Issue material for Subcontracting with reference to PO for multiple batches

Hi All,
Issue: I want to issue 5-6 materials with reference to PO which have multiple batches. How can that be done?
Thus, if my raw material in stock are:
mat X   Batch 1    50 nos
mat X   Batch 2    40 nos
mat X   Batch 3     30 nos
mat Y Batch 6    10 nos
mat Y Batch 7    10 nos
mat Y Batch 8    10 nos
mat Y Batch 9    10 nos
i f for semi finished material A, sub contractor order 45000009 is created, where raw material required are:
Mat X      100 nos
Mat Y      30 nos
then how can I issue the raw materials wrt PO, and select multiple batches at the same time, without user entering the material again and again.
I have gone through the SDN multiple times to see the probable solution exists, but I have not received any solution.
Regards,
Ankush

DO MB1B transaction, with Movement type 541,
Enter the material with different Batches for required qty. as different line items.
e.g
line item 1 : mat X Batch 1 50 nos
line item 2 :  mat X Batch 2 40 nos
line item 3 :  mat X Batch 3 10 nos
line item 4: mat Y Batch 6 10 nos
line item 5 :  mat Y Batch 7 10 nos
line item 6 :  mat Y Batch 8 10 nos
Edited by: sudhansu satapathy on Oct 21, 2011 7:29 PM

Similar Messages

  • Subcontracting - outbound delivery by ME2O for Multiple batch of 1MTR

    **Dear Expert**
    **Subcontracting -we want to send One material to Vendor for processing but this material having Multiple batches,In T-code ME2O  we can enter only one Batch while creating delivery.**
    **If we want to create Delivery  for multiple batches of one material how we can send By ME2O ? is there any option to add multiple batches in ME2O**
    **please reply as early as possible**
    **Thanks & regards**
    **Pash@SD**

    Moved from sales forum.   Please try to post the question in right forum so that you will get right solution.
    thanks
    G. Lakshmipathi

  • Batch derivation for multiple batches

    hello,
    anybody pls help me i am doing batch deivation. i have made all configuration. but i am not getting how it will work for multiple batches. i my scenario when i am doing sheet clitting against sales order if my rm have two batches and my fg have four batches in one production order. how can i assign which rm batch characteristics goes to fg batch.pls pull out me for this situation.
    bhakta

    Hi Bhakta,
    Bigger problem in your case is not multiple Batches of RM but more then one Batch No. of Header Material in single production Order.I guess in your case Batch No. are triggered at the time of GR and not in Production Order at the time of Release.Correct?
    But up to my knowledge Batch Derivation is triggered at the time of Batch Creation in Production order.For which you have to first carried out Batch Derivation of sender Material.But in your cases the scenario is totally different due to Batch is created at the time of GR.So Difficult one and can be possible if you go with 1 Batch for 1 prod. order.
    Regards,
    Dhaval

  • IST OPERATION SUBCONTRACTED WITH REFERENCE TO ORDER

    Hello SAP Experts,
    i am doing operation subcontractiing. My first operation is subcontracted. So, I have assigned PP02 control key to first operation  and maintained external processing data for opration in routing. When i saved the order, for that operation PR gets generated.
    Now, I converted PR into PO and assigned raw material that has to be send to vendor. By 541 mvt. type material is issued to vendor. When i do goods receipt in MIGO, system is not showing storage location field. I dont find material in stock anywhere.
    But i can see quantity received in external processing tab of first operation in routing overveiw in order.HERE P.O is generated with reference to order.& it is in cost center.while confirming the second operation system will ask for storage location of material received from vendor.it ie not seen in mmbe.iam creating new code and it is assigned to second operation .
    Then how can i issue the material from storage for second operation if it is not in stock?
    How can i get stock of subcontracted material by MIGO?
    Please help me.
    regards,
    RAHUL

