hi experts,
     In Organization plan, I want to assign an organization unit under a position..If possible, how?..
  For example HR dept and Purchase dept need to be assigned under a position say MD or likewise..
    Thanks in advance..

Hi Ramesh
Check this Link
http://help.sap.com/saphelp_40b/helpdata/en/9d/9bd0348a955c0ee10000009b38f83b/frameset.htm
https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/404169f4-6ddd-2a10-35a0-e4a5a7c539b2
Hope this will be useful
Regards
Vel

Similar Messages

  • Can there be Org units under positions?

    Hi guys,
    Please let me know how to create Org units under positions
    Thanks
    Deepali

    Deepali,
    Standard SAP configuration for PPOME transaction does not allow you to create or units under positions.
    If you want to do so, you need to carry out the following configuration settings:
    1. Goto table T777E via SM30, select 003 relationship, double click allowed relationships from the menu on the left hand side.
    2. In the table add the following entry:
    S B 003 Incoporates O
    3. Goto table T778A via SM30, select evaluation path SBESX, double click evaluation path(individual maintenance) from the menu on the left hand side.
    4. In the table add the following entry:
    98 S B003 Incorporates * O
    1. and 2. steps are carried out to allow the relationship "Incorporates" between position - org unit.
    3. and 4. steps are carried out to allow the maintenance of this relationship via PPOME transaction.
    Please before doing these configurations make sure that assigning an org unit under a position is logical for your org structure and "Head of org unit" does not solve your requirement.
    Good luck,
    Dilek

  • New Organizational plan

    Dear friends,
    We are in face of an enormous organizational re-organization in my company.
    I think the better way is to create a new organizational plan with the new structure, but, I have a lot of doubts:
    - What about the old shopping carts ?
    - I guess both organizational plans can not work together and one of this have to be on hold...
    I tried to create a new one organizational plan and I did it, but, when I try to establish the validity periods then I get the following message error:
    No changes to data, periods undone
    All of the information about will be wellcome
    Best regards
    Ángel

    Hello Angel,
    I guess all existing users assigned to the old structure will be the same in the new one.
    This should mean you will move them to the new organizational plan ?
    If this is correct, i would advise you points below regarding your request (even if i never did it) if you do not use a standalone scenario:
    - create your new organizational plan with a begining validity period corresponding to the date you should switch on it,
    - "close" all your purchasing documents in SRM by making the goods/services receipt before this date,
    - when no document created with the old organizational structure remain, put a ending validity period with the day date for all its organizational units,
    - move users to their new organizational unit,
    - keep the old organizational plan.
    Some variants could exist if you do not keep old purchasing organizations, purchasing groups, company code, etc.
    If there is no modification for Financial and Controlling, invoices will remain possible in the backend.
    Here are my first suggestions. You will have also to do your own test play.
    Concerning you error message, at which node level did you create your new org. plan ?
    The root node for both are at the same level ?
    Regards.
    Laurent.

  • Two intercompany customers can be assigned to Sales Organization

    Need help on Intercompany customizing.
    Aas per the SAP standard configuration for intercompany postiing, one Inter company customer is assigned to Sales Organization.
    Is there a way thru configuration or User exit, two intercompany customers can be assigned to Sales Organization. Based on different Distribution channel, posting should be done for different intercompany customers.
    Thank You

    Hi
    See SAP Note 308989 - Consulting note for cross-company transactions for details and checkpoints. To check data in customer data, try with enhancement SAPMF02D.
    I hope this helps you
    Regards
    Eduardo

  • How can we change the assigned Family Organizer?

    How can we change the assigned Family Organizer?

    Hi J. Stephen G.,
    Great question! It is not possible to change the family organizer, however you can disband the group and restart it under a new organizer. For information on doing so, check out these resources:
    Leave Family Sharing - Apple Support
    http://support.apple.com/HT201081
    Family Sharing - Apple Support
    http://support.apple.com/HT201060
    - Matt M.

