In-process insp seperately for al products

Hi, my production order qty is for 5 qty. for header material 03 insp type is assigned, in routing micu2019s are assigned. In routing insp point assigned as 100. System generated the insp lot for in-process inspection. Now wants to record the inspection results of all 5 products separately. In results recording screen, entered u201C1st part inspectionu201D as text and recorded the results, similarly for all parts results were recorded. During results recording, individual part valuation is mentioned as accepted or rejected. Say, now out of 5 parts 3 are good, 2 are rejected. In UD, I have not seen any field to show 3 are good and 2 as rejected qty. pls advise how to maintain Different UD qty for the same inspection lot.
Edited by: ys yadav on Mar 18, 2010 12:40 PM

Hi,
You can here 150 inspection type & can give inspection at regular qty interval.say in your case qty interval will be 1 .
You can do confirmation also their it self  but finally posting you can do during GRN only.
Regards
SANIL

Similar Messages

  • Implementation content for MTS for consumer products in SCM

    Dear friends,
      I am trying to find business scenario in business process repository (BPR) for consumer products for MTS  from SCM 5.0 (Supply chain mgmt) .
    I could not find that option in solution manager 4.0. My scenario is very narrow to consumer products for MTS scenario. How to get it?
    If any latest implementation content CD needs to be downloaded from service market place.
    My i check system status my implementation content level is :
    ST_ICO:
    Release 150_700
    Level:0006
    Highest support package:SAPK-15076INSTPL
    Please guide me.
    Thanks
    Senthil

    Hi Dolores,
        In Solar01, In "structure"tab, under secnario name, if i press F4, i am getting
    SAP for consumer products. Under this i am having the following:
    1.Brand management
    2.DSD paperbased
    3.Global data synchronization
    4.Mobile DSD order to cash
    5.Mobile DSD Van sales
    <b>6.Responsive replenishment</b>--- Under this node i am having SAP ECC 6.0 & SCM 5.0, R/3 47 X 200 & SCM 4.1
    7. Trade promotion management
    My support pack level are:
    ST-ICO-150_700-<b>0006</b>-SAPK-15076INSTPL
    But what u told as latest is level 0007. What we have is 0006. How to upgrade the patch level?
    Senthil

  • Post to SL In-process insp. for production order

    Dear All,
    Please advise me how i can post defect (Scrap) into storage location during the In-process insp.
    As you know during the inspection you find defect quantity during production operation , some of this can be defect for raw material and some for semifinished material
    Please let me know how i can post to storage location ?
    Regards
    Rami

    Hi,
    Please note that i need to do this through Quality inspection lot, like the others inspection lot 01, 04
    This SL can be under Quality Control people and he can transfer the inspected quantity after that
    note also i can't transfer any quantity to any SL as i'm not Inventory clerk who responsible for this SL
    Thanks
    Rami

  • Process Code for Outbound Production Order??

    Does anybody know the Process Code for Outbound Production Order??
    BASIC Type : LOIPRO01
    Message Type : LOIPRO
    Regards,
    Ravi

    Hi Everybody.
    There's no standard process code for LOIPRO Outbound Idocs.
    This Idocs are threated as master data info, and could only be automatically generated by Data Distribution Model.
    BD64.
    Anyway, you can define your own Outbound Process Code in WE41 using CLOI_MASTERIDOC_CREATE_LOIPRO FM.
    You can choose.
    Regards.
    Albert.

  • Help: I have recently downloaded the newest software version for apple products. I have a iPod touch. After the process of updating my software, my photo app doesn't work anymore.

    Help: I have recently downloaded the newest software version for apple products. I have a iPod touch. After the process of updating my software, my photo app doesn't work anymore. I can't take pictures or view them at all. Every time I try opening the app it kicks me out of it and sends me to the home screen. I have tried turning off my iPod and back on multiple times. Even double tapping the home screen button and closing my opened apps. And I tried looking for the photo app in the app store but I did not see it. So I am wondering what can I do? And is this due to the new software update? Does anyone else have this problem?

    No, I have not tried any backup tools. I havent restored my ipod back to factory settings yet and then sync everything back on it. I am kind of scared too because I dont want to lose anything. I have just been hoping some new apple software update will come out because I know several people have had problems when updating to the newest version available.

  • No 101 for Co-products in Process order confirmation

    Hi All
    I have a problem in Process Order Confirmation.
    I have a order with Co-products.  When I do confirmation, 101 Mvt type is not happeneing for all the co-products along with the main product.
    The configs looks fine
    1.  Control key has "Automatic GR"
    2.  Confirmation parameters have "GR Co-products"
    What else could be the problem?

