Intra Stock Transport Order -- Route Determinatation

Hi Guys:
In the Shipping Data TAB of a Stock Transport order I have a shipping condition.
When I change the Shipping condition , Route Determination Not getting changed.
what settings might have missed which is not triggering the change in shipping condition reflecting in Route Determination?
Thanks
Sweth

have a look into OSS  Note 498143 - FAQ: Stock transfer with delivery in purchasing
among many other important info, it explains:
In the R/3 standard release, the system does not determine the route again if the shipping data is changed. Only a check is carried out. This is because SAP provides a more flexible solution with the "ME_PROCESS_PO_CUST" BAdI.
Customers can adjust the shipping data individually to meet their requirements in the PROCESS_ITEM method.

Similar Messages

  • Inter and Intra Company Stock Transport Orders

    Hi All,
    has anyone set up the following scenarios?
    1. Intra Company Stock Transport Orders between 2 plants in the same company code and same Sales Org
    i.e Plant 0001 (Supplying Plant) exists for Company Code 0001 and Sales Org 0001
    Plant 0002 (Receiving Plant) exists for Company Code 0001 and Sales Org 0001
    2. Inter Company Stock Transport Orders between 2 plants in different company codes and different Sales Orgs
    i.e. Plant 0003 (Supplying Plant) exists for Company Code 0002 and Sales Org 0002
    Plant 0002 (Receiving Plant) exists for Company Code 0001 and Sales Org 0001
    We are unable to get both scenarios to work at the same time due to the fact that only one Sales organization for intercompany billing can be assigned to a plant.
    Regards
    Chris

    Hi chris,
    Followings steps are involved for configuring intra stock transport order.
    Intra Company STO Scenario: Plant B receives material from Supplying plant A.
    1.create combination of Shipping condition, Loading Group and Supplying plant.
    2.Create Customer master with sales org, Distribution channel and Division.
    3.Assign customer master to receiving plant with same Sales area.
    4.Assign Delivery Type and Checking Rule.
    5.Assign Document Type, One-Step Procedure, under delivery Tolerance.
    6.Make Sure Assignment of  sales organization - distribution channel - plant
    7.Create material master with purchasing view in plant B.
    8.Extend material master with sales view to plant A.
    9.In Plant A create STO (UB), with supplying plant. Check for shipping point XXXX.
    10.In Plant B create STO (UB), with supplying plant.Check for shipping point XXXX.
    11.Create delivery for XXXX shipping points.
    12. Post Goods issue.
    Thanks,
    Muth's

  • Overdelivery in intra-company stock transport order

    Hello,
    I have the following scenario - I have two plants, 1000 and 2000, both under the same company code.
    I transfer 450KG of material 123456 from plant 1000 using STO with SD (mvt. type 641), material is packed in HUs. In the receiving plant, the HUs are being place on a weight to check their actual weight. It;s possible for the actual weight be greater than the GI weight of 450KG (for example, due to weight scale accuracy issues) . When doing GR, I need to be able to receive quantity greater than the GI quantity. That is not allowed in stock transport order (per note 212387). For the same scenario with intercompany STO (GI mvt type 643) I'm able to post GR quantity which is greater than GI qty.
    Any suggestion on how to solve this? Can I create a customer order type that is both intra-company and allows for overdelivery?
    Thanks,
    Yossi

    a overdelivery does not make any sense in stock transfers, you would solve the problem of the stock accuracy in the receiving plant, but at the same time you create another problem with a negative stock in transit, that never gets cleared.
    a STO having stock left in transit is never considered as closed. even intercompany stock transfers are not considered as closed, even you can receive more than issued.
    Latest when archiving purchasing documents then you will see all your error in the process design, because only closed business cases can be archived.
    in stock transfer business you always have to care about both sides, you cannot just care about the receiving plant and ignore the problems of the sending plant.

