In-process inspection and confirmation

Hi, i have used 03 insp type in material master. for each operation, some characterstics were assigned. after prod order confirmation with co11n t-code, i have done results recording thru qa32 t-code. even without confirmation (co11n) also, system allows to record the results thru qa32. please advise how can we restrict this? is there any link or relation in between confirmation and results recording?

Dear Yadav
Let me explain to you in detail the business process and the relevance of 03 inspection .
1)Suppose you have a product A and routing of this product A be like this.
0010 Forming > 0020 u2013 Winding > 0030 Testing > 0040 Assembling > 0050 Final Finishing.
2) In a normal production process suppose you have a production order of 100 for product A
3) Now during the production process you need to confirm each operation through CO11N what was the yield, rework, scrap, activity time taken etc.
4) Once all the operation are confirmed the production order is GRu2019ed and this product A goes to quality stock for 04 inspections. 04 inspections is always considered as Final inspection.
5) 0030 operation being a inprocess inspection , 03 inspection type gives the Quality personal a control over the confirmation process.
6) Quality personnel can do not only result recording but also confirmation of the quantity thereby giving him the control over the production quantity.
7) Quality personal can also do the testing partially and record result multiple times and confirm partially
8 ) To bring the confirmation pop up in QA32 you will have to do
a) In Routing at header kindly maintain inspection point as 150
b) At Operation level maintain a QM work center ( testing ) with Control key QM04
b) double click on the control key and go to Quality Management : Inspection points
c) Maintain Inspection point completion : Quantity , Valuation and confirmation
10 ) For a better control over the 03 inspection these setting have to be defined in PP configuration for production order Type in Tcode OPK4 in config
SPRO > Production> Shop floor control> confirmation> define confirmation parameters
Maintain
1)Operation sequence u2013 error when order sequence is not adhered to
2) Overdeilvery u2013 Error when over delivery tolerance is exceeded
3) Results Rec. (QM)- Error message if no Insp results exist
Edited by: Gajesh Nagesh on Dec 17, 2009 9:12 AM

Similar Messages

  • In process Inspection and Rework Qty Issue

    Hi,
    There is Production Order for 100 qty.  There are 5 in process operations like 0010 Cutting, 0020 Welding, 0030 Inspection, 0040 turning, and 0050 Inspection
    (1)0010 operation is finished by production for 50 qty and confirmed through co11n by entering yield as 50 qty.
    (2)0020 operation is finished by production for 50 qty and confirmed through co11n by entering yield as 50 qty.
    (3)0030 operation: Quality inspected and entered results as 25 as yield and 25 as rework. For defects Q3 notification is
         triggered.( ie CO11N transaction is called in QM)
    (4)Production opened rework order CO07 and confirmed the rework operation and booked material and labor cost on cost
         center instead of orginal order.
    (5)0040: Operation production could confirm only 25 qty as earlier 0030 operation of inspection  yield was only 25 qty.
    (6)Inspection already in 0030 operation 25 qty  was entered as rework. Now after rework how results recording will be done 
         and qty will be posted in yield. Unless yield is entered under 0030 operation for 25 qty , production cannot confirm the 0040
         operation for pending 25qty.
    (7)Business requirement is what ever the qty production manufactures it has to be entered in system. Based on quality
         inspection incentive will be paid to only qty which is passed by quality.
    Settings Made:
    (a)100 Free Inspection, No Qty Relation, Quantity Valuation and Confirmation in Production for only inspection work center
         without any cost capturing.
    (b)Confirmation parameters settings with error for over and under delivery tolerance, error if inspection sequence not adhered,
         error message if no inspection results exists
    Any suggestion or any other way of handling this requirement.
    Thanks & Regards,
    RSR

    Hi RSR,
    Your way of mapping is absolutely fine, few points to be clear...
    03 inpection type and enable inspection characterisitics for operation 030
    04 inspeciton type to be enabled and operation 050 shall be eliminated if possible, material stock posting will be done from 04 inspection lot for 25 nos.
    let me know if you have questions..
    regards,
    Lenin. A

  • Steps for in process inspection

    Hello experts,
    I am new to QM, I have configured system by reading documents
    please explain me the  steps to be followed..
    I have created a production order
    Inspection lot is created
    Confirmation is done
    what is the next step to be followed
    I thought to post the results, but it is giving me message order is niether completed nor confirmed
    please guide me the steps to be followed
    Thanks
    Satya

    Please find the link below where Gajesh has already explained step of in process inspection.
    [Re: in-process inspection and confirmation]
    Thanks!!!

