Use of field 'StartPoint' in work order operation's 'Dates' tab

Hi,
Can someone please explain me on the uase of field 'StartPoint' on work order operation's Dates tab.
Regards.

Start point will be used in case of scheduling for the operation.
By mentioning the condition & date, while doing automatic scheduling, system will change the start date of the operation & correspondingly finish date.
Note: This will work only when Automatic scheduling is ticked for the control key.
Regards,

Similar Messages

  • Work order operation number in Production Scheduling

    Hi,
    We are using production scheduling for scheduling the discrete jobs. In production pegging view, the work order operation is shown in number "xx:xx:xx:xx:xx" not the name of the operation. Is there any setup required to display operation name? Any patch required?
    Thanks,
    Anitha.

    Hi,
    I have face similar issue in deleting PO line items.
    Even though I delete items, system check budget for deleted qty with the currency conversion + value & gives budget exceed error.
    In some cases we have asked user to deactivated AVAC asked to do the transaction, which is not recommended.
    You can try running CJBN & CJBV in sequence for affected WBS.
    Thanks & reg,
    Sam

  • Assign equipment to work order operations

    What configuration is needed to be able to assign a equipment to work order operation ?
    I already have few equipments assigned to a work order (displayed on the objects tab) but I need to assign some equipments to certain operations.

    Sveinn,
      You would need to be in ECC6.0 to be able to do this. This should be available through SPRO under PM> Maintenace and service processing > Functions and setting for order types > Define notification and order integration.Within this you would need to enable the assignment of operations to object list for specific order types.
    Hope it helps.
    Regards
    Narasimhan

  • Work Order Operation Duplicated on Operation/Activity Number

    I had a coworker duplicated his activity number on a operation. He hit save after he had changed the operation number. Now it is giving an error "Inconsistent data: Order 20066826 02/11/2008, duplicate entry U 0125. This had only happened once before and I tecoed/business completed the work order. Then told them to create a new order. But this one, has important information in it, so I was asked to save this order.
    Any way to renumber the operation or delete it, or just get in the work order itself? I get this error in change or display.
    Thanks

    What you describe should not have happened, and in 11 years of consulting on SAP Plant Maintenance I can only recall having seen this kind of problem once previously. It's not a very easy problem to resolve. There are a couple of suggestions I can make, neither of which are particularly easy or straighforward:
    1. Raise an OSS message with help.sap.com to see if they are aware of the problem and have an ABAP that you can download that will correct or delete the database entries. I have done this successfully previously but whether they have an off the shelf solution for this will depend on which version you are on and which tables have corrupted entries in them.
    2. Get an ABAPer to look at the problem and produce an ABAP program to correct the entries internally. It wouldn't need to be a particularly complex program, only a few lines, but some analysis would be needed to ensure that all of the affected table entries are corrected as the work order operations are split across several tables.
    Sorry but there is not really an easy answer to this one.

  • 1.     Defining dependencies between Work order operations and Isolation Operation Steps

    Hi All
    Will you please let me know how i can define dependencies between Work order operations and
    Isolation Operation Steps? Suppoose I want to have WAP--->WCA-->WCD at operation level, is it possible? Can we have the Switching of Status & allowing that perticular operation for releads. e.g. I have operation 1 in Maintenance WO Which needs machine where only operational control panel to be Locked & tagged. No Need to Tag total machine. So once i complete complete the taging for it & once give permits for it, system should permits only that much operation. Not all operation which may have some other permits which needs to be issued.
    Regards
    Makarand      

    Hi All
    Will you please let me know how i can define dependencies between Work order operations and
    Isolation Operation Steps? Suppoose I want to have WAP--->WCA-->WCD at operation level, is it possible? Can we have the Switching of Status & allowing that perticular operation for releads. e.g. I have operation 1 in Maintenance WO Which needs machine where only operational control panel to be Locked & tagged. No Need to Tag total machine. So once i complete complete the taging for it & once give permits for it, system should permits only that much operation. Not all operation which may have some other permits which needs to be issued.
    Regards
    Makarand      

