Issue unit of measure being used in purchasing tab of work order

Hi, I've got a material with a base unit of measure of 'EA'.  This material has a issue unit of measure 'BOX'.  When I go to add this material as a component to a work order the unit of issue 'BOX' is used as the base unit of measure.  This of course is incorrect.  Can anyone shed any light on this?

Not sure whether it will help you.
Have you maintained the relationship in MM in Additional uom tab.
Also check t code CUNI if any conversion factor you can mention there.
Regards,
Divraj

Similar Messages

  • Unit of measure translation using CUNI

    Hi,
    I am trying to maintain unit of measure translations using CUNI transaction.
    When I save the translation detail system doesn't ask for transport request number.
    What could be the reason? Any idea?
    Thanks,
    Dipak

    Hi Dipak,
    the following SAP Notes might be helpful:
    [1047291|https://service.sap.com/sap/support/notes/1047291] "RBZMETRANS does not transport ISO codes"
    [639459|https://service.sap.com/sap/support/notes/639459] "Error message BM302, BM303, BM304"
    Best regards,
      Andreas

  • Reservation Creation in Issue Unit of Measure

    Hi,
    I have a product whose component has Base Unit of Measure as EACH and Issue unit of Measure is  PIECE. ( 5 Piece = 1 Each) .In BOM we maintain as PIECE and in Work Scheduling view of materialMaster issue unit is maintained as PIECE.  Now the issue is, when I create an order reservation is created in EACHs. (Base Unit of Measure) and same appears in Stock requirement list also.
    If my Order issue Qty. is 2 PIECEs but still Reservation will be created for 1 EACH ( 5 Pieces) which upsets the requirement figure for the components.
    Please suugest me if there are any ways out so that Reservation is created for Issue Unit of Measure so that correct quantity of measure can be seen....
    Thanks in advance

    Not sure whether it will help you.
    Have you maintained the relationship in MM in Additional uom tab.
    Also check t code CUNI if any conversion factor you can mention there.
    Regards,
    Divraj

  • How to know which Smart-Form is being used for Purchase Order print output

    Hi Gurus ,
    How to find which Smart-Form and and methods/program being used for Purchase Order print output in SRM  ?
    In ECC we have tcode NACE where we can check all the details.Is there something similar in SRM ?
    Please help.
    Regards,
    Saurav

    There is no similar transaction in SRM for your purpose. Usually if the customers customize the smartforms, they would choose to use their own form by implementing BADI BBP_OUTPUT_CHANGE_SF. Take a look into your system and see if this BADI is implemented. If so, debug it (by pressing "Print Preview" for a PO for example) and find out what form it is using. Or, if the BADI is not implemented, by default, the system uses form BBP_PO.

  • Whenever i update iPhoto by my app store after the download completes a message appears stating that a problem has occurred iPhto cannot be installed please try again by using the purchases tab in the app store.....i am in a big fix please help

    whenever i update iPhoto by my app store after the download completes a message appears stating that a problem has occurred iPhto cannot be installed please try again by using the purchases tab in the app store.....i am in a big fix please help

    There's a link on the right hand side of the App Store Window.LN

  • Unit of measure changed in BOM not reflected in Production order

    We noticed the following problem in one of our production order.
    1. We have a bom component having a unit of measure MT.
    2. A planned order already exists for this header material.
    3. We changed the unit of masure in the same BOM component to KG.
    4. We processed the production order and did confirmations and did auto GR.( Value 20 times high)
    5. The cost at GR is very high , although the material consumption is considering the changed unit of measure KG.
    Any possible solution to this problem,
    Thanks,
    Manohar

    All steps suggested including read PP master data , rerun MRP and generate a new planned order and then convert to a new production order, have been done but the effect at 101 remains same with high actual costs.
    The production order is acocunt-assigned to a WBS.
    In table QBEW , the standard price is updated as very high. We havs S as price control in header material master.
    May be , some one has some idea about how the standard price in Table QBEW gets updated. What is the source for this standard price which gets updated on doing GR ( It comes to project stock and we see the standard price being very high and so the actual cost is very high)
    Thanks,
    Manohar

  • Purchase failed on candy crush message stating a different id was used to purchase the app in order to buy the item with this id you must first purchase the app. I have had the same id? How can I fix this?

