Inspection in the Production Process.

Hi Experts!
I'm Work in a company that have inspection in production process (inspection type 03). In customizing about PP confirmation parameters, was defined to stop confirmation if not have inspection results in inspection lot. However, if entered a result to only one inspection characteristic, even if out of specification, no usage decision, the system allows the operation confirmation with quality inspection.
I want that the system not allow the confirmation if the inspection is out of specification, and if not all characteristics of the operation are evalueted and done. Other issue that is allowed enter values for inspection characteristics of the operation 0040 before enter values to inspection characteristics 0010, when i have more then one operations with inspection. The system show the message QE264, but is only a warning. I want that is a error, but not have configuration for this.
I read all documentation for inspection in production, and in accordance with the texts, is correct the behavior, is the concept. I do not agree.
Any sugestion?
Best Regards,
Richard

Hi Richard
To block confirmation if without inspection result
Go to t code:OPK4
select your plant and order type click details
Under the tab of general valid setting
select:Error message if no inspection result exist form result record QM
And check the scenario
Reg with out of specification of QM RR
i don't think that it is possible inn standard SAP
just wait other expert comments of this subject
Faisal

Similar Messages

  • Batch Traceability for Sugar as raw material during the production process

    Dear Colleague ,
    I need your support for a traceability issue in a customer on beverage sector
    See the case below:
    Batch Traceability for Sugar as raw material during the production process
    In AMSB the batch traceability in some production processes is very difficult, especially in case of sugar where tanks wherein more than one batches of the same material can be mixed. For example, in a single day almost 17-20 batches of the same material can be mixed and as the result is a composition of water and sugar the normal FIFO rule strategy cannot be applied during the component consumption.
    The raw material (sugar) is received in tank S5 at different points of time, and its content is transferred to tank B1 for storage purposes as well as for mix the sugar with other material such as water.
    At a specific moment the S5 tank contains only a single batch, while the tank B1 contains more than one batch. Tank B1 is used in order to supply the production line and the corresponding material consumption is triggered in backflush as soon as the production activity is declared (production confirmation). Along with the material consumption the batch determination takes place and a complex algorithm is applied: at a very high level, the single batch is consumed depending on its percentage inside the mix of composition and in case the this
    percentage is under a threshold level the current batch should be full used in order to avoid that it will exist for ever.
    Moreover, the good movement reversal (reversal of material consumption) and its correction lead to a complete new calculation of all the batches consumed after the original movement date/time. This means that the algorithm for batch determination should be reapplied for all the consumptions subsequent to the original movement.
    On the other hand it’s not possible to identify the mix of batches at the exit point of silos B1 because the total consumption of the material in the tank will never happen. As long as the tank level decreases it will be filled up from the tank used for receiving of sugar (S5).
    As requirement AMSB needs to post the material consumption starting from EWM, this means that EWM should be the master system in this case and the correspondingmovements have to be  transferred to ECC afterwards. This mainly because EWM  should guarantee the business continuity in case the ERP system is not available.
    AMSB asked if the scenario depicted has been implemented in some customer, in EWM system or in any other SAP solution.

    Hi ,
    At the time of consumption you can put ' * ' aestrix sign in the batch field.
    You will get list of batches of that material.select ur batch and consume the quantity.
    Regards
    Piyush

  • About the first inspection before mass production ,and the end inspection after mass production

    Hi ,experts :
           There is a scenario about my customer : before mass production they need to do first inspection avoid a lot of defect for the finish goods ; and he also need  doing the end inspection to check whether the mold can be used for next batch or need to do some repair .
         I want to add two operations in the routing ,but it seems unreasonable .
         Can anyone give me some advice  for it ? thanks advance .

