Hi all,
Is there any way we can create a purchase requisition(PR) or purchase order(PO) from a Maintenance Notification? I know we can create PR/PO from Maintenance Order but our client doesn't want to take that route.
To add more info, the piece of equipment for which the notification will be raised, is created with a link to a material in MM (Serial Data tab in equipment master). We also have a vendor partner attached to the equipment as well as notification. We need to generate PR/PO from the maintenance notification which is raised for this piece of equipment.
Any help / pointers / suggestions are welcome.

Thanks Pete
Is there one, or many PRs to a single notification
There needs to be only one PR for a single notification. The notification pertains to only one piece of equipment, and once the PR -> PO -> GR cycle is completed, the notification will be closed. Next time, if the equipment fails, a new maintenance notification will be created. So, yes, there will be only one PR for a maintenance notification.
How will you handle missing data e.g. vendor, material, etc
The material no. for that particular piece of equipment is maintained in the equipment master (material field in the Serial number view). Also, we maintain vendor number under partners for the equipment master data. We should be able to use these while creating PR from notification. At least that's what is our initial thought. Please correct me on this.
What will be the account assignment for the PR
I'm not sure about this one though, I'll confirm with the MM consultant and update this reply.
Will the notification user-status be update on PO creation, GR, IR, etc
Yes, thanks for bringing this up. The client intends to use this functionality to check the availability of the equipment. So, not only the notification's user status should update based on PO status, but also the piece of equipment's user status should also get updated when the notification is closed and the piece of equipment is available.
Will the notification be referenced in the PR/PO
Not exactly, but there should be a report available which will list all the PRs / POs raised for maintenance of a particular piece of equipment. So, if notification is linked to PR/PO, we may  be able to generate this report easily. Again, correct me if I'm wrong on this.
Do you want to limit who can create the PRs
Well, if we are talking about auto-creation from notification, then only the person releasing the Notification will be able to generate PR indirectly. If it is manual creation, then yes, we will need to restrict this authority to limited people.
Please let me know if these responses help you understand my requirement and give any other possible solution.

Similar Messages

  • Sales Order -- Purchase Req -- Purchase Order ..... Sales Document flow??

    Hi Guys,
    We have a process where we proccure few parts externally. When a sales order is created in our system based on the item category config we are able to create a purchase requition automatically. This Preq is further used to create a PO based on which the purchasing group proccures the part from the vendor.
    We are trying to identify if there is a way to find out a way if we can relate the PO number created in the sales document flow? Currently we are not able to view the PO number in the sales document flow. We are trying to identify if this is possible and if yes what needs to ne configuered to enable PO number linking in sales document flow?
    Any pointers?
    Cheers
    VJ

    Hi Bikash,
    The PO field which u r referring to on the VA01 screen is the PO number against which a SO is created. This PO number is the customers PO number. My requirement is i need to store the Intercompany PO number which is the PO number created to procure the part externally from the vendor. So its the vendor PO number and not the customer PO number.
    Secondly if i try to misuse any other field to store this PO number it dosent make sense as it would not show up in the document flow screen so it would be of no use to us. We want to enable it the std way and i am sure SAP has provided some way to do it.
    I check the OSS notes and found some interesting tips working on that hopefully should be able to resolve it.
    Cheers
    VJ

  • MRP Generating Purchase Reqs for Materials Needed in 2013

    Hi, all.  We're running MRP and it's generating a massive amount of purchase requisitions (18,310 to be exact).
    The following is a typical part setup:
    Lot size = EX
    Planned delivery time = 5 days
    GR processing time = 2 days
    Individual/collective requirements = 1
    MRP profile = BTO
    We have one existing sales order with a delivery date in 2014.
    With a lead time of roughly a week, why is MRP generating purchase requisitions out into 2013 for this material??
    Thanks!
    Sarah

