Managing projects changes - left behind

When I upgraded to 8.0.0, I loved the new feature that created a project folder, and also nested folders for organization. With the 8.0.1 update, I noticed lots of files being copied when I saved a new project. This essentially means that I have to go back to my old ways and create these folders manually, or waste HUGE amounts of drive space.
I finally figured out what was going on and found this in the Late-Breaking News file:
+Saving a Project+
+When you use the File > Save As command to save your project to a new location+
+(outside the current project folder) and select the Include Assets checkbox, the new+
+project folder will contain all audio files used in the “old” project’s Arrange area. The+
+“Copy external audio files to project folder” checkbox does not affect this behavior.+
Later, in the next section, it adds:
+If, for some reason, you don’t wish to include used audio files, don’t enable the Include+
+Assets checkbox in the Save As dialog.+
How about a way to create these project folders without wasting so much space with duplicate files?
Is anyone else having a problem with this new "feature"?

I think its a Adobe bug, not a Microsoft bug. The behaviour started when Microsoft released a update (KB2993651) back in august 2014. The first thought is that it is a Microsoft issue but the KB clearly states a change in FONT behavior. Adobe didn't react to this change and Microsoft keeps updating the engine on a monthly basis so there are already alot of other KB's that can cause the same issue.
Furthermore. The same problem already existed before in 2011 on older systems. Adobe never figured it out and only suggested a workarround.
Acrobat/Reader: [email protected] files left behind in Temp folder after printing
Another user on this forum did some research and found that Adobe uses a legacy function when printing from Adobe reader.
http://blog.notmyfault.ch/?p=378
If Adobe leaves Z@ temp files behind in the user temp directory after printing and those files can't be deleted other than a reboot it must be a Adobe bug. Other utilities like FoxIT reader do not have this problem on modern updated Windows OS-es.

Similar Messages

  • Project - Change Management Tab missing

    Hi Guys
    After renaming a test Solution Manager, which is a copy from an existing System, Change Management Tab is not visible in the a Project Attributes.
    Before the SID renaming, the tab was visible, but after chaning the name to SMT, it no longer appear.
    When accessing  SOLAR_PROJECT_ADMIN transaction, under System Landscape, there are only three tabs instead of four
    Some logical relation is missing? Any idea where can I verify why?
    Thanks!
    Copied and Renamed system (SMT) with SOLMAN_ADMIN, client 200
    Original System (SSM), user SOLMAN_ADMIN on Client 200

    Hi,
    as you copied the system, probably there is a missing entry which defines the client in which ChaRM will be active. Check in SPRO below "Change Management->Basic Configuration" the IMG activity "Activate Integration with Change Request Management->Activate Change Request Management and Set-up client". It must have your client 200 specified.
    Regards,
    Raquel

