Am booking series of A/R invoices in SAP B1 from the legacy system ,have a current scenario where document 1,2,3 are regular invoices and document 4 is a inventor transfer the bill is being raised for the same , now i have assigned document numbering in SAP B1 but am not able to maintain this continuity in the SAP B1 system ,is there any way to achieve this or there any way to cancel or create a dummy A/r invoice inorder to maintain the document numbering
example
LT012-- copied from delivery
LT013-- copied from delivery
LT014-- copied from delivery
LT015-- inventory transfer
LT016-- copied from delivery
Regards
srini

Hi
There is no way to get the document no after cancelling ... The Document no. is Auto incremental whenever u  r adding the doc. in SAP the system will automatically allocates the next no for the new doc....
Suppose if u wana to enter the document like 101 but ur sap Document Next No is 88, By Choosing Manual in Document series u can go for the no. directly to 101 and when ur document no continues it will skip the 101...
Giri

Similar Messages

  • Document Series Authorization

    Hi All,
    I am using SAP 8.8 PL 10, I am facing an issue related to the authorization of  document series. I have 4 different series for four different locations and 4 different series group. Users of one particular location are authorized by group to view only their respective series. However users are facing a problem in opening the document, as it is suggesting to define new doc. series. it works by giving full authorization to all the series.
    Note: Groups are assigned to the doc. numbering and it works by selecting the series again and updating the same series group in the doc, numbering window for a particular document. however I have to do it for all the users and for all the documents..
    please help.
    Thanks
    Agranshu

    Hi joseph,
    I did the same thing.Its not working.. even after giving right authorization to the user they are not able to open the document.
    only after select the document in doc. numbering. selecting the same series group . setting default for certain user(even if that same user is not selected) it works .here my problem is solved for a particular user and particular document.
    But my client has 80 users, 8 series groups, and SAP B1 has 26 diff. document..
    so i have to do the same process 80826 times :).
    thanks
    Agranshu

  • How to maintain the documents like PDF, EXCEL and WORD in database

    Hi,
    I am working on UI, I am tracking the COREMODS data using this UI. My requirement is need to maintain the related documents also in database using this UI. I think SLM system have that functionality. If any one know about this functionality, explain about
    How to upload the documents into database.
    How to maintain this documents in database.
    Is there any standard methods/function modules to upload this documents ( I am not asking about content of document, I am expecting about total file).
    i.e. I want to maintain the all core mod related test cases and other documents in SAP database.
    How to handle this functionality?
    Rayudu

    hi,
    There is a Utility in SAP called Easy DMS.
    Here you can create folders, maintain authorisations and store your documents.
    Hope this is wht u r looking for.
    Reg,
    Raj

  • Warning message : Maintain the document in language German

    Hi all,
    I want to release the customizing but there is a message
    "Maintain the document in language German" and then
    "Release of tasks without documentation is not allowed"
    What should i do ??
    Thanks & Regards,
    Saiful arif

    Hi Arif,
    unfortunately it is only possible to modify documents in original       
    language.   It seems, that you want to update the standard docu (which indeed might have been created in german language once upon a time....)                                                            
    Please use the possibility to store Notes within your project IMG       
    These notes can be maintained in IMG-project language.                                                                               
    To get the functionality you need to assign a documentation type        
    with transaction SPRO_ADMIN on tab 'Documentation Types' to your        
    IMG-project. Afterwards you can use the icon 'Note' while maintaining   
    your IMG-project within transaction SPRO.    
    b.rgds,
    Bernhard

  • Incoming Excise document automaticaly show the base document Series ans Do

    Dear All,
    One of my customer  have two branches and for that they  created them as two separate warehouses. And both branches are excisable unit. So when they  are transferring inventory from one branch to other which are excisable so they have to raise Excise invoice based on Inventory Transfer.
    They require in an incoming Excise document automatically show the base document Series and Docnumber  in a  "Excise Ref No."  field .
    pl provide me FMS query .
    regards
    Rakesh