  • In-process inspection...how to stop the process order confirmation?

    Hi...i'm making an in-process inspection and i want to stop the movement to the next phase or the process order confirmation, until the usage decision is made...how can i make this ?

    Dear,
    You can do this with OPK4 setting here slect your plant and process order type go in details here change the setting to
    Results Rec. (QM) = Error message  if no inspection result exist.
    Regards,
    R.Brahmankar

  • Production order should be confirmed before in-process inspection UD

    We guys,
    I have activated the In-process inspection for one Finished goods and inspection lot is getting created when Production order released. This production order can be confirmed without UD for In-process inspection lot.
    Please let know How can I control that Production order should not be able confirm before UD of Inspection lot for in-process inspection.
    When production order released it means an production has just starded. Then What is the meaning in getting the inspection lot created on release of production. I think it is supposed to be on completion of each opration.
    Please give your inputs.
    Thanks
    Dhanu

    Hello
    inprocess inspection are used to assisst you to record results , defect , rework, during the production operation. It is defined to get created during the release of the order. It gives QM personnel a control over the quantity confirmation. You can do the result recording based on time and quantity.
    Operation confirmation and UD are independent and it will not be possible to do confirmation once you do the UD.
    The controls that can be brought in 03 inspection for a better usage
    1) Result recording mandatory for all inspection points
    2) QM operation can be confirmed only by QM personnel
    3) At the time of GR of the order check whether UD for the lot is given. Make UD mandatory for GR of the order
    4) Only after QM operation confirmation the next operation can be confirmed
    5) make use of Rework to capture rework cost and First Pass Yield
    Hope this gives some picture to you
    Regards
    gajesh

  • REM: production tracking, rework, and in-process inspection

    Gurus,
    I have three issues with REM, and I have my own views on them:
    1. Rework: In case of discrete manufacturing with the help of trigger functions we can generate an operation (in the same  order) or a rework order to cary out reprocessing. But in case of REM we cannot achieve this because there would be no order for inserting new operation and since it is REM we should not generate a new order. The only way is to manually backflush the activities and components (without any reporting point).
    2. Tracking: In case of discrete we have a set of system generated production orders through we can track the GRs, confirmations and issues. But in case of REM we can track those parameters only against cost collector. Only way to know the pending activities is to carry out backflushing against planned orders (which are subjected to reduction) and check pending GR/GI/Operations with the help of the remaining planned orders. Are there any standard reports on that?
    3. In-process Inspection: Can be achieved through inspection type 13 and lot needs to be generated through t-code MFPR.
    Kindly let me know if my understandings are correct. Please let me know if there are other way arounds in Standard SAP.
    Thanks in advance!
    Snigdho

    HI
    As In discrete there is no Rework order in REM.For Tracking you need to assign the Planned order to the Prdocution versions in Planning table thru MF50 and then Backflush against the planned order .Check report MCP6/ MCP8 for GR against planned orders.
    Inprocess inspection can be done thru 13 and lot generation is done thru MFPR.
    hope it is useful.
    Regards
    Anupam Sharma

  • In process Inspection  Lot Qty and Actual Lot quantity difference.

    Hi Experts,
    In case of  In process Inspection
    Scenario : 1. Production Order created, released but before saving the qty is changed.
                    2. Production Order created released and saved. Then qty is changed in Change Prod order txn.
    These scenarios are causing a discrepancy in  Inspection  Lot Qty and Actual Lot quantity. Is there any method to avoid this ?
    This can be made correct in  Inspection lot by resetting the sample calculation. But once confirmation has started for Prodn Order (not necessarily QC operation) or  RR has been done  resetting is not possible.
    Is this the std behavior ? Disallowing the resetting once RR done seems OK, but even if any of the operation in Prodn Order is confirmed it still give status error while resetting. Canceling all the confirmation all the way back  also does not solve the problem.
    Any suggestions ?
    Regards
    Joe

    Hi
    Although your suggestion is valid, it is not practical from user point of view.
    Moving this thread to QM forum.
    Rgds

  • In process inspection for partial confirmation of production order

    Hi QM Guru,
    how i will do in process inspection for partial confirmation of production oder
    Senior is this  I have maintain inspection type 03 in finish material u2026..suppose production order quantity 20 kg..there are 2 operationu202610 and 20.. I have maintained MIC on operation 20u2026after release the production order  lot are generatingu2026but when they confirm operation 10 they do partial confirmation for 10 kgu2026.then again when do confirmation 20..they checku2026for quality resultu2026
    Then I do the result record ok of 10 kgu2026then they confirm 20 operationu2026.
    Now. again he do the confirmation of rest production order 10 kg..opration 10 ok..but in operation 20..system does not check for qualityu2026..
    Again I want to do the quality inspection of 10kg on 20 operationu2026
    How I will do. kindly suggest me
    Regards
    Aqueel