  • A note on Setup Manager - Application Change Management Pack

    Hi All,
    This is Mugunthan, Development manager for iSetup and Setup Manager. I am happy to begin my note with the launch of Application Change Management Pack 3.1. For those who are not aware of Application Change Management Pack, it is a new product built on top of Oracle Enterprise Manager and comprises of three major modules namely Setup Manager, Customization Manager and Patch Manager. You can find more information about this pack here (LCM: Oracle Application Change Management Pack Setup Manager is enhanced and advanced version of iSetup on Oracle Enterprise Manager. There were good amount of reasons to re-architect iSetup on Oracle Enterprise Manager as Setup Manager.
    Why Setup Manager?
    Ability to migrate to data over point releases of EBS – EBS comes up with rollup patches on top of major releases periodically. It means that you have to certify the patch before it get deployed on to production which means that setup data are to be certified again. iSetup cannot connect between 12.0.4 to 12.0.6 or 12.0.6 to 12.1.1. We have achieved the data migration for above scenarios in Setup Manager (11i to R12 is not supported in Setup Manager)
    Projects – Setup Manager supports grouping of Extracts, Transforms, Loads and Reports as a single entity and can be deployed multiple times to multiple targets. The project consists of one or more tasks (of type Extract/Load/Transform/Report) and can be orchestrated according to your ends. Project execution supports scheduling which means that you can use this feature to sync up setup data between two instances at periodic internal. Projects can be shared with other users which is remarkable difference between iSetup and Setup Manager. You can share your projects with others in a combined development environment. The functional configuration data (Extracts) are stored in Oracle Enterprise Manager. This means that you can refresh EBS without losing Extracts.
    Integration with Change Approval mechanism – Execution of projects is integrated with change approval mechanism which means that you can control who executes what. Also, you have fine grain access control where you can control EBS targets assigned to a user.
    Offline Transformation – I would say this is the most unique feature of Setup Manager and as an implementer you would welcome this feature very much. iSetup has got very limited capability on Transformation. Here we have gone way ahead and support Transformation on almost all Setup Objects. We present you the extracted data in excel sheets. You can download the excel template and work offline. All the attribute value fields in the excel sheet are editable which means that you supply your own value. For example, you can download Operating Unit data in xls file and change operating unit “OU100” to “OU200” and upload it back to system and load to target instance. Please note that any attribute of Operating Unit setup data can be edited. Also, system has got intelligence and once you upload the excel sheet, it automatically changes all the inventory organization which belongs to “OU100” to “OU200”. This behavior can be controlled using attribute mapping which you can create in Setup Manager. Hold on, this is not the end, also you can add more operating unit in excel, say OU300 and OU400 and load it to target instance. You can delete few Operating Units from extracted data in excel sheet and load the remaining to target instance. This gives you complete flexibility to manage (add/edit/delete) functional configuration data offline. This is fantastic feature and please have a look at how it works.
    Advanced Filtering – Filter support in iSetup is not flexible where you cannot use comma separated values and complex sql join conditions. Also you do not know what query is executed behind the scenes to the data. All this problems are addressed in Setup Manager 3.1. We show you the “select clause” (SQL) associated with interface and provide you a text field where you can refer the select clause and provide your own custom where criteria (SQL). This means that filter support is unlimited and you can set filter any database columns. For example, you can extract “Responsibilities/Menu” which are active or created as on yesterday. You can extract all Operating Units excluding “OU100 and OU200”. We support all filter criteria that are supported by SQL.

    Hi,
    your note very interesting. Is there any other way to extract the configuration using SQL? not using Enterprise Manager? hope this will be fastest way then using GUI base.
    Thanks,
    Fahmi Fahlevi