  • How can we assign Items from One Organization to a different Organization.

    Team,
    1. We have a requirement to load all the items from Organization A to Organization B. Both are in different Operating Unit.
    Is there any API available to do this?
    Thanks
    -Karthik

    As long as you have the same master org in the 2 operating units, all you have to do is
    INSERT INTO mtl_system_items_interface
                (organization_code, segment1, transaction_type, set_process_id, process_flag)
       (SELECT '&new_Org', msi.segment1, 'CREATE', 100, 1
          FROM mtl_system_items_b msi
         WHERE organization_id = &old)And run the Import Items request.
    Hope this helps,
    Sandeep Gandhi

  • How to configure PI user in organization plan?

    Hello SRM guys,
    When transfer external purchase requirement from ECC to SRM, PI user is needed assigned to organization plan. My question is: Which role should be assigned to PI user.  Which attribute should be configred in organization plan.
    Any one know about this?
    Envirement: SRM Server 7.0
                           ECC EHP 4.
    Thaks.

    HI Justin,
    You can assign a organization unit say EBP_EXT_CHANNEL under your root node or the node which has all the required attributres to create a SC for backend category.
    THe PI user should have the following roles :
    /SAPSRM/EMPLOYEE
    /SAPSRM/OP_PURCHASER
    SAP_XI_APPL_SERV_USER
    Hope this helps
    Regards
    Sam

  • Doubts in Organization Plan!

    Hello Experts!
    I would like to known if there is the possibility to associate one purchase groupe for many companies in PPOMA_BBP?
    Because when I try to associated the purchase group for other companies, it show up the error message
    Purchasing group XXX in system SXRXXXXXX already assigned to XXXXXXX
    Is there a form/way to divide the time for many purchase groups, because in our scenarrio of bussines one purchase group can buy for all companies.
    thanks..
    Kristin

    Hi, Imthiaz Ahmed..Thanks for our help..But I still have a doubt..Could you help me again?
    In my Organization Plan the scenario was defined with 3 company codes and for each company code one purchase organization (under). I create one purchase group only and i associated in one purchase organization.
    I found that field in responsability tab and I associated in organization responsability the ID reference for 2 companys codes.  This procedure is right?  Now Can I make the pruchase procedure using this purchase group for others companys codes?
    Thanks again...

  • Urgent: Organizational Plan Set-up!!

    Hi all,
    I'm on SRM 5.0 and I'm setting up the Organizational plan.
    I've a question regarding Purchasing Group and Purchasing Organization: is it possible (as it is possible in the back-end) to assign the same back-end Purchasing Group to different back-end Purchasing Organization?
    I'm creating Organization unit on SRM and mapping with back-end Purchasing Organization and Purchasing Group using Function Tab, but I'm not able to assign same Purchasing Group to different Purchasing Organization.
    Can anyone explain me how it works??
    Thanks
    #Bill J.

    Hi Yann,
    thanks for your reply..
    Do you have any suggestion on how to manage this?
    Any BADI to implement?
    Thanks
    #Bill J.

  • We work with SRM 5 Ext' Classic & report based on organization plan

    Hello expert,
    We work with SRM 5 Extended Classic scenario and BW for reports.
    We have a lot of purchasing types and we need a good report that can give as a clear picture of the purchasing process according to the organization units (departments). We have one purchase organization and a lot of purchase groups,  and the way that the system is built doesnu2019t support this requirement. We need a report that is based on the organization plan.
    For example:
    We need the option to extract all HR unit purchase documents or all direct supply goods that are purchased by the supply chain department. The report also needs to give a clear picture of the purchase operations and costs of every unit.
    Thanks,
    Gil

    Closed but Unanswered

  • Error while adding user in organization plan

    Dear all,
    When I try to add user in organization plan through users_gen, it raises an error 'Action cancelled'. Currently this user has only 1 node in the plan whereas it should have 4.
    What can be the problem?
    Regds
    Amit

    Dear Anita/Muthu
    Thanks for your replies. Note 1055921 is not relevant for my process. Email Id etc is maintained for the user.
    I have made one single user through SU01. Then I am using USERS_GEN, I am giving country code, org ID. Then system asks " area of user", I enter the userid. After that, this error comes.
    Default country is US and no tax system is there in SPRO. I am using SRM component version 5.0.
    I am lost!
    Regards
    Amit

  • Purchase Requisition Workflow - Organizational Plan required?

