Task list in hyperion planning dataforms 11.1.2 version

Hi,
I created a task list using administrator account and assigned these task list to user1. I mention a due date and alerts also. Here user1 have appropriate roles to access the dataform and to finish the task also.
Now the issue is, when user1 finished and put the status as completed. But in admin user, those tasks status is showing as Incomplete.
How admin will get that updated status as completed in task list.
Regards,
Madhu

Hi David Mendele,
Thanks for the reply.
ya as u said i looked into report. but there also am getting status as incomplete using admin user.
First of all i will explain u clearly about this issue.
using admin account i created two task lists and assigned these tasks to user1. for example salary account and salary details ok.
Now i login as user1 and put those task lists status as completed ok.
Then now i login as admin and checked out those Task lists. In this scenario, am not getting those task lists(*salary account* and salary details) status as completed.
It is still showing that status as Incomplete only which is already finished by user1 ok.
Now, how can i get those assigned task lists status as completed automatically using admin user.
I hope u understand about the issue.
Regards,
Madhu
Edited by: 895234 on Nov 30, 2011 8:01 AM

Similar Messages

  • Extend task list for new planning plant

    Hi Gurus,
    I have 40 task lists for a planning plant 1000. I want to extend them for a new planning plant 2000. Is there any method to do it without usnig BDC or LSMW?
    Regards,
    VM

    Hello VM,
    No it is not possible to simply extend the Task list.
    You can copy the same for different planning plant. But if it is not so much necessary, Make other as Maintenance Plant rather than Planning plant.
    Regards
    Naveen

  • Plant Maintenance - Linkage between Task List and Maintenance Plan

    Sir,
    In Plant Maintenance, I have an equipment for which there are 9 maintenance activities that have to be performed every year. Out of these 4 activities will be carried out every month. 1 activity will be carried out during the months of February, June and October. 5 activities will be carried out only in the month of December.
    I need to create Task List for all these activities and subsequently create Maintenance Plans for all these Task Lists.
    Can I group all the 4 activites which will be carried out every month into one single Task List, with separate operation nos and time against each activity?. I don't know whether it is correct or not.
    If I use the above method I can create 3 Task Lists for this particular equipment with same Group no and 3 Group Counters.
    How to create Maintenance Plan for the above scenario?.
    Eventhough, 4 activites are carried out every month and they have been grouped into a single Task List (Group counter 1) and if these activites are carried out on different dates within a month how can I create Maintenance Plan and subsequently create a Maintenance Order?.
    I need some help in this regard. A detailed reply will be helpful.
    Can anyone throw some light in this regard.
    Regards,
    R. Vijayakumar

    you need to create one task list with a maintenance strategy with packages and hierarchy to outline the work requirements i.e. some tasks to be carried out 3 monthly some 4 monthly etc, and also if common tasks appear in 3 monthly package vs 4 monthly package then to suppress the duplicating task
    you would then define a strategy based maintenance plan and run it to get the respective maintenance orders

  • Task list usage inspection plan - Universal 3 and GR 5

    Dear Friends,
    while creating Inspection plan for GR inspection from Procurment it is advisable to use Task list usage 5 or usage 3 which is universal
    may i know what is the difference
    Please advise also
    There is task list type  Goods receipt model  -    501  which  is Material, vendor and manufacturer what that mean and where it  is used
    Thanks & Regards
    Raj

    Hi Rajkumar,
    While planning an Inspection,which Task List gets assigned to which Inspection Lot is linked through combination of TaskList Usage and Lot Inspection Type
    In spro (at the location as suggested above) we assign TaskList usage to the Inspection Type. When any Lot is created based on the setting in QM view of MM, it looks for this link for automatic assignment to the lot.
    For your question "while creating Inspection plan for GR inspection from Procurment it is advisable to use Task list usage 5 or usage 3 which is universal"; both options will work as long as the above config in spro is maintained.
    It is however advisable to use the standard option of TaskList Usage of  05 as it is easier to segregate and analyse TaskList / Inspection Plans based on their usage; in case any need arises.
    Hope this helps,
    Thanks,
    RKM.

  • Loading Smart List to Hyperion Planning 11.1.2.0

    Hi !! I am new to Hyperion Planning. I need to upload the SmartList into Hyperion Planning using Outline load utility. Could you please show me the steps.
    I just need some sample metadata may be two or three line of metadata that will give me idea to generate our metadata file..
    I have created outline utility syntex .. .please guide me....
    any help from you would really appreciated...