  • Setup Manager - Application Change Management Pack

    Hi All,
    This is Mugunthan, Development manager for iSetup and Setup Manager. I am happy to begin my note with the launch of Application Change Management Pack 3.1. For those who are not aware of Application Change Management Pack, it is a new product built on top of Oracle Enterprise Manager and comprises of three major modules namely Setup Manager, Customization Manager and Patch Manager. You can find more information about this pack here (LCM: Oracle Application Change Management Pack Setup Manager is enhanced and advanced version of iSetup on Oracle Enterprise Manager. There were good amount of reasons to re-architect iSetup on Oracle Enterprise Manager as Setup Manager.
    Why Setup Manager?
    Ability to migrate setup data over point releases of EBS – EBS comes up with roll-up patches on top of major releases periodically. It means that you have to certify the patch before it get deployed on to production which means that setup data are to be certified again. iSetup cannot connect between 12.0.4 to 12.0.6 or 12.0.6 to 12.1.1. We have achieved the data migration for above scenarios in Setup Manager (11i to R12 is not supported in Setup Manager)
    Projects – Setup Manager supports grouping of Extracts, Transforms, Loads and Reports as a single entity and can be deployed multiple times to multiple targets. The project consists of one or more tasks (of type Extract/Load/Transform/Report) and can be orchestrated according to your needs. Project execution supports scheduling which means that you can use this feature to sync up setup data between two instances at periodic internal. Projects can be shared with other users which is remarkable difference between iSetup and Setup Manager. You can share your projects with others in a combined development environment. The functional configuration data (Extracts) are stored in Oracle Enterprise Manager. This means that you can refresh EBS without losing Extracts.
    Integration with Change Approval mechanism – Execution of projects is integrated with change approval mechanism which means that you can control who executes what. Also, you have fine grain access control where you can control EBS targets assigned to a user.
    Offline Transformation – I would say this is the most unique feature of Setup Manager and as an implementer you would welcome this feature very much. iSetup has got very limited capability on Transformation. Here we have gone way ahead and support Transformation on almost all Setup Objects. We present you the extracted data in excel sheets. You can download the excel template and work offline. All the attribute value fields in the excel sheet are editable which means that you supply your own value. For example, you can download Operating Unit data as xls file and change operating unit “OU100” to “OU200” and upload it back to system and load to target instance. Please note that any attribute of Operating Unit setup data can be edited. Also, system has got intelligence and once you upload the excel sheet, it automatically changes all the inventory organization which belongs to “OU100” to “OU200”. This behavior can be controlled using attribute mapping which you can create in Setup Manager. Hold on, this is not the end, also you can add more operating unit in excel, say OU300 and OU400 and load it to target instance. You can delete few Operating Units from extracted data in excel sheet and load the remaining to target instance. This gives you complete flexibility to manage (add/edit/delete) functional configuration data offline. This is fantastic feature and please have a look at how it works.
    Advanced Filtering – Filter support in iSetup is not flexible where you cannot use comma separated values and complex sql join conditions. Also you do not know what query is executed behind the scenes to get the data. All this problems are addressed in Setup Manager 3.1. We show you the “select clause” (SQL) associated with interface and provide you a text field where you can refer the select clause and provide your own custom where criteria (SQL). This means that filter support is unlimited and you can set filter on any database columns. For example, you can extract “Responsibilities/Menu” which are active or created as on yesterday. You can extract all Operating Units excluding “OU100 and OU200”. We support all filter criteria that are supported by SQL.

    Hi Mugunthan,
    Can you provide links to any tutorial or example (screenshots) of using Setup Manager to transfer something between two environments (say Users or DFFs)?
    Thanks,
    Gareth

  • Address Book Sharing: are custom fields shared or left behind

    I want to share an Address Book on one system with 3 other users through MobileMe. I will also allow the 3 other users to add, delete and change the contacts. All 4 systems have their own MobileMe accounts.
    We make extensive use of custom relationship fields. Will those fields transfer with the with the shared contacts, or are they left behind?
    (I know that only a limited number of relationship fields (no custom fields at all) in Address Book are available to Pages and Bento)
    I've looked all over the Address Book sharing information (that I can find), and the issue of custom fields does not seem to be addressed in connection with Address Book Sharing.
    Can anyone recommend any documentation that answers this question?
    Is there any real (detailed) documentation at all about Address Book Sharing?
    Thanks for your help.

    @taylor thanks for the suggestion, but it's not quite what i had in mind. The red -/green + buttons are used to add/remove more items in the same category, ie., phone numbers, email addresses, URLs, etc. If you finish editing a record and then click on one of these fields, you get a contextual menu with various options.
    But, my Skype name is not an email address, nor is it a phone number. It belongs in the IM section of the Contact template, but unlike the "Custom" option for labeling a Phone Number, the IM drop-down menu doesn't have a Custom option, nor a Skype option.
    There are several possible workarounds, but that's the point, innit? Skype has been around a long time - there shouldn't be a need for a workaround.

  • Oracle BPM for Network Management Projects

    Has anybody used Oracle BPM for network management projects with millions of events?
    Can Oracle BPM handle it?

