Update inspection lot when MIC changes

Hello Gurus,
Is there a way to update existing inspection lot when master characterstic changes?
Any help would be really appreciated!
Regards,
Owais

Hi
You can change the Existing Inspection plans by doing setting at Cleint level as Replace MIC
When you cahnge MIC it will give popup of where used.You can change the task lists.
But this changes will not automatically reflect in an inspection lot.
for this you have to
Go to Qa02
Enter Inspection lot
Click on reset
save
check status of lot CRTD in QA32
now go to QA02
enter
click on Inspection Specification
selct sample
save
check status in QA32 as REL
Regards
Sujit

Similar Messages

  • Mass change in Inspection lote, when assigning UD Code.

    Dear all,
    curently we are facing an issue of having to mass change inspection lotes when assigning UD code.
    The senario is as follows:
    using the tcode QA16 I can mass assign UD code for various inspection lotes using the option "in background". The requisition of the client is, however, to enter also a description text, for all the lotes treated. I an use the tcode QA16 and run a UD manual option, that lets me enter a long text for each inspection lote, along with assigning UD code. That is not acceptable, since there are daily hundrets of lots, we are talking about. That makes the manual option very time consuming.
    Anyone had a similar issue? What I am looking for here is some exit, or other type of solution that allows me basically replicate the long text (the same for all treated lots) for various lots automatically. I was thinkig of QA16, making some necessary adjustments, but I not sure if it will serve for this purpose.
    Any suggestions will be highly appreciated,
    best regards,
    Anna

    Hi,
    I think you would need to go for BDC to achieve this. Since this is required on daily basis, you should run BDC to enter the long text against the UD for each batch. This should work.
    ntn

  • How to updating plugin.xml when it changed in 12C?

    After Importing the Plug-in Archive and Deploying it on Management Service with 12C, I need to make a change with plugin.xml in Plug-in Archive. Here it's the change,
    --- Old one:
    <PluginAttributes Type="MP" ReleaseStatus="Test"/>
    --- Change to:
    <PluginAttributes Type="MP" DisplayName="MySQL Database" Category="Databases"/>
    So I un-deployed Plug-in from Management Serbice, and used command "emcli import_update" to update the brand new OPAR file successfully, and the deployed again. But it seems the new plugin.xml didn't work at all, neither from UI nor the plugin.xml located under Management Server folder. I am sure it should work cause after I changed the Target Type and etc. in all related files to made a new plug-in, it works well.
    So how to updating plugin.xml when it changed in 12C? (It seems there is no option with MRS.)
    Thanks in advance!
    Best wishes,
    Satine

    Hey Caroy,
    Thank you for your help.
    It seems there is no entrance within page "Setup->Extensibility->Self Update" to delete a plugin. Would you please tell me more specific position?
    I will upgrade the version of plugin and try again to see if it works.
    Thanks,
    Satine

  • Recurring inspection lot status "created" changed automatically to "Release" without change history

    Dear Experts,
    I observed that for few materials recurring inspection lot (inspection lot origin 09) status from "CRTD CHCR SPRQ" to "REL  CALC SPRQ PRSI" changed automatically without manual interruption.
    I have thoroughly checked the change documents in status management, but the there is change history found.
    can anyone help me understand the root cause of the issue?
    Regards,
    A.Suresh

    Hi
    Pls check this link
    QM - Recurring Inspection (type 09)
    Inspection type 09 process
    Note : System status CRTD because there is no Insp.plan master data for particular material
    Check & create Inspection plan for material & also check the Material master QM view Insp.set up tab.
    Suppose if already created Insp.plan for material,then you need to assign Insp.plan manually in QA32 select the insp.lot line & click change Insp.lot icon in Header ,click spec.& save
    Then system status change from CRTD to REL.
    Thanks in advance

  • Linkage of inspection lot when the stock is posted to new material in UD.

    Dear QM Gurus,
        My client has the following requirement.
       The stock is sometimes posted to the new material whle Usage decision(Partially or completely)
        In this case the target  material has no linkage with the inspection lot of the material for which the Usage decision is done.
       The user has to manually create the inspection lot for the target material and record the same results once again for the record purpose.
       The requirement is to establish a link between the inspection lot original material and the target material  so that the additional step of creating the manual inspection lot and result recording  can be avoided.
      Is there any standard functionality through which I can link the inspection lot/result recorded to the target material or can it be acieved through some enhance ments.
      Please help.
      Regards
      Ankush

    Hi Ankush,
    I am not aware about the standard functionality for this link. But following work around may work for you. Possibly you may have to develop the ABAP report for this linkage. Try this if works.
    1.     When you do material to material transfer in QA11 it generates a movement in background with material document generation.
    2.     Pass the inspection lot through QAMB table and fetch all material documents
    3.     Pass these material documents in MSEG table and get the material
    4.     You may put several conditions for fetching these details.
    Best Regards,
    Anand Rao

  • Userexit for MIGO or COR6N  to update inspection lot ?