    Bom dia Marc de Ruijter,
    Não dá para ler sua thread, mas imagino que seu validador esteja desligado.
    No GRC vá em SPRO --> SAP GRC Nota Fiscal Electronica --> Configure System Response for Each Tax Number (CNPJ)
    Para ligar/desligar o Validador basta clicar no check box na coluna Validation.
    Observação: Para correto funcionamento do GRC deve-se sempre utilizar o validador ligado.
    Após isto refaça seu teste, é provável que você receba um erro de validação para a NF-e. Veja em GRC Web monitor -> NFe Detailed View -> Validation History.
    Atenciosamente,
    Fernando Da Ró

  • Mass upload in KM maintaining the up-to-date versions of documents

    Hello guys,
    I need to do the Mass Upload in Repository Manager (persistence mode DB) in KM.
    My documents are stored in a file system, where they have versioning control. I need to upload the documents in portal with the up-to-date version.
    I have activated the versioning in the folder that I intend to upload the documents, but when I have done the upload, the documents have stayed with versions number = 1.
    Could you tell me what I need to do for upload the documents with the up-to-date version number, for example, if a document in file system has the version number 5, when I do the upload in the portal, the document should stay with the same version, 5 instead 1.
    Regards,
    Mary

    Hello Julian,
    Thanks for your help.
    There is only one document. There arenu2019t any old versions of document, the version of the document is kept by the author in the document, but only as a reference, to indicate that the document already was modified x times.
    The situation is like that:
    You open the Microsoft Word application and you created a document.
    You have the necessity to modify the document.
    You open the document and modify it and save it.
    Now the document has 2 versions, but the document is the same, no document is created from this.
    Inside the document in the second page, the author kept the versions, for example, the author creates a table where he specify the document version, like that:
    Version     Date            Author     
    01      13-08-2008        Mary
    02             14-08-2008        Mary
    I want to know what I need to do for when I upload the document in the portal, itu2019s appears with versions = 2 instead 1.
    Any idea about it.
    Regards
    Mary

  • New Document Series for different locations for Production Orders

    Hi Experts,
    I have came across a scenario where we have to setup different Document Series for Different Locations. Actually the Company is having 2 units . First one is the factory itself and the second one is Subcontracting Unit to which the company sends the job work order . But there it wishes to track the productions processes and the Stock tracking Warehouse Wise for
    this Second unit also . As Such I have created 2 locations and one warehouse for (RM,SFG,FG) for both the units.
    The obvious requirement here is to maintain different Document Series for Productions orders for both the units .
    Please guide me about how to overcome this scenario.
    Thanks and Regards,
    Pooja Singh.

    Hi Pooja,
    Yes. You can maintain different document series for production Order or any documents depending upon your business scenario.  Let's say, you need to maintain Production orderu2019s of job work and sub contracting.
    You can define this under Administration>System Initialization> Document numbering.
    Select Production orders--> let say Factory first number 1, last number 199999, select current period indicator and update. Similarly for the subcontracting, in the name field, "work order", first number as 110001 or the way you desire, and then the last number.
    Reards,
    Senthil Maruthappan.

  • Merging/Flattening Layers with different blending modes and maintaining the visual appearance

    Hello,
    I see there are many others that are having the same problem as me. And alas, it doesn't seem like the problem has been solved or very understood for that matter.
    I want to be able to take a document, that has multiple layers, inside of multiple groups with various layers having various blending modes applied to them and from within that document, select simply two of those layers, one with a Divide blending mode and the other layer Normal, merge those two layers, but have the visual appearance of the merged layer maintain the visual appearance of what the layers looked like before I merged them.
    Everytime I attempt this, Ps takes my Divide layer, reverts it back to Normal and then merges the layers, thus changing the appearance of what it was before the merge. This is not the desired result.
    I understand that when you flatten an entire series of layers, it applies all the blending modes and maintains the visual appearance. Is there a way to do this with just two layers instead of all the layers? If so, that would be great information. If not, why not?
    Thank you
    Jake

    Short answer:  No. 
    A "layer" with a specific blending mode implies a sequence of math operations on a given pixel.  Think of the visible pixel R, G, and B values as the result of a potentially complex math formula that combines numbers from each layer in complex ways (those ways being defined by the blending mode you've chosen).  You can't always simplify particular factors of your choosing in a given math formula.
    The next step is to examine why you would want to do so.  Perhaps there's a more direct way to achieve your goal that would avert the need entirely.
    Another possibility, if the effect of several layers together is something you'd like to manipulate as a unit, is to Group the layers.
    -Noel

