Finished product stock

I have a small doubt which I had asked through component assignment
You answered it rightly.However I have a doubt.
In IDES ( I hope you have the access), I created an example of project elevator where I need to deliver the elevator from project.
The BOM was assigned to standard network activities and no where the header material E-1000 was assigned.
Hence I dont see E-1000 material in operative network too.
All the components assigned to activites haveen issued and I see the cost as well.
However, how do I see the elevator under project stock. Unlike production order, PS control key do not have automatic goods receipt flag. So even after I confirm all the activities, I will not see the finished stock.
Unless I see the stock, I can not deliver also.
Cheers
Sunny

You need to assign the header material with negative quantity in network. So, when you confirm the activity with header assigned it will come in Project stock / Plant stock. As mentioned by Sai in previous post.
With Regards
Nitin P.

Similar Messages

  • STOCK OF FINISHED PRODUCT BY PIR NOT CONSIDERING WHILE TAKING MRP RUN

    DEAR SAPGURUS,
           I have finished product stock of 50 nos through planned independent requairement. now i am creating sales order for finished product but mrp run generate the planned order for finished product. I dont have planned order for finished product because material already have stock. what can i do please give solution.
    thanks.
    Regards
    Atul

    Hi Atul,
    Please describe your problem better, it's not easy to understand...
    Strategy 10 is net reqirement planning:
    - SAP considers only PIRs as requirements, SOs are not considered
    - SAP considers stock levels
    - requirements should be LSF (check in MD04)
    If you input sales order SAP won't create PldOrd for it. If you have stock and you want to create more to fulfil you SO, you have to input PIR accordingly and run MRP.
    Please clarify your problem...in a way that we may understand it.
    http://help.sap.com/saphelp_47x200/helpdata/en/60/9ea1536fbd11d191820000e8a5f6e6/frameset.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/e0/71bb199c9f11d191920000e8a5f6e6/frameset.htm
    Thanks,
    Csaba

  • Daily Automatic delivery creation for Finished Products

    Dear All,
    As per my client requirement, they need automatic delivery creation when ever the finished products posted(Reached) in to the Finished Products Storage location with out time specification.
    Scenario is like this.
    1.Scheduling agreement will be created for one month or one year for the specific customer with specific products.
    2.After producing the material, from the production line finished products will taken in to the Finished product Storage location with some acknowledgement.
    3.When ever the acknowledgement happen(stock get added) automatic delivery need to be created for that acknowledged quantity with reference the scheduling agreement.
    4.There is no time specification When ever the finished products stock acknowledgement happen automatic delivery need to be created.
    5.There is no quantity specification also what is the quantity at finished products Storage location acknowledged for that quantity automatic delivery need to be created .
    6.If there is no production-->There is finished products -->No delivery should trigger.
    This will be applicable to specific customer and specific material only.
    Please give your valuable inputs as early as possible.
    Regards,
    Murali.

    Dear Rohit,
    1) Who creates the acknowledgement..
    -->Finished Products Storage location people will run this entry when they recieve the finished product from the production line.
    2) How frequently is this acknowledgement created..
    -->When ever receives the finished products from the production line,
    3) Is this acknowledgement a print out or a documetn type.
    -->It is not a print or document type, it is just an Transfer posting entry to add the Finished products qty to the existing stock at that particular storage location.
    4) If it is document type does it appear in document flow.
    -->No it will not come in the document flow.
    I hope it will clear for you,
    Regards,
    Murali.

  • Valuated Sales Order stock for Semi-Finished Products

    Dear Gurus,
    One of my client faced the issue that the semi-finished products is valuated-sales order.  We are in Mill Industries, downstream (steel processing).  The situation is:
    1.  We use configuration material for both finished and semi-finished products. Both are valuated at standard costs with valuated sales order stock.
    2.  Once the sales order is created, the cost estimates are created for both Finished, and semi-finished products.
    3.  The production orders is created for the semi-finished products.  During production, several semi-fg and fg can be manufactured at the same time.   We are using the co-products feature to cover that.
    4.  During the goods receipt of semi-finished products, instead of using the standard costs in sales order cost estimate, it use the planned costs in production orders which against our design.
    I tried to use the user exit COPC002 and influence the standard costs.  But it seems that the routine is not called for semi-fg at all.  Anyone has any light on this?
    Regards,

    Hi
    I think you are talking about Special Stock "E"...ie) Sale Order Stock...
    If my understanding is correct then,
    If you go and see the Table T156....For the
    Movement Type: 101,
    Special stock Indicator : E,
    Qty. Updation Checked,
    Val. Updation Checked,
    Movement Indicator : Against PO,
    Consumption Indicator: Sales Order Stock.....combination....the transaction Event Key....GBB only has been Assigned....these  settings you cannot change...
    This linkage you can view in OLMW-----> Account Determination -
    > Acc. Determination W/O Wizard -
    >Account Grouping....also
    Reward if useful
    Regards
    S.Baskaran
    Edited by: baskaran srinivasan on Dec 20, 2007 12:18 PM

  • Make to stock planning for a finished product with variant attributes

    Hello All,
    I have one finished product with different characteristics like color and sizes, I have to create demand for the same finished product
    and to define different characteristics but should get one planned order for each combination of characteristics. Can anybody suggest how to create demand in make to stock situation.

