Mass Extraction of planning data in EHP3

Hi,
I am trying to map this functionality. For this Already I have configured Selection rule & Extraction mode.  To extract the data we need to use one report : "RMDMRPEXTRACT01" in this report a field is called " server group" which is mandatory to maintain this.
Please let me know how to configure this server group. If any one has worked on this please share with us.
Regards,Kundan

Hi Vivek,
Actually This is a part of EHP3 of ECC 6.0. You need to activate this business function "LOG_PP_MIS" In SPRO.
plesae go through the given link.
http://help.sap.com/erp2005_ehp_03/helpdata/en/42/fbded750e61febe10000000a422035/frameset.htm
After activation you will get that node.
Regards,Kundan

Similar Messages

  • Extraction of plan data from S&OP HANA (on-premise)

    Hi Experts,
    We are integrating S&OP on-premise (source) with CRM (target) application for sales forecasting, can you guide as to which table to extract plan data from?
    Regards,
    Aditya G

    Are you attempting to extract calculated key figure data or stored key figure data. The latter will be much easier due to the construct of the system. Stored key figure data can be found in the 'timeseries' table.
    Stored data surfaces from the join of three main tables.
    xxx represents your planning area name
    ### represents your time profile #
    Note schema and table names might not be exactly as written below, since I'm going off memory.
    SAPSOPG.SOPDM.PLOBJECT_xxx
    SAPSOPG.SOPDM.TIMESERIES_xxx
    SAPSOPG.SOPDM.TIMEPROFILE_###
    Conversely the stored data can be extracted using the generated hana analytic view for your planningrp area. I don't recall the exact path to that view from memory.
    Calculated key figure data extraction would require extra prescriptions that I'll defer to an expert to better explain.

  • Generic Delta Extraction (Bill Plan Data)

    Hi BW Gurus,
    We need to cerate data source from Bill plan extractor.
    Please note that there is no SAP standard extractor for the bill plan data. So that is the reason we are using generic extractor (RSO2). We were using sales order delta extract program to find out the changes in bill plan data and there was routine in that extract which updated the custom table. But, soon they have to get rid of this design, because they observed that all the changes being done to bill plan were not being captured in the sales order delta extract. So, they have to go ahead with a full extract instead of the delta extract for bill plan data. Now we need to create design so we can do a delta extract on the billing plan data.
    Please advice me ASAP.
    In Advance Many thanks for your help.
    Regards
    SAP Team

    You could use the date field instead , you could have a lower safety interval and then when you do the delta again the records included in the lower safety interval are included. As for delta with timestamp , I have a question what is the timestamp used for delta - is it UTC Timestamp or the date and time concatenated together. UTC Timestamp did not seem to work for me and I did not have the luxury of having a concatenated timestamp.
    When I checked the base tables for delta maintenance , I found both timestamps and am confused as to what timestamps to use.
    Arun
    P.S I have a current delta with changed date and a lower safety interval of 1 day and it is working fine so far.

  • Extraction of CO Plan data with filter on company code

    Hello,
    I have this urgent requirement:
    Extracting CO Plan data (from COSP) by selecting on the company code.
    Problem: company code not in extract structure used by 0CO_OM_CCA_1
    Actual data are extracted with 0CO_OM_CCA_9.
    My first idea was to use make an append to the extract structure of 0CO_OM_CCA_1 (i.e. BUKRS) and to fill this new field in the CMOD enhancement.
    Do you have any other hint?
    Thxs.
    LauQ

    Hi,
    I donot think the Selection works with any Customer enhanced fields(i.e the fields foe which, code written in CMOD) . So you have to keep filter some where either in Transfer rules or in update rules.
    Or Check whether you can replace the datassource 0CO_OM_CCA_1 with the datasources:
    0CO_OM_CCA_10
    0CO_OM_CCA_9.
    With rgds,
    Anil Kumar Sharma .P
    Message was edited by:
            Anil Kumar Sharma
    Message was edited by:
            Anil Kumar Sharma

  • Copa actual and planning data

    Hi,
    May I know if I am correct for the below where
    1)
    KE26 or KE21N is meant for correction of actual data in copa and
    KE13N or KEPM is to load copa planning to copa
    2) we have many planning tcode like kpf6, kp06, kp26.
    what is the difference between them and ke13n/kepm?
    thanks