    Hi Jack,
    I'm not sure how it works with process orders but in case of production orders is it not possible to do auto GR for co-products - according to my best knowledge.
    Please check:
    http://help.sap.com/saphelp_erp2004/helpdata/en/b1/c04d01439a11d189410000e829fbbd/content.htm
    You can use MB31 + PrdOrd reference to book the co-products by mvt 101.
    (You can also search in this forum to find threads in connection with this.)
    BR
    Csaba

  • More than one insp. types for a material

    Dear all
    If two insection types are assigned for a material e.g, for a raw material insp. types 1 and 5 have been assigned.then please guide me from where this material will pick characteristic separately for each.
    Following steps i have taken already.
    i-maintained material specs for insp. type 1 and insp. plan for insp. type 05.so for type 1 it will pich characterstics from material specs and for insp. type 05,it 'll pick from insp. plan.is it right way.or any better suggestion somonecan give.

    Simpy use QP01 like you would normally.  If you want to include the material number and plant on the first screen you can.  In the header, select the appropriate task list usage for the inspection type.
    You should review in SPRO which usages are assigned to which inspection types.  You may need to change or modify them from what SAP delivers.
    From 6.0
    Task list
    Usage      Short text                         Assigned insp. types
    1     Production                        
    2     Engineering/design
    3     Universal                        04, 89
    4     Plant maintenance
    5     Goods receipt                 01, 05, 07, 08
    51     Goods receipt model
    53     GR external process.
    6     Goods issue                   02, 10, 11,12
    7     Returns                          06
    9     Material check                09, 15, 16, 17
    99     Production Rework
    You can change these in SPRO under "Maintain inspection types".  You can also add and create your own usages under the "General" section of "Quality Planning" in SPRO.
    Craig

  • Creation of EBP Purchase Order for Service Products in MM

    Hello all,
    i have created the service master in MM system and then i have replicated the service master to EBP later i tried to create a EBP PO for Service Products through Sourcing from EBP to MM.
    But i am getting a failure message as "Error during determination of  backend document follow on documents for shopping cart " and PO is not created anyway.
    But i can create PO for Materials with the same process.
    I am getting this message only during creation of PO with Service Products.
    I request you if any body has the solution please post your valuble information as early as possible.

    Mahesh
    What I understood from your case is you were able to create PR in backend for service items when you assign vendor manually durin g SC creation.
    In that case definitely it will create PR instead of PO in backend. Because when a vendor is assigned manually during SC creation. that vendor is treated as desired vendor and not fixed vendor. So it gives suggestion to buyer, who converts PR to PO, to use this vendor.
    When a desired vendor is assigned manually, SC is treated as incomplete. SC is complete only when source of supply is assigned automatically.
    If you want that desired vendor to be treated as fixed vendor you need to maintain the same in BADI BBP_DOC_CHANGE and method BBP_SC_CHANGE.
    If PO is to be created directly(Without BADI logic) make sure vendor is assigned automatically in source of supply section of SC. This  can be possible by maintaining vendor list in SRM or maintain a Contract for that product in backend so that system will pick that source automatically.
    Try this and see what document is created in backend.
    PS:Reward points if the solution is helpful to you.
    Regards
    Jagadish

  • Report to Generate Materials Used for the Production of FG/SFG Materiak

    Dear Experts,
    I am working for a Cement Factory. CLINKER is a SFG used for the production of FG Cement.
    RMOPCK1 and FINECOAL are another SFG used for the Production of CLINKER
    RMOPCK1
         +               = CLINKER + (Different Materials) = CEMENT
    FINECOAL
    For CLINKER we will create process order every month similarly for RMOPCK1 and FINECOAL.
    RMOPCK1 is using 5 Raw materials and FINECOAL is using 1 raw material
    Limestone + Silica 1 + Silica 2 + Bauxite 1+ Ironore 1 = RMOPCK1 and
    Rawcoal = FINECOAL
    All the raw materials, SFGs are used for creating different variety of cement.
    I want to know for a certain period how much is the CLINKER produced and How much is the raw materials used for producing the CLINKER.
    When i try through KOB1 with the process orders for CLINKER it is giving me total usage ofr RMOPCK1 and FINECOAL for producing the CLINKER.
    I Want to know for ex:
    the quantity of raw materials (Limestone + Silica 1 + Silica 2 + Bauxite 1+ Ironore 1 )used for producing ex: 1000 TON of CLINKER.
    Please help. Thanks
    Edited by: simonjohn on Oct 9, 2011 6:46 PM

