Material on Project Systems(PS) and RRB(Report Resouce Billing)

hi,
    i am new to this forum .can anybody send me material on RRB and PS plzzzzz.

Welcome to SDN.
Here is a link for PS.
http://help.sap.com/saphelp_46c/helpdata/en/04/926eae46f311d189470000e829fbbd/frameset.htm
Regards,
Rich Heilman
Please be sure to award point for helpful answers and mark as solved when solved completely.  Thanks.

Similar Messages

  • Project System SAP and MS Project

    Hi,
    Someone know a software for integration between Project System SAP, and MS project, in addition to the "OpenPS".
    Best Regards,
    Helena Granja

    Hi
    Please check this
    http://www.pipelinesoftware.com/psi/news.jsp?page=20080105
    And from Impress
    http://www.impress.com/stuff/contentmgr/files/7e364d6f079722b5d13bb004e69649c2/misc/impress_for_epm_web_1007.pdf
    Regards

  • Setup and configuration for system monitoring and IT Reporting for Java sys

    Hi all,
    How to setup and configuration for system monitoring and IT Reporting for Java system ?
    How to connect Java system to Solman system?
    Regards,
    Neni

    HI,
    What is your OS? You can use SAPCCMSR.exe to monitoring  IT Reporting Java system on Solman.
    Go to solman rz21 create a csmreg user. and configuration fil for agent. copy configuration fil on usr/sap/ccms/..
    Go to comman line cd ../user/sap/xxx/sys/exe/.../ wite SAPCCMSR.00 -R pf=< ...../sys/profile/instans profile> .
    You can se agent on rz10 and use this connaction on rz20 to monitoring and IT Reporting Java system on Solman.
    I hope this help

  • CProjects - Project Systems Linking and other features

    Dear All,
                  I need inputs on how to integrate cProjects with Project Systems. Also i need information on the what are all the information we can integrate between these two.
                  One more important thing is i am seeing the Services, Details Data and Controlling links in My cProjects system. Where as i found Account Assignment, Costing links in one screenshot of Documents. And both are for cProjects 4.0. Why this difference is showing up
                  And one generic question is, what is the requirement for these kind of scenarios. And pros and Cons of both the systems.
    regards,
    rajesh.
    Edited by: Guest on Feb 14, 2008 5:59 PM

    Hi Srini,
    Thanks very much for the links. However, I've already gone through the standard documentation in SAP and they are a bit too high level/vague for me. I have considerable experience in xRPM, cProjects Suite and have good grasp of project management concepts, tool and techniques. My knowledge of PS is somewhat limited though.
    What I am specifically looking for is what type integration options and scenarios are available. For example, cProjects can have phases and tasks defined. How would these integrate with for example WBS elements and networks in PS? What are the things you would do in cProjects and not PS and vice versa? Hope my question is clearer now.
    Appreciate any further information you may have on the above.
    Thanks,
    Lashan

  • Compile Project with Maven and Crystal Reports dependencies

    Hi.
    I'd like to build a java project with maven. That project uses Crystal Reports.  I have added all Crystal Reports jar files in the folder lib (from the runtime download) to my maven dependencies. But i get always the following error message.
    The import com.crystaldecisions.ReportViewer cannot be resolved
    in that package is the ReportViewerBean.class an so i get also the following message.
    ReportViewerBean cannot be resolved
    I tried several different ways with no success.
    im looking foreward for your advice.
    thanks.
    Edited by: hansmeier_de on Aug 25, 2010 11:20 AM

    did you list them in the dependencies in your pom file?

  • General Info on integration between Project Systems (PS) and cProjects

    Hi,
    I would like some general info on the integration scenarios between PS and cProjects. Links to any documentation/blogs on this would also be very helpful.
    Thanks,
    Lashan

    Hi Srini,
    Thanks very much for the links. However, I've already gone through the standard documentation in SAP and they are a bit too high level/vague for me. I have considerable experience in xRPM, cProjects Suite and have good grasp of project management concepts, tool and techniques. My knowledge of PS is somewhat limited though.
    What I am specifically looking for is what type integration options and scenarios are available. For example, cProjects can have phases and tasks defined. How would these integrate with for example WBS elements and networks in PS? What are the things you would do in cProjects and not PS and vice versa? Hope my question is clearer now.
    Appreciate any further information you may have on the above.
    Thanks,
    Lashan

