Mass change final issue indicator in production order

Hi
Is there any report can show final issue indicator for all production order? How can I mass change the indicator?

Hi,
  In reports such as COOIS and COHV you can select in the initial screen "List: Components" and check your "Change layouts" to view the report with the "Final Issue" indicator.
But you cannot do a mass change in this option. One way is : You can just select the particular order -> goto Component Overview of the order to be changed and do the necessary changes and save to get the required result.
-Thaila Shree

Similar Messages

  • Mass change of work center in production order

    Dear All,
    Is it possible to mass change work center in production order, i.e. i have around 100 production order of which i have to change the work ceter assigned in particular operation .
    Thanks and regards
    Manish

    Hi Manish,
    If you have not posted any activity or goods to the production order, then in header click on Functions -> Read PP Master Data.
    The order will now read the routing with the new work centers, provided the same has been changed.
    If you have posted some activities or goods movement done, then its a manual process.
    Hope the above answers your query.
    Regards,
    Vivek
    Added
    If in case you have posted some goods or confirmed some activity, check if you can reverse the same, re-read the routing & then post back the goods.
    Edited by: Vivek on Feb 24, 2009 12:22 PM

  • Issue with printing production order after changes through CO02

    Hi,
    Currently I have one issue with printing production order changes through CO02. If I go for print, all the operations are captured in printout. But after the print, if I add any new operations to this production order, and then go for print, its not capturing the newly added operations. Also, there is information popup coming "Copies will be printed for order. Original list already printed". This message effectively means, even after changes, when I go for print functionality, its just going for printing copies of original printed list.
    Can anyone help me out to get the newly added operations reflected in the print through CO02 ?
    Regards,
    Shiva

    Hi Shiva,
    Refer SAP note 28887.
    Source: http://www.sapfans.com/forums/viewtopic.php?f=9&t=308577
    Please search /google before posting queries.
    Regards,
    SuryaD.

  • Final Issue Indicator not set in maitnenance order after ECC 6.0 upgrade

    Hi,
    We encounter this problem after upgrading to ECC6.0 from SAP R/3 4.6C
    Final issue indicator (RESBD-KZEAR) is not being set in maintenance order (IW33) for sub-component non-stock items in General Data page
    Would be great if anyone could guide in this regard
    Detailed Scenario:
    1) Maintenance Order is created (IW31) is created in plant A
    2) For non-stock items, reservation created by maintenance order creates a purchase requisition
    3) Account Assigned STO (against maintenance order) is created from purchase requisition
    4) Transfer Posting done from Plant B (351 movement) for complete qty
    5) GR at Plant A done (101 movement) for complete qty.
    6) Final Issue Indicator is not set in General Data page eventhough the complete quantity is delivered.
    Thanks
    Edited by: muthukumarv on Apr 2, 2010 8:59 PM
    Edited by: muthukumarv on Apr 2, 2010 9:00 PM
    Edited by: muthukumarv on Apr 2, 2010 9:03 PM

    Hi,
    Please check in the STO if the "Delivery completed" indicator is checked or not?
    If Yes, then search some correction notes of SAP and get it implemented or raise OSS message with SAP to get the Final Issue indicator to be set in maintenance order.
    If No, then ask your MM consultants to investigate that. They can check the config of "Goods Receipt" Or check if the total quantity GR has been done Or some Under delivery/ Over delivery tolerance has been maintained.
    Thanx.
    Nilmoni.

  • Mass reversal of one component issued  to many production orders

    Hello SAP GURUS
    One of the common component is issued  to many production orders from wrong storage location ie instead of 0002  storage location it got issued from storage location0001,
    Is there any way to mass reverse of this common component  that got issued to multiple production orders
    Thanks & Regards
    Himakar Raigir

    Dear Himakar,
    In my understanding,There is no standard T Code to do this mass reversal.
    But in MIGO/MB1A you can do 262 movement to the same storage location from which it was consumed for one single
    production order if required or else you have to cancel all the documents using MBST.
    Check and revert
    Regards
    S Mangalraj