    Hi ,
    Try using "Planning with Planning Material' .
    1: Define Planning material ( which is never produced) & it's BOM with only common assemblies( Finished product specific assmblies should not be added here)
    2: Create Finished products seperately & assign planning material to Finished products. Finished product BOM should contain common assemblies & Variant assemblies
    2:Enter Planned independent req for planning material & run MRP , it will generate procurement of it's  common componenets
    3: SO for Finished product reduces PIR of planning material & triggers Final assembly.
    4: Planning with planning material should be 60 strategy . it must be entered in both planning material & Finsihed goods.
    This is possible with make -to stock as seperate Finished goods are created for each combinatin of color & sizes.
    Hope it helps,
    Jatin

  • Stocking Level- Two levels below the finished product

    Hi all,
    I want to maintain stock two levels below the finished product in MTO environment...How can i acheive this in SAP...Also i want to maintain forecast one level below the finished product..Please give ur expert opinion in order to achieve this requirement..
    Actually scenario is Packed liquid is my finished material and forecast is given at liquid level and both these levels are not produced until a sales order arrives...i am taking liquid as SFG, please suggest otherwise if i m not moving in right direction.
    Thx
    Shah

    Hi,
    Kindly follow the steps mentioned below, I hope it addresses your query.
    Warm regards,
    Umesh
    Process Scenario & the BOM structure
    Level 1: ZURP_PKG_LIQUID <Sales order received here>
    Level 2: ZURP_LIQUID        < Forecast done here to plan lower level materials, this material is planned on the receipt of sale order at higher level>
    Level 3: ZURP_RM_LIQUID  < Procured/Produced and kept in inventory>
    Step no 1: OMP0  use Requirement class u2018103u2019 or create a copy u2018Z70u2019
    Step no 2: OMP1  create a new requirement type u2018Z70u2019 and assign the Requirement class u2018103u2019 to it.
    Step no 3: SPRO  define a new strategy u20187Tu2019 and assign requirement type u2018Z70u2019
    Step 4: SPRO  create strategy group u20187Tu2019 & assign the strategy u20187Tu2019
    Step 5: MM02 u2013 MRP3 view  Assign this strategy to material code ZURP_LIQUID at which forecast is done
    In MRP4 view leave the individual/collective indicator blank
    For Material ZURP_PKG_LIQUID  maintain strategy group as u201820u2019
    For Material ZURP_RM_LIQUID  maintain strategy group as u201810u2019 & individual/collective indicator as u20182u2019
    Step 6: MD61  Create Planned independent requirement for ZURP_LIQUID
    Step 7: MD02  Execute MRP for ZURP_LIQUID
    Note: Planned orders for ZURP_LIQUID are created, but they cannot be converted into Production order, but this triggers requirement down the line triggering procurement/production for material ZURP_RM_LIQUID
    Step 8: VA01  Create a sales order for ZURP_PKG_LIQUID
                MD02  Execute MRP for ZURP_PKG_LIQUID
    Note: The MRP run triggers the procurement proposal for ZURP_LIQUID, which can be converted to production order & simultaneously reduces the created PIR

  • Avoid posting of Goods receipt of finished product without consumption of components in Subcontracting process

    I have one requirement:
    I provide components using movement type 541 to the subcontracting vendor.
    Now system will allow the goods receipt of the finished product using movement type 101.
    If the components which are to be consumed using movement type 543 O are unchecked when doing goods receipt of the finished product then system will allow to do the goods receipt.
    As a result of which the component consumption will not be done.
    Subsequent adjustment can be done but,
    I want to have a check that without consuming the components the system will throw an error message when tried to do goods receipt using movement 101.
    Please advice if it can be done, if so how to achieve it.