    Hi!,
    When you say operation subcontracting, in SAP it is considered as a service you are recieving and hence there is no material movement involved in that because you are sending a WIP material and recieving a WIP material back. But as per indian requirements whenever a material is sent out side the factory premises, you need to send a challan alongwith that. To print a challan you need to have a material movement. This movement (541) happens in normal material subcontracting but not in operation subcontracting. To generate a material doc, you can send the raw material with 541 movement but on GR of the processed material just reverse that movement so that raw material will again come in the stock. Then issue that raw material on order with 261 movement.
    I hope this will help in resolving your problem.
    Regards,
    Uday

  • Creation of Material for multiple sales organizations

    Hello,
    is there a way to create a material for one sales organization and that this material can easily be copied
    to other sales organisations? Now it takes a lot of time to create the materials for different sales organizations with
    transaction MM01. Thanks in advance,
    Ivo

    is 5 seconds a lot of time?
    make use of copy from fields in MM01 initial screen, enter as copy from material the material number you want enhance with a new sales org view.
    At the organisation pop-up make sure you enter the copy from sales org and plant on the right.
    next step is just to go into the material and click save button.

  • Report of result recording for multiple batches in a given time span .

    Dear team ,
    I am looking for a standard SAP report that gives the details of result recording with all the characteristics for mulitple batches in a given span of time . The MICs will show the actual values recorded for each of the batches.
    The colums may be like this
    material/batche/lot/quanity/mic1 value/mic2 value/mic 3 value...........
    A standard report is prefered and we would also like to have a trend analysis done for the batches .
    Looking forward to hearing from you .
    Ram

    Thanks for the answer Firefighter.... cheked the t code and seems to be useful . But I would like to have the report in the folowing format . Kindly guide.
    SN     MATERIAL     BATCH     INSPECTION LOT      QUANTITY     CHARACTERISTIC 1     CHARACTERISTIC 2     3     4
    Ram

  • Customer Quality notification for multiple batches

    Hi All,
    Is there any way I can reference multiple Batches to single quality notification?
    Present solution Proposed -  Using user exit insert New Zfields to notification to enter Batch nos manually.
    is there any other standard enhasment where multiple batch entry can be done!
    Thanks in advance!
    Jay

    Dear Sadan,
    There is a chance of happening this due to that field is marked as mandatory.
    I hope this would happen, when Pm guy was making settings for the notification fields.
    He might have made this filed mandatory w/o any reference of Notification type (Influencing in spro filed selection), If he doesnt select Influencing and Notification type, that field Mandatory will effect all the Notification types.
    So please check with ur PM guy and change the field setting for Notifications and ask him to use Influencing - Notification type and desired notification type.
    Regards,
    Praveen

  • How to remove Sales Order to Own for multiple Batches at a time.

    Dear All,
    We use to scrap FERT materials using Mvt. Type 551 / 555, but before scrapping stocks are being removed from Sales Order using Mov. Type: 411 'E', because Batches are produced against Sales Order under MTO strategy.
    The removing process from Sales Order using T.Code MB1A & Mov. Type: 411 'E' is quite time consuming because in this case only one batch is removed from Sales Order at a time.
    So is there any way by which I can remove multiple Batches at a time from Sales Order.
    Thanks and Best Regards,
    Vivek Kumar

    Hi
    YOu can use transaction MASS with the sales document, sales document item, batch fields.
    create a variant and do the changes
    regards,
    Ramana

  • Report for Req Material and Issue Material for Project/WBS

    Dear All,
    My client need a report for a WBS element-wise material required and material issue with value.
    Let me know if any standard report avialble for same??
    Or Incase of devlopment which are the tables we can use to Get req qty and issue qty of materials?
    Thanks and Regards,
    Atul R. Rajmane

    Dear Shirkant,
    Thanks for your input. I am using CN52N report.
    I this I have selected Req Qty, Qty Received, Qty Withdrawn, Shortfall Qty. I am getting figures in  Req Qty, Qty Withdrawn, Shortfall Qty but I am not able to get Qty Received figure. Let me know how I can get it i.e. for this any Note is required or any other configuration??
    If I can get this figure than I can use this report for requirement.
    Thanks and Regards,
    Atul R. Rajmane

  • Subcontracting with BOM

    Dear all,
    Can anyone tell me the method of creating PO with BOM
    i mean what are the additional fields should be maintained in Material Master???
    How to create Material BOM using Tcode CS01??
    Is CS01 Tcode is for to create for maintaining Bill of Materials for a Finished product??
    pls tell me in detail step by step to Create BOM and subcontracting BOM
    Thanks a lot in advance??

