs available.
    Finish basic post install activities as per installation guide.
    Run T-Code "SOLMAN_SETUP" and go through each step.
    Install Wily Introscope Enterprise Manager.
    Assign proper security roles to RCA Work center
    deploy Introscope Agents.
    create Autoprobe
    Configure E2E RCA scenerio
    - Digesh

  • Task list usage inspection plan - Universal 3 and GR 5

    Dear Friends,
    while creating Inspection plan for GR inspection from Procurment it is advisable to use Task list usage 5 or usage 3 which is universal
    may i know what is the difference
    Please advise also
    There is task list type  Goods receipt model  -    501  which  is Material, vendor and manufacturer what that mean and where it  is used
    Thanks & Regards
    Raj

    Hi Rajkumar,
    While planning an Inspection,which Task List gets assigned to which Inspection Lot is linked through combination of TaskList Usage and Lot Inspection Type
    In spro (at the location as suggested above) we assign TaskList usage to the Inspection Type. When any Lot is created based on the setting in QM view of MM, it looks for this link for automatic assignment to the lot.
    For your question "while creating Inspection plan for GR inspection from Procurment it is advisable to use Task list usage 5 or usage 3 which is universal"; both options will work as long as the above config in spro is maintained.
    It is however advisable to use the standard option of TaskList Usage of  05 as it is easier to segregate and analyse TaskList / Inspection Plans based on their usage; in case any need arises.
    Hope this helps,
    Thanks,
    RKM.

  • FR reports not working for new planning application

    Situation:
    Hyperion 9.2.0
    New planning application created and also registered to share services. One existing group have role assigned as 'Interactive User' and not able to perform operations on workspace (FR), FR Studio and Smart view. (Note: Admin can perform such activities and there is no error.)
    Key user receiving mention below messages while accessing FR report from workspace and using FR studio for particular report related to only new application. The existing FR reports on different planning application working fine working fine from workspace and FR studio. Here are the errors:
    *Workspace Error [Only for new application report]*
    [Wed Aug 24 15:04:35 2011]Local////Error(1051440) Analytical Services user [abcd] Authentication Fails against the Shared Services Server with Error [Failed to authenticate user abcd against provider Native Directory]
    *FR Studio [Only for new application report]*
    Error connecting to database connection XYZ: [Wed Aug 24 15:08:50 2011]<Server Name///abcd/Error(1051025) User abcd is not permitted to access application XYZ
    Smart View Error (Only for new application connection)
    Cannot open cube view. OLAP Error (1051025): User abcd is not permitted to access application XYZ.
    Analysis
    While looking Essbase, I identified that under security (User/Groups), group that have access as interactive user is not listed. Only I can see the groups that have admin roles. However I can see all other planning application successfully displayed groups associated to particular question.
    Please help to resolve the issue. I am new to this concept, so the detailed level description will help me lot
    Thanks
    Edited by: user10070515 on Aug 25, 2011 4:25 AM

    Hi
    Thanks For the replies.
    After the data is copied into the layout. User is changing the values of few key figures and saving. A new line item is created in the cube with the new values.
    Ex
    Cust ....qty.....Value....Revenue
    c100....10........100.....1000
    Changing the value in layout
    Cust ....qty.....Value....Revenue
    c100....10........150.....1000
    After saving in the cube
    Cust ....qty.....Value....Revenue
    c100....10........100.....1000
    c100....0........50..........0
    When the user execute the report revenue is not populating correctly. And i was expecing 150 *10 = 1500. I understood the issue. Can anyone tell me how can i achieve without updating the quantity how can i get this?
    Thanks
    Annie

  • Separate panel or task list for mimized and not-minimized windows

    I am using OpenBox and I am looking into how to have two task lists (or panels), one with minimized windows and second with non-minimized windows. xfce-panel can show only minimized windows, but cannot show only non-minimized windows.
    Is there any panel/task list which can do this?

    xpixelz wrote:All what I found right now is that you may set properties on windows you don't want to show up in taskbar playing a little with "wmctrl -r yourapp -b toggle,skip_taskbar" and "-b toggle,skip_pager".
    wmctrl -r :ACTIVE: -b toggle,skip_taskbar is interesting possibility. I can use wmctrl to apply skip_taskbar to do custom "archive" command - minimize and apply skip_taskbar. But only way how to list such a "archived" windows and possible unminimize + remove skip_taskbar would be custom Openbox pipe menu. It is a way, but I was hoping for simpler one.
    Last edited by stabele (2012-12-31 13:43:23)

  • Need Task list for starting a Rosettanet.