    Hello
    I think that the process can be mapped in one of these ways:
    - according to what you describe this is closer to a good receipt inspection and not to in-process inspection, as the trigger for the inspection is the GR and not the release of the order. So, why dont you give a chance to a 04 inspection type, with inspection lot creation for every GR ? Check the indictor in MM02, QM view for "04" inspection, and uncheck the "Stock in quality", so you dont get caught by the stock in quality and resembles in process "Non-stock relevant" inspection
    - alternatively you can define the use of inspection points ? So you are adding new results as new confirmations are made. Disadvantage: you can only give one usage decision to the inspection Lot, irrespective of the number of samples you have analyzed.
    Regards

  • Process Order does Confirmations and GR even after the Process order is CNF

    Not Sure why the Formatting is lost.
    Hi Gurus,                                                                               
    I am a beginner in this area and request your help.                                                                               
    We are implementing a project where the process order Confirmation in SAP ECC 5.0 in SAP PPPI module is done using xMII which call the BAPI_PROCORD_CREATE_TT     RFC.
    The customer wants to (certain times) do a final confirmation without actually completing the order e.g if the Order Qty is 100 then, they want to just manufacture 25 and then do a final confirmation, after which SAP GUI screen does not allow any Process order Confirmations against that process order.
    We are using the BAPI_PROCORDCONF_CREATE_TTRFC to do multiple PO Confirmations and GR for particular Process order. Below is a scenario
    Case 1:
    1. Order Qty =100  ( Unlimited Delivery is not checked and tolerance is Zero).
         Which means only 100 is accepted.
    2. 100 Quantities are produced and confirmed using the BAPI_PROCORDCONF_CREATE_TT (with Final confirmation value as 1 , which mean auto confirmation)
    3. Next when the BAPI confirms & GR's against the same order, the Complete qty is not visible in the COR3 status. And is visible only in the COGI transaction.
    That is expected behavior. and i am ok with that.
    Case 2: (The one with the problem)
    1.  Order Qty =100  ( Unlimited Delivery is not checked and tolerance is Zero).
         Which means only the 100 is accepted.
    2.  25 Quantities are produced and confirmed using BAPI_PROCORDCONF_CREATE_TT (with Final Confirmation value as X , which mean Final confirmation)
    3. The Confirmation and GR go through and the status of the process order now changed is CNF and the Deliverd qty is 25.
    At this point , if you logon to SAP GUI and try to make a process order confirmation you get an error messages which says the Process Order is already confirmed and no more confirmations or GR can be done against this Process order.
    4. But when you Again Run the BAPI_PROCORDCONF_CREATE_TT, it goes ahead and confirms and makes the GR for that Process order.
    The Expected Behavior should have been that this quantity is now in the COGI transaction.
    5. The Process order  allows any number of Further confirmations till the Ordered Qty and Delivered quantity are  same .
    so dear gurus I know i have written a very long doubt but would be very happy to get a response from you. I would ideally not like to enhance or change the BAPI and want to understand if I have missed some setting or parameter that I have to pass in the BAPI for the final confirmation so that once the Status of the Process order is CNF , no more Confirmations are allowed even from the BAPI.
    Thanks in Advance.
    Regards
    Suraj

    Hi Suraj,
    I am not positive, but I suspectt the problem lies in the BAPI.  It might be how you have the data set in MII, but it sounded like you are doing it correctly. 
    However there are a number of things you can do to troubleshoot your situation.
    First create a few process orders to test with. 
    Record the confirmation numbers and counters for each of the following:
    1) Do a final confirmation (for quantity of 25 instead of the 100) in CORK (or whichever transaction you are using). 
    2) Do a final confirmation (for quantitiy of 25 instead of the 100) in SE37 or BAPI in ERP using the BAPI_PROCORDCONF_CREATE_TT.
    3) Do a final confirmation (for quantitiy of 25 instead of the 100) from MII using your current transaction. 
    Review the confirmations in ERP to see if there are any differences.
    Review the confirmaitons in MII to see if there are any non visible differences (use a Tracer to retrieve the response segment from an execution of BAPI_PROCORDCONF_GETDETAIL using the recorded confirmation numbers and counters) 
    Case 1) If there are differences in the results, that should tell you how to modify your transaction to include or change the appropriate values in your inputs. 
    Case 2) If there are no differences, then it is most likely that there is something not working properly in the BAPI you are using.  It may not completely replicate the functionality in CORK (or whichever transaction you are using in ERP).  Then open a ticket, because the BAPI is not working as it should.
    Good luck,
    Mike
    Edited by: Michael Appleby on Aug 17, 2009 8:20 PM

  • I submitted my trade in and then placed order for iphone 6 - processed payment and everything  - no email confirmation was sent and no order history on my acount - did it go through or not???