  • How to regenerate COSS table for work order operation planning hours

    Hello,
    I am looking for a SAP report or a custom solution to update the table COSS table from work order operation hours. Several work orders incorrectly updated in the table COSS with result the cost is incorrect.
    For example: In the work order opertions, I have  planned 2.5 hrs and in the table COSS it is 1.5.
    Much appreciate for your help
    Bill

    It is quite simple actually.
    As soon as your array exceeds SDU (defaults to 2048), sqlnet will fragment the packet. (see: sqlnet more data to client messages in your trace file)
    As soon as the packet is bigger than your NICs MTU, the NIC will fragment the packet.
    So, depending on the number of bytes for 1 record, high array size make sense or don't make sense.
    And ideally SDU should be a multiple of MTU.
    So do high arraysizes make sense? Usually not.
    Hth
    Sybrand Bakker
    Senior Oracle DBA

  • Assign Work order & Operation to individual technician

    Hello,
    I would like to assign a work order and the operation in the work order to a technician name.
    At the order header, i can enter a person responsible.
    At the operation, I can also enter a person responsible.
    I am wonder where is this person responsible maintained?  I do not have HR module implemented?  Can i use this person responsible without HR?  is there any suggestion how to use assign order & operation to individual?
    Thanks a million.

    Hi,
      On the standard config, this is the personnel number maintained in HR. If you don't have HR, you may want to consider implementing mini HR.
      The other option is to work around the same
      For Order header: Create the employees as different partner types and use Assign the different partner type for Order header.For ex: User (SAP Logon ID), Create the employee as a different vendor type or Customer type (Special types / category to differentiate normal vendor / customer), Create them as different positions)
      For Order operation: Use the enhancement tab to create a New field key.You configure to use one of the standard available fields for the same partner assigned on the order header and use the standard user exit for F4 (IWO10015 )and validations(IWO100156) on data entry.
    Once you have HR implemented then you may have to switch back to the standard process for more flexibility.
    Regards
    Narasimhan

  • Making Storage Location field mandatory in Work Order

    Hi
    As per our proces, if PR is created from work order and if there is no storage location in work order then PO will have warehouse address as a shipping address. So it is expected that PR must have storage location details when it is created from work order to avoid incorrect shipping address in PO.
    So, I want to make storage location field mandatory in components tab of work order.
    Also I want to avoid the users to deliberately removing the storage location and making it blank.
    Regards
    Prakash

    Hi,
      You will have to use one of the below mentioned user exits  to accomplsih this requirement.
    CNEX0026 Maintenance order: General check for material
    CNEX0027 Maintenance order: Determination of plant or storage location for component
    Thanks
    Narasimhan

  • Euipment or Function location field Mandatory in Work Order

    Hi
    How to make either Equipment or Function location ( either of the one) mandatory in Work Order.
    Thanks ini advance
    Thiyagarajan

    Hi ,
    The field equipment or f.loc can be made mandatory using transaction variants  -- but it would be applicable for all order types .....
    1.use tcode SHD0 , give IW31 in Transaction code and ZIW31 in transaction variants and press create ..
    2.this would take you to IW31 initial screen and enter planning plant and order types and press enter this would give the dialog box of screen variant .Here press continue and this would take you to inside screen .
    3.Here you again press enter and by entering some required data you can finally reach to screen variant of reference object
    and can mark the equipment or f.loc field mandatory as required .
    4.Once this is finished you can you can select local object and save ... and come back and test the same ... now this trans varint ZIW31 can be assigned to user group ...
    go thru the documentation of SHD0 for bette information
    regards
    pushpa

  • Table name& field name for production order  & operation confirmation

    Hi All,
              I would like to know the table name and field name for the production order "confirmation" (CNF) and the operation confirmation (CNF).
    Thanks and Regards,
    PSS