  • Project Systems: Profit and Cost Centres

    Hi
    When maintaining a WBS element through transaction CJ02 or CJ20N for example; it is poossible to link a profit centre, ressponsible cost centre and requesting cost centre to each WBS element.
    My question is: When cost gets incurred against a WBS element the profit centre gets updated with the cost as well. However, the cost centres (responsible and requesting) do not get updated. Is there any automatic effect on these cost centres (such as is the case with profit centres)?
    I know that the requesting cost centre will be the cost centre allocated to AUC's assigned (if applicable) and that to get cost onto the cost centre a settlement rule must be maintained. What therefore is the use of having responsible and requesting cost centres assigned to a WBS apart from this?

    Hi
    Cost center and WBS elements are both cost objects hence at a time real posting can happen to only one of them. Since WBS elements are getting debited , it will not simultaneously debit a cost center. However profit center it is not the case , hence the data flow to the profit center happens as an when a posting is done to WBS element and also when WBS is settled to cost center then also there will be a posting to profit center.
    Anand

  • Report Painter Drilldown on Cost Element for Project Systems

    I am currently working on a report for Project Systems. I am trying to copy the functionality of the Internal Order summary (60I2-001) into report group 6P3. I was able to copy the whole layout and also the values of 6oI2-001 into a copy of 6PP4-001 but when I double click on "Balance" it is bringin up the ALV report that 6PP4-001 is using. I would like to call another report which looks like 6LS0-001 but contains Project System info made in report painter when I double click on Balance. Is this possible? Please let me know how.

    Hi Avinash,
    See my replies below.
    1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
    When  you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
    coming to equipment cost - are you capturing using PO through GR?.
    2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
    Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
    When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials  have their own valuation class and have default CEs accordingly. that would not be big issue.
    Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
    The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
    3. I have answered the relevance of Cost relevance check box in above.
    Hope above makes sense.
    Thanks,
    Sudhakar

  • Technical spec for Project systems report

    Hi all,
    My requirement is to create technical spec's on this Project Systems monthly and yearly budget and actual tracking with drill down capability
    And the char and KF are:-
    Char
    Project Definition
    WBS Element
    Cost Element
    Vendor
    Purchase Order No.
    Purchase Order Item
    Requester
    Created On
    PO Description
    Final Delivery
    KF
    PO Value
    Value - Quantity Delivered
    Amount Invoiced
    To be invoiced - Value
    To be Delivered - Value
    Can anyone help me that which standard query is suitable for this requirement.

    Hi,
    Check the below business content queries:
    0PM_MC01_Q0001     Budget Comparison (Actual Costs) 
    0PM_MC01_Q0002     Budget Comparison (Planned Costs)
    0PM_C06_Q0002       Budget Proposal (Periodic)
    0PM_C06_Q0003       Budget Proposal (Objects)
    Check this might be useful:
    http://help.sap.com/saphelp_nw2004s/helpdata/en/e8/858f40f5767d17e10000000a1550b0/frameset.htm
    Hope this helps.......
    Rgs,
    Ravikanth

  • WBS Standard report and customized reports

    Hi Frnds
    we have one SAP standard reports for WBS elements ( plan/actual/variance) and one whichis customized project management report in Projects systems but both the reports are showing different balance.
    is there any particular reason for showing different balance for both actual and budget colum?
    plz reply asap
    thanks
    manish

    Hi,
    Thanks for reply...
    If u have any idea regarding other reports, please let me know...
    Thanks..

  • Best practices for Project Systems

    Hello Experts,
    I am working from BI side to integrate Project systems to BI for reporting purposes.
    On the sdn, I have seen the term 'Best Practices guide'.
    1) What is this 'Best Practices mean'
    2) Where can we find it from
    3) How is that going to be useful if I am working from BI side.
    Kindly advise on above questions
    Regards
    Shanthi

    Hi
    Bc set is avilable on service market place you download this file and than you found the method and i am sending you a link its give you help This link is for  retail.
    http://help.sap.com/bp_retailv1500/Retail_IN/html/Retail_toc.htm
    http://help.sap.com/bp_retailv1500/Retail_IN/index.htm
    Reward point if helpful
    Thanks
    Pankaj Kumar
    Message was edited by:
            Pankaj Kumar