    Cant purchase next level on candy crush. Message reads that a different id was used to purchase this app and in order to buy the the item with this id you must first purchase the app. I have always had the same id

    Did you download that game, or could somebody else have downloaded it or synced it to your iPad ? And the id that shows in Settings > iTunes & App Store is your id - if not then tap on it to log out of it and then log back in

  • Make item to create Purchase Requisition and Work Order

    I have a requirement for a Make item to create Back to Back Purchase Order from Sales Order. At the same time, need to create Work Order from Sales Order for the same item. I have done all setups for Back to Back order and able to create Purchase Requisition from Sales Order line. But how to create Work Order. What are the setups to achieve this? Thanks

    Ajith_Kz; Consultant wrote:
    I have a requirement for a Make item to create Back to Back Purchase Order from Sales Order. At the same time, need to create Work Order from Sales Order for the same item. I have done all setups for Back to Back order and able to create Purchase Requisition from Sales Order line. But how to create Work Order. What are the setups to achieve this? ThanksI guess it can't be done..when u say u created a purchase req?i was just wondering how did the system let u to create a POR when you say it is a make item?
    HTH
    Mahendra

  • Use of field 'StartPoint' in work order operation's 'Dates' tab

    Hi,
    Can someone please explain me on the uase of field 'StartPoint' on work order operation's Dates tab.
    Regards.

    Start point will be used in case of scheduling for the operation.
    By mentioning the condition & date, while doing automatic scheduling, system will change the start date of the operation & correspondingly finish date.
    Note: This will work only when Automatic scheduling is ticked for the control key.
    Regards,

  • Purchased tab not working

    Hi. I updated to ios 5. After none of my apps came along which was no biggy i will just redownload. The store loads fine except purchased tab where moving between screens is taking anywhere up to 5 mins. Down loads once i can get to them are nice and quick.
    Any one else notice this?

    It isn't 10.7.  I purchased Lion last night and downloaded it on my MB Pro.  Now when I go into the App Store on my iMac, I can't get to my purchases to load it on that machine. It is still running 10.6.8.  Think it may be something wrong with the App Store servers and they aren't updating.

  • Upgrade : Issue with Specical character being used in 4.6C ( Dynamic calls)

    Hi ,
      We are working on Upgrade from 4.6C to ECC6.0 . in SPAU phase we are facing an issue :
    When we are trying to see the variants from the program, it says that the program contains Syntax Error
    "In Unicode programs, the "&" character can not appear in names as it does here in the name 'op&xv0' "
    The 'op&xv0' is a form. we tried changing the form name, but couldnt get the PERFORM stmt for the form and it might be a dynamic call. what can we do for this type of programs?
    Please also suggest how we can identify the places where that particular Subroutine is being called.
    Thanks & Regds
    Teja

    This is probably an operation defined in Tcode PE04. You can change the operation subroutine name and then modify the code accordingly in the report.
    Go to PE04 and put in operation name, suposedly &xv0.
    Instead of using standard name suggested by SAP use custom name (for example opYvx0) and then change in the report as well and it should be ok.

  • HT1918 The credit on my account is not being used for purchases

    I have redeemed two cards and am not being given the option of using the credit on my account from the cards purchased. I do not want to use a credit card at all. Why is Itunes so inefficient? How can I use the credit?

    Use migration assistant.
    See http://pondini.org/OSX/MigrateLion.html
    Although this is only up to Mountain Lion it is still relevant to Mavericks.. only expect Mavericks to kick and buck a lot more.

  • Insane performance issue. GPU not being used at all for cropping.

