Hi Gurus,
We are using mf60 material staging issue material to production storage location against planned order.
If we select particular planned order to issue the material through MF60 material staging which is issuing correctly. But when if we select other planned order to issue material and for common material system considering the stock laying at production location and netting off further not showing for staging which is incorrect the material which is already issued is reserved for some other planned order.
please advice..
Regards
cs

Hi,
In planned order bom, materials are under dependent requirement, and not in reservation.
Unless you convert it to production order, the dependent requirement will not be converted to reservation.
I think its okay,
If you have any special stock indicator for this then it will not consider the stock,
Regards
Raghu

Similar Messages

  • Material Staging for Production Order

    Hi,
    I am doing Material Staging against production Order using T Code MF60. We don't have WM setup in the enterprise structure so the Staging is done via IM Mvmt. Type 311. My problem is that the material document created using MF60 does not have a reference of Production order or vise versa. Can anyone suggest a configuration or a user exit that can be used to make a reference link between the Production Order and the Staging Document?
    Thanks
    Arvind

    Hi!,
    Though whatever you are asking for is not possible with standard SAP but you can try this work around solution:
    Click on replenishment element.
    Now in MF60  Menu > View > Table column > Select " All Column" (after clicking ).
    Now system will show some open fields (like Goods recipient, unloading point etc) on replen. element.
    There in one of the field like unloading point (which you are not using elsewhere) you can enter the production order number so when you stage the same that order number will be saved in that document and you can get it from RESB table against the reservation number.
    To automate the same you can use some enhancement with above logic.
    I hope this helps in resolving your problem.
    regards,
    Uday
    Edited by: Uday Parchure on Jul 29, 2009 12:50 PM

  • Reservation against planned order

    Hi...
    I have one issue with reservation against planned order.
    We have REM & after MRP run generates planned order with order type PE.When i check planned order in table PLAF.
    I found reservation no. & same has been passed to RESB , I got the reservation details but it is not allowed for goods movement XWAOK field in RESB. So no question of goods movement through MB1B with movement type 311.
    My question is that is there any customization related to above scenario so that reservation is allowed for goods movement?
    Regards
    Tushar

    Dear ,
    In REM , you will recieve reservation against planned order .But GI always happens during GR or after GR along with back flashing .I do not think so you can issue material against reservation as like normal PP Order reseravation  in the production order .
    1.Goto -SPRO->production-> Rep Manufacturing->Define Rem MAnufaturing profile(OSP2) --->Control data, in the Control data 1 tab select the "GI back flush at GR posting".
    2.Check in  the REM profile assigned in MRP view of material Master (MM03)
    Based on this above set up , you can make Goods Issue for Planned order in REM .If you deselect that option execute material staging transaction code is MF60 and then go for REM backflush. In materil staging the components issue is carried out for the planned order.After that you can execute the REM backflush in MFBF
    In rem scenarion components placed on the production lines anonomously (without ref to planned order)...you cannot issue materials like in production orders scenario. if you want to have track on the good issues before the GR then use the pull list concept...there will be no movement type but you will have track on quantities issued to header parts/production lines not to planned orders.
    Hope this clarifies your doubt .
    Regards
    JH

  • Material requisition against production order

    Dear all,
    How do i put material requisition against production order. Kindly give me the t-code and total path till material issue from a particular storage location. i.e
    --> requisition against Production order for a storage location
    --> Transfer posting by movement type
    Thanks

    Hi,
    Procurement of RM: -
    1. MM01 - First of all create materials (RM, SF, FG)
    2. CS01 - Create BOM (FG > SF > RM)
    3. MD61 - Planned Independent Requirement for FG
    4. MD02 - MRP Run for FG (System will create Planned orders and PRs automatically as per procurement key - E, F and X in Material Master)
    5. MD04 - Stock / Requirement List OR ME5A - PR List
    6. ME21N - Create PR w.r.t. PO
    7. MIGO - GR w.r.t. PO (Movement Type - 101, Capture Excise invoice here)
    8. J1IEX - Post Excise Invoice
    9. MIRO - LIV for PO
    Goods Issue of RM: -
    1. CO40 - Convert Planned Order to Production Order (Schedule, Release Order)
    2. MIGO - Goods Issue > w.r.t. Production Order (Movement Type - 261) - You can also use MB1A for GI against Order
    3. CO11N - Confirm Production Order
    4 MIGO - Goods Receipt > Order (Movement Type - 101)
    5. KO88 - Order Settlement

  • Automate WM material staging for release order parts.

    Hi all,
    We use LP12 for monitoring WM Material Staging of Release Order parts.Is there a way to automate the process of WM Material Staging for Release Order parts?
    Is there is any Standard SAP Program which can be run in the background or user exit to achieve this?
    Pl suggest
    Regards
    SB

    Hi Arunachalam,
    You can configure WM staging settings in Production Scheduling Profile (OPKP)
    You need to update WM Request field and the available options are:
         No creation of transfer requirements on order release
    X   Only creation of transfer requirements on release
    1   Transfer requirement and transfer order on release
    Hope this will solve your problem.
    Please check and Revert.
    Regards
    Suri

  • Material staging for process order

    Dear All,
    Can we use material staging for process orders.
    If possible pls brief the procedure.
    Subbu.