    Dear John
    Please help to load the smartlist, I am getting the following error.
    Successfully located and opened input file "d:\smartlist_create1.csv".
    Header record fields: SmartList Name, Operation, Label, Display Order, Missing Label, Data Form Setting, Entry ID, Entry Name, Entry Label
    Located and using "HSP_SMARTLISTS" dimension for loading data in "acpt" application.
    Parent-child ordering option (/H switch) will not be performed: this option is not available for the "HSP_SMARTLISTS" dimension.
    Input file member load ordering option (/O switch) will not be performed: this option is not available for the "HSP_SMARTLISTS" dimension.
    Unable to obtain dimension information and/or perform a data load: Unrecognized column header value(s), refer to previous messages. (Note: column header values are case sensitive.)
    Examine the Essbase log files for status if Essbase data was loaded.
    Planning Outline data store load process finished with exceptions: not all input records were read due to errors (or an empty input file). 0 data records were read, 0 data records were processed, 0 were successfully loaded, 0 were rejected.
    Unrecognized column header value "Data Form Setting".
    Unable to obtain dimension information and/or perform a data load: Unrecognized column header value(s), refer to previous messages. (Note: column header values are case sensitive.)
    Planning Outline data store load process finished with exceptions: not all input records were read due to errors (or an empty input file). 0 data records were read, 0 data records were processed, 0 were successfully loaded, 0 were rejected.
    I have used the same structure as provided in your earlier thread.
    OutlineLoad /A:acpt /U:admin /M /I:d:/smartlist_create1.csv /DS:HSP_SMARTLISTS /L:c:/OutlineLogs/outlineLoad.log /X:c:/OutlineLogs/outlineLoad.exc
    SmartList Name, Operation, Label, Display Order, Missing Label, Data Form Setting, Entry ID, Entry Name, Entry Label
    SL1,addsmartlist,SL1Label,,,,,,
    SL1,addEntry,,,,,,entry1,entrylabel1
    SL1,addEntry,,,,,,entry2,entrylabel2
    PLEASE HELP.
    Regards
    Sim
    Edited by: SimT on May 14, 2012 7:22 PM

  • Error while starting Hyperion Planning Web in 9.2 version

    Hi,
    When I am launching Hyperion Planning web it is giving the following error:
    HTTP Status 500 -
    type Exception report
    message
    description The server encountered an internal error () that prevented it from fulfilling this request.
    exception
    javax.servlet.ServletException
         org.apache.jasper.runtime.PageContextImpl.doHandlePageException(PageContextImpl.java:825)
         org.apache.jasper.runtime.PageContextImpl.handlePageException(PageContextImpl.java:758)
         org.apache.jsp.LogOn_jsp._jspService(LogOn_jsp.java:2763)
         org.apache.jasper.runtime.HttpJspBase.service(HttpJspBase.java:94)
         javax.servlet.http.HttpServlet.service(HttpServlet.java:802)
         org.apache.jasper.servlet.JspServletWrapper.service(JspServletWrapper.java:324)
         org.apache.jasper.servlet.JspServlet.serviceJspFile(JspServlet.java:292)
         org.apache.jasper.servlet.JspServlet.service(JspServlet.java:236)
         javax.servlet.http.HttpServlet.service(HttpServlet.java:802)
    root cause
    java.lang.NoClassDefFoundError
         org.apache.jsp.LogOn_jsp._jspService(LogOn_jsp.java:81)
         org.apache.jasper.runtime.HttpJspBase.service(HttpJspBase.java:94)
         javax.servlet.http.HttpServlet.service(HttpServlet.java:802)
         org.apache.jasper.servlet.JspServletWrapper.service(JspServletWrapper.java:324)
         org.apache.jasper.servlet.JspServlet.serviceJspFile(JspServlet.java:292)
         org.apache.jasper.servlet.JspServlet.service(JspServlet.java:236)
         javax.servlet.http.HttpServlet.service(HttpServlet.java:802)
    note The full stack trace of the root cause is available in the Apache Tomcat/5.0.28 logs.
    After going throgh Google search i came to know that it problem with Tomcat CLASS PATH.
    I checked C:\Hyperion\HyperionPlanning\AppServer\InstalledApps\Tomcat\5.0.28\HyperionPlanning\bin\startHyperionPlanning.bat.
    It says
    " REM Hyperion Workspace startup script for tomcat server
    REM Check HYPERION_HOME
    if "%HYPERION_HOME%" == "" set HYPERION_HOME=C:\Hyperion
    SET CATALINA_HOME=%HYPERION_HOME%\common\appServers\Tomcat\5.0.28
    SET CATALINA_BASE=C:\Hyperion\HyperionPlanning\AppServer\InstalledApps\Tomcat\5.0.28\HyperionPlanning
    CALL %CATALINA_BASE%\bin\setSAPEnv.bat
    CALL %HYPERION_HOME%\common\config\setJAVA_HOME.bat
    REM Setting custom parameters
    SET SETPARAM_SCRIPTNAME="%CATALINA_BASE%\bin\setCustomParams.bat"
    if exist %SETPARAM_SCRIPTNAME% (
    call %SETPARAM_SCRIPTNAME%
    call "%HYPERION_HOME%\common\appServers\Tomcat\5.0.28\bin\startup.bat"
    I checked my environment variables every thing is fine.
    Where should i set the Tomcat class path to web client. or
    it is due to another reason, if so what could be the solution.
    Thanks in advacnce