    Thanks

  • APO Constrained and unconstrained Forecast for a Product, Location

    Hi Gurus,
    Please let me know the simple ways to get the constrained and unconstrained forecast for a product / location. I am new to APO, so please help me to send the detailed information. I would really appreciate it.
    Thanks in advance for your wonderful help.
    Best regards
    Nagarajan

    Nagarjan,
    When you run the fortecast in DP you consider the sales history. Now, this sales history is actual sales. While forecasting all that is considered are these values of the past and not the present and future capability to actually meet this forecast. Its just plain statistically generated numbers. Now suppose based on your sales you generate the following forecastL
    Jan 1000
    Feb 1000
    Mar 1500
    This is then released to SNP. Use the TX /sapapo/mc90. The idea is now to EVALUATE THIS FORECAST AGAINST OUR CAPABILITY TO SUPPLY, IN OTEHR WORDS CONTRAINTS!
    After releasing to SNP you can do a finite planning taking into consideration constraints such as Capacity, vendor capabilities, procurement constraints etc... Its almost always the case that the exact numbers cannot be met and thats whgy we do all the replanninga and levelling and rescheduling etc etc...
    In SNP you can run an unconstrained pla., You can then level this using SNP capacity levelling. Remmeber this process may span certain levels like DC- > FG Plant -> SFG Plant etc...
    After considering supply capcbilities you can come up with a REVISED forecast:
    Jan: 800
    Feb: 1000
    Mar: 1600
    Note that for March you are able to take an increased volume. You can now release this plan to DP back again to tell it that this is the demand I can meet and this is what should be planned. This can be done using Tx /SAPAPO/SNPFCST or /SAPAPO/LCOUT
    Hope this clarifies.
    Abhi

  • Multiple batches for a production order and mapping with components

    Hello Gurus,
    Our business requires to create multiple batches for one production order + they want to trace which component in the production order has been issued to the main equipment.
    For example, I am creating production order for 'A' equipment for 4 qty. Business wants to create 4 different batches for these equipment
    Lets say now 4 batches are created A001, A002, A003 and A004.
    Now lets assume 2 nos of 'B' component are required for 1no of 'A' component. So the requirement of B component is 8.
    Lets say 8 batches are generated B001, B002 ......B008
    Now lets say batch B001 and B002 are issued for A001 and packed together. How do we map this?
    I understand we can do some enhancement for creating the multiple batches but I still dont know how to map them with each other.
    Please help

    Hi Ethan
    There is a functionality called WIP batches, that allows you keep the batch traceability within an order.
    With WIO batches you can track which batch of component was used to produce each batch of finished product.
    See this link for more details:
    Work-in-Process (WIP) Batch - SAP Library
    BR
    Caetano

  • Licensing for this product has stopped working - Acrobat 9 Pro / OS 10.7

    I am having a problem with Acrobat 9 Pro (9.4.5)  following my upgrade to Mac OS 10.7 (MacBook Pro).  The error that I've been receiving is "Licensing for this product has stopped working" with a numeric code at the bottom of the page of (0).
    As suggested on that screen, I uninstalled and reinstalled Acrobat 9 Pro and spent quite a bit of time loading all of the updates.  At the end of it, I still receive the same message and the program will not continue after that message.
    This is part of CS4 Master.  All other products in the suite are working correctly and without issue.  No challenges with other Adobe products for licensing.  Acrobat is the only program I have that gives this message and then closes.
    I found this page -> http://kb2.adobe.com/cps/512/cpsid_51260.html and started working through the process on that page.  When I got to the step of the License Recovery Tool (11.6.1), the launcher program will not launch with the error "You can't open the application LicenseRecoveryLauncher because PowerPC applications are no longer supported."  I guess that this program relies on Rosetta and will no longer function.
    Can you help?  I've already uninstalled and reinstalled Acrobat 9 Pro several times.  Some of the steps noted on http://kb2.adobe.com/cps/512/cpsid_51260.html disable the licensing for the other apps in CS4.  I really don't want to uninstall and reinstall the entire suite.
    I have been on Adobe Customer Service Chat for a few hours.  Recommendations have been to just upgrade to Acrobat X or to call it in.  Before that, I wanted to check the forum to see if anyone else has hit this issue and if there is another possible fix.
    Thanks!