  • Urgent : Unable to maintain the Number ranges for Excise Groups

    Hi CIN experts............
    In Development server I created 3 excise Groups (E2,E3 and E4), the same I was transported to Production.
    J_1IRG23A1, J_1IRG23A2 object number ranges are Excise Group specific.
    When I go to Tools - Number Ranges to maintain number range for J_1IRG23A1, J_1IRG23A2 objects I didn't find these excise groups.
    Im able to see these Excise groups in Tools - Number ranges in Development server, but not in Production.
    Can any one guide me something to resolving the issue ?
    regards
    Durga Ram

    Hello Nagaraju,
    Can you please tell me the customozing path for maintaining the number ranges for PM log entries.
    I require to mention customizing path in my document.
    Puneet

  • How to maintain the dimension member that had large amount (over 10K)

    Hi, all,
    I am now doing a Project Planning using BPC and had some questions as follows:
    1. the total amount of the project memeber is huge (exceeding 10K in total). it will be crazy for the Administrator to maintain it only by himself. Is it possible that we can find a workaround method to let the end user to do the restricted work of administrator. in another word, can we find a way that prevent the end user to enter the Administration interface but can add the member themselves through the front end. the process work can be done in shcedule or by manually by the administrator?  Anybody had the experience on this? Or do you have any alternative and workaround way to solve the problem?
    2. the project memeber adding is not finished within one time. that means, in the first time, maybe only add the highest level. and later, adding the members under it. how can we manage it? Dynamic Hierachy or the others?
    Thanks

    You could also have the end user update a regular excel spreadsheet with the same column format as a membersheet.  Easiest would be to save off the membersheet in another location accessible to the end user.  Then it can be modified using excel.  Or have the end user maintain a delimited flat file containing all the information included in a membersheet.
    Using the bpc makedim package as a starting point, you can create a custom version that takes the user updated document as input and updates the bpc sql mbr table for that dimension then process the dimension. As long as the member list does not exceed the excel limitations, I would also suggest updating the membersheet in bpc.  In previous implementations this has meant taking a copy of the membersheet, deleting it, coping a template with the correct columns, then adding the members into it.  Updating excel spreadsheets from SSIS can be challenging if you have to deal with deleted members.
    Also if you have the potential of deleted members that might have associated facts, I have another post concerning that issue, but have not had time to try any of  the suggestions.
    Now, the end user is responsible for updating the member list without having access to BPC Admin tool, but someone with access to run datamanager packages would have to execute the datamanager package to process the dimension.

  • How to create multi garnishment order for the same garnishment document

    Hi,
    Can anyone tell me how to create multi garnishment order for the same garnishment document. I tried to copy the entry in IT0195 but the sequence field is grayed out so it will just delete the old record. What configuration should I do to make this possible?
    Thanks a lot in advance.

    hi,
    As far as I got it.
    You cannot have multiple Garnishment order but if a need arises you have to maintain it in IT216.
    For that follow this path goto PA30->pernr->194->change->Garnishment->adjustment.
    Since like order you cannot maintain adjustment also directly.
    Regards,
    Amit
    Reward all helpful replies.

  • "Can't install the software for the HP Officejet 6300 series because it is not currently available from the Software Update server" when I try to install a HP 6300 printer.

    Hi there
    I am trying to install a HP 6300 printer. I can see it when I look to install initially. Then click on installa nd the process starts and I get a message saying it is searching for the software. However after 20 seconds or so I get the message: Can't install the software for the HP Officejet 6300 series because it is not currently available from the Software Update server. This has happned over and over. I have updated the OSx and am 10.8.5. It works on my Mac Book Pro and did once work on the Mac Book Air but stopped so I unistalled and tried to reintsall but no joy. How can i gte the right drivers onto the laptop so that the seach finds them and connects the printer that it already sees?
    Many thanks
    Rob

