COPA - Planned Material Cost not appearing in KE30 report

Hi all
  In COPA planning, I manually planned the Material cost (Material External Price) along with the Sales Quantity and Revenue for two company codes (one plant in each co code). But in KE30 report, I could see the material cost (MEP) values only for one company codeplant. What could be the issue?
  I even tried valuation in KEPM. Valuation step is calculating and populating the material cost in KEPM, but the values are not flowing to KE30 reports. And this happens to only one of the two company codes.
Thanks
Vamsi

Hi Vamsi
Please check table CE2XXXX, where XXXX = Op Concern.... Here, can you see the plan line items??
If yes, then the issue is with your report definition in KE30... May be you are restricting values display in KE30 report by virtue of your selection parameters
br, Ajay M

Similar Messages

  • Order plan cost not appearing in PS report.

    Dear PS friends,
    I have an issue in order plan cost updation ( budget report ).
    Used the prescribed WBS in maintenance order ( additional data ), but its not appearing in planned cost of CJ31 screen.
    Checked the following
    a)  WBS is account assignment element.
    b) Network type order appended indicator in OPSV.
    c) Setting in network type parameters for " determine plan  
        cost".
    d) WBS and order - both are showing plan cost when booked separately, but not integrated.
    Can anybody help me to resolve this ! 
    Thanks in advance
    --  Sri  --
    Edited by: Srinivasan Madaswamy on May 18, 2008 2:15 PM

    Hi,
    In case of the maintenance order (Order Category:30)
    Please check the follwoing in Tcode OPSV:
    1. type is maintained default i.e ++++ (this will consider all the order types mantioned for maintenance order.
    2. Please selelct the appropriate controlling area.
    3. Appended plan indicator has to be checked mark,
    4. Assigned funds in the plan indicator has to be checked mark,
    5. In Tcode IW32: In the additional data Tab assign the WBS Element. Save the maintenance order.
    Hope its useful.
    Reward point if useful. Revert abck if any other issue.
    Thanks..

  • Planned material costs not seen in reports

    hi to all,
    i planned costs for a project using networks and activity elements and material components.  for the activity elements i placed the costs as a direct input and for material components, i input the required quantity and the material number. However, when i looked at the structure overview(CN41), the materials i placed have 0 cost. YET THE TOTATL AMOUNT in the network&activity INCLUDES the cost of the material (quantity multiplied by material price).
    Thanks in advance

    hi again..
    i checked both your suggestions but they have already been carried out earlier so the problem lies elswhere..(but at least i was able to eliminate some of the possible causes..).
    allow me to give an example of whats happening in my case..
    MY INPUTS:
    WBS 1
    NETWORK 1
      ACTIVITY 1
         Material Component 1     3 pcs  ( 1 $/pc)
         Material Component 2    10 pcs   (1 $/pc)
         Element 1(cost)             500 $
         Element 2(cost)             300 $
    OUTPUT REPORT:(CN41 - Project cost Sch 000)
    WBS 1                                  $ 813.0000
    NETWORK 1                        $ 813.0000
      ACTIVITY 1                          $ 813.0000
         Material Component 1           0.0000
         Material Component 2           0.0000
         Element 1(cost)                    500.0000
         Element 2(cost)                    300.0000
    So if you notice in the report the material is 0 but the total includes the material cost..
    thanks!

  • Settlement of planned deliv. costs not possible if GR-related data entered

    Hi gurus,
            While doing T-code MRRL if i am entering the GR posting date and ticking the good + delivery check box an error message is trigerd 'Settlement of planned deliv. costs not possible if GR-related data entered'.PLZ reply the reson for this error.

    I Have the same problem them I realise  that :
    This message just appear if i am using doc. selection = 4 .
    tks
    Teresinha

  • Target cost not appearing in process order

    Hi All,
    Please let me know the reasons for target cost not appearing in process order.
    Thanks,
    SAP PQ

    Two more scenarios:
    1. You have co-product.
    2. You reverse the variance calculation.
    It will show the target cost only after you run variance calculation.