    Steve,
    I appreciate your answer.  While it might work, I'm a bit hesitant to remove the other programs as a possible solution since they are all currently working.
    With Acrobat 9 Pro failing with the OS 10.7 upgrade, I'm hoping that there is a less severe solution.
    Since the trigger appears to be 10.7 and may have something to do with the discontinued support of Rosetta, I could be spending a few hours working on a reinstall without a change.  Yes, it might work.  The "might" is the part that makes me hesitate.
    Is anyone else out there on OS 10.7 and running Acrobat 9 Pro?  Any issues with anyone else?
    Thanks Steve.  I do appreciate your offering a solution.  I may end up trying it if nothing else comes together.
    Mark

  • Licensing for this product has stopped working - Acrobat 9 Pro Trial Edition

    Before committing to purchase of 50 licenses for the office, I though I'd better make sure Acrobat 9 Pro works on my laptop. Nyet
    I am totally frustrated by spending 20 minutes installing the package, only to get a "licensing for this product has stopped working" "You cannon use this product at this time"
    I've reinstalled - twice
    I've followed instructions relative to Flexnet service.
    Anyone have a do this and Acrobat 9 will work list of instructions - preferably something that will work in a batch file since I don't want to spend two weeks getting the units on our network to work with Acrobat 9.
    TIA

    OK - or i should say not OK!!
    I am running the licensed version of Acrobat 9 Pro on Mac OSX. It is installed on 2 of my MacBook Pro 17" laptops. These machines are respectively 1 month and 14 months old, and both are completely up-to-date software wise. 3 weeks ago Acrobat presented the error message "Licensing for this product has stopped working" and then quits. Searching through the error logs reveals the following: No matching processes were found. Shutting down licensing service ...
    I have meticulously, several times worked through all the recommended steps on the Adobe site to address this issue but to no avail. Booting up in safe mode makes no difference. In desperation I re-installed the OS, but to no avail. My several and extended communications with Adobe online help have left me chatting with what sounded like a couple of uni students from India who had insufficient understanding of English, Macs and Acrobat. After 3 weeks my case has been closed twice by Adobe who report that they believe my issue is resolved and have therefore closed my case. Great!!! What's more, occasionally Safari is presented online with a pdf file which it attempts to load, and then crashes.
    This issue has seriously affected my ability to work with and create pdf's which in my work as a medical researcher is essential. To add insult to injury, I have wasted too many precious hours attempting to rectify the situation.
    The bottom line is caveat emptor (buyer beware). Adobe it seems are committed to making a sale but not to follow-up, service or genuine concern for their customers. When some company produces a less buggy (and cheaper) alternative I will be definitely be buying their wares.
    In the interim, if anybody out there can advise me as to how to get Acrobat working again, I would be most grateful.
    Have a great day.
    David

  • Runtime exception for configurable products

    Hi Gurus,
    I am getting a runtime exception for configurable products on clicking the link You can select more product options in CRM 7 b2c application . But when i login with a registered user and click the same link , it opens up and takes to the page for configuration of products .
    Please find the error from logs :
    [EXCEPTION]
    79823   java.lang.NullPointerException: It was tried to rebuild the connection because of invalidity. It is not allowed because the connection type is not JCoConnectionStateless. You may also check the user authorizations.
    79824   at com.sap.isa.core.eai.sp.jco.BackendBusinessObjectBaseSAP.getDefaultJCoConnection(BackendBusinessObjectBaseSAP.java:55)
    79825   at com.sap.isa.maintenanceobject.backend.crm.DynamicUICRM.readData(DynamicUICRM.java:121)
    79826   at com.sap.isa.maintenanceobject.businessobject.DynamicUI.read(DynamicUI.java:767)
    79827   at com.sap.isa.ipc.ui.jsp.action.InitDynamicUIAction.ecomPerform(InitDynamicUIAction.java:67)
    79828   at com.sap.isa.isacore.action.EComBaseAction.doPerform(EComBaseAction.java:375)
    79829   at com.sap.isa.core.BaseAction.execute(BaseAction.java:212)
    79830   at org.apache.struts.action.RequestProcessor.processActionPerform(RequestProcessor.java:484)
    79831   at com.sap.isa.core.RequestProcessor.processActionPerform(RequestProcessor.java:692)
    79832   at org.apache.struts.action.RequestProcessor.process(RequestProcessor.java:274)
    79833   at com.sap.isa.core.RequestProcessor.process(RequestProcessor.java:409)
    79834   at org.apache.struts.action.ActionServlet.process(ActionServlet.java:1482)
    79835   at com.sap.isa.core.ActionServlet.process(ActionServlet.java:243)
    79836   at org.apache.struts.action.ActionServlet.doPost(ActionServlet.java:525)
    79837   at javax.servlet.http.HttpServlet.service(HttpServlet.java:760)
    79838   at javax.servlet.http.HttpServlet.service(HttpServlet.java:853)
    79839   at com.sap.engine.services.servlets_jsp.server.runtime.RequestDispatcherImpl.doWork(RequestDispatcherImpl.java:321)
    79840   at com.sap.engine.services.servlets_jsp.server.runtime.RequestDispatcherImpl.forward(RequestDispatcherImpl.java:377)
    79841   at org.apache.struts.action.RequestProcessor.doForward(RequestProcessor.java:1069)
    79842   at org.apache.struts.action.RequestProcessor.processForwardConfig(RequestProcessor.java:455)
    Can anybody help me out to find the issue .
    Thanks and Regards,
    Tony Isaac