    Sarah,
    MRP Profile doesn't mean much to us, they are all created individually during each implementation, and they are all different.  However, I will guess that BTO is some type of Make-to-order profile.
    You mention 18K of PRs.  Are these all being created in a single run, or is it possible that they may have been accumulating for a while?   To find out, run MRP, but using the parameter for Planning mode 'Delete and Recreate planning data'.  It will delete all the unfirmed PRs and then regenerate new ones based on the current situation.  I will assume for the moment that all these 'future' PRs are unfirmed, please let me know if they are not.
    Since it appears to be a MTO environment (if not, let me know) then you should be able to see in the planning segment which requirement (sales order) is driving the purchase reqs.  Depending on your MRP type, this could give you understanding of why MRP is proposing so many PRs.
    One thing that will generate a large number of purch reqs is an unrealistic value in Maximum Lot size (MRP1 page of material master).  For instance, for a requirement of 1000 widgets, and a max lot size of , say, 2, it would generate 500 PRs for 2 widgets each.
    If my suggestions don't help you, please specify MRP Type, Lot Size, max lot size, rounding value, Safety stock, reorder point, Strategy group,   From these values we can begin to understand your problem a little better.
    Rgds,
    DB49

  • Prevent Hourly Employees from Ordering Non-stocked Materials and Creating Purchase Reqs in Work Order

    Our SAP plant maintenance system is configured to create a purchase req when a non-stocked material is ordered. We would like to prevent hourly employees from creating a purchase req or ordering non-stocked materials. Only supervisors should be able to order non-stocked materials and create a purchase req. Is there a way to do this via config or system enhancement?

    Hello Rick,
    Clearly there will be 2 ways if not more. One is the Authorization object route and another is Enhancement route. I'm not going to touch the former one. So let's expect answers from other members for that. For the later one, we need to know the answer for the question below:
    'Can we distinguish the hourly employees from regular employees by the user-Id or some other means? If yes, how ?'
    Once we know this, we need to use some user-exit or enhancement spot of the program SAPLCOIH to capture the event of 'N' in the ItemCategory field of Components tab by such UserIds and trigger an error message.  (Suitable user-exit is not striking my mind, so this might go the implicit enhancement way of Order program SAPLCOIH ).
    KJogeswaraRao

  • PR from Maintenance Order - Material Purchase

    Dear Experts,
    Likewise we can generate Servide PR against Maintenance Order,  also it picks service data frrom Maintenance Order....Similarly can we generate PR for Material Purchase against Order also it should pick Material from component that we have enetered in Maintenance Order ..is it possible??
    Thanks
    DM

    Hi
    Deletion of PR from Maintenance Order is not possible because the PR is created automatically
    This PR will get deleted automatically when you cancel//teco/complete the order
    Otherway around is you can always block the PRs
    Regards
    Kartik

  • Purchase req. for activity/element  cannot be generated

    Hi:
    I want to creat a new external activity,but the Purchase req. for activity/element cannot be generated. The Messagr No. is CN705.
    I checked the network activity,I fount that the"Reservation/ Purchase Requisition" be setted option 2 ( From Release). I want this should be with option 3 (immediately).
    I have checked network profile , the option 3 (immediately) is setted.
    Is there any other place where we set this setting. Please share your valuable opinion.
    Best Regards.

    Hi,
    If it is appearing in display mode only (It must be made to "display" only in SPRO at Field settings for Network) then it is not possible for the users to change it in the operative project. If you have made the changes in the Network profile for Pur.reqn. after the Project / NWA is created and released then  create a fresh  Network /activity and check.
    Regards,
    Bala.

  • Purchase Requisitions from Maintenance

    Dear Friends,
    We are implimenting Plant Maintenace and all other modules.
    Purchase requisitions are created with Maintenance Order automatically, and Purchase Requisitions will be created with MRP also.
    I want the Release strategy for MRP created PRs and Maintenance Order created PRs are different.
    Is it possible to Trigger the PR release strategy automatically on creation of Maintenace Order.
    (How to trigger the Automatically created PRs from Maintenance Order for release strategy.)
    Please give me the steps for it in IMG.
    Regards,
    Canand

    The best way to trigger the requisition for release for Plant Maintenace is check the indicator of this kind of requisition in the requisition contact person tab and include this indicator in your PR release strategy
    for Release starategy config see the following document
    http://www.sap123.com/showthread.php?t=59

  • Purchase req details from ECC to SNC

    hi All,
    Any standard IDOC or FM to send the Purchase req details from ECC to SNC system.
    any pointers will be highly appreciated.
    thanks