  • List of planning applications does not appear

    Hello,
    in EAS i create New Rule -> in Rule Editor displays in right pane -> i click on Select outline -> The Select Database Outline dialog box displays -> when i click on +planning -> nothing is displayed: the list of my planning applications does not appear !!
    is this normal?
    N.B : i use hyperion planning V11.1.1.3
    cheers,

    Did you log into the planning application first before logging into EAS, if the planning application service was recently restarted and there have been no logins to the applications then they won't appear.
    As a test log out of EAS, log into one of the planning applications, log into EAS
    Also be sure that the planning applications have been created to use Business Rules and not Calculation Manager if you want to use EAS.
    If you are still having issues then it may be worth having a read of the following document on Oracle Support - "Troubleshooting Hyperion Business Rules Issues [ID 763345.1]"
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Material is not appearing in MD04

    Hi ,
    I have created one sales order for one matearial. For which materail is not confirmed in Schedule line.
    But when I check in MD04, This material is not appearing.
    What could be the reason ?
    Regards
    PK

    Hi
    Check these notes:
    SAP Note 321803 - Explanatory notes on the ATP Customizing
    SAP Note 457787 - Collective SAP note: Advice notes ATP check
    SAP Note 547118 - FAQ: Result of ATP calculation
    SAP Note 835219 - FAQ: ATP composite note
    SAP Note 89362 - No confirmation despite available quantity/stock
    I hope this helps you
    Regards
    Eduardo

  • Lead time values are not appearing in the report for current year.

    Hi friends,
    Iam checking a report in production.  where lead time values are displayed as 0 for 1 key figure lead time3 (w/0 dim) . i found there is a formula for this it shows like NODIM ( 'Lead Time 3' ).and there is a value for cal.lead time
    how can i get values in the report.
    Thanks ,
    VRV.

    Hi,
    Although your question is not clear, I understood that the formula built on that KF is NODIM. Basically it means, units of measurement is not considered when calculating.
    Eg: 5 Minutes + 5 Kilograms = 10
    You please try to analyze your KF by the above logic. Then you would be able to figure out why the data is not appearing in the report..
    Assign if helps...
    Regards,
    Suman

  • WHT amount not appearing in FBL1N report for Document type RE

    Dear Friends,
    While running FBL1N report for any vendor where TDS is applicable, the WHT amount is appearing for KR document type. But when it is RE document type the WHT amount is not appearing in the report. How can we resolve this? Any enhancement/any note to be applied?
    Regards,
    Ramkumar

    Hi,
    FBL1N is having the classic withholding tax field hence please don't refer the those fields.
    please don't refer those fields.
    Please review attached note 363309 for detailed explanation.
    BSEG-QBSHB is designed to fill for the classic withholding tax. And
    extended withholding tax information is stored exclusive in table
    WITH_ITEM.
    You can check in table BSEG for the fields and will find that system
    do NOT update field BSEG-QBSHB.
    In your line layout,you define a field BSEG-QBSHB. But actully the field
    of vendor/customer line item is filled with zero from FI. Thus,it shows
    zero in line item display.
    And as note 363309 says,
    "Remove the field which contains the withholding tax information
    from your display variant.
    If you want to display the withholding tax information, double-click on
    the document number and subsequently choose 'Withholding tax'."
    Regards
    Madhu M
    Edited by: M Madhu on Jan 18, 2012 9:13 AM

  • Raw material cost not coming KE30 profitability report

    Dear Gurus,
    We have two material type for our finished product for one material type without having cost release for current period we can't release the billing document for accounts but in other material type we can release the billing document for account without releasing the cost for current period.
    This occurs with problem that in KE30 we are not receiving the raw material cost & administration cost. Please suggest what should I do to correct this?
    Thanks in advance.