    Hello there. I understand you are experiencing issues installing your printer on Mac 10.8.5. This document will provide multiple methods on performing this task: http://h10025.www1.hp.com/ewfrf/wc/document?cc=us&lc=en&docname=c03378792
    Please let me know if you have any other questions or concerns.
    I work on behalf of HP

  • Restrict the creation of documents in the cfolders after the Bid End Date

    Hi All,
    The System allows the bidders to create documents in cfolders even after the Bid Submission deadline has reached, whereas the Quotation would not be submitted as the Bid Submission date is in the past. Is there any way to restrict the creation of documents in the cfolders after the Bid Submission End Date?
    Waiting for your reply,
    Mary

    Hi Mary,
    In the competitive scenario in the first screen itself there are fields for "Due date" and "Due time". Once these entries are maintained, that particular collaboration will get freezed then and no documents or bids can be submitted post that time.
    I hope this will solve your query.
    Regards,
    Nishit Jani
    Award points only if you find the information useful.

  • UCCX 8 - Dramatic change in the Create File Document step that is used by the Create XML Document step in order to read an XML file

    /* Style Definitions */
    table.MsoNormalTable
    {mso-style-name:"Table Normal";
    mso-tstyle-rowband-size:0;
    mso-tstyle-colband-size:0;
    mso-style-noshow:yes;
    mso-style-priority:99;
    mso-style-qformat:yes;
    mso-style-parent:"";
    mso-padding-alt:0in 5.4pt 0in 5.4pt;
    mso-para-margin:0in;
    mso-para-margin-bottom:.0001pt;
    mso-pagination:widow-orphan;
    font-size:11.0pt;
    font-family:"Calibri","sans-serif";
    mso-ascii-font-family:Calibri;
    mso-ascii-theme-font:minor-latin;
    mso-fareast-font-family:"Times New Roman";
    mso-fareast-theme-font:minor-fareast;
    mso-hansi-font-family:Calibri;
    mso-hansi-theme-font:minor-latin;
    mso-bidi-font-family:"Times New Roman";
    mso-bidi-theme-font:minor-bidi;}
    For the last 5 years (and in IPCC3.x/4.x,UCCX/5.x/7.x) I've used the same basic subflow to read a XML document that contains holiday dates where the queue should be closed.  I've re-used this script on 20+ client installs and it's always worked.  The structure of the script allows you to pass the path and filename of the XML document as parameters to the subflow. (The document is in the repository)
    I loaded this script in UCCX 8.0.2 recently and it crashed with a Java.IO error.  It looked like it was trying to read the file system directly and not the repository. (In the Linux appliance model this kind of makes sense but why is the step trying to read the file system directly?)
    So I open a TAC case (SR# 615243125) and TAC tells me that the method of using the Create File Document step is not supported anymore and that I should specify the filename directly in the Create XML Document step
    The problem that I see (aside from having to edit all my scripts that use XML files) is that the Create XML Document step is looking for the input to be a type DOCUMENT and not a type STRING.  This seems to imply that I have to hardcode the document in each script that I deploy for a customer.  When it was a string it was easy to construct the full file path from parameters and pass to the subflow.
    Questions to the group
    #1 Am I missing something here?
    #2  Do you assume that you'll be able to load a script that worked fine in UCCX 7 into UCCX 8 and that it should completely function when you're doing everything according to the step reference documentation.
    #3 Cisco didn’t document this in any way that I can find.
    #4 How can you use the Create XML Document step in a fashion that would let you construct the path of the file and the filename previously in the script so you could pass it to a subflow ?  It would seem this functionality has been killed in UCCX 8
    /* Style Definitions */
    table.MsoNormalTable
    {mso-style-name:"Table Normal";
    mso-tstyle-rowband-size:0;
    mso-tstyle-colband-size:0;
    mso-style-noshow:yes;
    mso-style-priority:99;
    mso-style-qformat:yes;
    mso-style-parent:"";
    mso-padding-alt:0in 5.4pt 0in 5.4pt;
    mso-para-margin:0in;
    mso-para-margin-bottom:.0001pt;
    mso-pagination:widow-orphan;
    font-size:11.0pt;
    font-family:"Calibri","sans-serif";
    mso-ascii-font-family:Calibri;
    mso-ascii-theme-font:minor-latin;
    mso-fareast-font-family:"Times New Roman";
    mso-fareast-theme-font:minor-fareast;
    mso-hansi-font-family:Calibri;
    mso-hansi-theme-font:minor-latin;
    mso-bidi-font-family:"Times New Roman";
    mso-bidi-theme-font:minor-bidi;}
    (Background)
    Create File Document Step
    The input filename is a STRING, could be an explicit path and filename in the repository or a variable that represents that path and string
    The output of this step is a DOCUMENT to be used in the Create XML Document step
    The string FILE_FullPathHolidayFiles references  en_us\folderName\documentName.xml
    The document was properly uploaded into the repository only, NOT trying to directly read c:\foo\blah…
    /* Style Definitions */
    table.MsoNormalTable
    {mso-style-name:"Table Normal";
    mso-tstyle-rowband-size:0;
    mso-tstyle-colband-size:0;
    mso-style-noshow:yes;
    mso-style-priority:99;
    mso-style-qformat:yes;
    mso-style-parent:"";
    mso-padding-alt:0in 5.4pt 0in 5.4pt;
    mso-para-margin:0in;
    mso-para-margin-bottom:.0001pt;
    mso-pagination:widow-orphan;
    font-size:11.0pt;
    font-family:"Calibri","sans-serif";
    mso-ascii-font-family:Calibri;
    mso-ascii-theme-font:minor-latin;
    mso-fareast-font-family:"Times New Roman";
    mso-fareast-theme-font:minor-fareast;
    mso-hansi-font-family:Calibri;
    mso-hansi-theme-font:minor-latin;
    mso-bidi-font-family:"Times New Roman";
    mso-bidi-theme-font:minor-bidi;}
    The create XML document input can only be a type DOCUMENT