    KE13N is for mass upload of Plan data into COPA, COPA planning os for operating margin planning this is different from cost planning in controlling
    KEPM is for input of planning data by the users in the system
    Thanks
    Naveen

  • Mass creation of planned order

    Hello,
    is there a way to mass creat a planned order for a finished product? having same FG mat, plant and prod version.
    Thanks

    Dear
    1.Goto MD61 with User parameters like Plant , Requirement type , Version and Planning Date .Then Select the Material Radio Buttion with FG item code .
    2.Enter the FG qty as required in each month as demand
    3.GotO MD02-Single Item ,Multi Level with indicator : NETCH , 2,1,3,3,2   and Execute the MRP to create the Planned order  for FG
    4.Check the result in MD04
    There is no SAP Standard Traction to Mass creation of  Planned Order .That is possible in Demand Creation and MRP run .
    Regards
    JH

  • Loading Demand plan data from APO to BW

    Hi Gurus,
    We have requirement as below.
    we have to extract two key figures from APO to BW system
    The 2key figures of APO will get data as below:
    First key figure has to hold Yearly snap shot and 2nd Key figure has to hold QTY snapshot.
    we have constrained production plan & sales plan keyfigures in apo demand planning and the requirement is to extract these 2 keyfigure quaintest into BI.
    Data Example as below:
    KF1: Yearly snapshot
    KF2: Quarterly snapshots
    Yearly  data means from   Jan to Dec  and
    Quaterly data is as below
    Qtr1 - Dec       JAN to Dec
    Qtr2 (in FEB) - Mar to Dec
    Qtr3 (in May) - Jun to Dec
    Qtr4 (in Aug) - Sep to Dec
    so please let me know to how to handle or extract these data into BW.
    Thanks,
    Shailaja

    Hi Venkat,
    Yes, both the key figures are ther in the same planning area.
    But my question here is how to get that data into BW? meaning...
    If APO/DP does the planning  in the month of Sep 2010 for Jan to dec 2011 and the
    values are like
    Sep-10   jan      Feb  mar   april  may  june  july  aug  sep  oct   nov  dec
                   15     14     13      11    10     11     12     16    14         15   22     20                                        
    Dec-10   12     14   16        18    29     20    18     15   14    12   17        20
    Mar-11          10  12   13       14     15   16    17  18         20
    Jul-11                                  20       40     30      40       50
    meaning, If the planning is done in the month of Sep 2010 for the yr 2011 as explained above that values should be extracted into BW and the next planning will be done in the month of Dec 2010 again for entire yr of 2011 i.e. Jan 2011 to Dec2011.
    But the values should be captured as they are.. that means if i use DSO the values from request1  to request2 will be over written n if i use the cube they will be added up..
    Request1 will hold data of Sep2010: planning data
    Request2 wil hold Dec 2010 data ....n req3 will hold data of Mar 11...
    but users want to see the values or planning figures as they are.
    Hope i made my requimrent more detailled.
    Please let me know the solution to get the data as it is in BW.
    Thanks,
    Shailaja

  • Special ledger plan data exctraction

    I'm trying to extract special ledger plan data on a line item level.
    We have a custom defined Z -starting special ledger tables defined in our system:
    T -table (summary table)
    A -table (actual data on line item level)
    P -table (plan data on line item level)
    I can extract the actual line items from our T summary table through the standard SAP defined special ledger extractor.
    I have received a response from SAP that the standard extractor can only extract plan data on a summary level.
    I have decided to try to create a custom extractor that will extract the items through a query from the P - table.
    (you cannot extract directly from the p -table as there are currency/unit references needed from other tables that seems over complicated).
    I'm also a little bit puzzled with our special ledger configuration, P - table seems not to have any items, but still plan data exists in the system. (possibly in the GLPCP table?)
    Would someone have a clear idea in terms of special ledger plan data extraction?