  • Version in Project System

    Hi all,
    can anyone explain me the Concept of version in Project System?
    And How to get the Version by giving the Project ID as Input

    Hi,
    SAP PS differentiates between the following versions:
    1.• Simulation versions
    •2.Project versions
    •3. CO plan versions
    In SAP PS simulation versions are modifiable versions of projects. You create a simulation version in the quotation phase, for example, if an operative project does not yet exist or if you want to plan other alternatives to an existing operative project or subproject.
    Project versions are snapshots of a project at a specific point and are used for documenting the progress of a project over time. Both quantities and values are stored in versions. Project versions are created either manually or automatically when a status changes.
    CO planning versions are used to plan costs and revenues. Using CO planning versions you can define various cost plans for a project, for example, an "optimistic" and a "pessimistic" plan. You can copy values from one version to another. You can change planned values manually in every version. The costed values are retained.
    Muzamil

  • Planning Profile for Project System

    Dear All,
    In planning Profile (T Code OPSB) for Project System we can find  RElem.f.billing plan ..field, in this field which cost element we have to assign wheather it is sales revenue or secondary cost element cat.31 or else..plz adives me..
    Thanks and regards

    Mr. Sridhar,
    Thanks for ur reply, here my querry is, i have types of sales revenues like domestic, export, industrial etc.. there is only option is there to maintain revenue cost element, so which revenue cost element i have to maintain in planning profile.
    Regards
    Ramesh

  • What is project systems are related to fico

    hi sap gurus anybody clesrly tell me about  project systems are related to fico   ,  and what are the relations to these sap fico and ps?
    regards
    venkatareddy

    The Project System guarantees close and constant monitoring of all aspects of your project.Projects are generally part of the internal processes of a company.
    There is no orgnization structure of project system like in FI ( Company code), CO ( Controlling Area), Funds management ( FM area).  but it depends upon other.
    Therefore, The high degree of integration between the Project System (PS) and other SAP  application components means that you can plan, execute, and account for projects as part of your normal commercial procedures. This means the Project System has constant access to data in all the departments involved in the project.
    Further, in project system mostly controlling & ligistical is more important.
    Plz assign point as way of thanks

  • Trabsfer Pricing Treatment in Project System

    Hi,
    Can someone provide me with a brief overview of how transfer pricing work in Project System?
    Do we need to have profit center activated for this?
    In my business scenario, I will have projects which perform work to support other project.
    Under this circumstance, the service provider project would like to charge the service receiver project with certain profit margin.
    I would like to understand how this will work in project system environment and will the margin be charged from one project to the other project as and when the transfer of service happen or this will be charged only periodically?
    If then what will be the basic the calculate the transfer price and margin?
    Thanks for the help in advance.
    Regards,
    Cheah

    hi gurus
    any reply
    regards
    vijay
    Edited by: vijju489 on Jun 2, 2011 11:25 AM

Maybe you are looking for

  • I delete emails but they do not show up in the trash folder, how do I make them visible?

    There are 2 trash folders one under my email address and one under local folders but the deleted emails do not show up in either. I have been using file>empty trash to keep things from getting too full but sometimes I would like to see what is the tr

  • How to use standard VS commands in custom menu (vsct)

    Hi, I have a .vsct file which defines a custom menu. I want to add some default Visual Studio commands to this menu as well. I already managed to add some default commands such as copy / paste: <UsedCommands> <UsedCommand guid="guidVSStd97" id="cmdid

  • Newbie question (I think you can answer me)

    Hello. I am a newbie about EJB. But I am teacher of a Java course and I have introduced EJB to my students. I have said them that EJB is good for big applications but, when the application is small, is overkill (I read this in several books). But the

  • About HLD and LLD

    Hi experts,                  Can anybody help me in understanding what HLD and LLD are all about and what is the part of an abaper with respect to a HR ABAP project. Regards, Shanthi.

  • Adding Virtual Apps to "Default Programs" list in Windows

    Ok, How can I get my virtual app to show in the list of Default Programs in Windows control panel? For instance I want to set my virtualized Notes client to be the default mail client for the workstation.