  • Final issue indicator on the general data button on the work order

    Hi Gurus,
    can anybody please let me know why the final issue check box is checked automatically even before the goods are issued via migo against the work orders. This check box is on the general data tab of the material entered on the components tab of the work order. Please help. As a result of this, the store room clerk cannot issue the material againsth the work order, because this check mark is checked. I want to understand what is causing the check mark to be checked automaticallu even before tthe materials are issued out
    Thanks
    ANusa

    Hello!
    This might have occured due to completion confirmation of order before goods issue. Generally this happens if final issue indicator is set as default in completion confirmation tab. Please check and reply if problem is something else.
    Regards,
    Vaibhav Mishra
    Edited by: Mishra_Vaibhav on Jan 27, 2011 5:23 AM

  • How to mass set deletion flag for the production order

    Hi Expert,
      do you know which transcation code or program is used to mass set the deletion flag for production order?
    thank you in advance!

    Hi,
    http://www.sap-img.com/production/how-to-delete-old-production-orders.htm
    Note that CO78 is the start of the Archive process.  We are not using Archiving yet but the initial process fits the bill for what we need to do as mentioned in the original note.
    Decide the range of orders you want to delete.  This range will be used in the program variant. Note that we will be running CO78 many times because of the number of orders involved. 
    Running CO78 calls program PPARCHP1 and this involves the use of a Variant where the parameters for selection etc. are set. 
    First of all, create the variant via SE38 for PPARCHP1. 
    Enter details for number range, order type, plant and set deletion flag. Flag Detailed log and set this to go to Spool when running. Save the variant. You can also force the job to run in background at this point (which I would recommend) via menu line Variant --> Attributes.  Also here you can flag order number, order type and plant to be required fields. 
    Run CO78
    Press the first button - deletion flag/deletion indicator.
    Choose the variant you have just created.  Press "Maintain" to update the selection range on subsequent runs. Save changes and return to initial screen.
    Press Start date to set date and time for job to run as per any background job. Icon will turn Green.
    Press Spool Params to set save output in Spool Q rather than print immediately. Icon will also turn Green.
    Press Execute and job can be tracked via SM37.
    Details of deleted orders and errors will appear in the Spool.
    Rerun as many times as you need with relevant order ranges till all required orders are deleted.
    Hope this will resolve your issue.
    Regards,
    Naveen.

  • Final issue indicator for component

    Hi
    I have requirement to set final issue indicator to all components when process order has DLV status.
    We have confirmation configuration which will set  final issue indicator when operation is finally confirmed.
    Iam using special control key to identify operation for which components are attached
    If i use COHVPI mass confirmation then it confirms all operations though i select special control key in layout filter. We dont want to confirm all operations
    Is there any STANDARD way to do mass confirmation of selected operation / phases. ?
    Or
    Is there is any  STANDARD way to set final issue indicator for all process order components, when order is delivered?

    Hi Caetano
    My requirement is to do this in background with confirmation of only one operation for which i have special identifier like control key.
    I dont want to confirm other operations.

  • Final issue indicator for Reservation Item

    Hi,
    The issue is as follows:
    The Componets for the Process order are issued through T. code COIK. Some componets are not appearing in COIK list . when the picking is done for the order, the final issue indicator is set in the process order where the componets are not picked and also the final issue indicator is not set where the componets are picked.
    Can anybody tell me what could be the Reason/s for the above.
    Regards,
    Prasad

    Dear,
    FI indicator can be set manually via MB22 though the Reserved qty has not been withdrawn.
    There is indicator in MB22 to tick for the final issue, this indicator is set automatically for a goods movement when the total reserved quantity has been withdrawn or delivered.
    Final option is to clean only the reservation for a given material, just go to the ordern in change mode, and then to the material details, and set the flag "on" for the field "Final Issue".
    Reservations are created when order gets released.
    1. can clear these reservations at the time of the order confirmations by clicking on checkbox for clear open reservations.
    2. You can also clear this reservations by using transaction code MB22 & deleting the reservations.
    3. You can delete all reservations by deleting material documents or by cancelling process order confirmations.
    4. Or by checking final issue in process order transaction COR2.
    Hope this will resolve your querry.
    Regards,
    R.Brahmankar

  • Backflush indicator in production order

    I have set backflush indicator in prod order components view. even though order status is CNF (through co11n), goods movement for the material that we set backflush is not done (withdrawn qty is still zero)? any settings req?

