Linkage of inspection lot when the stock is posted to new material in UD.

Dear QM Gurus,
    My client has the following requirement.
   The stock is sometimes posted to the new material whle Usage decision(Partially or completely)
    In this case the target  material has no linkage with the inspection lot of the material for which the Usage decision is done.
   The user has to manually create the inspection lot for the target material and record the same results once again for the record purpose.
   The requirement is to establish a link between the inspection lot original material and the target material  so that the additional step of creating the manual inspection lot and result recording  can be avoided.
  Is there any standard functionality through which I can link the inspection lot/result recorded to the target material or can it be acieved through some enhance ments.
  Please help.
  Regards
  Ankush

Hi Ankush,
I am not aware about the standard functionality for this link. But following work around may work for you. Possibly you may have to develop the ABAP report for this linkage. Try this if works.
1.     When you do material to material transfer in QA11 it generates a movement in background with material document generation.
2.     Pass the inspection lot through QAMB table and fetch all material documents
3.     Pass these material documents in MSEG table and get the material
4.     You may put several conditions for fetching these details.
Best Regards,
Anand Rao

Similar Messages

  • Can we create 2 inspection lots at the time of goods receipt.

    Hi experts,
         Can we create two inspection lots at the time of goods receipt from vendor.I will assign two inspection types in material master
    suppose 01,02.Both are releated to goods receipt.For one inspection lot when we take usage decision stock should not post into usage decision.for other inspection lot stock has to be posted.Is this possible?if possible how to do configuration?

    I think I made this recommendation in a previous post concerning this but this is exactly what reference operation sets are created for.
    Create the reference operation set for the characteristics that are used for all the materials.  You create this once.
    When you create the sepcific plan for the individual materials, you include the reference operation as one of the operations, (probably the first one in your case).  You don't have to add characteristics, modify or change it.  All the characeristics and settings come from the reference operation.  If you need to make a change you edit the reference operation and make the change once.   The change is immediately seen in all newly created inspection lots.
    In a second operation of the plan, you add the characteristics specific to the material.
    You can add different workcenters to the operations if you want.  That way you can set up security on the workcenters and control who can record results against which operations.
    Aside from creating lots manually, you can't create two lots at the same time from the same GR.
    Craig

  • Inspection Lot with Zero stock posting qty

    Dear QM Consultants,
    We have come across following scenario,
    1.     Repetitive manufacturing
    2.     Material has inspection type 04 and Z04. Preferred inspection type is not ticked. Z04 inspection type has been assigned to inspection lot 04.
    3.     Production GR done by 131 movement
    4.     Inspection lot generated with reference to 131 movement type. Lot for inspection type 04 is created.
    5.     Inspection lot qty in QA32 it shows correctly as that of GR qty.
    6.     But when we click on UD, in stock posting tab, qty to be posted it shows as ZERO. So no qty is available for stock posting.
    Has anybody came across such scenario? Is this any bug? Any SAP note for this?
    Best Regards,
    Anand Rao

    Dear Sujit, Thanks for so prompt reply,
    Basically this is a complex case,
    1.     See we have set Posting Proposal in Usage Decision as u2018To unrestricted useu2019 in selected sets for usage decision. That means we need not every time go to stock posting tab. The moment we select ACC UD code it automatically posts the stock to unrestricted use.
    2.     Now, what has happed, by 131 movement declaration, backflush happened with 261 movement for child parts.
    3.     Inspection lots with inspection type 04 were created. (Here we did not note whether the stock was posted in quality inspection or in unrestricted use)
    4.     Now the requirement is to cancel 131 movement document. Kindly note UD were not given up to this moment.
    5.     Now through MFBF, user did document specific reversal. As a result of which and as per my knowledge 132 movement should happen and 262 should also happen. At the same time inspection lot status should be set to LTCA. But in actual case 132 movement happened and 262 did not. Surprisingly inspection lot did not set to LTCA status. It remained in REL mode only.
    6.     After this document specific reversal, user gave UD to these inspection lots without noticing where the stock was lying.(in unrestricted or in quality inspection). So the lot status set to UD   ICCO SPCO STUP after giving usage decision.
    7.     Now while doing reverse engineering that why 262 movement did not happen, we came to know that no 321 movement happened for the inspection lots which were generated with reference 131 movement document
    8.     Also, qty to be posted it shows ZERO as explained in my earlier post.
    9.     When we display 132 movement document through MIGO, in where tab it shows stock type as Quality inspection. That means stock was lifted from QI for 132 movement.
    In short  it cannot be predicted where the stock was actually posted whether in QI or in unrestricted use. But yes the post to inspection stock tick has been ticked in material master.
    Can you help further in this regard?
    Best Regards
    Anand Rao