  • Intra Company Stock Transport Order

    Hi,
    This is a scenario of Intra Company Stock Transfer (using Stock Transport Order with document type UB) from one manufacturing plant to another manufacturing plant within the same company code.
    I have created STO, prepared Outbound Delivery with T-Code VL10B and did PGI. Billing was done with T-code VF01 and Outbound Excise Invoice was created with T-Code J1IIN
    While doing Goods Receipt in the Receiving plant with the T-code MIGO, when I referred the outbound excise invoice that was created in the previous step with the T-code J1IIN (put Excise Invoice No. and Date), I got the following error message "Excise invoice doesn't exist in the supplying plant" and not any Excise Value is flowing from the Excise Invoice in the screen of MIGO.
    The CIN configuration and master data in J1ID seems to be ok.
    Please provide the expert opinions to overcome the issue.
    Thanks in advance
    Rajesh Praveen

    I did Goods Receipt with reference to Outbound Delivery in the Receiving Plant without referring any Excise Invoice Number (as our system has been designed now like this). I updated part RG23A part 1 using the material document number (generated as a result of Goods Receipt) in J1I5.
    Now I am trying to post RG23A part 2 in J1IEX with reference to the material document number (generated as a result of Goods Receipt) and putting the Excise Number created in J1IIN earlier. The system is picking BED, ECS and SECess values but the value of Base Value is not being picked up as a result of which I am not able to post the Excise Invoice.
    Please provide some idea to resolve this
    Thanks in advance

  • Stock Transport Order for Intra Company Code Plants (UB Document Type)

    Hi All,
    I have a doubt with respect to Intra Company Code Stock Transport Order (Document Type: UB).
    When you do Post Goods Issue (PGI) with reference to Outbound Delivery, Accounting Document is generated.
    But, when you do Goods Receipt with reference to Outbound Delivery, Accounting Document is not generated.
    I am OK with the Receiving part.
    But, I am not clear about the Issue part.
    Please clarify this doubt.
    Looking for the kind respons from all.
    Thanks & Regards,
    Srinivasa M.S
    +91-7387702227

    Hi Srinivasa,
    In STO, the issuing plant stock is credited and receiving plant stock is debited at the PGI from supplying plant. Then at the receiving plant accounting entry is not generated as the receiving plant stock is already debited at PGI accounting entry in the supplying plant.
    Go through the below SAP documentation,
    http://help.sap.com/saphelp_oil472/helpdata/en/70/23ccfe419311d2ac100000e829fbfe/frameset.htm
    Hope this will solve your issue.

  • Vendor determination for Intra company stock transport order

    Team,
    We need the vendor and the partner function to be determined for intra company stock transport order.
    I have create Vendor and assigned the vendor to the plant code. When i create scheduling agreement with LU , the vendor filed is not getting updated as the agreement is with supplying plant.
    Is there any possibility that the vendor code and the partner functions can be populated to the Intra company stock transport order.
    Regards
    Gobinthan G

    Hi,
    To plant, you have to assign customer. Create a cutsomer and assign it to the plant through following path.
    SPRO-> Materials Management -> Purchasing -> Purchase order - > Setup stock transport order - > Define shipping data for plants.
    Then you assign delivery type and checking rule as per following path.
    SPRO-> Materials Management -> Purchasing -> Purchase order - > Setup stock transport order - > Assign delivery types and checking rules.  Here you can create the assignment of po document type with delivery doc type and checking rule.
    The last step is to maintain the all sales views of the material you tranfer, both of the receiving and sending plant.
    Now you will get the tab 'shipping' in the purchase order item details section.
    For intra company transaction as you said, in the vendor master, relevent customer code has to be updated.  This will make suitable updation in sales process in line with your scheduling agreement / purchase order.
    Thanks,
    Hari.

  • Intra company stock transport order with delivery to subcontracting vendor

    Hi Friends,
    We have an issue with Intra company stock transport scheduling agreement with delivery to subcontracting vendor.
    We have a scenario where the component is provided by another plant (Plant A -Intra company) directly to subcontracting vendor and the subcontracting vendor processes the component and sends us(
    Plant B) the finished good.
    We have a subcontracting scheduling agreement created with the subcontracting vendor with Item category u201CLu201D for plant B .(Document type LPA)
    And we created the stock transport scheduling agreement with document type LU (Between Plant A to Plant B) by entering the subcontracting vendor number to the "EMLIF- Vendor to be supplied/who is to receive delivery" field but the check box "LBLKZ-Subcontracting vendor" is hidden in the delivery address tab.
    Field selection with document type (LU) and Field selection with transaction code (ME37) did not help to bring the field to the delivery address tab.
    As a result, when we do PGI from the supplying plant, the stock is posted to "in transit" (Movement type 641) instead of "Component provided to vendor" (Movement type 641 u2013 O)
    The same behavior for purchase order with document type UB as well/
    Is the movement type u201C641-O u201C supported by standard SAP or do we have any other workaround to address the requirement. ?
    Now we are in ECC 6.0 EHP3.
    Your inputs will be highly appreciated.
    Regards
    Gobinathan G