    It is not clear by your issue what is required for you.
    If you have not done confirmation, then set the backflush indicator in production order component view for all or some component.
    Save the order and then in CO11n in the goods movememt screen you can see all these c omponents.
    If you have done the confirmation already, then reverse the component, then in CO02...set the backfkflush indicator and do the confiormation.
    Please come back

  • Final Issue Indicator on reservation

    I am looking for the answer to how the Final Issue Indicator should function when it is checked doing a partial goods issue to a reservation.
    I've found differing documentations.
    1- Final Issue indicates that a reservation item is completed. Further goods movements in respect of this reservation item are not anticipated, although they are still possible.
    2- If the Final Issue Indicator is set that it will no longer be suggested as a selectable item for issue.
    My problem is that when the Final Issue Indicator is set while doing a partial goods issue, the item still shows up on MIGO as a selectable item when you are issuing remaining items. I did not think the item would still show up as selectable. (seems to be following #1)
    When the Final Indicator is set before issuing anything on the item, then the item doesn't show up as selectable on MIGO. (Seems to be following #2)
    Thanks for any help.

    Hi
    Final issue indicator behaviour in reservation.
    1) Create reservation and in change mode set the FI indicator.
    In this scenario system will not not allow you to use reservation saying that XXXX does not contain selectable item.
    2) Create reservation and do the partial goods issue then set the FI indicator.
    In this scenario system still allows to do the goods issue for the remaining item.As per standard SAP it is still possible to do the GI for the partial issed one even the FI is set. If you want to restrict then you can either set the deletion indicator or remove the movement allowed indicator.
    Hope it helps at some extent.
    Karthik

  • How to deactivate automatic setting of final issue indicator in reservation

    Our client has a requirement to deactivate the automatic setting of the final issue indicator after the reserved quantity on a reservation has been fulfilled.
    The requirement comes from an overnight shift that does not have access to the SAP system, so the final issue indicator that is automatically set after the reserved quantity is fulfilled cannot be reset manually when the material is needed during the overnight shift.
    I do not believe backflushing is an option because the material is issued to a cost center (orders are managed outside SAP) and thus there is no confirmation.
    Is there a standard method for deactivating the automatic setting of the final issue indicator when the reserved quantity is reacched?
    Thanks.

    Bob_Smith1103 wrote:
    The requirement comes from an overnight shift that does not have access to the SAP system, so the final issue indicator that is automatically set after the reserved quantity is fulfilled cannot be reset manually when the material is needed during the overnight shift.
    Please see my earlier comment that the overnight shift does not have access to SAP and therefore cannot manually reset the final issue indicator until the next day when someone with SAP access is present.
    Obviously the goods issue could wait until the next day, but the client is not satisfied with waiting until the next day to post-process the goods issue.

  • Clear open reservation for Final issue indicator.

    Final issue indicator is not getting checked unless we issue the entire requirement quantity.
    How can we get it checked for all components without going into the process order?
    Does the clear open reservation checkmark be used for this purpose and if with Final confirmation?
    or is there something else?
    Thnx!

    Hi Abhi,
    While confirming the operations, flag 'Clear open reservations' check box & this will set the "delivery completed" indicator for all open reservations.
    Hope it answers your query.
    Regards,
    Vivek

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • How to change the status of a production order

    Dear All,
    May i know how to change the status of a production order.I want to de-active the status like OPGN (Operation generated).This status is updated as there was no routing assigned to that particular production order during its creation
    Thanks and Regards,
    Varun Siddharth

    Dear,
    When you create a production order, an operation created by the system is generated automatically if no routing is used for the creation. As a result the order header receives the status HOGAN; the operation created automatically also has this status.
    If you delete the operation created automatically and then do not have the status HOGAN.
    To avoid this maintain the Routing for the material or delete the setting of default operation from OPJG.
    Regards,
    R.Brahmankar

Maybe you are looking for