    Hi there,
    CORU(R/3 Application development: PP Confirmations )
    AFFW       Goods movements with errors from confirmatio
    AFRC       Table of planned changes to conf.: Automatic
    AFRD       Default values for collective confirmation 
    AFRH       Header information for confirmation pool   
    AFRP1      Table of planned changes to conf.: Automatic
    AFRP2      Table of planned changes for confirmation: B
    AFRP3      Table of planned changes for confirmation: C
    AFRP4      Table of planned changes to confirmatn: Data
    AFRU       Order completion confirmations             
    AFWI       Subsequently posted goods movements for conf
    TAFWD      CORU: Messages that are not interpreted as e
    TCORD      Table for field-dependent check routines   
    TCORU      Parameters for order confirmations         
    TCORV      Table with Routines for structureing variabl
    TCORW      Confirmation: Window Control               
    TPARU      Control parallelized confirmation processes
    TPRRU      Control table for process chain for confirma
    TPRRUT     Text table for process control of confirmati
    TRUGS      User status caused by deviation            
    CO(R/3 Application development: PP Production orders )
    AFBP        CIM order: Batch print requests            
    AFFL        Work order sequence                        
    AFKO        Order header data PP orders                
    AFPO        Order item                                 
    AFVC        Operation within an order                  
    AFVU        DB structure of the user fields of the opera
    AFVV        DB structure of the quantities/dates/values
    FAPW        Index of production-/issuing plant for produ
    FTIND       Missing parts index                        
    ORDCOM      Communication control Operation download   
    T024F       Production scheduler                       
    T399X       Parameters dependent on order type         
    T441C       Profile - availability check               
    T441CT      Texts for Profile "Display Availability Chec
    T490        Transactions PP - orders - order category  
    T496B       CIM order: Assigning document types to refer
    T496D       CIM: Destination/lists/spool parameters per
    T496F       CIM order: Form description of the list    
    T496K       CIM order: Entity table of possible table id
    T496N       CIM order: List descriptions               
    T496P       Print PP documents: Determination of output
    T496R       Print PP shop papers: Report control       
    T496T       Print PP shop papers: Transaction control  
    T496V       PP Print: Default Value for Printing Online
    T496Z       CIM order: Table-controlled table access   
    TC32        Assigning subscreen to processing location 
    TC34        Allocating operation to object type for the 
    TC62        Sequence of detail screens when processing h
    TCO01       Sequence/operations control in logicstics or
    TCO03       CIM order: Texts for TCO01, Description of o
    TCO04       Table for controlling the screen sequence gr
    TCO05       CUA status depending on panel, trans. type, 
    TCO06       Exclusive functions for PP orders           
    TCO09       CIM order: Text IDs of objects in orders    
    TCO10       Valuation variant for order costing         
    TCO11       Control table for production orders - availa
    TCO12       Control table production orders - stock dete
    TCO36       PP orders: Control table for calling up pop-
    TCO41       CIM order: Default values for generating ope
    TCO43       PP-SFC order profile                        
    TCO43T      Description of production scheduler profile 
    TCO60       Sequence keys for input facility and verific
    TCO61       Sequence key for PP orders                  
    TCO62       Defining screen sequences for input facility
    TCO63       Sequence of detail screens when maintaining 
    TCODB       Database fields development class CO per ord
    TCOF        Profile for missing parts info system       
    TCOFF       Profile for Missing Parts Info System: Displ
    TCOFFT      Texts for Missing Parts Info System: Display
    TCOFG       Profile for missing parts info system: crite
    TCOFGT      Texts for Missing Parts Info System: Criteri
    TCOFK       Texts for functions in milestones/trigger po
    TCOFS       Profile for Missing Parts Info System: Sort
    TCOFST      Texts for Missing Parts Info System: Sort Cr
    TCOFT       Texts for Missing Parts Info System        
    TCOKO       Constants for PP orders                    
    TCOKT       Account assignment categories for order    
    TCOP        Field selection profile                    
    TCOPS       Field selection profile                    
    TCOPT       Description of Profile for Field Selection 
    TDUMMY      Dummy structure of a table for READ with VER
    TRUG        Reason for variances in completion confirmat
    TRUGT       Text describing the reason for a variance in
    TXPR1       XPRA control - missing parts info system   
    Regards
    Hemant G