  • Inspection lot w/o stock tab

    Hi Guru,
    We receive job work items through MIGO and MB31.
    During MIGO , create one inspection lot  w/o inspection lot stock tab and again create one more inspection lot at the time of MB31.
    Pl. suggest any setting so that only one  inspection lot will create after MB31.
    Regards,
    Rakesh Patel

    Hi Rakesh,
    Kindly excuse me but thereu2019s a confusion to me, if you can please clarify the same.
    1.     First transaction that you are carrying out is MIGO for 101 movement I guess.
    2.     For this movement you are observing that inspection lot stock is not getting generated. The probable one of the reasons for this according to me is, goods receipt against cost center using item category K in PO.
    3.     When you inward such material against K, the stock gets consumed at the same moment you inward it. This is standard behaviour of SAP.
    My question is,
    1.     MIGO is done for say material XYZ. (the stock is not visible in MMBE if you have inwarded against cost center.)
    2.     Now MB31 is done for which material? Is it the same material or different? If you have activated 04 inspection type to the material whose production you are declaring then system will generate the lot for it in 04.
    3.     MB31 is generally used for goods receipt against production order.
    I am unable to establish the link between MIGO and MB31 here.
    Regards,
    Anand Rao

  • Mass change in Inspection lote, when assigning UD Code.

    Dear all,
    curently we are facing an issue of having to mass change inspection lotes when assigning UD code.
    The senario is as follows:
    using the tcode QA16 I can mass assign UD code for various inspection lotes using the option "in background". The requisition of the client is, however, to enter also a description text, for all the lotes treated. I an use the tcode QA16 and run a UD manual option, that lets me enter a long text for each inspection lote, along with assigning UD code. That is not acceptable, since there are daily hundrets of lots, we are talking about. That makes the manual option very time consuming.
    Anyone had a similar issue? What I am looking for here is some exit, or other type of solution that allows me basically replicate the long text (the same for all treated lots) for various lots automatically. I was thinkig of QA16, making some necessary adjustments, but I not sure if it will serve for this purpose.
    Any suggestions will be highly appreciated,
    best regards,
    Anna

    Hi,
    I think you would need to go for BDC to achieve this. Since this is required on daily basis, you should run BDC to enter the long text against the UD for each batch. This should work.
    ntn

  • Update inspection lot when MIC changes

    Hello Gurus,
    Is there a way to update existing inspection lot when master characterstic changes?
    Any help would be really appreciated!
    Regards,
    Owais

    Hi
    You can change the Existing Inspection plans by doing setting at Cleint level as Replace MIC
    When you cahnge MIC it will give popup of where used.You can change the task lists.
    But this changes will not automatically reflect in an inspection lot.
    for this you have to
    Go to Qa02
    Enter Inspection lot
    Click on reset
    save
    check status of lot CRTD in QA32
    now go to QA02
    enter
    click on Inspection Specification
    selct sample
    save
    check status in QA32 as REL
    Regards
    Sujit

  • Cancel inspection lot when results already recorded

    Hi,
    I have an inspection lot created via the release of a process order, since the lot has been created the process order has been canceled and now there is a requirement to cancel the associated inspection lot also. However there are results recorded and confirmed against the inspection lot and the option in QA02 Functions ->Inspection lot -> cancel is no longer available? Any suggestions on how to cancel this inspection lot would be greatly appreciated.
    Regards,
    Gary