    Hi Avril Liu,
    OPTION - A
    I think, you can try the below option which may not be the best solution but looks logical to me -
    a) Create to inspection types 8901 (Initial Mold Manual Inspection) and 8902 (Final Mold Manual Inspection) and assign them to inspection lot origin 89. Please note these inspection types are manually created and these are not linked to stock movement.
    b) Use the inspection type 8901 to test the initial condition of the process. In case if the UD = R, then use enhancement to create a new 8901 inspection lot by linking the old number in "TEXT" field.
    c) If the next inspection UD = R, then repeat the manual inspection lot 8901 inspection lot creation step. If the inspection lot 8901 UD = A, then this process is Good to start he process. So create a follow-up action and send emails to stakeholders.
    d) If you are not interested in testing the in-process quality of the produced materials, then you need not need 04 inspection type to be added for GR inspection. If you do test (I think yes, based on your answer...) you can add this inspection type to your material. Then you will be able to Release/Block your produced materials too using UD= A/R  respectively.
    e) Once the production process is complete, you can create manual inspection 8902 to test the mold characteristic. If the UD = R, then again execute the enhancement to create a new inspection lot 8902, by adding the previous inspection lot number in TEXT field, and keep repeating this process. If the UD = A, then there is no further need for testing, and follow-up mail can be send to the stakeholders for the completion of the process.
    OPTION - B
    Else, you may need to use inspection type 14 linked to your equipment doing the production, to test the mold characteristics. This process will be linked to PM-QM module, and you need to map this process too.
    1st inspection can be linked to 89 manual inspection to double check the process and the final inspection after entire production can be done through inspection type 14. Checking the produced material quality will again need inspection type 04 activation like normal process.
    Thanks,
    Arijit

  • Taking the Components into Production process

    Hi All,
    I have got one Businee Scenario for i need to map in SAP.
    Scenario: Customer is sending the Components for making the finished goods. In this case Business will be using the customeru2019s components for production process.
    Now, How to take the components inside the plant for the Production Processing
    In this below points needs to be consider:
    1. Components Stock should be Stock of this Production Plant
    2. Components valuation should not effected of production Plant
    3. These components should be used for the Production
    Please suggest the Suitable Process in SAP.
    Regards
    Vinay

    Hi,
    Below process steps would help you.
    Configure seperate storage location for customer materials which is not relevant to MRP. Receive Customer material with (101) or without (502) the purchase order. Maintain the material master with "S" standard price 0.01 so the iventory at the plant will always show minimum. Dont know HERS material type would be helpful to you.
    Configure seperate movement type (261 to xyz) to issue the customer material into production process. The new movement type will help track the goods issues and goods receipts for customer materials.
    I have following questions on your scenario:
    (1) Would the customer material cost to be added to your finished prouct?
    (2) Do you wanted to have the MRP for customer materials?
    (3) Do you process customer material at the plant or JUST use them as it is?
    Above questions will little change the process steps but overall it'll work.
    Best regards
    Nagarajan

  • Taking the Customer Components inside plant for Production process

    Hi All,
    I have got one Businee Scenario for i need to map in SAP.
    Scenario: Customer is sending the Components for making the finished goods. In this case Business will be using the customeru2019s components for production process.
    Now, How to take the components inside the plant for the Production Processing
    In this below points needs to be consider:
    1.     Components Stock should be Stock of this Production Plant
    2.     Components valuation should not effected of production Plant
    3.     These components should be used for the Production
    Please suggest the Suitable Process in SAP.
    Regards
    Vinay

    Try this..
    You can have the BOM of the Finl material with the customers materials as the COMPONENTS...
    Then in cs02 ,double click the item numbers (components) and uncheck the costing relevency indicator..
    This will make the accountability in stock and not in valuation..
    hope this helps..
    karthick

  • Problem in Production Process

    Hi
    My client receives vehicle from customer and changes into ambulance.Assembly process is done here.
    According to him there are stages in production like:
    1. Structure
    2. Insulation
    3. A/c fitting
    4. Despatch
    These are the stages.Now he wants to issue items to each stages with fixed decided quantity.*There is BoM for each stage but
    problem is no new parent item is formed*.So i cant use production process.For this i have made store,  Structure, Insulation, A/c fitting, Despatch as warehouses in the system so that items could be issued from store to these warehouses stages wise.
    Now the items issued to structure, insulation will make medical component as a item.And item issued to A/c fitting, Despatch contribute to form ambulance component.
    Now during delievry medical component,ambulance component and vehicle that was received will be invoiced to customer.
    Please suggest me how can use this process in SAP B1?
    Thanks

    There is no purchase of vehicle it is just receipt of vehicle from the customer and then passing the same vehicle through various stages and then  receive ambulance at the last.
    At each stage items are issued from store.
    If i could use production process then it was easy for me to alott a serial no to the production process but now imn not able to solve this production  procedure in B1, so tracking will be definatly nxt issue.
    But in system what i calculate is that he wants inventory transfer from store to these warehouses and then at last consuming them to form new product.