    Please follow this step may this solve your problem.
    please modify any thing in process "ExpenseReporting" for example any transition or any activity to place some where else or any other modification and then save that process. Then clean the project and build and deploy it.
    if this also not solve the problem then export that project to and import it again in your workspace (Create new workspace or change the project name in same workspace ) and then again clean, build and deploy the application then test in work space.
    Thanks,
    Brijesh Kumar Singh

  • Data left behind after scripted imaging

    I know this sounds a little weird, but sometimes after one of my techs runs one of the scripts we use stuff is left behind on the workstation (games, or media players that are not part of the image - but not everything). You can actually watch the image process and complete ok and restart the computer - it even goes though the post imaging stuff prior to login. Here is an example of one of the 2 scripts doing this sometimes -
    dd if=/bin/mbr.mbr of=/dev/hda
    dd if=/bin/mbr.mbr of=/dev/sda
    img pd1
    img pd2
    img pd3
    img pd4
    img pc1 ntfs
    img rp $PROXYADDR //$PROXYADDR/zen/images/imagename.zmg a1:p1
    img pa1
    reboot -f
    It's happening on XP and 2000 latest updates on both, were currently running Zfd version 6.5.2. Has anyone seen this, or do you see any reason with this script that this would happen?? It works normally if you go though imaging w/o the scripts.
    Thanks for any clues!!
    Dennis

    Dennis,
    I had the exact same issue after updating from ZEN4 to ZEN7. The solution
    for it was to change the command from:
    img rp $PROXYADDR //$PROXYADDR/zen/images/imagename.zmg a1:p1
    to:
    img restorep $PROXYADDR //$PROXYADDR/zen/images/imagename.zmg a1:p1
    That was the solution to my problem.
    Hope this one helps for u
    Greets
    Tracer60
    > I know this sounds a little weird, but sometimes after one of my techs
    runs one of the scripts we use stuff is left behind on the workstation
    (games, or media players that are not part of the image - but not
    everything). You can actually watch the image process and complete ok and
    restart the computer - it even goes though the post imaging stuff prior to
    login. Here is an example of one of the 2 scripts doing this sometimes -
    >
    > dd if=/bin/mbr.mbr of=/dev/hda
    > dd if=/bin/mbr.mbr of=/dev/sda
    >
    > img pd1
    > img pd2
    > img pd3
    > img pd4
    > img pc1 ntfs
    > img rp $PROXYADDR //$PROXYADDR/zen/images/imagename.zmg a1:p1
    > img pa1
    > reboot -f
    >
    > It's happening on XP and 2000 latest updates on both, were currently
    running Zfd version 6.5.2. Has anyone seen this, or do you see any reason
    with this script that this would happen?? It works normally if you go
    though imaging w/o the scripts.
    >
    > Thanks for any clues!!
    > Dennis

  • SOLAR_MIGRATION of multiple projects & Change documents

    Hi,
    We are in the process off migrating solution manager projects to a new server using solar_migration. The idea is to migrate project by project since the projects are rather large.
    Now I get the idea that the generated transport contains all the change documents, also those of of other projects not yet migrated, even though I have only selected one project for the migration. The reason I get this idea is that the size of the transport files of empty migration test projects runs into several GB, so they must contains documents that do not belong to it.
    This could be a problem if for instance in 2 weeks time we migrate the second project which also contains all the change documents. This second migration could then overwrite the possibly updated documents in the project we migrated first.
    Is the assumption correct that you cannot limit the migration of a project to only contain the change documents of that specific project?
    If it is could we for the second project select the change documents based on a date range? And will the documents of the second project that have a change stamp before this date range authomatically become visible once the second project is migrated?
    Thanks for any clarification
    Tom

    Hi Tom,
    there is no risk to overwrite any documents, documents are identified by a unique ID, and each change generates a new version.
    If there are objects (=documents) in the transpotr request, that should not be in there (you should verify from the transport objects), you should open a call to SAP asking for clarification there.
    Kind regards,
    Carl

  • Exporting a Solution Manager project

    Hello Solman experts,
    My prof. wants to know if it is possible to export a solution manager project to another Solution Manager. So experts, how to do an export of an project an how to import it in another one? If there is no possibilty please tell me also!!
    Thank you for answering!