    Hello,
    JohnGoodwin is correct you will need to create a Planning application and also generate your HspJSHome.properties and make sure it is in the right location to be picked up by the start up which should be something like:
    C:\Hyperion\HyperionPlanning\AppServer\InstalledApps\Tomcat\5.0.28\HyperionPlanning\webapps\HyperionPlanning\WEB-INF\classes
    Also if you are starting the JVM as a service it might not have all the correct CLASSPATH information and if you have not already you might try starting the JVM using the startHyperionPlanning.bat file from the command line. Many times you will get better output from that when troubleshooting.
    Regards,

  • Loading Smart List in Hyperion Planning

    Dear Gurus
    Please help to load the smartlist, I am getting the following error.
    Successfully located and opened input file "d:\smartlist_create1.csv".
    Header record fields: SmartList Name, Operation, Label, Display Order, Missing Label, Data Form Setting, Entry ID, Entry Name, Entry Label
    Located and using "HSP_SMARTLISTS" dimension for loading data in "acpt" application.
    Parent-child ordering option (/H switch) will not be performed: this option is not available for the "HSP_SMARTLISTS" dimension.
    Input file member load ordering option (/O switch) will not be performed: this option is not available for the "HSP_SMARTLISTS" dimension.
    Unable to obtain dimension information and/or perform a data load: Unrecognized column header value(s), refer to previous messages. (Note: column header values are case sensitive.)
    Examine the Essbase log files for status if Essbase data was loaded.
    Planning Outline data store load process finished with exceptions: not all input records were read due to errors (or an empty input file). 0 data records were read, 0 data records were processed, 0 were successfully loaded, 0 were rejected.
    Unrecognized column header value "Data Form Setting".
    Unable to obtain dimension information and/or perform a data load: Unrecognized column header value(s), refer to previous messages. (Note: column header values are case sensitive.)
    Planning Outline data store load process finished with exceptions: not all input records were read due to errors (or an empty input file). 0 data records were read, 0 data records were processed, 0 were successfully loaded, 0 were rejected.
    I have used the same structure as provided in your earlier thread.
    OutlineLoad /A:acpt /U:admin /M /I:d:/smartlist_create1.csv /DS:HSP_SMARTLISTS /L:c:/OutlineLogs/outlineLoad.log /X:c:/OutlineLogs/outlineLoad.exc
    SmartList Name, Operation, Label, Display Order, Missing Label, Data Form Setting, Entry ID, Entry Name, Entry Label
    SL1,addsmartlist,SL1Label,,,,,,
    SL1,addEntry,,,,,,entry1,entrylabel1
    SL1,addEntry,,,,,,entry2,entrylabel2
    PLEASE HELP.
    Regards
    Sim

    First step: finding the right forum for your questions.
    http://forums.oracle.com/forums/category.jspa?categoryID=146

  • Best Practice for Hyperion Planning : Essbase or Dataform for Adhoc Analysi

    Hi,
    with Hyperion Planning, you are able to start an Adhoc Analysis from an Hyperion Planning Dataform or from an Essbase cube?
    What is the best way / pro / contra ? thanks in advance
    .... I 've juste notice that when you delete the dataform the Retrieve doesn't work anymore :-( .... and with Essbase you get some "un-useful" dimension as HSP_Value
    Regards
    xavier