    Dear,
    You need to use transaction QA12. In the intial screen enter the Inspection lot number and enter. From menu bar "Usage Decision" ->Functions->Cancel Lot and then save the lot.
    Please refer this link,
    [ Cancel Inspection Lot |Re: cancel QM inspection lot]
    Regards,
    R.Brahmankar

  • HT1349 When the tech set up my new iPad last week, I can get email on IT, but now I can no longer get email on my Mac laptop.  How can I correct that?  Tish

    When the tech set up my new iPad last week, I can get email on IT, but now I can't get email on my Mac laptop.  What's wrong?  Tish

    It could be a POP account which means the first device which accesses the account gets the email unless the settings have been changed. Here are links to show what is involved. It may not mirror your circumstances though.
    http://support.tigertech.net/outlook-2007-lmos
    http://email.about.com/od/outlookexpressbackuphelp/qt/et_server_copy.htm

  • Generated EDI message when the invoice is posted.

    Hi!!!,
    We are implementing a process to receive electronic invoice, we are using the FM. IDOC_INPUT_INVOIC_MRM  to process the IDOC with the invoice, so we need to confirm the reception of the invoice using an output idoc when the invoice is post. Anybody know some way to customizing this confirming message using EDI? we would like to send the message when the invoice is posted (we need to use IDOC to send the confirmation)
    Thanks for your help!!!

    Hi,
    How you are creating invoice?
    Creating based on data coming from Idoc or sending Invoice data as Idoc.
    please elaborate.
    Regards,
    Bhavana.

  • Stock Posting to New Material

    Hello Experts,
    The key user of QM module want that the QA11 transaction will suggest the same batch number when he is
    gonna to do the stock posting to new material, because they dont change the
    batch number when do this procedure.
    I want your advise, because i dont find any User Exit  or set up to do that.
    Check the attach file.
    Thank you

    Hi,
    please go through the below links, it may help you out to resolve the query,
    Post to new material in QA11 and inspection lot creation
    Inspection lot creation for posting to new mate... | SCN
    Regards,
    Narresh

  • BAPI_MATERIAL_SAVEDATA - Error when i try to create a new material

    Hi.
    When I try to create a new material with bapi BAPI_MATERIAL_SAVEDATA, This function return following error :
    M3 - 262 - Enter a material number.
    I understand that is obligatory to fill this field to create a material, but i need that the system give an automatic material number .
    Is this posible with this bapi, or I need other function ?
    thanks.

    Hello
    Control will be at the Material type level.
    We will define whether the number range for Material type is internal (automatic assignment) or External.
    If it is set as External, we need to input the Material numebr externally.
    Please check your material type selection and number range for the same during the BAPI execution.
    More info :
    Define Number Ranges for Each Material Type
    In this step, you define the type of number assignment and the number range intervals for material master records. When creating a material master record, you must assign it a unique number. There are two ways of doing this:
    internal number assignment
    In this case, a number within the number range interval allowed is assigned by the SAP system.
    external number assignment
    Here, the user assigns a number within the number range interval allowed. You can define the intervals for external number assignment numerically and alphanumerically.
    You define the number range intervals for so-called groups. You assign one or more material types to each group.
    If you assign just one material type to a group, you can define both an internal and an external number range interval for the material type.
    Recommendation
    SAP recommends using internal number assignment. Since you can use matchcodes to select materials according to any desired criteria, it is not normally necessary to use a mnemonic external number.
    However, external number assignment can be advantageous if you want to use your materials in other systems outside the SAP system. However, the field Old material number and a matchcode are also available as standard for this purpose.
    Actions
    1. Assign each material type to a group. Remember that you can also group together more than one material type.
    2. Define the number range intervals for each group.
    warm regards
    Ramakrishna.