    Hi Simon,
    It is true that the transport is easy if the connection for transport between the systems is created correctly.
    But the consequences are delicate.
    E.g. a project that is assigned to a released transport request cannot be deleted.
    And there are difficulties to change the projects in both systems back to be local. Any change to the origin project needs authority to add the change to the transport if the project is not defined to be local ($TMP in transport tab).
    To avoid this problem you can copy the project first by the transaction SOLAR_PROJECT_ADMIN and then transport the copy.
    Another point of view is: If the origin project was defined to be local ($TMP in transport tab) some assigned objects may got lost (e.g. links, assigned users, testers). On the other hand: if you define the transport request first before creating objects to the project you enhance effort for maintaining the project. Because any change has to be added to the transport request. And the users need the authorities to do so.
    I hope this additional information helps you too.
    Best regards,
    Adelbert
    Edited by: Adelbert Kaub on Aug 24, 2011 7:16 PM

  • Linking solution manager projects with CHARM implementation project

    Hi Guys,
    Currently i am working in CHARM implementation project, i have created one CHARM implementation project with urgent correction and i am able to create the Transport request and release the transport request succesfully and i am able to move it to quality system successfully. But my customer is asking to link the solution manager project to CHARM implementation project.
    Earlier before implementing CHARM they have implemented project managent in solution manager, during that project they have created so many projects which are currently running, now they want those projects to be linked CHARM implementation project.
    When ever they create a transport request through CHARM they want the TP to be saved under a respective project which they are using currently. but according to my knowledge the TP can be saved under CHARM implementation project only.
    Now i want to know whether the projects created in SOLAR_PROJECT_ADMIN can be linked to CHARM implementation project. Pls give ur valuable inputs as it is very urgent.
    Thanks&Regards
    Raju

    Hello,
    We have implemented this with two systems landscape where in we have in place a Solution Manager Dev system and Solution manager Production system both are SOLMAN 4.0 with SP12. So the path for us to move the changes is from Development Systems to Production system.
    We have ChaRM between the Dev and production. We reapplied the satellite system concept. For us the Solution manager Prod is a satellite systems all the changes that we move from Development system to Production systems is tracked with necessary documentation in the ChaRM process.
    Yes, I agree with you that this is not any big magic. Working with two SOLMAN implementation, I strongly feel that SAP needs to have well rounded ChaRm processes. We have robust Change Management Process, but when we moved to ChaRM we were limited functionality of the ChaRM processes.
    I had approached and did some research on how other companies are implementing the same process. Most of them have almost the same process for tracking SOLMAN changes. I am still look out for improved process to manage SOLMA changes.
    Hope this helps!!! Thanks
    Vish

  • Shadow Instance Left Behind in SLD After Using SUM

    Hello,
    Is there a standard procedure for removing the SLD information left behind by the creation of shadow ABAP instances when using SUM to update or upgrade systems? Should SUM have some final step for this built in, or should the update instructions include a step to go into SLD and delete the shadow instance information manually?
    My situation is as follows. I recently updated the support package stack for my Solution Manager 7.1 system from sps4 to sps12 using SUM (this was for a new installation of Solution Manager). Afterwards, I used SOLMAN_SETUP to perform the System Preparation and Basic Configuration steps, and now I have progressed to Managed System Configuration. The first managed system to configure is Solution Manager itself, and in working on the SolMan ABAP instance, in step 6, 'Enter Landscape Parameters,' I noticed that there is an extra ABAP instance, DVEBMGS03, showing up as a landscape object node. I was puzzled for a bit about this, as there is no instance 03 in my SolMan system, only 00, 01, and 02. Eventually I figured out that SOLMAN_SETUP gets this landscape information from the obvious place, LMDB, which in turn gets it from SLD, and sure enough in LMDB and SLD I can find the "AppServer 03" instance defined.
    That's when the light bulb hit. SUM creates a shadow ABAP instance when updating the support package stack (unlike using SPAM), similar to as it does during an upgrade. It deletes the shadow instance at the end of the update, but in the meantime the system has synchronized itself to SLD, and now SLD has a definition for that shadow instance that doesn't go away when the instance is deleted.
    It's easy enough to manually delete it in SLD, of course, but that leads me to wonder if there's a preferred option for handling this other than manual manipulation of SLD data.
    The version of SUM I used was 1.0 sp11 pl9.
    Regards,
    Matt