    A couple of other things that go with Planning as the data source:
    1) You have access to all of the non-Essbase data -- think SmartLists, text (okay, it's there now in Essbase, but not from Planning applications) fields, supporting detail, etc. If you want users to see that relationally stored data, the only other way to get it in Excel is to run a Financial Reports report into Excel (or hack the tables and write SQL to pull the stuff -- did that pre 11x and it's too much work).
    2) There's a performance hit when going against Planning, just like there is when Planning is the data source in Financial Reports.
    Using a form to limit dimensionality - isn't that what SmartSlices are for? I guess it's another way to get to the same place. Although you have to administer the SmartSlices, I would imagine they would break less often than a form might. Having said that, once built, how often do you delete a form?
    It's really nice that ad-hoc analysis from forms are now possible, but I've always thought of it as nice feature to have alongside data entry, never as the primary path into Essbase analysis.
    Just my $0.02.
    Regards,
    Cameron Lackpour

  • Strategy in task list and Strategy based Maintenance Plan

    Dear Gurus,
    I have some doubt about
    is it same if we create a single cycle plan with a task list in which maintenance strategy let say A is being used and a maintenance plan strategy based let say A and task list without any strategy
    can some one explain use of strategy in task list and maintenance plan
    Regards
    Armaan

    Hi,
         In Strategy Based Plans :- When ur entering strategy in initial screen of IP42 then inside the plan system will allow u to select tasklists created with that strategy only ...
    In Single Cycle Plans :-  Here even though if u select tasklist of a particular strategy , system copies all the operations of the tasklist to the order...
    From your above example :- Single Cycle Plan if cycle is monthly is equal to strategy based plan having only 1Month package .
    further package in strategy allows u to select which operations of tasklist u want for 1Month..
    regrds
    pushpa

  • Hyperion Planning Classic vs. BPMA 9.3

    Hi,
    We are on Hyperion Planning 9.3 (including all latest patches). We are in the process of building a new Planning application. Currently we donot have an ETL tool and it doesnt seem we will get one for the next few months until our new Planning application is deployed into production. So in a nutshell we wont have an ETL to solve the below problem.
    I have used Planning Classic along with an ETL tool to build my meta-data in past implementations, and havent had a chance to use BPMA. Lately I have started getting aquinted with BPMA and understand some of its advantages. However, I still have a few specific questions;
    1. I know Planning Classic allows manual creation of members, does BPMA allow the same? Or does BPMA have to have flat file or interface table to create or add members? Our business users would be manually creating some members, or for instance change the start or end month of a 'Scenario'. So, does BPMA allow manual editing and pushing of meta-data?
    2. If an application is created via BPMA, they would have to interface via BPMA and not Planning Classic anymore. Is that true?
    3. I understand it is possible to convert a Planning Classic application into BPMA but "NOT" vice versa. Is this true?
    4. Finally, a more difficult question, a more specific question which kinda of dictates the choice for us.
    My client would like individual departments do their respective budgeting (noting unusual there). However, most of these departments budget per 'Project' and more specifically like to budget based on 'Project Name' (which are unique and not generic) as opposed to 'Project Numbers' (there isnt a Project number standardization as such yet). The challenge is getting the 'Project Names' into Hyperion Planning (sadly it doesnt exist in ERP/GL yet because these are new projects).
    So, though the Finance Team ultimately approves each department's budget, they would like each department be able to create their respective 'Project Names' in Hyperion Planning. And Planning capabilities like supporting detail, etc wouldnt work as they would like variance based on 'Project Names' and be able to slice-n-dice based on 'Project Names'.
    Now if we had an ETL tool the above would have been simple, I would have just created an automation to say pick-up a file with 'Project Names' from a pre-determined folder location. However, because we donot have an ETL, I was wondering if BPMA could do the same, i.e., automatically pick-up a file from a folder and create members and refresh Hyperion Planning? Could the 'Batch Processing' in BPMA handle this?
    Appreciate all your responses...

    Hi,
    First of all I wouldn't recommend using EPMA until version 11, 9.3.1 was riddled with issues.
    To try and answer some of your questions
    1. You can manually maintain members in EPMA if you choose to do so, you need to push it down to planning/essbase if you do make changes.
    2. If the planning app is in EPMA mode then you can't edit/add/delete member information through the classic route, you can view. You still can design forms, task lists etc through planning web.
    3. It is possible but no you are not meant to.
    Sounds like you could do with ODI it would make your life easier, are you sure you are not licensed to use it, you may be entitled to use it.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Plant independent general maintenance task list

    Hi, All,
    Can it be possible to create a general maintenance task list without maintenance planning plant & which can be used for all plants in same client?
    This is required to reduce the common task list data per plant existing in the system.
    Regards,
    Sanjay

    Hi Sanjay,
    maintenance Planning plant & Work Centres may differ according to the Centralised & decentralised maintenance.
    Hence not only maintenance planning plant but alos work centres may also needs to changed.
    Logically each work centres planned activity cost may differ so if u create a common task list it will not serve the purpose too.
    Ref link
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/5b/ae33e04b8611d182ba0000e829fbfe/frameset.htm
    Ramesh

  • How to exclude certain operations in PM order from task list?