    Hello,
    This EhP4 feature addresses only the one step Stock Transport Order to subcontracting vendor for intra company.
    Does anybody know how to do a two steps Stock Transport Order to subcontracting vendor for intra company?
    By "two steps" I mean:
    1- Goods Issue from supplying plant A to in-transit stock of the subcontracting vendor at receiving plant B.
    2- Inbound Delivery Notification (IDN) at receiving plant B + Goods receipt against this IDN into the subcontracting stock at receiving plant B.
    Thanks and regards,
    Stéphane

  • Proforma Invoice (F8) for Stock Transport Order

    With regard to intra-company STO, we have a specific requirement:
    Referencing delivery document generated using Xn: VL10B (delivery from Stock Transport Order), we create proforma invoice type F8. Subsequently, excise invoice is created referencing the proforma invoice.We need to capture the material cost plus 10 % of material cost as PR00 value in the invoice.
    Problem:
    However, here comes the problem: condition type PR00 does not come automaticcally in the proforma invoice, though pricing procedure has PR00 condition type. We have to manually entere the PR00 condition type for every line item (a routine calculates 110% of the value once value is enetered in the manually entered condition)
    Is it the standard system behaviour ? Any way out?
    with kind regards
    Muraleedharan.R

    Hi,
    Have you maintained the condition records for PR00 , if not than you have to enter it manually at the item level .
    If your price is same for all the items than maintain use header condition or else at item level you have to enter PR00 item by item.
    Regards,
    Krishna O

  • Stock Transport order with Freight Charges- Payable to an external vendor

    Hello
    we are implementing the stock transport order between two plants in SAP 4.7. The document type is UB and it has to be a two step process. We need to post the Freight Charges as well. The freight Provider is external vendor.
    What is the best way of configuring this scenario for freight cost?
    I did put the freight forearder vendor code on the conditiond tab detail of condition tyep FRA1 but  can't do the invoice verification for the same.
    Any tips are appreciated.

    Hello,
    This EhP4 feature addresses only the one step Stock Transport Order to subcontracting vendor for intra company.
    Does anybody know how to do a two steps Stock Transport Order to subcontracting vendor for intra company?
    By "two steps" I mean:
    1- Goods Issue from supplying plant A to in-transit stock of the subcontracting vendor at receiving plant B.
    2- Inbound Delivery Notification (IDN) at receiving plant B + Goods receipt against this IDN into the subcontracting stock at receiving plant B.
    Thanks and regards,
    Stéphane

  • Stock Transport Order - Partners not Determined

    Hi Colleagues,
    We have a simple Intra company Stock Transport Order and want to get the partner function 'VN' into the purchase order and then into the Inbound Delivery
    We have configured the partner schemas and assigned to the vendor account group 0007. Partners are created in the plant vendor record
    We have configured the purchase document schema and assigned this to document type 'UB'. However, the partners are not defaulted into the STO. We can assign them manually
    However, when we create the Inbound Delivery for the STO the vendor is not defaulted into the delivery and gives an incompletion error. We can manually enter vendor in the inbound delivery and then save the document.
    Any Ideas what is wrong or missing?
    Thanks
    Steve

    have a look into OSS note 863541 - Standard vendor for inbound delivery w/ purchase order refer

  • Stock Transport Order Without Delivery

    I m trying to transfer stock from one plant to another (within same company) without delivery.
    what all configuration do i need to do.
    pls. guide.
    I m little bit confused over stock transfer,
    Regards,
    Pramod Kumar