  • SAP AII for production process

    Hello,
    I'm an ABAP programmer but I have to find some information (integration scenario example) about using RFID for managing a production process with SAP.
    I found only for SCM:
    http://help.sap.com/saphelp_autoid40/helpdata/en/43/ec3b1c601f6bf1e10000000a11466f/content.htm
    Is it posible to manage a production process with SAP's  AII <-> XI <-> ERP like it can be done for SCM?
    Thanks.
    Traian

    Hi Mustata,
       Yes it is very much possible to RFID enable the SAP R/3 Production process.
       AII 4.0 supported out of the box execution of Outbound delivery process and Inbound Delivery process.
       The configuration guide for same are available at this link http://service.sap.com/scm
        you can get the config guide in detailed information of RFID under SCM.
       Now answer to your question SAP AII for production process.
       AII 5.1 supports creation on new document in AII. Also the documents from backend system SAP R/3 sent to AII via XI with the help of standard document interface.
      The documents related to production process can be then executed in AII with the help of RFID and after document execution in AII, if required, the document data can be sent to SAP R/3 for completion of the document in backend system.
    Hope this answers your query. Do read the configuration guides.
    If same process needs to be done in AII 4.0 then customisation will be need to implement the production process integration.
    Thanks and regards,
    Amit Deshpande

  • Wear Counter in Production Process

    Hi Experts,
    I have a counter  as a prt assigned to a Production Workcenter, it will only update in a make to order process. The counter is not updating as the production process is repetetive. Any solutions?
    Kind regards,
    Johan

    I would request you to make it a bit more elaborative, in terms of EAM.
    Regards,
    Ketul

  • Byproducts from Production process

    Hi all,
    Any suggestions how I can handle by-products being produced in the Production process?
    The scenario is...
    BOM
    Produced Item: 1(unit) X P1 - 1000lt Drum of Liquid Syrup
    By-product Item: 2.5(kg) X B1 - Waste Metal
    Comp1: C1 = 5 Unit (a 200lt Drum Liquid Ingredient)
    Comp2: C2 = 1 Unit (a 1000lt Drum Packaging Material)
    So as the above goes, To Produce 1 X P1, I need 5 x Drum of 200lt Ingredient and 1 X Packaging Drum.  In the production process, we get waste material B1 which is the packaging material of our C1 component and this B1 waste material is stocked and is sold to recycle companies.
    How do we incorporate this in our BOM?  Can SBO handle By-products?
    Thanks

    Hi Noor
    Your explanation for my questions were  sufficient.
    SBO addressing the co-products concept.
    Try out following steps and let me know results.
    <u>Material Masters Required</u>.
    1. Main Product - 1000lt Pkd. Syrup
       While creating above material master "tick" the
       co- product indicator in MRP-2 Procurement Tab.
    2. 200lt Pkd. Ingradient. Maintain all views as required.
    3. Drum Empty 200lt - "tick" the co-product indicator in
       MRP-2 view.
    4. Empty drum 1000lt maintain all views as required.
    <u>BOM Design</u>
    1. Header - 1000lt. Pkd Syrub
    2. Bom Items. Other than Header materials.
        *Important Note: For Item Drum Empty - Qty should
         be -ve. ie. as per your input give 5-.
        select this item and click "detail" icon which will
        take you details of above item. There in Basic tab,
        General Data "tick" co-product indicator. SAVE BOM.
    Now Run MRP after maintaining all master data.
    hope above steps will help you to start.
    Rest in next.
    Best Regds
    Poongunran

  • Production Process of NON SAP

    hi:
    can any one explain me the production process of NON SAP?
    and the major difference between the sap and non sap?
    thanks in advance

    In brief the accounting entries. A search in the forum might get u better inputs on this topic
    Thanks and Regards
    Purchase order
    No accounting entry
    Goods Receipt
    Inventory Dr
    Vendor Cr
    Payment to Vendor
    Vendor Dr
    Bank Cr
    Goods Issue to production
    Consumption Dr
    Inventory Cr
    Goods Receipt from production
    FG Inventory Dr
    COGM Cr
    Sales-Delivery
    COGS Dr
    FG Inventory Cr
    Sales-Billing
    Customer Dr
    Sales Cr
    Receipt from Customer
    Bank Dr
    Customer Cr

  • Production process tracking

    is there anyway i can track the progress of a product on every stage of the production process??