    Hi SanKumar
    The purchase requisitions can be sent to SNC using the standard report RSMIPROACT for Dynamic Replenishment Scenario.
    The Purchase requistions are sent as a part of Customer firm net requirements.
    In the screen Transfer Stocks and Requirements to SAP ICH/SNC
    Set the Tab to Dynamic Replenishment.
    Then input the Plant,MRP Area, Material and Target System.
    Select the data to be sent(only for DR)
    Duely check the Purchase Requisition.
    Then the data can be seen in webui under Demand -
    Order Forecast Monitor.--Overview/Details
    Thanks
    Vinod

  • Attachment transfer issue from Shopping cart to Purchase req in ECC

    Hello,
    How are you all. Need your expert advise..
    We are trying to achieve functionality where documents which are attached on shopping cart get transfer into Purchase req in ECC (Classic Scenario with SRM 5.0 and ECC 6.0). For this we have done following config / enhancements:
    - Activated BADI "BBP_CREATE_BE_RQ_NEW" in SRM with following code for attachment;
    cs_ctrl_att-BE_DOC_TYPE = 'SRM'.
    cs_ctrl_att-BE_storage_cat = 'DMS_C1_ST'.
    cs_ctrl_att-TRANSFER_ACTIVE = 'X'.
    - Created new document type ECC with t.code DC30 for SRM and assigned the object links for EBAN table.
    After performing above task we are able to see Link of the attachment into Purchase req in ECC with document number (i.e. the one we assigned while defining document type in DC30) but not able to open the document in ECC.
    Could you please let us know if there is any settings which we have missed for actually opening documents in ECC?
    Thank you
    Ritesh

    Issue as reported Please let me know why the docs are not uploaded to SRm succesfully .
    I am facing the below weird issue .
    Easy shopping >Shop> eHiring catalog
    Click Transfer to SRM
    Now click on the button ‘Details’ and open the tab ‘Notes and attachments’
    All attchments are names after the 1st attachment and all have the same file type
    Basically you have lost all you attachments here, except 1 (when you click on the link, all links refer to the same document, so not just cosmetic). This is a problem.
    When you order this shopping cart and search for it and open it again, the attachment tab is even completely empty, so now all attachments are lost.
    Something like this, but less severe, happens in the process a bit further.
    - Approve the shopping cart with the applicable approver
    - Log in as Hiring desk:
    Still no original attachments (like job descriptions).
    Now click button ‘responses and awards’
    Click tab ‘Items’ and fill out price ‘40’ euro
    Click notes and attachment tab
    I added 5 attachments
    As can be seen here, the docx becomes an xlsx again, but it looks like it just takes over the 1st file type that was uploaded, it can also be the other way around (xlsx becomes docx) when the 1st uploaded attachment is a document.
    But in this case, when you click on the link, it will open the right file with the right program, so over here it looks like it is just cosmetic.

  • Purchase Req & Standard PO - Price is not getting Defaulted from Price List

    Dear All,
    Hope you are doing good!!!
    We are implementing R12.1 for one of our client. This query is pertaining to the Advance Pricing with Purchasing. Infact client wants to default the Purchase Requisition and Standard Purchase Order Price from Price List.
    I have done entire setup and defined ASL for this reason. But still price is not getting defulted from Contract Purchase Ageerement.
    What could be the reason. Its an standard fucntionality but still its not picking up.
    I would really appreciate if someone could help me on this. Its URGENT.
    Thanks in Advance.
    Thanks & Regards,
    Aditya

    Let us go through the steps involved in integrating Advanced Pricing with Purchasing so that we know if we have missed anything.
    1. Create Price Lists in Advanced Pricing.
    2. Setup Profile Options in System Administrator responsibility:
    QP: Licensed for Product - at Application: Purchasing level = Purchasing.
    QP: Pricing Transaction Entity - at Application: Purchasing level = Procurement
    ( Site level - ‘Order Fulfillment’ )
    Profile option can be set at site, application, and user levels.
    QP: Source System Code – at Application: Purchasing level = Oracle Purchasing
    ( Site level -- ‘Oracle Pricing’ )
    Profile can be set at site and responsibility levels.
    QP: Item Validation Organization - at Application: Purchasing level = null
    ( Site level -- specified in Financial Options )
    Profile option can be set at site and responsibility levels.
    3. Add item to the Price list Advanced Pricing ->Price Lists -> Price List Setup.
    Enter the item/price/dates etc.
    4. Create Contract Purchase Agreement.
    5. Create Approved Suppliers List. In the Source Documents, select the Type as Contract and reference the Contract Agreement Number.
    Create the Sourcing Rule and add the Rule to the Assignment Set.
    6. Create the Standard Purchase Order referencing the Contract Purchase Agreement in the Reference Documents.
    The Price listed should be defaulted from the Price Lists.
    Cross-Check the following steps and let me know if it still fails and we can try to resolve from then on :)