    Hi,
    It depends on what you want your subcontractor to do with the faulty raw material stock - if you want them to scrap it you can scrap stock from subcontractor stock using movement type 551 and special stock "O" (the system should prompt you to enter the vendor code). If you want it returned for you to scrap it - movement 542 to return it then scrap it from your own stock.
    You shouldn't receive an additional 20 of the finished parts - as you only received 80 not 100. Close the purchase order off to close off the balance of 20 remaining.
    Thanks

  • Creation of Production order for FInished Product through Project

    Hi,
    Pls clear me on how we can create a Production Order for finished product.  
    If we confirm the production orders in PP, cant the same be confirmed in PS.. Should we consider the same activity types in both PS and PP
    Pls clarify

    hi srikanth,
    your answer has been very helpful... but could u clarify  why MRP is run in MD51 for WBS element and in MD02 for network..
    Pls clarify...  My scenario is like this ...                                                                               
    A
                            B                                                                                C
                    D  E F G H I                                                                                J K L M N O
    I have  a Assemblies B and C which are always delivered in sets.. under assemblies B and C,  we have 6 sub assemblies which has its own components.  I am assigning sub assemblies to differenet WBS elements 01 and 02. so, initially these sub-assemblies are produced to stock. this should happen in PP i.e., through production orders generated in MRP run ( MD51 ). In the next phase i will assign Assemblies B and C to another WBS element.  Again system should generate two Production orders thru MRP for this. Here the 6 sub-assemblies produced earlier will be consumed in confirmation of the production order...
    What i am doing is this correct...
    and the procurement for the components is happening thru the purchase requisition generated via MRP. the components themselves are not directly assigned to the project..
    Pls advise and clarify?

  • With what value finish product as come when we do goods recipt from prd

    Hi,
    With what value finish product as come when we do goods recipt for oa prodution order in make to order scenerio.
    The material is not talking standard price form th e material master when we are doing goods recipt.
    Regards,
    somiraghu

    If you use non-valuated sales order stock (account assignment E) there will ne no value posting at all during GR, thus also no accounting document. The full actual costs (that Pankaj listed) will be posted during settlement of the production order.
    Regards,
    Kay

  • Creating a production order for a semi finished product

    Hi
    I am having a multi level bom scenario over here.
    one of the bom components of the header material is a semi finished product.
    I am using the planing stratagy 40 for that material.
    in standard sap when i create a production order for  header material. the requirement gets transerd to all the components. if the components are not available then only  a requirement is placed. when i run MRP that requirement gets converted in to a planned order. which converts in to a purchase req or a production order,
    well for my semi finished product. its a Work in process item. there wont be any stock for that item in the storage location any time.
    what my requirement is. when i create a production order for my finished product it should automatically create a production order for the semi finished product.
    is this possible with some configuration settings.

    Dear Deepu,
    for ur requirement u need to maintain MRP type PD for FERT material and also for ur HALB.
    If u run  MRP  only, it will create planned order for FERT and for all its dependent requirement(for PD).
    If u create order manually for FERT material then it will not create order for HALB material, u need to create manualy for this also.
    sree

  • Wait time from WIP to finished product

    Dear PP experts,
    I have a case need your help:
    We're a construction company, we have a concrete factory.
    Our product (called spun pile) is made from concrete and mixture.
    In put: concrete + admixture
    Out put: spun pile (WIP)
    usually, it takes 7 days for a spun pile (WIP) becomes a finished product.
    in other cases, we have to speed up the progress, so, we put the spun pile (WIP) into heat oven. It only takes 1 or 2 days for a spun pile (WIP) becomes finished product.
    In total, we have production date, called A (date)
    We have wait time, called T (days)
    We have the date that we can sales finished product, call B (dates) = A + T
    Can we manage it in SAP PP? We expect after T days, stock in finished product will be increased, automatically, instead of manually do the stock transfer in SAP MM module.
    Please consult me on this. Thanks in advance.
    Regards,
    Gent
    Edited by: Nguyen Phuoc Toan on Jun 18, 2011 9:15 AM

    Hi Toan,
    Can you explain your business in this case? If you want to check available in SO, you need to setting waiting time in routing, if you need to receipt into stock, it impossible.
    KietNVT

  • Revaluate Finish product GI

    Hi,
    We have Production order with settlement rule as follow:
    Sender:production Order
    reciever : material (Finish product)
    Type:Full
    and also we assign this Finish product to network and during month posting GI of following material to related network,when I make settle in current period according to settlement rule I expected  that production cost  transferred to material price but after settle only balance of order was zero and material price did not change,
    I have a doubt why material price did not change and  how actual price of Finish product will  transfer to network  that I assign this material ,
    with tracking project actual cost via CJI3 ,finish product price is standard price of previous period and because of at the first period we considering standard price of finish product  as 1 $ therefore all unit price of finish product in project is 1 and I dont have actual cost of project .
    The worst side of my problem is that because of business problem I could not settle production orders for 3 month and during following periods all  GI posting  with unit price 1 $ and  we dont have actual price in network,
    How I can revaluate all GI of previous periods to have real cost of project up to know?
    It would be my pleasure if you help me as soon as possible,
    Regards,
    Azam