    Hi,
    I already assigned costing key to material type (FERT,HALB) but bifurcation of COGM not flow to CO-PA.
    In T.code KEPR
    1.All F/V i maintained as 3 is it ok or i need to maintain it 1 or 2.
    2.In T.code KE4J
    Record type = F i maintained for FERT,HALB category materials & assigned in Costing key
    Earlier before release i assigned in T.code ke4i
    Condition type             Value fields
    VPRS                          Stock value
    Then some value flow to copa
    After i release i removed stock value from ke30 report and added material cost ,sub contracting cost,material overhead but no value flown CO-PA.
    Pl check
    Regards,
    Debashis

  • Material Cost Not Shown in Production Order if planned with MD50

    Hi,
    We have run MRP MD50 for a sale order item ie FERT material which has BOM Items. All the stock of the BOM items is tranfered from Unrestricted Stock to Sales order stock. FERT ITEM planned order is converted to Production Order and all the BOM items sales order stock is issued against PO & Sales order no with Movement Type 261E.
    After confirmation and goods receipt stock of FERT is shown under sales order Stock of Fert Material.
    We can see the cost of operations but cost of materials consumed against the Production order is not displayed in Production order Cost analysis..How material cost can be displayed????
    If i create PO with out refering the sale order that is normal process i can see the cost of materials triggering in Production Order.
    Can we settle the varience when we are planning against sale order???
    Some one Pl help us.
    John

    Dear,
    Check your variant which showes the cost. See the following report
    KKAC - For Sales Order with Assigned Orders  or
    KKBC_KUN - For Sales Order or
    KOB1 - Actual Costs

  • Material cost not getting displayed in CN41N

    Hi Gurus,
    When we execute CN41N, Materials assigned to the Network activity are visible but the cost of each material is not getting displayed against it (under Proj. Cost Plan Column) and it is appearing as '0' whereas, it is appearing as an accumulated cost against the activity. I checked SAP notes for this problem, though I could see some notes which are very close to the problem but all are for Release 600 whereas we are using 604 (ECC 6.0). Have anyone encountered such problems or whether the cost will not appear against Material in CN41N.
    Awaiting your valuable suggestions.
    thanks in advance.
    Vinodh

    I have seen planned cost of material against material itself in structure report like CN41, CN41N under following conditions:-
    1. Valuated Project Stock
    2. Material is created using Reservation for WBS or PR+Res for WBS Procurement indicators.
    3. Costing relevancy box ticked for material
    4. Statistical Cost element exists for Inventory account.
    I have not seen planned cost for non-stock item or material with res for network in project. This is purely based on my experience and I dont have any notes or help document to validate my statement.

  • Packaging material is not appearing in the Goods receipt of STPO

    Dear All,
    We are currently dealing one Roll-Out project for one multinational company. In that from sales side, one of the main processes defined is u201CStock Transport Purchase Order processu201D. As a regular process, outbound delivery document also created with ref to STPO.
    As per the client requirement the u201CPackaging materialu201D needs to be added as additional line item in the delivery to calculate the packaging cost. This packaging material is a "Stockable and Valuated" material. So while performing the PGI the stock will get reduced from SD side.
    The problem is, using this same STPO delivery document the Goods receipt is planned to do in the another side of company code. while doing the Goods receipt system is displaying only the "Finished Product" only. The packaging material is not displaying while doing the goods receipt in the another company code.
    due to this we are not able to complete our test cycle.
    so we need the expert opinion to solve this issue.
    if the packaging material is added as additional line item while doing Goods receipt then, the problem is solved.
    Kindly suggest us...
    Regards,
    MANI
    frWe have customized that also and now u201CPackaging materialu201D is adding as a new line item in the delivery document as a non valuated material.
    But the issue is, the Billing type u201CZICu201D is not getting determined while creation of billing if u201CPackaging materialu201D is added as a new line item. If u201CPackaging materialu201D is not added as a line item then, billing type is getting determined automatically without any issue.
    We have checked in LIKP table, its containing the billing type as u201CZICu2019. But if packaging material is added then, the billing type determination is not happening.
    We are assuming that some customizing needs to be done from MM/SD point of view. I am seeking the experts help regarding this issue to solve the problem.
    Regards,
    MANI

    Dear Friends,
              Thanks for the Feedback.
    Even though it is a associated company, in one company code the packaging material stock was reduced and packed for the STPO shipment.
    After receiving the consignment, in the receiving company code they will perform the goods receipt with ref to "Outbound Delivery" document.
    Since in the outbound delivery document "Packaging material" also available. So as a business strategy we are expecting the same "packaging material" also should available for goods receipt.
    I hope i have explained with max of my knowledge to clear your doubt.