    Hi,
    Please let me know what are the intial steps to be done for setting up the  XI and RNIF systems from XI point of view. Please  reply with the task list.
    Thanks & Regards,
    Pragathi.

    Hi,
    1)First you need to identify which Rosettanet PIP messages your are going to use,identify and download the PIP messages from rosettanet org,already different version dtds available ,download the DTDs with version what you looking for.
    2)Identify the who is the receiver , how to transform thsi structure in tro receiver format,you already have any standas receiver formats use it like IDocs(id your receiver is SAP ).
    3)Thenu use Rosettanet adapter to read the message.
    remaining steps all are same,refer any sample scenario,you wil understand.
    Regards,
    Raj

  • Task list in hyperion planning dataforms 11.1.2 version

    Hi,
    I created a task list using administrator account and assigned these task list to user1. I mention a due date and alerts also. Here user1 have appropriate roles to access the dataform and to finish the task also.
    Now the issue is, when user1 finished and put the status as completed. But in admin user, those tasks status is showing as Incomplete.
    How admin will get that updated status as completed in task list.
    Regards,
    Madhu

    Hi David Mendele,
    Thanks for the reply.
    ya as u said i looked into report. but there also am getting status as incomplete using admin user.
    First of all i will explain u clearly about this issue.
    using admin account i created two task lists and assigned these tasks to user1. for example salary account and salary details ok.
    Now i login as user1 and put those task lists status as completed ok.
    Then now i login as admin and checked out those Task lists. In this scenario, am not getting those task lists(*salary account* and salary details) status as completed.
    It is still showing that status as Incomplete only which is already finished by user1 ok.
    Now, how can i get those assigned task lists status as completed automatically using admin user.
    I hope u understand about the issue.
    Regards,
    Madhu
    Edited by: 895234 on Nov 30, 2011 8:01 AM

  • Is there a way to change default Reminder List for new Reminders?

    In iCal, I have Reminders showing.  I have three Reminder Lists, but I've only got one List checked so only that List's Reminders show up.  When I create a new Reminder, iCal always wants to create it in one of the unchecked Lists - always the same List, but not the one currently showing.  I always have to finish creating the new Reminder, and then change it to be part of the other Reminder List.  And, because iCal insists on creating the new Reminder in one of the unchecked (non-displayed) Lists, it checks the box for me so now I have to go an uncheck it again to restore the display of only one List.
    Am I doing something wrong or is iCal Reminder creation just this clunky?
    Is there some way to tell iCal to use a particular Reminder List for creating new Reminders in?

    Duh.  Found it right on the General tab of iCal's Preferences.
    I really don't know how I missed that.

  • Not able to create a Task List for Charm Retrofit

    Hi All,
    we are trying to implement retrofit for our client. Created two projects one for implementation and one id maintenance and defined the system landscape for both.
    I have checked the RFC connection for all the systems involved and all works fine. IMG projects are created successfully for both.
    Problem comes when we are creating a maintanance cycle or task list after activating the change request management. We always get a logon screen after giving the name of task list and press ok. First we thought it could be the trusted RFC issue but trusted RFC for the current user is working fine.
    Could anyone know what is the problem and if you faced the same issue pls share your experience what all did you try to rectify it.
    Thanks
    Tripti

    Hi,
    BC sets are active. I have already checked, it ended up in warning but its general we can avoid it. One thing which we found out was thi error when I am checking the application log for the project
    System cancel RFC destination SM_GTDCLNT020_TMW, Call TMW_SET_PROJECT_SWITCHES: No authorization to change file /usr/sap/gttrans/a ctlog/GTDZP000XX.GTD
    I don't understand what exactly is this error about but informed the authorization team regarding this.
    Any idea?
    Thanks,
    Tripti

  • Need to restrict Tasks to come to Task list for Leave Request approval.

    Hi all,
    Can anybody guide me to resticting  the Task to come to Tak list For the Leave RequestApproval.
    As soon as we create a Leave Request  a task is generated and it is visible in task list.
    Here the requiremnet is the task which are generated for this LEave Request functionality should not  be seen in the task list.
    I have removed the task from UWL Configuration in XML code.
    Thanks and Regards,
    Anand

    Hi all,
    Can anybody guide me to resticting  the Task to come to Tak list For the Leave RequestApproval.
    As soon as we create a Leave Request  a task is generated and it is visible in task list.
    Here the requiremnet is the task which are generated for this LEave Request functionality should not  be seen in the task list.
    I have removed the task from UWL Configuration in XML code.
    Thanks and Regards,
    Anand