    Sub : I am looking for User exit or Badi for MIGO tcode.
    Who have good idea on this, please help me .
    I have to update the inspection plan ( in qa33, select one of the record --> "inspection lot" button on application tool -->  Insp. Specifications --> Usage field to be updated )
    Do I have any userexit which can do update this "Usage" field .
    Through "COR6N" tcode, I am trying for the user exit.
    Could you please help me.

    Hi Check below exits/BADIs
    Exit
    MGA00001                                Material Master (Industry): Checks and Enhancements
    MGA00002                                Material Master (Industry): Number Assignment
    MGA00003                                Material Master (Industry and Retail): Number Display
    Business Add-in
    WRF_DISCONT_PARAMS_I                    BAdI: Parameters in Fashion Discontinuation
    WRF_DISCONT_FACT_E                      BAdI: Follow-Up Actions in Discontinuation
    WRF_DISCONT_CHECKS_I                    BAdI: Scope of Check in Material Reorganization
    MG_MASS_NEWSEG                          User-Specific Fields & Segments in Mass Maintenance
    MATGRP_SKU_UPD                          BAdI for Article Hierarchy Connection
    CDT_CHECK_MATERIAL                      Checks for Existence of a Material in a CDT
    BADI_MM_MATNR                           Modification-Free Archiving Enhancement of MM_MATNR
    BADI_MATNR_CHECK_PVS                    Check Material for Use in iPPE
    BADI_MATERIAL_REF                       Addition of customer-defined default data for material
    BADI_MATERIAL_OD                        Integration of New Objects in Material or Article Master
    BADI_MATERIAL_CHECK                     Enhanced Checks for Material Master Tables
    BADI_GTIN_VARIANT                       User Exit for Customer-Specific GTIN Variant Check
    BADI_EAN_SYSTEMATIC                     BAdI for Internal Control of EAN Logic

  • Inspection lot sample Qty change manual

    Dear Friends ,
    Is there any T Code or procedure to change inspeciton lot sample size in inspection lot
    like how we change the Inspection lot Qty
    Thanks & Regards
    Raj

    Hi
    You can only reset the sample Quantity using qa02>enter inspection lot>click on sample ->save>This will reset the sample(remove task list)
    Now you can change the task list an attach modified sample
    Or
    Assign manual sapme calculation in Inspection type (without inspection task list)
    This will allow you to maintain/enter the manual sample size during lot creation.
    try this

  • Cancel inspection lot when results already recorded

    Hi,
    I have an inspection lot created via the release of a process order, since the lot has been created the process order has been canceled and now there is a requirement to cancel the associated inspection lot also. However there are results recorded and confirmed against the inspection lot and the option in QA02 Functions ->Inspection lot -> cancel is no longer available? Any suggestions on how to cancel this inspection lot would be greatly appreciated.
    Regards,
    Gary

    Dear,
    You need to use transaction QA12. In the intial screen enter the Inspection lot number and enter. From menu bar "Usage Decision" ->Functions->Cancel Lot and then save the lot.
    Please refer this link,
    [ Cancel Inspection Lot |Re: cancel QM inspection lot]
    Regards,
    R.Brahmankar

  • Update button label when locale changes, in AS3

    What I'm trying to do is pretty do what this does:
    <s:Button label="{resourceManager.getString('Strings', 'some_resource')}"/>
    but in ActionScript code. I have a function to add a new tab button to a layout which takes a string and just trying to set the label to the same string doesn't work obviously. So what I need is a way to set the button label to some bindable value that will update whenever the locale changes, like it does automatically when doing it in MXML.