    Hi raf timan,
    Please try with COOIS Report. To get the report as u need try with below selection criteria.
    List=oprations
    profile= stad profile
    prod order check box=select.
    Give ut production orde & plant as selection criteria.
    Inside the report u can ues change layout option to select whatever information u need like Operation numbre, qty, yield qty, scrap,dates,...like
    u can "select stytem status" field also using this option,   this will give the status of each opreation in prod order.
    status= CNF confirmed fully (final confirnation)
    PCNF = Partialy confirmed, then the opeartion yet to confirm with balance qty.
    regards
    Pradeep

  • Production process usage in PCC

    Hi,
    Would request any one to explain the usage of
    the production process in PCC cost object please.
    Thanx
    SMK Ganesh

    When you create a production or process order for a material, The planned cost are derived for the order based on the current released standard cost estimate stored in the material master.
    When the order is completed, it would have captured all the cost for material issued and activity performed. GR is made for the material produced. Variance is calculated for the order and Settlement is carried out, to post the variances in the order.

  • Production process flow

    Hi all,
    Below is the list of doubt.
    1.can any one sent me the production process flow diagram with tranaction and the tables that have used in the transaction.
    2. what is mean by backlash in production process
    with regards,
    paul

    backflush means automatic good issue document generation after the actuall physical issue of the material in the shop flooor.
    suppose u have backflush for component in the order, then u will issue the same while production of the header material, but there is no updation in the system so when u will do teh confirmation for the order then automatically in the background document will be generated for the issued componenets.
    backflush can be defined in Material master, work center and routing with decending priority....

  • Can we obtain Inspection lots against a Process Order / Production Order

    Can we obtain Inspection lots against a Process Order / Production Order  on time basis i.e hourly or day wise against the same order

    HI
    i think there is no this option.Like Plant maintenance ther is no scheduling tool.
    or you have to go with stability studies...
    -ashok

  • In inprocess inspection lets say the production order qty is 20. i would want only 1 no. to be inspected while inprocess inspection is configured. kindly guide. Regards,Mathew

    In inprocess inspection lets say the production order qty is 20. i would want only 1 no. out of the 20 to be inspected while inprocess inspection is configured. kindly guide.
    Thanks in Advance
    Regards,
    Mat

    Hi Mathew,
    Create sampling procedure with fixed sample and give sample size = 1. Assign this sampling procedure for the characteristics of the in-process materials in Routing/Master Recipe etc. For sample size calculation at-least one characteristic should be required characteristic for the Material.
    Thanks&Regards,
    kumar

Maybe you are looking for

  • I upgraded to itunes 10.5 and now the store will not open.

    The bar goes about halfway (between the "g" and "I" in accessing Itunes store) and stops.  I can see words and hyperlinks in the store, but no pictures.  Have tried several of the fixes listed here, but so far none have been effective.  Anyone know w

  • Undeploying a SOA composite in OIM 11gR2

    I have two versions of approval processes deployed in SOA. What are the steps to undeploy the older version SOA composite which is not in use. Thanks in advance

  • HELP TO DEBUG THE PROGRAM OF AGILENT6600X

    Hello,           First let me simply introduce this program.           The horizental toggle switch is used to set the default value to the power supply.           The vertical slide switch is used to read the value from the power supply(after board

  • Javac doesn't recognize java.io as valid class...

    This is my program... class MyProgram {      public static void main(String[] args) throws java.io.IOException {           java.io.FileInputStream("TestDocu.txt"); }This gives this error c:\Java>javac MyProgram.java MyProgram.java:7: cannot find symb

  • Upgrading to Adobe Lightroom 4 in 7 simple steps.

    The following steps can be used to upgrade Lightroom 1, Lightroom 2 or Lightroom 3, as well as Lightroom 4 Beta catalogs. Step 1. Download and Install Lightroom 4 Step 2. On your Mac’s finder, find the location of your Lightroom 3 catalog. It should