    Hi Experts,
    we have number of operations in task list and being attached to in maintenace plan. While scheduling Miantenance Plan system is creating order as per requirement with set of all operations present in the task list. we would like to restrict certain operations needs to be appeared in the maintenance order? any enhancement will work for this kind of user requirements?
    suppose if task list is having 100 opeartions. when we do scheduling by using this task list through maintenance plan system is defaulting 100 opreations in the order as per standard. we would like to restict certain operations not to appear in the order, even it is present in the task list!
    Thanks in advance
    Regards,
    Krishna

    Hi ,
    If you could convert this order type as Service order you will get a field called Service Product. Then you can use Classification and Characteritics for the service product and the Tasklist to choose the required operation in the service order created by the system. You need to use the techniques of varinat config to achieve this functionality.
    AlexPr

  • Problem in Preventive Maintenance - Task list attachment

    Dear PM Gurus
    In IP42 while attaching task list for a plan (by clicking binacular), a new selection screen opens (Display Task List), in that for Status field value '2' is set by default and it is disabled.  2- is for Released for Order.  I want to change it to 4- Released General.
    Pl. tell me how to change it ?
    Babu R
    Edited by: Babu Radhakrishnan on Dec 30, 2009 8:40 AM

    Thankyou Jitender
    In 2-Release for order
    reference operation set is released for usage in routings and plans was set. When I uncheck it is comming as 4.
    @ PeteA
    The issue is I can't able to select the task list, since the status is 4 - Released (General) and in the selection screen status is set as 2 and I cant able to change it.
    Babu R

  • Microsoft Project content Synced Task List

    Hi,
    I was trying to sync the microsoft project content with a sharepoint Task List.
    while doing so, i found out that the sync with task list option was missing form the backstage[i.e when i went to file menu].
    What appears to be a version issue as i have found from the internet that the microsoft standard project does not have this feature. If so, then could you please help me in
    1) confirm which version i am using ; where do i find if i am using standard or professional
    2) is there additional cost involved if i use Project professional rather than standard
    3) is there a way to sync the data from project standard with sharepoint task list.
    Tnx

    Hi,
    #1. To determine which version of Project is installed in the PC, we can check the registry key HKEY_LOCAL_MACHINE\Software\Microsoft\Windows\CurrentVersion\Uninstall or HKEY_LOCAL_MACHINE\Software\WOW6432Node\Microsoft\Windows\Current Version\Uninstall
    if you are using a 64-bit version of Windows.
    http://blogs.msdn.com/b/brismith/archive/2010/09/16/how-to-determine-if-you-have-project-standard-or-project-professional.aspx
    #2. The cost for downloading Project Professional will be more than the cost for downloading Project Standard, but Project Professional provides more features than Project Standard.
    #3. As the Project Standard does not support syncing with SharePoint, I recommend to use Project Professional instead.
    http://social.technet.microsoft.com/Forums/projectserver/en-US/820b0a5e-c961-4a80-a5cb-6369bd7e1098/sync-with-tasks-lists?forum=projectprofessional2010general
    In the meanwhile, you can post your question to the forum for Microsoft Project:
    http://social.technet.microsoft.com/Forums/projectserver/en-US/home?forum=projectprofessional2010general.
    More experts will assist you, then you will get more information relation to Microsoft Project.
    Best regards.
    Victoria
    Victoria Xia
    TechNet Community Support

  • URL Task List in System 9 Planning

    We have recently upgrade planning from 4.0 to System 9.3; however, there was a feature in Planning task list where you can build a URL to retrieve report from Hyperion Report with parameter passiing from Planning to Report for a POV driven report. Does anyone know how I would convert the below link in system 9.
    http://xxxx:8200/hr/common/HRLogon.jsp?elementName_UTF8=%5cTMWSP+Planning%Workbook&sameWindow=false&elementType=2&attribute=Locations.id.Region%20GOODSITE&gridHeadings=0&viewAs=pdf

    Hi,
    You can go to workspace and browse to the report through the explore page. Right click on the report and select properties. You should see the link called as smartcut over there. You can copy this link and use it in your task lists.
    Cheers,
    Alp