    Using warehouse management /WM) :
    - Create a control cycle for the component, using LPK1. Here you define if the supply will be specific for the order (when weighing takes place in the warehouse) or for released orders (normallu full packages of components and weighing is done at plant level). Reference to a supply area.
    - The resource used in the operation has a reference to the supply area.
    - Components have material master views in WM for the selected storage type
    Then, when releasing the orders run LP10 - LP12 to generate the Transfer requirements for the raw materials. These TR will be converted to Transfer Orders and Confirmed, so the stock will be moved to your supply area.
    Using Inventory Management, none of the above is required. You can use MF60 to move materials from General Storage Location to Shop Floor SLoc.
    Regards

  • WM Material Staging  for Production Order

    Hi,
    In the process order txn Cor3, Go to > List > WM pick list>  the initial screen is  Display WM Material Staging  for Production Order. In the All parts tab, could you please help me on how to be able to populate the fields in the  BSI, Category and Storage Bin. Your help is greatly appreciated.
    Thanks

    Dear Ellen,
    If you set the cursor on 'BSI' field and push F1 you'll get an explanation about the meaning of each category.
    '"<i>1" pick list item
    This materials are picked according to the required quantity specified in the production order.
    '2': Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    '3': Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "0" not relevant to WM-PP
    These materials are not relevant for WM production supply and cannot be requested using the WM system.</i>'
    For instance:
    You can set raw materials / SFG as pick parts if warehouse workers have to collect those parts from high racks (from different places) and they have to provide an exact qty for the PrdOrd.
    We use '4' (manual staging) for huge alu rolls that are near the machine and WH workers have nothing to do with it - the operators, who deal with the machine, have to put the new rolls on it.
    When we issue the PrdOrd the requirements of this material won't appear in LB10 since WH has nothing to do with them.
    'Storage bin' filed will contain a value automatically, if your settings are proper.
    E.g. you have to define the default 'stock removal' & 'stock placement' storage type on WM view of material master.
    Additionally you have to define control cycles for materials you use for your production. (LPK1)
    The control cycle says from which storage type & bin you want to consume the components.
    BR
    Csaba

  • MTO material - Combine three planned orders into one process order

    Hi Gurus,
    Does anyone know if and how I can convert three planned orders of the same material into one process order?
    So:
    1.
    Sales order 1 (material X) --> generates Planned order 1
    Sales order 2 (material X) --> generates Planned order 2
    Sales order 3 (material X) --> generates Planned order 3
    2.
    Process orders 1,2,3 (material X) --> Process order 1
    3.
    Process order 1 --> reserved sales order stock for sales orders 1,2 and 3

    M,
    One process order cannot create Sales Order Stock for three different sales order items.  A single process order can produce Sales order stock for AT MOST 1 sales order/item.
    This scenario can be achieved under a Make to Stock environment, where the production order creates 'generic' stock (not sales order specific).
    Best Regards,
    DB49

  • Sales order against planned order

    Friends,
    We are using currently Make-to -order scenario.
    So here one project has contains "n" number of semi finished products.
    and sales order is for only one project.
    Is it possible to create "n" of planned order against one sales order?
    If it is possible then how?
    pl. guide

    Sandy,
    Is it possible to create "n" of planned order against one sales order?
    Yes its possible by giving Indiv/Coll req as "1" in MRP 4 in Material Master.
    If it is possible then how?
    You need to maintain the BOM for the finished Product. And run MRP - MD02 the demand will generate for all the components.
    Hope this helps.
    Regards,
    Sundhu

  • Report for Material Issued against Service Orders But not Billed.

    Hi Experts,
    For CRM Service Orders Based on the Reservation number generated in CRM we will make the Goods issue document in ECC.
    My Question In CRM Do we have any standard report to see Material issued against CRM Service orders but not billed. i.e. Work in progress.
    Thanks in Advance,
    Abhinesh

    Hi Vivek,
    What I wanted to say that you won't get information from VAV about billing since as far as I know it doesn't contain any relevant table.
    You should try create a query using LIKP-LIPS-(joint type: left outer)-VBRK. This will connect deliveries to billing document, you can also get SO number. Please try this.
    (Sorrowully I don't know which logical database would be good for you)
    BR
    Csaba

  • Configurable material - Error converting plan order to production order CO6

    While I am coverting planned order to production order with configurable material, I am getting the follwoing error:
    You cannot make an assignment to make-to-order stock
    Message no. CO684
    As read in previous forum messages I am check settlement profile assigned for  new order type (ZSD01) with standard sett profile (SD1) at OKO7 and set "Valid receivers" with value "1" in Order, Material, Profit.segment, Sales order and Order item.
    Configurable material have item category group "0002", MRP type "PD", Lot size "EX", Strategy group "25" and "Individual requirements".
    Sales order with configurable materiale have item category "TAC".
    Where is the problem?
    Thank you in advance
    Oscar