    Sub Contracting Cycle
    (1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity.
    (2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor.
    (3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor. As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor"
    (4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated:
    DR FG Stock/ SC By-Product Stock
    CR Change in Stock (FG/ SC By-Product )
    (for finished goods received)
    DR Subcontracting Charges
    CR GR/IR Clg
    (for moneys payable to Subcontractor)
    DR Consumption (Components)
    CR Change in Stock (FG/ SC By-Product )
    (material provided to Vendor is now charged to expense)
    (5) You do the IV for SC Invoice, and the process is complete.
    Process of Subcontract in MM
    Sub-contract business process:
    You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor .
    Vendor shall process the item / use the item provided & supply the final item.
    SAP process:
    1.Create the finished goods material code.
    2.Maintain the BOM for the material.
    3.Create PO with item category as "L" .
    4.Issue material to vendor with movement type 541
    5.Receive the material against the PO with movement type 101.
    6.MIRO to account for vendor's invoice for the service charge& material used by him.
    Can anybody tell me how a process has to be given to subcontracting?
    Suppose, I have 3 operations 1)weaving 2)dyeing 3)cutting & packing
    if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
    The following process to be followed for subcontracting.
    1. Item code(material master) to be created at the stage of before dyeing.
    2. Item code(material master) to be created after Dyeing as subcontracted item.(F30)
    3. Bill of material to becreated for the material(2) calling for material(1)
    4. Inforecord and source list to be created for material(2) with the corresponding vendor
    5. PO to be released for material (2)
    6.Along with PO the material(1) to be issued to vendor
    7.On receipt of material when GR is made the stock with vendor will get updated.
    How to Create a Subcontract Order?
    To create a subcontract order, proceed as follows:
    Enter the material you want to order and the item category for subcontracting (L) in the order item.
    Press ENTER to display the screen for component processing.
    Enter the components that the vendor requires to manufacture the product.
    Please note:
    – You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER.
    It is calculated as follows:
    Delivery date of the item - Planned delivery time
    – If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F).
    – You can determine whether the components are available on the date required by selecting Edit -> Availability check.
    If you entered a bill of material as the material in the subcontract order, the components are created automatically.
    If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material.
    Save the purchase order.
    When you print the purchase order, the components are printed per order item
    Subcontracting - Key Points
    Special Procurement Process.
    Item category: L
    Order type: NB
    In info record vendor should be maintained as subcontractor.
    Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
    Your company should place a purchase order for the finished product. In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
    Stock check at vendor level: ME2O
    Company stock check: MMBE
    GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
    GI to subcontracting vendor: through movement type 541.
    GR from sub contracting vendor: through movement type: 101
    Movement type 543 is displayed to cancel the material cost account.
    If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
    - To create the Subcon Info Record : Tcode ME11 - Info Category - Click Subcontracting
    - To create Material BOM : Tcode CS01
    - With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N
    Regards
    Ravi

  • Purchasing with reference to sales order

    Hi,
    Can anyone help me to resolve the following issue.
    while creating PO with reference to PR which is generated automatically through sales order,we want to restrict the GL account.
    that is when GR is done for that PO it should not hit the sales order stock,it has to be booked as unrestricted stock.
    Material has been created with item category group BANC.
    Thanks
    Mahesh

    Hi Mahesh,
    If you use Account Assignments in Purchase Order System will not show the in Unrestricted stock. Because its an Indirect Procurement.
    You can do like this, after Inwarding the goods against sales order reference po go to MB1B trxn code use 411 E movement type to transfer sales order stock to Unrestricted.
    I think this is the only way.
    Reg,
    Ashok
    Assign points if useful