  • MRN9 How it will work when the stock is negative qty

    Hi,
    We have facing one problem while doing inventory valuation.
    when we running the program MRN9 it will determine the balance sheet value from comparition of lowest price then it will update.
    But the stock in negativeside like -1000kg qty and the NRV price is 50 and FIFO price is 60.
    When running the program it has determine lowest value.But in negative side it is showing the price as  -60000 is the lowest value. As a mathmedical it is correct. But when you see the other side (50000) compare with (60000)  the value (50000) is the lowest price.
    could you any one help to explain or any notes are available to rectify the issue.
    this is happening only for negative stock. Positive stock it is working fine.
    Thanks in advance.
    Regards
    Gopal

    Here are a couple of Adobe encoder activation links, maybe one of them is what you need:
    Adobe encoder activation
    Adobe MPEG Encoder activation
    And an offline product activation link: Offline Activation
    Cheers,
    Neale
    Insanity is hereditary, you get it from your children

  • Blocking MIRO when the stock is in Quality

    Hi all,
    We are using mySAP ECC 5.0.We have configured QM for Procurement.
    when the materials is received through MIGO, stock is posted to Quality.At this stage, if i am doing the MIRO, system is allowing me to do.But system should not allow me to do this? Can some user exits be used for this?
    Alos, based the quality's decision MIRO quantity should come. Suggest some user exit.
    Thanks in advance,
    Gowtaman

    Hi Gowthaman,
    The following BADI can be used in your case.INVOICE_UPDATE is the Interface name of the BADI.It provides the following methods ,
    CHANGE_AT_SAVE
    CHANGE_BEFORE_UPDATE
    CHANGE_IN_UPDATE.
    Do check out this BADI.
    Regards,
    Samson

  • Unable to restrict the Release of order when the Stocks are deficit.

    Hi gurus,
    i have a packing material for which the stocks are deficit when i checked in MMBE.
    While releasing the order the material is picking the stock from some where and is not restricting the Release of order. The same case is working fine with other materials as well.i.e when there is a deficit of stock then the release is Rejecting for all the materials except for this packing material.
    Thanks for your understanding.
    Naveen.A

    Hi,
    Please check the below mentioned points
    1.Material Master  MRP View : (View 2 or 3, i dont remember) You had maintained the proper Checking Group (Say 02)
    2. OPJJ: If you are using standard Checking Rule "PP" for the combination of the Checking Group and Checking Rule PP, make sure that scope is defined properly. Generally receipts from PR would be out of scope.
    3. OPJK : Make sure "you had NOT checked "No Check" for Material Availability.
    4.OPJK: The checking Rule is the right one (PP in Standard)
    5. OPJK : For the order type you use, the Plant  and business function 2combination check if you had set "3 -  No release if Parts are missing"  for the  field "Release Material"
    Thanks
    Bala

  • Some webpages resize the window but when the window opens in a new tab, the entire firefox browser is resized. How do I stop this from happening?

    This usually happens when the window is resized in order to fit the smaller content/intention for a webpage.
    I would like Firefox to ignore the window resizing (down sizing) commands when opening a window in a new tab and just display the window in full size.

    Go into ''Tools > Options > Content'' and next to where it says ''Enable JavaScript'', click ''Advanced...''' and then untick ''Move or resize existing windows''.
    This is the only way to do it. I believe there is a bug filed to prevent all sites (by default) from resizing the window if there are more tabs open, but I don't think it has been fixed.

Maybe you are looking for

  • How to map user-defined fields in XML communication on SRM site

    Hi All! We use the External sourcing scenario and we transfer requirements from ERP  in SRM through XI (PurchaseRequestERPSourcingRequest_In) We should transfer the user-defined fields, but we can not map it in SRM site. We have enhanced enterprise s

  • NFS client problem

    Hi, I have setuped NFS environment on solaris 9. All the services are running in Server and Client side. While the client rebooted im getting the mount point is not found. like : /pani/notape is not found or does not exist. When i umount /pani im get

  • I just want to convert a file

    My file is 150mb so it wont let me convert it to word....have I just wasted my time and money on this program?

  • Any fixes to the buggy PDF conversion in Coldfusion 9?

    Using CFDOCUMENT to convert html to PDF, but the resulting PDF pages are buggy. For instance table cell backgrounds bleed outside the table cell borders, and lots of other rendering issues that make it hard to use this tool. Has the PDF conversion be

  • Checking /Viewing Unix file permissions

    Is there a way for me to check file permissions (In Java) under unix, without having to call a system dependent function. (ie Runtime.getRuntime(); run.exec(....)) Any help would be greatly appreicated. Curtney