    Hey Dominic,
    I'm pretty sure the folks at SAP would have an issue with being quoted here in the forums.  If you want to post some kind of a summarization of their response, that's probably OK.
    -nathan

  • Function module / BAPI for changing planning date (FDTAG)

    Hi everyone,
    Let's go for a problem.
    Many FI documents have been created in our system, with a wrong planning date, these documents have to be changed and I have been trying to develop a report.
    I am having a big trouble finding a function module or a BAPI which allows me to change the planning date (FDTAG field). I have been trying these function modules:
    FI_ITEMS_CHANGE
    FI_DOCUMENT_CHANGE
    The first one works for changind data in the FI documents but it seems like it can't change the planning date, it returns an error message that informs that the FDTAG field can not be changed.
    The second one is confusing, I have been unable to feed the function module with the data it needs to determine a single document.
    I am trying to use BAPI_ACC_DOCUMENT_POST right now, it doesn't seems promising but you never know.
    Has anyone had the same problem? I have been looking for an answer in both google and here but I can't find one, just some people with the same problem.
    I will keep trying to find the solution, if I find it I will post it here.
    Thanks in advance,

    Hi again Max,
    This worked perfectly, even better because we where already using the FDTAG field for mass changes (don't remember right now which note we implemented) so I have just used FI_ITEMS_MASS_CHANGE with no changes at all.
    Thank you very much for the help.

  • Enahancement to 2lis_02_scl, EBAN table extraction & Actual GI date

    Hello Guyz
    I need to extract 3 important fields into BI:
    1. Committed date on the Purhcase Order Schedule Line (Field: DAT01, Table: EKET). This is not available as standard in 2lis_02_scl in LBWE. I can enhance the extractor and populate the field with USER EXIT. But I know that deltas might not get triggerred for this field? Is my assumption correct? If so, how can I extract this field and ensure that deltas will flow into BW?
    2. EBAN extraction --> Purchase Requisition Release Date (Field: FRGDT, Table: EBAN): I need to obtain 'Purchase Requisition' information into BW. But there is no standard extractor available in ECC. Am I left with building a genric delta extractor or can someone suggest a better way?
    3. Where is the Actual Goods Issue date stored for Purchase orders? In the EKET table we have GI date and GR date but there are planned dates. But we do have Actual GR date in 2lis_02_sgr... but this extractor is only built for Goods Receipts information? So how can I get Goods Issued information?
    Please provide an answer to any/all of the above.
    Thanks,
    Srujan.

    For your first question, you could do the below.
    Assuming that the DataSource is delta capable, you can populate the new field data using 'Repair Full Load':
    1. Create a View based on the base tables and EKET. Include the new fields along with the DSO key(s). Create a generic extractor based on the view. Write CMOD code to populate your new field. The CMOD code is as below. Test the extractor in RSA3 to make sure the records are being extracted. Replicate the DS in BW.
    2. Create transformation for your Datastore with this new datasource. Create a full load Infopackage. Under the Scheduler tab of Infopackage, select 'Indicate request as repair request'. Schedule the IP. This will populate all historical data for your new fields without harming the deltas.
    NOTE: If the record size if huge, you would want to limit the size using some filter criteria. For example, load the data only for a couple of years.
    Once DSO is loaded and data activated, Infocube will automatically pick these delta records.
    CASE i_datasource.
    data: v_dat01 like EKET-DAT01.
    l_tabix LIKE sy-tabix.
    when '2LIS_02_SCL'.
    LOOP AT c_t_data INTO wa_t_data.
    l_tabix = sy-tabix.
    SELECT SINGLE DAT01 into v_dat01 from EKET where <condition>.
    if sy-subrc = 0.
    wa_t_data-DAT01 = v_dat01.
    MODIFY c_t_data FROM wa_t_data INDEX l_tabix.
    endif.
    For your second question, building a generic extractor will be ideal. Hope this helps.
    -Mann

  • Table name for plan data

    Hi All,
    could you please give me table name for plan data. this is tcode where we can see for range of cost centers S_ALR_87013612 (range of cost centres) and cost elements as well. but our client wants to extract from the table which has the same values in the report S_ALR_87013612.
    from which table they need to extract.
    your early response will be highly appreciated.
    Regards,

    Dear,
    Try following tables..
    1. COKP - Primary planning
    2. COKS - Secondary planning.
    Regards,
    Chintan Joshi

  • Mass Maintainance of Planning Version "000"

    Folks,
    Is there any standard functionality available in SCM 5.0 for mass Maintainance of Planning version "000" to material-locations combinations ? These Material-location combinations are created directly in SCM and are not CIFed from ECC.
    Thanks in Advance !!
    Regards
    Pawan.