    I submitted my trade in and then placed order for iphone 6 - processed payment and everything  - no email confirmation was sent and no order history on my account - did it go through or not???

        Seeyasoon,
    I know this is something that I would be worrying about too, and I want to ease your mind. I've sent you a direct message and look forward to assisting you there.
    SarahO_VZW
    Follow us on Twitter @VZWSupport

  • Process Order Partial confirmation (PNCF) and Final Confirmation

    Hi expert,
    I'm already running t-code COHVPI to mass processing process order so it status change from TECO to CLOSED. But there is an error message "process order partially confirmed". Is that true if process order must be final confirmed before it changed to CLOSED. Should we change the status of partial confirmed (PNCF) to Final confirmed (CNF) before process order CLOSED.
    Please give me a suggestion.
    Thank you.

    Correct. Final Confirmation is THE signal to the rest of the world that that this order is DONE (at least from the GR standpoint). This will also retire the order from the APO/SNP radar.

  • BW - Process Chain for Service Orders and Confirmations

    Hi,
    I need advice on the creation of my process chain and basically I'm still new in this BW technical area.
    I have done on the infopackage (full update) , DTP from PSA (delta once update) and DTP from ODS (delta update). My datasource is 0CRM_SRV_PROCESS_H and my ODS is ZSOL_O01. while my cube is ZSOL_C01.
    my plan for the step of the process chain is as below. this is based on my understanding after doing 'try and error' things using the update mode for infopackage and DTP.
    1. delete the old PSA/datasource - the infopackage is run in full update
    2. delete the old ODS - after afew loading, seems there are afew ODS request created with same number of record and data. that's why i plan to delete the old ODS
    3. run the infopackage - new PSA request will be created
    4. run the DTP (PSA to ODS) - new ODS request will be created based on the new PSA request
    5. run the DTP (ODS to Cube) - new cube request will be created based on the new ODS request
    izzit ok with my above step? i'm not sure on the deletion of cube index. izzit needed?
    thanks

    i need advice on below things since this is my 1st BW task..
    1. transport list - how do i group all the objects into this transport list? if the object is attach to other TR, how do i trace it and put into my transport list? should I group all the objects into 1 TR or is there any sequence should i follow? maybe characteristic/key figures 1st or DTP first...
    i'll tel you the most easy way to collect transport that you will never have issues
    go to RSA1--> transport conenctions
    when you get your item on on left ,you have to set up few things.. on the right there is a display mode ,, do the drop down on it and do it a list and do cloeection mode manually.
    you wil always get alist of items under or over then way you can pick waht you want to transport very easily withouth missing objects or figuring out what did you miss
    and you can collect all in 1, Bw is smart enough to transport and activate dependences on its way as long they are in 1 transport
    2. currently my source data is from my solution manager (SOLMAN) development server. should i create 1 more infopackage for SOLMAN testing server? how about production? is that means, at the end i will have 3 different infopackage for dev, testing and prod?
    once you transport infopackages they autmatically gets assigned to the new system.
    3. is there any step i left or missed?
    not that i can think off. if any transports are locked go to se03 and unlock your transport , make sure you unlock any underlying transports, youc an find the transports in se09 or se10

  • Calibration process : inspection lot not created

    Hello,
    When creating a maintenance order (PM05) , i can not get the inspection lot created .
    There has been some thread about this process , i believe i followed the instructions :
    -equipment category is production ressource/tool
    -master inspection characteristics created (released)
    -sampling procedure created for PM
    -equipment task list created with inspection point at header level , with control key including inspection characteristic , with master inspection characteristic , with sampling procedure
    -configuration for inspection type and order type is done
    then when creating the order manually (or via a maintenance plan) : the order is created and released but with no inspection lot assigned...
    does anyone have an idea where the error might come from?
    Thanks again,
    Pete