    Hi,
    We are implementing purchase requisition workflow.
    Based on what I have read, it says that the workflow table (table V_T16FW) and SAP HR-PA-OM (organizational plan) must be set up to support the solution. 
    Question:  If we are routing the workflow to a UserID, i.e. Object Type = US (and not an HR data object like Position or Job), do we require an Organizational Plan to be also set up?
    Cheers,

    Thanks so much for your response.
    What about assigning tasks to users, etc. that is usually done in org plan, correct?  If object type US is only used, I assume this is not required either?
    Also, what is the benefit of using Object type = 'S', i.e. position?  At my company, most of the time, when people leave, the position is deleted and a new one is created (there are a couple reasons for this), which means, even if we did use positions, the workflow table would still need to be maintained everytime a person leaves/joins the company (I understand if only the user to position mapping changes, then it makes sense to use positions, and therefore the workflow table stays constant, and only the user to position mapping changes).  Are there any other benefits of using S instead of US?
    Also, is it possible to NOT use a workflow table, and ONLY define an organizational plan?  I was thinking to activate user exit M06B0001, and perhaps ONLY maintain an org plan, and use this to determine approver, rather than maintaining both MM workflow table and SAP Organizational Plan (HR-PA-OM).  Bottom line, we want to maintain as little data as possible.
    Your thoughts?
    Cheers

  • Doubts in Organizational Plan in SUS

    Hello everyone,
    I need your help. I am working in a SUS implementation (for SRM 5.0). I have been checking about the definition of the organizational plan in SUS and I have doubts.
    I checked that is essential the vendor organization in transaction PPOCV_BBP, could you tell me if I have to define the same in SRM an SUS??
    Also, I checked and It is necessary define purchasing organization (PPOMA_BBP) and I want to know if I need to define all the purchasing organization from SRM
    Thanks,
    Ivan

    If you look at the names of the components of SRM , you can realise what khan says easily.
    SRM is a broad term and comprises further components
    EBP Enterprise Buyer Professional
    SUS Supplier self services &
    ROS Registration of suppliers
    All these functionalities or software components are bundled in SRM server
    so technically can be bundled on client
    but not advised by SAP for security reasons
    Now the purchasing client (or server ) is EBP
    responcible for purchasing
    so should have the purchasing organisation and depts
    and internal users with necessary attributes.
    SUS client (or server) is for vendor data
    so should have vendor root node with necessary attributes.
    Hope it helps
    BR
    Dinesh

  • SAP Business Workflow / Organizational Plan

    Hi,
    This is not specific to SRM, but is specific to SAP Business Workflow within ECC, relating to Organizational Management:
    We have more than one instance of SAP, where one instance is used to run all of our business, except SAP HR (let's call this SAP Instance 1), and another instance that is only used for SAP HR (let's call this SAP Instance 2);
    We want to implement SAP business workflow (e.g. approving requisitions through workflow in ECC);
    Is it possible to use our SAP organizational plan that is already defined in our SAP HR instance of SAP (SAP Instance 2), instead of defining an SAP Organizational plan in SAP Instance 1 only to support SAP business workflow. 
    Is it possible to define an interface from SAP Instance 1 to 2, to look up the requisition approver, pass it back to instance 2, and then send the workflow to the appropriate person.  Or is there another better approach?  e.g. Replicate organizational plan that exists in instance 2 in instance 1? 
    From what I have briefly read online thus far, I understand that "The organizational plan is part of the PD component "Organization and Planning. The organizational plan is maintained on a client-dependent basis. An organizational plan which was created for personnel management purposes (or is to be created) can be used in SAP Business Workflow without any changes, provided the workflow functionality and the personnel management application run in the same client."  To me, this sounds like that the workflow functionality and organizational plan must exist in the same system and client.
    Any thoughts, suggestions, or any advice to share?
    Cheers,