    Nevermind, I figured it out. For those of you that are curious about the solution I found it's in the code below. The only way I could figure out how to get it working is by declaring a local function right after creating a button and attaching it as a "change" event handler to the resourceManager.
    public function addTab(resourceName:String):uint
         var newTab:Button = new Button();
         newTab.label = resourceManager.getString('Strings', resourceName);
         newTab.setStyle("skinClass", Skins.Buttons.TabButton);
         // Create a local function that will update the button label whenever the locale changes
         var localeChangeHandler:Function =
              function (e:Event):void
                   newTab.label = resourceManager.getString('Strings', resourceName);
         resourceManager.addEventListener("change", localeChangeHandler);

  • Delta update not working when i change material master data

    Hi SAP Guru's
    can any body help me in solving my issue.
    My issue is i created a data source with a function module to create delta in change date field LAEDA.
    .Full upload is working fine based on the selection screen but delta update is not working properly .
    it is working as full load run for every first run of the day.
    Please can any body help me in this.
    What i did in ECC.
    I copied the FM 'RSAX_BIW_GET_DATA_SIMPLE to Z function module.
    Done a select on three tables and passed the data into e_t_data
    In Rso2 i attached LAEDA filed after clicking generic delta field.
    after completing the steps in ECC
    Any help will be apperitiated .
    Thanks in advance

    Did you actually change the sold-to party though or just the payer?  The sold-to party's price list type controls the price list type value copied into the order header.  Even if the payer has a different value, it's not copied to the order header.  You can see this behavior in FV45KFKD_VBKD_FUELLEN.  If you switch sold-to's then you should get a pop-up that new pricing was carried out; you should also see your new price list type value in the order header and you can use the 'analysis' function at the item level to verify that the correct price was used.

  • Photoshop CC: Save For Web function does not update filesize previews when I change filetypes

    I recently tried to save some web banners and wanted to optimize for smallest filesize with best looking output, and as I changed filetypes from Gif to Jpeg to PNG, the preview at the bottom of the window that usually updates with estimated filesize was not changing and the preview image would not change as well. The issue made it impossible to predict the output and required that I actually save in all the variations, then reopen them to see the end result.
    My software is up to date.
    Not really sure what it can be.
    Please help.
    Casey

    Same issue. Hoping someone responds to this thread soon

  • Generate Inspection lot operation when needed

    Hi
    We are using inspection lots to record supplier results for certain raw materials.
    We now need to include our own test results to these inspection lots.
    To accomplish this we’re thinking of using the same inspection plan with a 2nd operation.
    This will enable us to generate one inspection lot per GR while recording two types of results (i.e. Op1 = Supplier, Op2 = Own).
    The inspection lot will always have results from Supplier, but we might only internally test every 10th delivery (GR).
    Is it possible to generate the 2nd operation (i.e. Own results) when needed?
    Or any other elegant approach/process?
    Thanks

    Hi Werner
    Not is possible add more results in a inspection lot when you made the usage decision.
    For this case, you can use the inspection class 89 (Other Inspection) for manually generation inspection lot when you need to register your own results.
    For this inspection class 89 you need an inspection plan with another usage (Usage 3). In this inspection plan you can to use your own test.
    Regards.
    Henry.

  • Quality inspection lot creation at  GIR

    Dear MM/QM guru's........
    Can you explain me in bref wat are the customizing setting in Quality managemnt and MM for creation of inspection lot the moment you go GIR and how to release the inspection lot..
    Reagrds
    SARFRAZ

    hi sarfrazny,
    first you have to activate the QM view in material and activate the inspection type in the material master .
    inspection plan to be prepared
    as soon as you process the the GIR a inpection lot will be created for which you have to record the result .
    kindly look into this
    <b>Inspection for a Goods Issue</b>
    Purpose
    The system can automatically create an inspection lot when a goods issue is posted in the system. A goods issue can be posted internally (for example, a material withdrawal from the warehouse) or to an external destination (for example, a goods issue to a customer). In a goods issue, the materials are usually withdrawn from unrestricted-use stock and posted to a cost center, project, customer, or other account assignment object. When the system creates an inspection lot for a goods issue, the inspection lot is not stock relevant.
    Prerequisites
    The system creates an inspection lot automatically for a goods issue if the following conditions have been met:
    In Customizing for Inspection Lot Creation (Inspection for a Goods Movement) QM is active for the movement type.
    QM is active for the material. This means that in the inspection settings of the material master:
    In Customizing for Inspection Lot Creation (Inspection for a Goods Movement) QM is active for the movement type.
    An inspection type is active for inspection lot origin 02 (goods issue)
    The other indicators for the inspection type are set appropriately to meet your requirements for inspection processing (for more information, see Processing Inspection Settings)
    Process Flow
    The system creates an inspection lot automatically when the goods issue is posted in Materials Management (MM).
    If the inspector will record results for inspection characteristics (controlled by the inspection settings in the material master), the system assigns an inspection specification (for example, a task list or material specification) to the inspection lot. If the system cannot find a specification or if more than one inspection specification is assigned to the material, you must assign a specification to the inspection lot manually.
    If dynamic modification criteria are defined for the inspection lot origin or task list usage, the system checks the existing quality level for the material (and the other criteria, if applicable):
    If a quality level is not available, the system creates one.
    If the dynamic modification rule specifies that the quality level must be updated when the usage decision is made, the system does not update the quality level now.
    If the dynamic modification rule specifies that the quality level must be updated when an inspection lot is created, the system updates the quality level now.
    The system calculates the sample size.
    If the sample calculation must be triggered manually (controlled by the inspection settings in the material master), you must call up the inspection lot in the change mode and choose the function to trigger the sample calculation manually.
    If you are going to inspect the goods in the inspection lot using an inspection specification:
    The system can print out the inspection instruction and/or sample-drawing instruction automatically when the inspection lot is created
    You can print out the inspection instruction and/or sample-drawing instruction manually when you call up the inspection lot in the change mode
    Result
    You can use the information in the sample-drawing instruction and inspection instruction as a guide to:
    Draw and prepare the samples at the work centers specified for each operation
    Inspect the goods in the inspection lot
    Record characteristic results and/or defects
    When you have finished recording inspection results and/or defects, you can complete the inspection.
    Result
    When you have finished recording inspection results and/or defects, you can complete the inspection.
    regards
    thyagarajan