    Tony,
    It looks more like an issue with the loading of the JCO properties before the logon. Can you go to XCM and try reentering the password and save the config. Once done do a test connection and restart the application.
    Then set a breakpoint in the BackendBusinessObjectBaseSAP class in the method getDefaultJCoConnection().
    Here when the current connection is invalid it tries to read the config properties from XCM. Just check if it is reading the correct values from the config ISA_COMPLETE which is read on the backend object.
    In case of mismatch, you need to fix that or you could try to build a new JCO connection with your own parameters.
    Pradeep
    Edited by: Pradeep Kumar on Mar 11, 2010 6:20 AM

  • Which is better MBPr for music production? 8gb or 16gb

    Hi everyone:
    I am seeking suggestions here from fellow music artists/ DJs and tech wizards to help me make the "right" decision in where to invest my money.
    I don't know wether to buy the base model MBPr 15inch with 2.0Ghz Quad Core i7, 8gb ram and 256 flash drive. I am a musician and this laptop will solve two purposes
    1) Usual everyday Microsoft Office kinda stuff and web surfing and
    2) More importantly for Music production using Logic Pro X, Ableton 9 using KONTAKT and Omnisphere along with Reason Rewire for loops.
    THEREFORE, now I am second guessing my purchase on two aspects -->
    1) Is the 8GB enough to run, say a typical setup of Ableton along with 2-3 vsts softwares, would these specs on the MBPr last about 3-5 years?
    2) Is the 256 GB SSD going to be an issue with file sizes? I mean like I can always transfer stuff to an external drive and keep creating space but then its almost like having a McLaren SLR and running it constantly on EMPTY and getting gas filled in it every 2 miles. Idk....
    Any advise, nudge in the right direction, suggestions, recommendations would be much appreciated. . Is 8gb of ram enough? I am more on the 8gb ram side because of money issue also the place I am buying is offering 10% discount (cannot configure with the specs) I want to be happy with my purchase, but I don't want to be 2 years down the road kicking myself for not having gone with the 16GB and bigger SSD.
    Which is a notable problem with the rMBPs and their lack of upgradability.

    Hi whopkins85
    Well I ended up going with the 16GB Retina MBP. For the simple reason that the 8GB would've seen me constantly second guess my decision. Plus I wanted to "future proof" myself as best as I could knowing that these babies cannot be 'upgraded' with additional ram at a later date due the whole soldered RAM issue. So yeah I shelled out some extra money, bought my rMBP from B&H in NYC through their webstore and saved a ton on not having to pay sales tax since I am not a resident of NY state.
    Another thing I'd like to recommend to you is that if you plan on running a number of VSTs or AUs with your DAW especially of the nature of heavy sound libraries such as Spectrasonics Omnisphere or KOMPLETE then I would highly highly recommend purchasing a Lacie 2 or 3TB 7200 RPM external drive. I wish I had known this earlier but an incredibly efficient (and correct) way to run DAW with sound libraries to load your VSTs on an external drive which is either a fast SSD or at least a 7200 RPM. This way your system drive doesn't get overloaded reading and writing at the same time between multiple programs running in parallel. Once your system drive runs the DAW and the system accesses the sound libraries through and external drive, it makes for a much more efficiently managed read/write process.
    I hope this helps. My mantra for technology is, when in doubt go with max specs on a machine.
    Thanks for your post

Maybe you are looking for