    Hi,
    There are some OSS Notes to address this problem..(OSS Note: 311651, 432109 etc..)
    But all ae for older versions of SAP.
    Regards,
    Siva

  • Best practice - material staging for production order

    Hi Experts,
    could any of You pls, support me with some hints of best practice how to handle material staging WM-PP interface in a certain case?
    Up till now we had a system, where production had no separate location in IM, but one location existed including raw material wh and production. In the same time in WM we had separate storage types for production and raw materials u2013 hence we did material staging transferring goods only inside one IM location between different WM storage types. The material staging should be done based on separate prd. orders.
    Now this need to be changed and separate location need to be handled in IM for production u2013 which means the staging should be done between different IM locations and WM administration also need to be handled.
    Up till now we used LP10 for staging, then LB13 for TO creation etc. We can keep going like that, but if do so, there is another step required in IM u2013 movement 311, where material numbers and qty need to be added manually to finish the whole procedure. I would like to avoid this u2013 which makes the administrational procedure quite long.
    I have been checking the following possibilities:
    1.     Set released order parts-staging at control cycle and use MF60 for staging u2013 but I can not select requirements based on pro ordders here (only able to find demand if component including into selection)
    2.     Two step transfer 313/315 u2013 but this not a supported procedure u2013 313 TI /TO / 315
    3.     Try to find solution how to create 311 movement based on TO or based on WM stock at certain storage type / dynamic bin.
    I have failed.
    So, could any of You pls, support me with some useful ideas, how to handle material staging where 311 included and definetly the last step of procedure, but administrator does not need to enter items manually one by one in MIGO.
    All answers will be appreciated

    Hi,
    Storage location control should be able to take care of your problem.
    If you want to stage the material to a different IM location then the WM location then make the following settings
    If location xxxx is your WM location and location yyyy is your Production location.
    You have defined Production storage type ZZZ for production storage location YYYY and have maintained the supply area for the same
    In WM configuration - For interfaces - IM interface-Control of Assignment "Plant / Stor.Loc. - Whse Number"
    Assign location XXXX as the Standard Location. Maintain entry donot copy sloc in TR for location YYYY
    In WM configuration - For interfaces - IM interface-  Storage Location control for WH
    This entry ensures that there will be a WM tarnsfer Posting between your WM and Production storage Location automatically when you confirm your TO. You can have this done via a btach job also if you want cumulative posting. (schedule job RLLQ0100)

  • I want to print multiple Material no against Purchase Order

    hi i want to display MATNR against Purchase Order
    suppose 10 Material no is there than i want to display 10 material no against that Purchase order.
    thanks.
    laxman sankhla.

    hi
       give PURCHASE ORDER as select options on selection screen .
    select matnr from table EKPO based on PO no.
    save them in internal table .
    loop At internal table .
    endloop.
    display it any where on report SAP script or SF.
    reward if helpful.

  • Material staging during Process Order..TR issue

    Hello,
    For creating a TO I am going to transaction LB13 for a Process Order but I am not able to see the TR.
    When I went in the Process Order and manually clicked WM staging I found that there is an error as mentioned below. The problem is it is an issue for only some Process Order as most of the other Process Orders are getting the WM staging(TR created automatically) and I can see in the LB13.
    Can you tell me based on the error what the issue would be.
    Is it something to do with the config in Production Scheduler Profile for TR creation?
    No picking request was generated for operation 0020 due to incompleteness
    Message no. LP133
    Diagnosis
    The pick requirement created for the pick parts ( material staging indicator "1") is incomplete. Errors occurred while the system was staging goods for WM. Therefore, the system could not convert all the relevant components into pick requirements. For this reason, no pick requests were created since material staging of only part of the components would cause problems in production.
    Let me know ASAP
    Thanks
    SAP Fans...

    Hi,
    For the operation 0020 check what is the resource used. Now check what is the supply area you have maintained for that resource or in material master.
    use transaction LPK3 and check out the control cycle set-up. the staging indicator should be 1.
    Also check the component screen of the process order and make sure the storage location is the same that is used in production supply area.
    Also make sure the material has been correctly assigned to that operation for which you are getting issue.
    Once you do these changes....you might have to create a new order to test this.
    Try and revert back.
    Swapnil

  • Material Staging for manufactoring order

    Dear experts,
    I have following scenario:
    The Source - Storage and the Production Supply Area are assigned to the same Storage Location.
    When performing material staging  for an manufacturing order, how can I AVOID that the stoch in the PSA will be considered as availible stock?
    Thank you very much in advance.
    BR
    Denis

    Dear Freddy,
    It is the standard SAP behaviour,if already reservation exists for the same material and same storage location the system will
    not propose anything to stage,instead I would suggest you to mention some other differents torage location for the second
    production order for the same component and then check what is the result in MF60.
    Either you clear the existing stock transfer reservation or else meniton a different storage location for the second order and
    check.
    Check and revert back with your findings.
    Regards
    Mangalraj.S