  • Purchase Order with reference to Purchase Requisition

    Hello
    I have this situation:
    One Purchase Requisition with quantity of 10.
    When I issue a Purchase Order with reference to this purchase requisition, for the moment I can use this Purchase Requisition many times. For example: two Purchase Order with the same purchase requisition, same item and same quantity.
    The objective is thay the system only allows to use the Purchase Requisition until the quantity is completed. For example: one purchase order for 10, or two purchase orders with 5 each. But never with a quantity superior to the total quantity in the purchase requisition.
    Somebody can help?
    Thank you,
    Elena

    Hi,
    1) By setting the configuration paths as suggested by the previous posts.
    2) In the first place, when converting a PR in PO Create Screen (ME21N), you should make the Open only and Released only field as Display. This way, the results will only show Open and Released PRs to be converted to PO
    Hope this helps

  • BDC - Create Material for Split Valuation

    Hi,
    Does anyone have BDC for Material Master creation with reference material from another plant.
    Regards
    Gokul

    The material type is stored in table MARA, however, MM17 can not change all fields that are contained in a table. MM17 is not a table modification tool, it just supports business process of mass changing some field contents. It is more like mass process MM02. But the fields that cannot even easily changed in MM02 like base unit of measure, batch managment flag are not supported within MM17. Material type cannot even be changed in MM02.
    There are that many checks that need to be performed and cause a failure, that you cannot do such in a mass change transaction.
    It is certainly possible to record MMAM to finally do this with batch input, CATT or LSWM for many materials. But first try it manually for 10-20 materials to make your experience.
    By the way, dont forget the number range. If you change material type, then the material number will remain, which may screw up your number range logic (that is often defined after heavy and long discussions. If you have different number ranges per material type, then you should block the transaction MMAM for anybody)

  • ADSUBCON with multiple batches to transfer the material to vendor

    Dear Gurus,
    I am using ADSUBCON tcode for subcontracting process , my problem is i am not able to transfer material to Vendor or received material ,  from multiple batches.
    please guide how to incorporate this functionality in ADSUBCON. (same available in MIGO)
    Thanks & Regards,
    Akshay

    Hi Jurgen ,
    Sorry for my way to raise the discussion , this will not happen next time ...
    Moving Further - In ADSUBCON I am not getting any option to multiply the same line items for multiple batches , like MIGO is having that option , if i am clicking on new items ,sales order no. and special stock E is missing for movement type 541... please check following screenshots.
    Thanks & Regards
    Akshay

  • Sales order with reference to quotations.

    Hello Experts ,
    I want to know how can a sales order be created with reference to more than one quotation??
    Is there a transaction to do this ?? or else its a process?? Please guide. points will be rewarded to the answers.
    Thanks,
    Arathi

    Hi Arathi Rajan,  ALL ARE GIVEN WRONG ANSWERS TO YOU : SORRY TO SAY THAT ....
    YES YOU CAN CREATE ONE SALES ORDER WITHR EFERENCE TO MULTIPLE QUOTATIONS:
    FOLLOW ME:
    1). GO TO VA01 SCREEN ENTER ORDER TYPE : OR
    ENTER SALES AREA
    2). SELECT THE ICON " WITH REFERENCE TO QUOTATION"
    AND THEN COPY THE 1 QUOTATION DETAILS, THEN IT WILL TAKE YOU TO SALES ORDER SCREEN, THERE U WILL FIND ONE LINE ITEM . OK
    3). THEN, IF U WANT TO ENTER MULTIPLE QUOTATIONS:
    SALES DOCUMENT- SELECT CREATE WITH REFERENCE AND SELECT THE MULTIPLE QUOTATIONS LIKE THIS:
    4). NOW U CAN ABLE TO CREATE THE SALES ORDER WITH REFERENCE TO MULTIPLE QUOTATIONS.
    HOPE IT HELPS YOU ,
    Thanks&Regards
    Venkat.Dhanemkula