    Hi
    1. GI revaluation is ruled out w/o Material Ledger in place, as said above.... However, I wont recommend Price Control V for SFG/FG either
    2. In a similar scenario, what I have seen a possble workaround is this
    a. The scenario was project driven MTO... .i.e. Production order was tagged to WBS element.. This scenario is called Production Lot scenario in SAP
    b. Each time you create a Production order, you create a project 1st and then create the Prod order...
    c. The Price control of the material was kept as V
    d. No partial GR was done from Prod order as a matter of policy to avoid unfav situations
    e. After GR, the prod order was settled so that any variance would be inventorized.... Even if not settled, and the stock is consumed, the variance will be booked on the WBS element... It wont tamper the entire FG valuation
    However, this workaround might not help you because you wish to revaluate the GI, which is not possible w/o ML
    br, Ajay M

  • Manufacturing finished products from other finished product(co11n)

    Hiii all,
    Please can any body tell me how to avoid or block 261 movement type for some material..? we have some products which are manufactured with finished product then when we use CO11N to report the consumption: automatically that finished product used for manufacturing is s reported as if the raw material (261 mov)
    THANKS!!!

    Hello Abelo,
    First I would Like to understand in which country you / your client is. This is very important as in India there are Excise Tax Rules those ask you to submit the status of FG materials at the end of every month end. Now if you are consuming one FG material to produce another FG this is in general not applicable in Indian Scenario. (I am not aware about other countries).
    Now your requirement is "Not to consume 1 FG material while posting the production of another FG" (Correct me if I am wrong).
    In std. SAP this is possible as well as not possible.
    Possible:
    1.In the Bill of Material of FG2 (Header material for FG1), you can mark the component (FG1) as Engineering relevant and not Production and Costing Relevant. In this case, system will not propose the material for Back Flush.
    2. Mark Component (FG1) as Bulk Material in MRP2 view. System will not propose this material for Order Release as well as Backflushing (261 movement type).
    Not Possible:
    This is more of a discipline issue. If you are converting the One FG to another FG without consumption, How you are going to match the Stocks of Component. There will always be mis match in Physical and System Inventory. How you are going to address this? There will be Financial Impact of Inventory in this case.
    I suggest, please check the feasibility of stocks verification and then try solution given above.
    Please check and confirm whether you succeed or not.
    Rahul.

  • Dismantling of a Finished Product

    Hi Gurus,
    I am facing a Problem
    My client sends a finished product 'A' to his customer.
    It is returned back as customer return and Quality people does quality inspection and keep it in the block stock.
    Now my client wants to dismantle the finished product 'A' and
    use the component which he got by dismantling the finished product 'A' in the new production order.
    For that after dismantling of the material 'A', The BOM of Component of finished material 'A' has to be updated in the stock.
    How can I map this Senario.
    Please guide me.
    Thanx and Regards,
    Praveen Kumar.S

    Dear Praveenkumar,
    Checkout this procedure,
    1.A production order without material using CO07 will be created .
    2.And in the BOM components will be entered in - ve quantity,so that their stock will get uploaded using 531 movement as a By-
    Product.And enter the header material in + quantity so,that its getting issued using 261 movement.
    3.But for this ,the same has to finalised with FICO & MM consultants as accoutn determination for 531 movement should be
    configured.
    Regards
    Mangalraj.S

  • Purchase requisition generate for alternative bom use for finished product

    i hav alternative BOM for finished product in which different raw material component in both BOM of same finished product.But when i RUN MRP that time only one raw material requisition generate another alternative bom raw material requision not generate.
       Is there any option when i RUN MRP that time we select one of the alternative bom component of  raw material for generation purchase requisition.
    Thnaks in Advance

    Dear ,
    MRP will select the BOM based on the MRP4-BOM Explosion tab -Selection Indicator .It can eitehr of these ways :
    1.Maintain Production Version with  different Alternative BOM  and keep Selection Indicator -3 .So sysetm will look into only the Valaidty  and lot size of the Production version and select the correct BOM to explode  and generate PR for depednts based on stock situation
    2.If you maintain Blank -then it will look into order qty and select the BOM according ly
    As in your case , selection methods 3 will fit  and you need to maintain PV with correct validity and lot size in MMR-MRP4-PV option .
    Try in sand box with different lot size and validity with indicator-3 .Create Order and run MRP-MD02-1,,3,3,3,2
    Check and revert
    Regards
    JH