    #1 Am I missing something here?
    You are mixing two different issues together here.
    The Create File Document step is indeed not needed or supported for creating an XML document. That is why there is a unique step; to trigger XML parsing within the MIVR subsystem.
    Accessing the file system is restricted to a single folder within the VOS model (i.e. 8.0+). This folder is not backed up, replicated, or cleaned up automatically. It was intended to give developers some FS access as a temporary swap location only.
    #2  Do you assume that you'll be able to load a script that
    worked fine in UCCX 7 into UCCX 8 and that it should completely
    function when you're doing everything according to the step reference
    documentation.
    Assume nothing; read the documentation and attend one of the dozens of partner training sessions that CCBU put on advising of the upcoming changes.
    #3 Cisco didn’t document this in any way that I can find.
    You're right, I guess, on the Create File vs. XML Document step. AFAIK Cisco never wrote a notice into the Step Reference Guide explicitly stating that you cannot use the Create File Document although the documentation seemed pretty clear to me without it. File system restrictions are documented in the 8.0 release notes.
    Scripting and Development Series: Volume 2, Editor Step ReferenceUse the Create XML Document step to create a logical document that maps a document to another document variable (where the document has already been pre-parsed as an XML document and is ready to be accessed by the Get XML Document Data step).Use this step before the Get XML Document Data step to obtain data from a document formatted using the Extensible Markup Language (XML).
    #4 How can you use the Create XML Document step in a fashion that would
    let you construct the path of the file and the filename previously in
    the script so you could pass it to a subflow ?  It would seem this functionality has been killed in UCCX 8
    No it hasn't; just concatinate a string to build the Source Document parameter the step needs. Example:  "DOC[" + myFilePath + "]"

  • Issue in maintaining the freight condition in SRM pricing conditions

    Hi All,
    We have maintained the freight condition in SRM pricing conditions But when a buyer try to add the freight condition it does not give any field to add the value.We want the freight condition at the header level.
    Let me know if there is any service needs to be activated or we have to activate any business function to enable this.
    Please find the attached document to check the settings  and actual issue while entering the freight condition.
    This is urgent and please provide your suggestion to avoid this issue.
    Thanks,
    Ankur

    Hi Anil,
    Its not a standard functionality  to get the Header level price condition in SRM PO . I got to know that we need to implement note 1898304 for SRM 7.13 SP01 and activate a Business function.Can anyone let me know how it used to handle in previous versions.
    Thanks,
    Ankur