    That's right, although for a support pack update, I'm not sure if the jobs even get suspended. In the past, when doing this with SPAM, there was no shadow instance to worry about, so it wasn't an issue. In upgrades, when there typically is a shadow instance, things are much more "shut down" in the system (jobs suspended, etc) than is often the case with support pack updates (though perhaps those should be just as much "shut down").
    So in future I will definitely keep an eye out for it. Stopping the data supplier should be added to the tool and/or listed as a manual step in the guide to prevent inconsistent landscape and software component data from being replicated (or perhaps it already is and I missed it). I'm going to tag Boris Rubarth to get his take on it, as he is a key player in the development and maintenance of the SUM tool.
    Deleting the extra instance in SLD was very easy, and I watched it replicate to LMDB very quickly, and it immediately disappeared upon refresh from the managed system configuration tool. However, it later showed up in diagnostics agent administration, as well, as a warning about a system path not being reachable by the agent (it was trying to reach \usr\sap\SID\DVEBMGS03, which doesn't exist), and so I had to edit the agent landscape paths to remove that as well).
    Although the problem is long since solved in my system, as described above, I will keep the question open for a few more hours to see what Boris or others may have to add.
    Regards,
    Matt

  • I'm a Pro Tools user, who just did an "Archive and Install" installation of 10.5.8 over my 10.4.11 on my 2 Ghz G5, now Pro Tools won't launch.  I checked the extensions folder and sure enough, the digidesign extensions were left behind.  Can I revert back

    I'm a Pro Tools user, who just did an "Archive and Install" installation of 10.5.8 over my 10.4.11 on my 2 Ghz G5, now Pro Tools won't launch.  I checked the extensions folder and sure enough, the digidesign extensions were left behind.  Can I revert back to the "Archive" of my 10.4.11 System from the "Previous Systems" folder?  If not, what's the point of creating the "archive"?

    Did you select "Preserve User Settings"?
    Archive and Install installation automatically moves existing system files to a folder named Previous System, then installs Mac OS X again. (See tip 3.) You cannot start up your computer using a Previous System folder, nor can you "re-bless" the Previous System folder. (See tip 1.)
    You can choose to preserve your user and network settings before installing. This option automatically moves existing users, Home directories, and network settings. This also skips the Setup Assistant after installation.
    Note: Because the "Preserve user and network settings" option moves, not copies, existing users, Home directories, and network settings, from the Previous Systems folder to the newly installed System, these items will not exist in the Previous Systems folder after the Archive and Install is complete.
    http://support.apple.com/kb/ht1710
    Read this:
    http://support.apple.com/kb/HT2196
    BTW, it is never recommended to do a major OS change without having a full, bootable backup.

  • "ADMINI~1" folder left behind

    I use MDT 2013 to build reference images, and SCCM to deploy them, as I'm sure most people do. I get a folder left behind in the Users folder: C:\users\ADMINI~1\AppData\Local\Temp. The folder is empty, so I'm not sure how to figure out how to find what's
    leaving it there. I've seen other folders where a Java log file is left behind, but no such luck with me.
    It's happened with a Windows 7 image, as well as a Windows 8.1 image.

    Hi,
    Here is a workaround:
    Manually running sysprep.
    Booting into a WinPE environment.
    Capturing a WIM using imageX.
    Reference.
    Windows 7 Temp folder within capture
    http://social.technet.microsoft.com/Forums/systemcenter/en-US/9bb435c8-07dd-4ca7-979e-3eb9a6237522/windows-7-temp-folder-within-capture?forum=configmgrosd
    We
    are trying to better understand customer views on social support experience, so your participation in this
    interview project would be greatly appreciated if you have time.
    Thanks for helping make community forums a great place.