    Oh no, not at all!  This forum is meant to answer all your problems!
    Configure Inter company Stock Transport Order
    Material should exist in both the plants (Delivering & Ordering),
    Internal customer should be assigned to the ordering plant ( MM -> Purchasing ->
    Purchase Order -> Setup stock transport order -> assign the internal customer to the
    ordering plant and assign the Sales area of the internal customer.
    Assign its Sales area to the delivering plant
    Assign the document type and Delivery type NB and NLCC
    Assign the Supplying plant --> Receiving Plant --> NB
    Take the delivering plant and assign the sales area.
    Vendor master has to be created and assign the supply source (Delivering Plant).
    Create a purchase order ME21N ---> Save
    Delivery VL10 G ---> Calculation rule (appropriate) --> Assign the purchase order
    number here and execute.
    Select the Delivery creation line and do the back ground process.
    Start the log display and see the delivery document number by the documents button
    Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery
    document.
    Billing (Intercompany pricing conditions should be set).
    AND
    1. Customer No. for the Goods Receiving Plant - OMGN
    2. Availability Check- Checking Rule (if necessary) - OMGN
    3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders,
    NLCC)
    4. PO type (which i believe you have done) - OMGN
    5. Assign Vendor No. to the Supplying Plant (done) - VK02
    6. Assign Customer No. to the Purchasing Plant for the Inter-Company Invoice (but you
    need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
    IMG-SD-Billing-InterCompany Billing-Define Internal Customer No. by Sales Org
    ***and by the way for the Invoice to work between Cross-Company Plants, you need
    also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure
    STO:
    STO CONFIG:
    The following steps have to be followed in order to configure stock transport order
    between two plants.
    1. Create a vendor for the Company code of the receiving plant using account group 0007
    via T-Code XK01.
    2. In the purchasing data view assign the supplying plant and the schema group
    3. Create customer with the sales area of the vendor.
    4. The shipping conditions, the delivering plant and the transportation zone determine the
    route in the STO.
    5. In the pricing procedure determination relevant to the STO assign document pricing
    procedure and customer pricing procedure to get the pricing in the invoice.
    6. Maintain condition records for pricing condition.
    7. Maintain carrier as a partner in the customer master.
    8. In OMGN select the supplying plant and assign the company code and sales area.
    Similarly select the receiving plant and assign the company code and sales area (The
    company code to which the plant is assigned to).
    9. Assign the delivery type and checking rule to the document type.
    10. And finally, assign the purchasing document type to the supplying plant and the
    receiving plant.
    11. Create the STO using T-Code ME 21N and save.
    12. Check for release strategy if any and release using T-Code ME 28.
    13. Create delivery in background using VL10G.
    14. If delivery is created, it is an indication of correct configuration and master data
    creation.
    Stock transfer between two plants in deffernet company codes is known as inter company
    stock transfer.
    Material shoud be maintained in both supplying and receiving plant MM01
    Sotck should maintain only in supplying plant MB1C
    Create receving plant as a customer in suplying plants company code and sales area
    XD01
    Assign this customer number in receving plant detials OMGN
    Assign supplying sales area in supplying plant details OMGN
    Assign delivery tupe NB for in combination of supplying/ receving plants.
    Create STO ME21N
    As it is normal there in the item details wer should get shipping date i.e customer number
    Go for Deliveryy VL10B
    Shipping point *****
    Select PO go for execute
    then select the delivery then go for delvy ............create delvy,,,, delvy nubmer generated.
    Goods Issue VL02
    Delvy doc **********
    Click on picking
    enter the picking qty
    Click on PGI
    in the mean time check in the PO history you will get the details
    Goods receipt MIGO
    Stock overview the stock will be updated....

  • Intercompany billing: can price date be taken from stock transport order UB

    Hi,
    I have an issue and I think that I'm not the first person who has this problem.
    We are working with stock transport orders (UB) to relocate goods from one plant to the other (different company codes). We have some troubles with different prices in the purchase order and in the intercompany invoice because of different pricing dates.
    Example:
    1. the stock transport order is created on 15.02.2012 --> here the price date is 15.02.2012
    2. the delivery is created on 25.02.2012 (PGI date 25.02.2012)
    3. the intercompany invoice is created. On item level is placed the pricing date 25.02.2012
    This situation may lead to a price difference, as already happened several times.
    Do I have any chance to take out the pricing date from the stock transport order into the IC invoice?
    thanks for help.
    Chris

    In the copy control settings (t.code VTFL), go to item level and check what value assigned in the field price source. Assign value A and test by creating new documents. If this solution does not  resolve your issue, then check the routine assingned in the field Data VBRK/VBRP. In t.code VOFM, copy this routine and create a new routine with additional code for VBRP-PRSDT to have STO pricing date and then add this route in field VBRK/VBRP.
    Regards,