  • Inspection lot at deadline monitoring

    Hi all,
    I've a question about the deadline monitoring function in SAP. I want to create an inspection lot when the batch is about to expire. Here are a couple of assumptions:
    - We use batch status management
    - inspection type 09 active in material master
    - QA07 to trigger inspection.
    I don't want to use the next inspection date. So when i run qa07 i set the field batch status change when exp is reached. The batch is set to restricted, mvt 341 is used for this. But how do i create an inspection lot? I already activated mvt 341 in customizing, but nothing happens.
    Hope you can help.

    In config:  Materials Management > Inventory Management and Physical Inventory>Movement Types-->Copy,Change Movement Types
    Select "Movement Type"
    Enter in range of movement types to review.
    Select a movement type
    Click on folder "update control/WM movement types
    Double click on any of the lines displayed.
    Inspection lot origin field is on the bottom left.
    FF

  • Can we create 2 inspection lots at the time of goods receipt.

    Hi experts,
         Can we create two inspection lots at the time of goods receipt from vendor.I will assign two inspection types in material master
    suppose 01,02.Both are releated to goods receipt.For one inspection lot when we take usage decision stock should not post into usage decision.for other inspection lot stock has to be posted.Is this possible?if possible how to do configuration?

    I think I made this recommendation in a previous post concerning this but this is exactly what reference operation sets are created for.
    Create the reference operation set for the characteristics that are used for all the materials.  You create this once.
    When you create the sepcific plan for the individual materials, you include the reference operation as one of the operations, (probably the first one in your case).  You don't have to add characteristics, modify or change it.  All the characeristics and settings come from the reference operation.  If you need to make a change you edit the reference operation and make the change once.   The change is immediately seen in all newly created inspection lots.
    In a second operation of the plan, you add the characteristics specific to the material.
    You can add different workcenters to the operations if you want.  That way you can set up security on the workcenters and control who can record results against which operations.
    Aside from creating lots manually, you can't create two lots at the same time from the same GR.
    Craig

Maybe you are looking for

  • Print pdf file

    Hello everybody. I have installed Oracle Database 10.2.1, Http server that comes with its companion cd, APEX 3.0.1, OC4J Standalone and Apache FOP, all in one computer. Now all good except by ORMI server that dont work enough good. All this in Linux

  • How do I move content from a second computer to my new iMac?

    I have a new iMac -- when you set it up you can import from a computer -- I did a backup to a LaCie.  Then used that to import to the new iMac. BUT I have a second computer that I need to get information from.  I tried doing the same but can't figure

  • Drag and drop in Edge Animate (was: drag and drop)

    hello friends I have a drag and drop on edge, I need that when you release the ad in the wrong place, my return to the starting point

  • Take long time to shut down for macbook pro OS yosemite

    after installed yosemite, my macbook pro (year 2013)take very long time (about 30sec) to shut off when i click shut down.. anyone have the same problem?

  • Role names with spaces (6.1 to 8.1)

    Hi All I'm working in an organization that has group and role names within their LDAP repository such that the group and role names contain spaces. Hence, for example, within a web.xml file lines like the following exist: <role-name>Some Role Name</r