  • SAP IDM on Solution Manager with Change Request Management

    Hi Experts,
    I'm facing a question. Does SAP Identity Management manage association between user in Solution Manager and links in PPOMA_CRM tree for Ticket validation on Change Request Management project ?
    It seems that it could be done using Compliant User Provisioning from GRC Access Control application.
    Thanks for your help,
    Ben

    Hello Ben,
    as far as I know currently there is no "business level" integration between IdM 7.1 and SAP Solution Manager. You only can create SU01 user data as for any other SAP ABAP system.
    I have heard that it is planned for the future to integrate the Solution Manager also in the business suite integration options the IdM product already provides for applications such as CRM, SRM and others.
    Nevertheless you could create your own implementation for your requirements.
    Regards,
    René Feister
    SAP Consulting Germany

  • FCP6 BIG PROBLEM - Media Manager Speed change from FCP5.1.4

    Hi!
    We have problem using a media manager project from FCP5.1.4 in FCP6. Almost ALL clips with speed change are messed up (all new speed around 1% to 7%). This is really a problem for us, since we always do media manager of everything we do to be able to go back and make changes.
    We have 2 MacPro 2 x 2.66Ghz, 8GB RAM, 10.4.9, Quicktime 7.1.6, FCP6, Decklink HD extreme or AJA Kona LH (with the latest driver).
    We tryed with different format: HDTV 1080i50, DVCProHD 720p59.94, SD Uncompressed 10bit, .... always the same problem.
    Is there a new way to use the MM in FCP6?
    Thank you!

    Hi! And thanx for the tip.
    But we use Media Manager everyday with speed change WITHOUT any problem (with FCP 5.1.4).
    We already try something similar, we copied the good clips (with speed change) from the ORIGINAL timeline to the media manager one, deleted the bad clip (with the wrong speed change) and pasted the good one in there place. Then we reconnected those clips with the MEDIA MANAGED one. We get a warning that the IN and OUT of the media are not the same, CLICKED continue and everything is always (well 95% of the time) OK.
    SO yes, we have the solution, but it's really really long and painful, especially with multilayered sequences.
    Right now, when I open any Media Manager in FCP 5.1.4 (created with FCP 5.1.4) everything works fine. Doing the same thing with FCP6 = speed change problem.
    Thanks again,still looking for another solution.

Maybe you are looking for

  • Workflow - Wrong approver name

    HI In our dev instance, users are getting action notification in email, once got approved, the transaction is over, and in the "Who" coloumn, different person name is storing instead of the approved person name. In our Test Instance, users are gettin

  • Flatfile output mask with source file name without extension

    I have an input file with name abcdefgh.xml. This is converted to flatfile output, but I want the flatfile output name to be abcdefgh. If I use the %SourceFileName%, I am getting the output filename as abcdefgh.xml, I want it to be abcdefgh

  • How to create production and development enironment in same server

    Hi All, We are using OWB10.2.0.1 version and we have only one database which has two schema.we are using default control center to run the mappings. We don't have separate servers for development and production.So we use same control center for runni

  • Query - calculate quarter-to-date?

    Hello Trying to "do the math" - getting nowhere fast. <cfset FirstDayOfQuarter = ?> <cfset LastDayOfQuarter = #CreateODBCDate(Now())#> SELECT etc. WHERE ((order_create_date BETWEEN #CreateODBCDate(FirstDayOfQuarter)# AND #CreateODBCDate(LastDayOfQuar

  • Auto Select Clip with playhead

    Hopefully this will be an easy query to answer. I would like to have premiere auto select a clip on the timeline via the playhead position. Eg: if I'm using the up & down arrows to go to next and previouse edit, I want the clips to auto select when t