  • Work order operation

    how to find out action log for operation line item changes in work order. ( ex Deletion / changes )
    Thanks in advance
    S.Naresh

    Hi,
    For setting up ECM you can follow the steps given in the below link with all the T-Codes:
    http://www.sap-img.com/pp007.htm
    And for the complete explanation of ECM you can follow the link:
    http://www50.sap.com/businessmaps/D0A45D785990457D990738D4CC4FD4C6.htm
    Amit.

  • Sub Order and Super Order - Operations and date in IW49N

    Hi Experts,
    Please explain in brief the scenario of Sub Order concept
    I am trying to use this scenario if we couldn't able to perform number of activities which is in Superior order
    I am copiying those activities in Sub Order and deleting those activities from Superior order
    And i am changing the date in sub order which is in future (i.e in main order date is 07.06.2014 and in sub order i am chnaging the date is 070.07.2014)
    It means further activities i will do in next month date.
    Correct if i am wrong
    And please explain the effect in report IW49N , Sub Number , Sub Operation , Superior Activity not showing and
    Sub Order is showing in Order and my main order showing in Super Order
    For Super Order Activity not able to seen.
    Please help which report we can refer to check where we can see activities for both orders along with date.
    Thanks & Regards,
    Abhishek Patel

    Sami,
    What issue?  Those results are perfectly acceptable under certain business scenarios.
    Your sched start/finish implies that your routing has no duration being calculated during the schedule process.  If this is your issue, look at the various forumulas attached to the scheduling tab of your work center(s)(CR03).
    Rgds,
    DB49

  • Work Order Cost/Planned data by Activity Type

    Does anyone know the cube that would contain planned and actual cost for work orders using the work order activity type (AUFK-ILART)
    Will reward points as always.
    Richard

    Hi Ashish Jain,
    I have planned activity type/price with the transaction KP26, but the system doesn't return any value in planned costs of WBE.
    Why?
    Thanks
    Nicola

  • Work Order Basic Start Date and Basic Finish Date to be changed

    Hi,
    Currently the business creates work orders without specifying the work resulting which the start and fish dates on work order are same. Also we have automatic scheduling turned off. In spite of this If I am trying to manual modify the basic start and basic finish dates on work order it does not allow me to do so. This issue is seen with work orders which are Released whereas orders with status outstanding have no issues. Could anyone please let me know what could be the reason?
    Thanks,
    Vinay

    Please check whether Scheduling type only capacity requirement is configured.
    If yes, choose this scheduling type in order, you can able to change Basic start date & basic finish date.

  • Addition of new field in VA02 and VA01 in additional data tab B

    Hi,
    I have added a new field called delivery date to additional data tab B in both tcodes va01 and va02. Now, while creating or changing a sales order, if the Sales group is I00 then this field should be filled up mandatorily. For va01 and va02 i have done all the required coding where all this is done on pressing the save button when we are in the additional data b tab.It would throw an error message if the date is wrong and a wrning if it is empty (provided sales group is I00). I did the coding in 4462 screen.
    My requirement now is that if somebody doesnt go to the 'additional data b' tab n try to save the Sales order then also it should throw a warning or error stating that delivery date field should be filled up. Where exactly should i place the coding now? if it is screen 4900 then can someone suggest me at what place should the coding be done.
    Regards,
    Puja

    Hi Puja,
    Seems you have added the fields at item level in sales order and for this you must have appended the additional fields
    in vbap table. So to validate these fields you can use USEREXIT_CHECK_VBAP available in MV45AFZB user exit include.
    The fields you appended will be available in vbap structure, add your validation here or even in USEREXIT_SAVE_DOCUMENT_PREPARE  available in MV45AFZZ which is called before saving the sales order.
    Regards,
    Pawan

Maybe you are looking for