  • COPA Extraction-Characteristics value not appearing in RSA3

    Hi All,
    We have developed Costing based COPA DataSource in KEB0 based on our operating concern. Included all standard fields(Characteristics from the segment  level,  Characteristics from the segment table, Characteristics from the line items, Value fields) in data source.
      When we do extract data in RSA3, All the key figure value fields are appearing correctly but I cannot see any Characteristics values. all the characteristic value  appearing blank value.
    I have checked everything is active and all (CE1 **** ,CE2 and CE4) tables have data with characteristics and value fields .
    My questions are:
      1)why COPA characteristics value are not coming in RSA3?
      2)what do I need to get this work?
       I hope it helps. let me know if you need  more further details
    Thanks,
    L.Prathap

    Hi,
    Worked on CO-PA but never got such an issue..........
    Do you have any of the chars selected from the line items section other than rec_waers?
    Also check if you have any summarization levels...transaction KEDV. If no other char from the line items are selected, data could be read from the summarization levels.
    There would be 2 tables for a summarization level...key table and the totals table. Check what chars are selected in the key table.
    http://help.sap.com/saphelp_470/helpdata/en/7a/4c40794a0111d1894c0000e829fbbd/content.htm
    Edited by: Murali Krishna K on Mar 8, 2011 3:32 PM

  • Costing in cProjects 4.0 - Material costs not reflecting

    Hi,
    In cProjects 4.0, i have replicated the cProject to PS project. I wish to capture the material costs in the project. How should i proceed ?
    Please suggest.
    Regards,
    Amit
    9820502246
    [email protected]

    Hi Amit,
    cProjects has not field to caputure material costs.
    You may however, create an additional field and use that to capture material costs in cProjects. You will need to map this additonal field to the material cost field in PS while replicating project from cProjects to PS. I am not sure of how you will do this. See if there is any BAdI that can help you.
    Regards,
    Reema.
    <i>pl award all useful points.
    Do post back if you find a solution.</i>
    Message was edited by:
            Reema Shahbazkar

Maybe you are looking for

  • Cost Center in automatically created line items in MIRO

    Hello SAP Gurus, While doing MIRO cost center is getting picked automatically in Tax line item even though there is no automatica account assignment in OKB9. Is it coming from validation or substitution? Please advise h

  • Package/class stuff

    I have created the package further below and access it with the code immediately below. If I don't have any reference to TestMe it works fine. But when I try to add the TestMe function, I get the error "Call to a possibly undefined method TestMe" I t

  • IPhone 'SIM failure' and 'invalid SIM'

    My iPhone 4 with Bell mobility was working just fine. I put it down and when I came back an alert saying 'SIM failure' appears and then instead if my carrier in the corner, it says 'invalid SIM'. Should I take my phone to Bell to get my SIM replaced

  • Mail for Exchange E61: getting "system error" whil...

    Hello everybody ! our company is using MS Exchange 2007.If try try to sync the calender I am getting a "system error". Synchronizing the e-mail works fine.If I look in the admin log I see the following error. 22/04/2007 01:15:49 start Calendar sync 2

  • How to select multiple nodes, which are not next to each other,  in a tree?

    The following code suppose to allow user select any combination of nodes (because of DISCONTIGUOUS_TREE_SELECTION), however, I can only select nodes which are next to each other. Can some one told me how to make this DISCONTIGUOUS_TREE_SELECTION work