    Hi Nitin,
    Planning-Version-Dependent Location Product Data Plng Version--- appears as a selection criteria but not as an attribute to be maintained. Below is my exact requirements.
    Lets say i have manually created products A, B, C...upto Z at location 123 directly in APO.
    Now i want to assign these product-locations combinations to 000 Planning version.
    In MASSD T-CODE i am not able to location Planning version as an attribute to be maintained ( i.e at bottom most of the screen).
    I hope you got my requirements and the problem i am facing.
    regards
    Pawan.

  • Display Planning data (for demand planning) in another UoM

    Hi All,
    The Planning area UoM is in "L". We have products whose base UoM is KG and some in L. In BW we convert all to L and load into Planning area.
    The Product master is CIFed to APO and has the conversion between L and KG.
    we have a requirement to view the planning data in Kilo tons i.e 1,000,000 KG.
    Have maintained a Mass UoM called ZKT in CUNI transaction and maintained the conversion that 1ZKT = 1,000,000 KG. Also have defined an ISO code for the same.
    Now when we load the data in the planning book the default UoM is L. When we go to user setting and maintain alternate UoM as Tons "TO", the system converts the data to tons and displays it. no matter what is the criteria used in header selection.
    But when we try to display data as ZKT UoM get a error msg that conversion from L to ZKT is not possible as the conversion is not maintained in Product master.
    But when we select material code (SKU) as the show condition and also in the filter condition use material code (SKU) and make a selection, the system converts the planning data from L to ZKT.
    The question is when the system can convert L to TO at any character level as long as the product master has the L to KG conversion, why is not able to convert L to ZKT.
    Why is the system able to convert L to ZKT for individual SKU's and only when the show condition is Material code (SKU).
    Would appreciate your quick reply.
    Thanks,
    Nitin

    Hi Nitin,
    We have same scenario right away in our system. Some of our material have a conversion in R/3 for example: 1Unit=10BULTOS, then CIFing into APO.
    The scenario is that, once we planned already in APO- we dont want to go back in r/3, any changes should be remained in APO. What we did is that we maintained the CIF user setup. Maybe you can try this as well without affecting other Uom.
    Cheers!

  • Mass extraction of BLOBS using OAF/Java

    We have multiple documents stored as BLOBS in the database with an OAF UI to find/list all the documents. We need to be able to do a mass extract to eg. a zip file of selected documents (or possibly) all documents. Whats the best/simplest way to do this ? As an alternative, we would also consider a Java concurrent program to do this.
    Initial thoughts are:
    1. Setup writeable area in middle tier or DB
    2. Extract each blob, keeping a file list
    3. Generate a zip file based on the file list
    4. Stream the zip file back to the user via http
    5. Delete extracted BLOB and zip files

    Check the part for csv reconciliation in the GTC Documentation:
    http://download.oracle.com/docs/cd/E10391_01/doc.910/e10360/prdfnd_prov.htm#Toc153968039
    I think this will explain how to import your Excel data.

  • Mass extraction of Pegged requirements

    Dear SAp Guru,
    We would like to know if there is a transaction wherein we could extract the pegged requirements linked to each planned
    or production order. Currently this is done individually via MD04
    Is there a way or a transaction that we could use for the mass extraction of pegged requirements?
    Thanks in advance,
    JMT

    Dear Jasmin,
      There is standard T Code MD09 to see pegging but only for one order at a time.
    Regards
    Sunil Kumar

Maybe you are looking for

  • Applying password to an external HardDrive - possible?

    Hi I use a Lacie 250 external HardDrive to backup my files and such. Is there anyway I can apply a password to this drive so that when I plug it to a computer I have to enter a password before I can access the files? I have turned off the auto log-on

  • Where can I find the MAC address

    Dear all, Do anybody know in which scripts or files I could find out the MAC address (not type command line e.g ifconfig -a), thx a log!! Regards, Vincent

  • Need to Uninstall CS, CS2, CS3, CS4 - Uninstall Tool Missing

    We've been with Adobe for a long time. We're upgrading computers and Mac OS on all to Mavericks. Would like to clean up in the process. Would like to thoroughly UNINSTALL all CS, CS2, CS3, and CS4 products on all computers. We are currently using CS5

  • Displaying percentages on pie chart

    hi All, I am displaying a pie chart to show some data based on some calculations. Its a simple 2-D pie chart. I want to be able to display the percentage on the different parts of the pie chart. I tried using the label property of the series as well

  • Canon MF 8280Cw Cannot Scan