    I regularly record my screen and later open the resulting file in Pr and export only a square on it. I import the video, maybe cut away some fluff, and export, choosing to crop it.
    The result is a painful ordeal that cripples my computer for hours every single day, where Premiere Pro CC uses almost 100% CPU constantly, but 0% of the GPU. It's really extremely slow. Other export tasks seem to be as quick as you expect them to be. But not this particular job, which I rely on every day. Very annoying.
    There is simply no way that this is intended. The GPU seems to be made for things like this. Why isn't Pr using it?
    I have 20 GB RAM, a very powerful quad core Xeon, a new Nvidia GPU, solid state disk, etc. Windows 8.1 Update 1. My computer is never slow for other tasks. This is really a very annoying issue as it makes using the computer nearly impossible for hours a day. For no good reason. It needs to use the graphics card to crop!

    It just really annoys me that this kind of thing is ever turned off, hidden away and just... ambiguous.
    Its hardly hidden away.  Its in the NEW PROJECT Settings page and first setting drop down option.
    There are reasons why its an option... buts its ON by default on any new project I start.

  • Prevent Hourly Employees from Ordering Non-stocked Materials and Creating Purchase Reqs in Work Order

    Our SAP plant maintenance system is configured to create a purchase req when a non-stocked material is ordered. We would like to prevent hourly employees from creating a purchase req or ordering non-stocked materials. Only supervisors should be able to order non-stocked materials and create a purchase req. Is there a way to do this via config or system enhancement?

    Hello Rick,
    Clearly there will be 2 ways if not more. One is the Authorization object route and another is Enhancement route. I'm not going to touch the former one. So let's expect answers from other members for that. For the later one, we need to know the answer for the question below:
    'Can we distinguish the hourly employees from regular employees by the user-Id or some other means? If yes, how ?'
    Once we know this, we need to use some user-exit or enhancement spot of the program SAPLCOIH to capture the event of 'N' in the ItemCategory field of Components tab by such UserIds and trigger an error message.  (Suitable user-exit is not striking my mind, so this might go the implicit enhancement way of Order program SAPLCOIH ).
    KJogeswaraRao

  • Unit of measure(Pur UOM) not printing in Good issue(MB90)

    Hi,
    when printing  using MB90 good issue,unit of measure(under heading Pur
    UOM) is not printing in the report
    Can you please give any tips to solve this problem? 
    With Regards,
    Jaheer,MM consultant

    HI,
    Ordering Unit of Measure is different from Unit of Issue.
    Please check the material master record and input the fields accordingly. this information is carried to PO from Material master record as soon as you select this material.
    Now in the form you have to guide the abaper to build a layout to get the appropriate information and have the logic built to get the relavent field names into the printout depending upon the screen field.
    Thanks & Regards,
    Kiran

Maybe you are looking for

  • INSERTstatement is not working if there is a before insert trigger

    INSERTstatement is not working if there is a before insert trigger on that table. That trigger contains an insert to another table which having the main table reference. Let us say, for example there a table named 'EMP_DEPT' and there is a before ins

  • Dbms_xslprocessor and namespaces

    I'm using dbms_xslprocessor to transform xml to xml (well, more specifically, xml to rss) My source document looks something like this: <?xml version="1.0" encoding="iso-8859-1"?> <feed xmlns:xa="http://host:port/portal/pls/portal/portal.wwsrc_app_xm

  • DBCA Exception in thread "main"

    Hey guys I am new to oracle and I am having some trouble installing the database. I have installed the Oracle software, but whenever I type "DBCA" on my terminal, I get this strange error "Exception in thread "main"... I read about it online, and it

  • 'Configure' issues

    The 'configure system' and 'configure app' button aren't there when I go on to configure EMET. Please address this issue

  • Transfer photos and videos from iPhone to external hard drive.

    Hi guys.. Assistance required.. Been quite sometimes.. How to transfer my photos from my iPhone 4 to an external hard drive/disc via laptop installed with Windows 8? Hope to hear soon.. Thanx..