  • Problems with Purchase Req.no in relation to Third-party-case

    Hi,
    Im trying  to create a third-party-case invoice with Sales Order No. xxxxxxxx
    I'm getting  an error regarding missing Purchase req. no. (the customer's credit block had to be released).
    This concerns a product that we buy from Helsingborg as XXXX1 and we sell it in XXXX2
    one more question?
    From where the valuation price for PR (w.r.to SO) being generated is taken?
    Thnaks in advance
    Akkshaya

    Akkshya,
    Go to VKM1 Or VKM 4 and release the same..
    Ten try..
    REWARD IF U FINDS THIS AS USEFUL...
    Regds
    MM

  • Contracts assigned to APO SNP purchase reqs

    I am using APO SNP release 7.
    I have a product for which a purchasing contract has been CIF'ed to APO and which is referenced on the transport lane from the vendor to the plant.
    If I run a heuristic plan in SNP to generate purchase reqs for the product, will the contract be actually assigned to the purchase req in APO, or will the assignment of the contract actually take place when the purchase req is in ECC (having been passed from APO)?
    Thanks for any advice on this...

    HI,
    When you CIF contract to APO , the external procurement relationships get created for the same in APO which in turn result in creation of TLanes(From Vendor to Plant)
    On running Heuristic, the TLanes are picked up from APO itself. It is not that purchase req gets created in APO and when CIFF'ing back to R/3 , it picks the tlane rel data from the contract
    For confirmation you may want to test this by ensuring that the Pur  req does not get trasferred to ECC(U have an option saying, DO NOT TRANSFER RESULTS, use this). Please test it in TEST System
    Thanks,
    SS

  • Question: how to move purchase req without firming

    Hi SAP folks,
    I've overcome this purchase req that is always showing after MPS run even the actual coverage is not so close to target (i.e. actual coverage=160, target coverage=30), i just want to know if there are possibilities that a purchase req can move in another date without firming it? i've tried removing PIRs but they still show up in the same period. Deleting it also not help as it again generated after closing.
    Thanks and waiting for all your replies

    Hi,
    Not sure what you're trying to achieve as the question is not quite clear, but based on what i understand, a procurement proposal is generated by mrp / mps run when the available stock is not able to meet the demand.
    If the need date shifts to a later date, the mrp / mps run will automatically reschedule the procurement proposal to a later date if the same is not firmed. So from your side ensure that the PR is not firmed, then system will automatically reschedule the proposals.
    A PR will be firmed if you manually edit it or manually create it or if MRP / MPS run firms the PR when it falls within the planning time fence.
    Hope the above clarifies your query.
    Regards,
    Vivek

  • How to Change attachment URL on a Purchase Req?

    Attachments in the EBP shopping carts are transferred to an ITS server and are linked to a back end R/3 Purchase Requisition. 
    Note that the attachments are physically stored on ITS server and the link (URL) to the attachment and Purchase Req is stored in SAP. 
    As a part of decommissioning, the server which was used for storing attachments is replaced with a new server and all the attachments are moved to new server.  
    Since the link associated to the Purchase Req and attachment is not changed, when user is trying to open the Purchase Req attachment, it is not displaying becuase all the attachments are moved to new server. 
    How to change the link (URL) in the Purchase Req so that it will point out to the new server instead of old server. 
    Due to the following reasons manually changing the URL is not advisable.
    1) 40,000 attachments link need to be changed.
    2) System is not allowing to change the URL manually because of the user differences.  All the attachment links are attached to Purchase Reqs by RFC user (since these are transferred from EBP environment). 
    Please advise what should be the feasible solution to change the URL (link) on the Purchase Req so that business can open the attachment with no issues.
    Thanks in advance

    According to SAP, since purchase order is a legal document they do not support the process of changing document number.  They suggested I do the change with debug and replace at my own risk.  In ME22N go to debug and type MEPO_TOPLINE-BEDAT.  The values for this field show up as 29991231 that should be changed to 20191231 and press F8, then save the purchase order.