  • Stock Transport Order-shipping point not determined

    Hi MM Gurus,
    We need to set up STO for transferring stock from plant 2000 to 1000. I have completed following setting.
    IMG
    Enterprise Structure-Assignment-Sales and Distribution-Assign sales organization to company code
    Both the sales orgnizations are in same company code. We have only one company code.
    Enterprise Structure-Assignment-Sales and Distribution-Assign sales organization - distribution channel - plant
    The sales area 1000 is are assigned to both the plants 1000 & 2000 and sales area 2000 is also assigned to both the plants.
    Enterprise Structure-Assignment-Logistics Execution-Assign shipping point to plant
    Plant 1000 is assigned to sales area 1000 & 2000. Plant 2000 is assigned to sales area 1000 & 2000.
    Materials Management-Purchasing-Purchase Order-Set up Stock Transport Order-Define Shipping Data for Plants
    For plant 1000 & 2000 cusomer master 56 & 57 respectively are maintained. The sales orginzation for these plants are 1000 & 2000 respectively.
    Materials Management-Purchasing-Purchase Order-Set up Stock Transport Order-Assign Delivery Type and Checking Rule
    Delivery type NL has been assigned to document type UB.
    The details of customer master 56 & 57 are as below
    Account Group - Sold To Party
    Reconcilliation account -121000
    Delivery plant 1000 & 2000 respectively
    Please note - No vendor number is maintained in these cusomer masters.
    Created these plants as vendors
    Account group 0007(Plants) and assigned plant numbers in the  additional data of purchasing.
    Material 251 is created and maintained in both the sales orgnization.
    Now when I am creating the STO for transferring goods from plant 2000 to 1000, I am getting error message.
    "Not possible to determine shipping data for material 251"
    Am I missing something? Some documentation say that I should create a receiving plant as customer in the sales area of supplying plant. If this is true, how to do it?
    Also, what is the significance of return vendor (maintaining vendor master in the customer) in this case?
    Your any clue will be appreciated.
    Thanks,
    Shekhar

    Shekhar,
    Customer must be maintained as a shipto as well.  
    In your STO config settings you don't need a customer assigned to the source plant, unless it will also be a destination plant (e.g. you also intend to execute STOs in the reverse direction, or from another plant).
    While looking at your customer (shipto), you will also want to look at Route Determination for this customer.  Typically, your route will be defined by customer zone (from cust master), shipping point zone (from shipping point definition configuration), and shipping conditions (customer master).  Route will be used during delivery creation to schedule the delivery.  Logically, the total duration between Material Availability date to Delivery date of the delivery (picking/packing/load/transit) should be something close to the planned delivery time in the Material Master, in order to maintain consistency throughout the entire planning and execution process.
    Don't forget to maintain your STO Purchase req stuff IMG>MM>Purch>PurReq>Set up Stock Transport Requisition.
    Rgds,
    DB49

  • Stock Transport Order Setup

    Hi
    I have to setup Stock transport order between plants in same company code through inventory route (by 351 movement). Kindly guide me for the
    1.Standard customizing and master data setup required for the same.
    2. Any additional Customizing &  Master data setup required for the same in the Cin Scenario.(i.e. customer/ vendor relation etc.)
    Regards
    Arvind

    Hi,
    If you are doing STO through 351 mvt in MIGO , PLease follow the below steps:
    Steps:
    -Create a Stock Transport Order (ME21N, Purchase Order doc type UB)
    -Process Goods Issue against STO (MIGO > Goods Issue > PO) u2013 movement type 351
    -Process Goods Receipt against STO (MIGO > Goods Receipt > PO) u2013 movement type 101
    Customisation:
    1. Config: MM > Purchasing > Purchase Order > Set up Stock Transport Order > Assign Document Type, One-Step Procedure, Underdelivery Tolerance.
    Here the source plant, destination plant and allowed STO document type is specified.
    2. MM > Purchasing > Purchase Order > Set up Stock Transport Order >define shipping data for plant. Here create receiving plant as a customer and assign.
    Regards
    Ram

  • Stock Transport Order with Delivery via Shipping

    Hai
    I created stock transport order Intra process. within company two plants .. i configured supplying plant i assigned sal.org,dis.channel,division and receiving plant i assigned customer number also. in po its automatically picked the shipping data details. but in delivery VL10B with ref po , it show the error log error message as: An item with no delievery quantity is not permitted.Item will be deleted. but i checked all the setting in STO.. how to solve the error message in delivery?

    Is committed qty showing in the delivery schedule tab of item details(STO)?
    And also check the delivery creation date in the shipping tab.While creating the O/b delivery you should give the date as it's given in the Shipping tab.
    And Also maintain the Stock in the Supplying plant.
    Otherwise Give the Message no.
    Edited by: John Boeckle on May 23, 2008 2:24 PM