    Hi Pete
    Weather this is correct or not for your scenario but please check the below spro setting.
    Plant Maintenance and Customer Service --> Maintenance and Service Processing --> Functions and Settings for Order Types --> Assign Inspection Types to Maintenance/Service Order Types
    click on the symbol
    in Change view " Assign Inspection Types to Maintenance/Service Order Types" :Overview screen assign inspection type against plant and order type combination. for PM 14 is inspection type.
    please confirm.
    regds,
    Venkat

  • QM In-Process Inspection for Batch Managed Material

    Hi,
    I have a issue related to UD of In-Process inspection for batch managed material. The production process is discrete manufacting for a cold rolling mill. A production order can have mutiple coils as per the production amount. To track the individual coil , batch management has ben activated. We have both in-process as well as inspection after production here.
    For inspection after production we are fine as we are doing partial confirmation after every coil and have separate inspection lot having different batch number.
    But for in-process I can have only one inspection lot for the production order (created on release of the production order). I can do the result recording but while trying to do UD u2013 it is asking for a batch number as the material is batch managed. W/o entering the batch number system is not allowing me to do the UD.
    Is there any solution/work around of this problem.
    -Regards
    ashim

    Hi Ashim,
    you raised a very good question? i am helpless here to execute same scenario,
    but i disussed with my QM guy here, he said, once the material is batch managed then it has to ahve batch in UD.
    so i discussed ur case, which is very much valid for heavy ind like cement and all,
    so what i suggest, u create a dummy batch in the UD for in process (no inventory posting)
    and at confimation give ur usual batch (if system propose the dummy batch which u give in the UD for inprocess, try to change there--- i hope it should allow)
    i would really like to here answer from u for this.
    try to do as suggested, and let me know the results.
    REgards,
    Pravin mukkawar

  • QM- In-process inspection Setup

    Hi all,
    My requirement is :
    - to setup inprocess inspection in the final operation in routing,
    - the operation and order can only be confirmed if the usage decision of inspection is favorable.
    - want Auto GR to happen after favorable usage decision and subsequent operation& order confirmation.
    I have done the following:
    - attached an in process inspection type with a required UD set and made it active
    -created an MIC and assigned in routing
    -assigned a control key that allows inspection and autoGR to the final operation in routing.
    The following happens when i test my setup
    - When i release the order an inspection lot is created.
    BUT, the problem i face is that when i confirm the final operation the Auto GR happens and the FG is posted to unrestricted stock even though the usage decision is not entered for the inspection lot. What i want is that on confirming the order the FG should be posted in Quality stock and once i enter the favorable usage decision it should automatically get posted to unrestricted use.
    Could you please tell me what i am missing here?
    Thanks,
    Ashok

    Hi!,
    Actually inprocess inspection doesn't involve any inventory movement. Means you can't control any goods movement with inspection type "03".  Only inspection types 01, 04 and 08 involves control on goods movements. For your requirement you need to opt for goods receipt inspection i.e. inspection type "04". For this you need to assign an inspection setup in material master with insp type "04", create an inspection plan for the produced material. Now when you make an order and confirm some quantity then system will create an inspection lot and till you give UD to that the confirmed quantity will remain in quality stock.
    I hope this will solve your problem. In case of further queries please revert back.
    Regards,
    Uday

Maybe you are looking for

  • Problem in Unicode Data in Oracle Forms 6i

    hello all, i m using forms 6i with oracle 10g. i have set Nls_lang =American_America.UTF8. Now my problem is when i type some data i marathi Using a font converter engine directly into the text box on form i just get ?????? in the text box. But when

  • How to use a robot,it does't work

    I would like to mimic keyboard using a Robot.In ButtonFrame,I need to put the focus in the 'blue' button and press it,but though the button has focus but failed to invoke the action.why?help me.ButtonFrame---the background color will change if you cl

  • Making two mono tracks from one stereo track?

    I've used the M-Audio MobilePre USB device to record  vocal and guitar at the same time. In GarageBand, this inputs as one track, with guitar on the left channel and vocal on the right. I'd like to separate this one stereo track into two mono tracks

  • Mapping failure when executed in process flow

    I am currently receiving the following error on one of my mappings when I executed a process flow: TEST_PF: NEW_MAP Error ORA-06550: line 1, column 1003: PLS-00306: wrong number or types of arguments in call to 'MAIN' ORA-06550: line 1, column 997: P

  • Restrict OM Infotype start date as 12/31/9999

    Hello Experts, I want to restrict OM infotype start date on entering start date as 12/31/9999. One of the OM infotype is accepting and saving that record when entered start date as 12/31/9999. Please let me know how to restrict doing that. Thank you.