  • Purchase requisition creation (STO) from Sales order

    Hi Gurus,
    Read the following scenario:
    Sales order is created with delivery plant A. No stock on plant A.
    Purchase requisition is created from plant B to plant A (intra-company flow or stock transfer order).
    Problem is that the purchase requisition needs a price. It is not logical because intra-company flow (stock transfer in same company flow) is like a stock transfer without purchasing. So in my mind, I don't have to maintain price.
    Also if I use ME27 to create manually STO between both plants, price is not asked.
    Other question is: is it possible to create directly a purchase order when sales order creation (and not purchase requisition, newt convert into PO)?
    Many thanks.
    Stéphane

    Hi Stéphane Vituret, Did you manage to find a solution for this. I have a similar problem as well.
    Please find the scenario below.
    Cusotmer places order of Mat-XX to Company A. The Company A creates PO to Company B. Company B delivers to Company A and then invoices Company A. Company A receives the goods into own stocks. Now the Company A delivers to the customer from its own stocks and then invoices Customer.
    I decide to go ahead with the Individual Purchase order solution and since the Company A is buying from Comapny B, I decided to integrate the Cross Company STO flow in the procurement part. Hence the flow in SAP is like;
    Cusotmer placese order to Company A
    Comapny A creates a Individual Purchase order type Sales order. So the Item category is TAB.
    This sales order generates a PR. PR is conveted into a CC_STO as thenvendor is Plant B in this case . Now this STO appears in the delivery due list of plant B.
    Now I genreate the delivery to move stocks from plant B(of co.cd B) to Plant A(of co.cd A).
    Here is the problem. I am not able to do PGI as the system checks for "sales order" stock at plant B and throws error
    "Sales order stock 36637 000010 does not exist". This should not be the case as the stocks should get attached to the sales order only when recieved into Plant A. Hence system should not check for "sales order stock" at plantB while trying to deliver from Plant B to Plant A.
    Lets take a normal IPO scenario.
    CusotmerA places order of Mat-A to Company A. This sales order generates a PR. The Company A converts the PR into a std.PO to external vendor. The PO from the sales order will have a account assignment "M- Ind. cust. w/o KD-CO". The stocks will be received into Plant with spl indicator "E" while GR (MIGO). Now the system ensures that this stock can only be delivered against the particular sales order. Thus the stock procured for the customerA is delivered to customerA and not consumed by anybody else. In this case there is only one delivery involved, in SAP, which is 601 mvmt type from the Plant A.
    However if the vendor becomes another Plant (Plant B) belonging to another company code then there are two deliveries involved in the SAP system one with mvmt type 643, from Plant B to Pant A, and the second with 601 from Plant A to the customer. Hence the system should check if the stocks are attached with a spl indicator only during the second delivery of 601 mvmt type. I am facing a problem because the system does it for the first delivery itself. If you know the answer please do let me know. I really appreciate it. Thanks a lot in advance.

Maybe you are looking for

  • Ipod touch has lost LOADS of my videos when connected to my MacBook Pro

    Ok this is a weird one, and it's happened twice now. So I use two macs, my 27" iMac at work which runs snow leopard, and my MacBook Pro laptop that is running Tiger. Now I connect both to my brand new iPod Touch, which is great and has all my videos

  • Depreciation posting for past period

    Dear All I have already posted depreciation for Jan 2012. After that I have made some acquisitions in Dec 2011 and want to post depreciation for that in Dec 2011 (with posting date 31.12.2011). While trying Repeat run for period 9 it gives message "O

  • Macbook pro not booting after software update

    Dear all, Since two days ago my macbook pro hangs at the gray apple screen, the round circle keeps on turning. Kept it running for nights but it does not exit this status. I read on the internet that I could run it in verbose mode, that's what I did,

  • Will restoring my iphone 4 make its performance any better?

    my iphone can only run one app at a time therefore rendering the multitasking feature useless is the iphone 4 just an outdated model? would restoring show any performance improvements?

  • Converting VHS to DVD using old Dazzle product

    I have read various posts about converting old family VHS tapes to DVD. I have an opportunity to buy an old Dazzle Hollywood DV Bridge unit. The manual that came with it says that it will function with these minimum system requirements: 300Mhz or Hig