    Hi,
    It depends on how you will get approver from system.
    If it is not from organization plan, organization plan is not required.
    You can also call remote FM to get approver from other systems.
    Regards,
    Masa

  • SAP Organizational Plan for SAP Business Workflow

    Hi,
    This is question is specific to SAP Business Workflow within ECC, relating to SAP Organizational Management:
    We have more than one instance of SAP, where one instance is used to run all of our business, except SAP HR (let's call this SAP Instance 1), and another instance that is only used for SAP HR (let's call this SAP Instance 2);
    We want to implement SAP business workflow (e.g. approving requisitions through workflow in ECC);
    Is it possible to use our SAP organizational plan that is already defined in our SAP HR instance of SAP (SAP Instance 2), instead of defining an SAP Organizational plan in SAP Instance 1 only to support SAP business workflow. 
    Is it possible to define an interface from SAP Instance 1 to 2, to look up the requisition approver, pass it back to instance 1, and then send the workflow to the appropriate person.  Or is there another better approach?  e.g. Replicate organizational plan that exists in instance 2 in instance 1?  SAP tools for this?
    From what I have briefly read online thus far, I understand that "The organizational plan is part of the PD component "Organization and Planning. The organizational plan is maintained on a client-dependent basis. An organizational plan which was created for personnel management purposes (or is to be created) can be used in SAP Business Workflow without any changes, provided the workflow functionality and the personnel management application run in the same client."  To me, this sounds like that the workflow functionality and organizational plan must exist in the same system and client.
    Any thoughts, suggestions, or any advice to share?
    Cheers,

    Hi AD1981,
    Standard solution would be using distributed Organisational Management. There is custom ALE for this (check tcode SALE: Application Link Enabling (ALE) -> Modelling and Implementing Business Processes -> Predefined ALE Business Processes -> Human Resources -> Master Data Distribution -> Set Up Distributed Organizational Management). Basically you would maintain organsation in HR system and distribute changes to other instance using ALE. Workflow would rely on the distributed org. structure.
    Regards,
    Saku

Maybe you are looking for

  • I am trying to get better playback rendering speed Premiere CS6

    I am new to Adobe Premiere CS6.  I am trying to get faster playback rendering speed from my machine. Windows 7 i7 4790K Haswell overclocked to 4.5 (watercooled with Corsair) 16 GB DDR3@799MHz Asus Z87-WS (4 double graphic card slots) Geforce GTX 760

  • Error message: Cannot load the rpt file

    Can anyone please help. I created a Crystal Report which I deployed into Business One. Tested this report on about 13 machines running Business One and all running well except one machine where it comes up with the following error messages: 1: Cannot

  • Photoshop CC crashes when I open it.

    I was using photoshop CC this morning and all was good.  There was windstorm and a power outage.  When I tried to use it tonight, It opens all the way, but immediately a window opens that says "Adobe Photoshop CC has stopped working".  I am on a dece

  • [SOLVED] Pacman not working after updating.

    While I'm trying to resolve issue "package-query: requires pacman<3.6", I did wrong that entering "pacman-key --init" right after upgrading pacman. Now it neither upgrade nor install programs. pacman -Syu :: Synchronizing package databases... error:

  • SQL Loader, CLOB, delimited fields

    Hello. I have to load using SQL Loader data from csv file into table, which one field is CLOB type. Here is how ctl file initially looked like: UNRECOVERABLE LOAD DATA INFILE '.\csv_files\TSH_DGRA.csv' BADFILE '.\bad_files\TSH_DGRA.bad' DISCARDFILE '