MB1B 343 and PCN confirmation (TO is placing in different bin)

Hi Gurus,
I received stock with migo but directly to blocked stock, it went to 902 and after that I transfered it to storage type 001, each material went into a different bin according to the putaway strategy, everything is good so far, then try to change from blocked to unrestricted with MB1B 343 and after that process the PCN with LU04 to create the TO, here are my questions
1) Is there a chance to combine all the materials that I put into MB1B into one single PCN? actually I have to Process one PCN per material
2) Due each material has its own PCN, that means that we also get a TO for each material, I need to create only one TO per document given by MB1B, So my question would be is it possible to create a TO directly by document through LT06 after MB1B? or is it a MUST to create the TO with the PCN in LU04??
3) Can we automate the TO creation? I mean once MB1B is saved (Posted) also the TO is created in background, (can this be achieved with OMLR?)
4) Each of these TO's have 2 lines, one for remove from the bin to 922 TR-ZONE and a second line to put back from 922 TR-ZONE to the 001 Sto Type but the destination bin in 001 is not the same as the source bin when the first line of the TO removed the material, I thought that by standard the system will put the material in the same bin but its not happening, any ideas?
Please advise,

Hi Lukasz,
As I understand your problem is that you have 3 different storage units for your material:
item1 1 pc > SU_ID1
item2 2 pc > SU_ID2
item3 3 pc > SU_ID3
If the storage type is not SU-managed you won't have such problem. If it is, your SUs remain separated, but you can make one storage unit from several (if the material IDs + batch IDs are the same).
When you make a stock transfer via LT10 you can choose 'foreground' again and give the SU number in the relevant field.
I mean:
Select e.g. item1&item2 in LT10 > stock transfer, foreground > give 'SU_ID3' in SU field on the pop-up panel and execute the tr.
Hopefully it will work. (the essence of this thing: you have to move your materials to one SU_ID).
You can make 'one' storage unit from the three differnt:
http://help.sap.com/saphelp_46c/helpdata/en/c6/f846694afa11d182b90000e829fbfe/frameset.htm
Is it a solution for your problem?
BR
Csaba

Similar Messages

  • Reg:different materials placed in different bins

    hi ,
    i configure standard inbound flow in wm with source and destination bin as per my requirement. if i place any gr/po in migo for a material automatically stock moved to 00-01-01 series of bin. once the bin is full it moved to other bins.
    now my requirement i created po which has five different types of material if i put gr for the material. a each material should be place in different bins(not in the single bin).
    please kindly let me know the steps which i have to configure to achieve my requirement.
    Regards
    Muthu

    Hi,
    Use split valuation for keeping same material with different price.
    For more check the links:
    http://www.sap123.com/showthread.php?t=29
    http://www.sap-img.com/mm025.htm
    Regards,
    Biju K

  • I have placed my SIM card into my iphone 5c and have confirmed co with my cellular network provider.However despite numerous reboots I am still getting "No Service" in the top left corner. Please advise

    I have placed my SIM card into my iphone 5c and have confirmed co with my cellular network provider.However despite numerous reboots I am still getting "No Service" in the top left corner. Please advise

    Contact the carrier and troubleshoot the issue.

  • Open Orders (Confirmed and Un-Confirmed)

    Hello BW Gurus,
    I am looking for Standard BCT that can give me True Open Order "quantities" and "Amounts". The extractor 2LIS_11_V_SCL seems to give open order qty for "Confirmed" Schedules only. I am looking to get the "Net Open Orders" based on "Planned Goods Issue Date".
    Any ideas on how to achieve this?
    Thanks in advance.
    Srini

    Hi Lily,
    But these extractors comprises of all orders thus, it means open orders,confirmed and not confirmed, delivered and not delivered, and orders that are already invoiced.
    In my case, we need to have an open orders report meaning confirmed and not confirmed and where invoiced orders, delivered, and etc should not be included at all.
    Any idea?
    Thanks
    Sheila

  • Order qty and total confirmed qty in PI sheets

    Dear Experts,
    Kindly suggest the possibility of appearing total order qty and already confirmed qty in the PI sheet, system useually provides the same while performing confirmation through co11n or cor6.
    Thanks in advance for your help..
    Regards,
    Nitish

    Hi Srini,
    The following details are available in the table AFVV,
    Standard value, operation qty & Base qty.
    With this values create a formula Standard value * operation qty/ Base qty , this will equal to the planned hours for that particular activity type. Similarlt planned hours for other activities can be calculated.
    The actual/confirmed hours are available in the table AFRU.
    Regards,
    Senthilkumar

  • I can print from my macbook pro using airport express usb connected printer, however my iPad is looking for an airprint printer.  Can I direct the iPad to the usb connected printer.  Both macbook and iPad confirm a wifi connection through the airport exp.

    I can print from my macbook pro using airport express usb connected printer, however my iPad and iphone are looking for an airprint printer.  Can I direct the iPad/iphone to the usb connected printer.  Macbook iphone and iPad confirm a wifi connection through the airport express.

    You will need to install an App like Print Central on the iPad to try to print to the printer. It will allow you to print to most printers. Check with their support folks if you need more info.
    PrintCentral for iPad on the iTunes App Store

  • Pricing date for Service Order and Service Confirmation

    Hi,
    I cretated a Service Confirmation as followup for Service Order.
    Client is asking "Pricing Date" should be same Same in Service Order and Service Confirmation. But, I am not seeing any such field in the screen.
    I need to check T&C field and Zone field. But, I am not seeing these fields also.
    Can you please let me know, where can I find this fields. (In which assignment block).
    Thanks,
    Sandeep
    Edited by: Sandeep Reddy on May 31, 2010 7:21 PM

    Hi,
    I think by PRICING DATE they mean BILLING DATE.
    In date profile of SERVICE ORDER and SERVICE CONFIRMATION you assign the BILLING DATE date type (i think it is there in the standard itself- however just ensure it).
    Or customize a PRINCING DATE date type in the DATE PROFILE of SERVICE ORDER and CONFIRMATION and copy the date set in SERVICE ORDER to SERVICE CONFIRMATION.
    This is one strategy you can use.
    Regards
    Surendra More

  • How to I get multipage pdf file placed in my document to conform to the document that I set up?  I have InDesign cc and the pdf pages are placed outside of my document?

    How to I get multipage pdf file placed in my document to conform to the document that I set up?  I have InDesign cc and the pdf pages are placed outside of my document?

    Hi Rave,
    InDesign cc couldn't open the script, I get an error message that it is not a supported file type.  I tried this first before using the "place multipage pdf" in my InDesign document.  The script which comes with InDesign cc works, but places the pages outside of the document.  That's what I'm trying to figure out how to do.  I had no trouble doing this in PageMaker 15 years ago.  I don't know why it doesn't work on my computer??
    Thanks,
    Yerbamansa

  • I am unable to sync all my selected songs to my iphone.  The error message is that the computer is not authorized.  However, I have authorized the computer and iTunes confirms that.  Any ideas what can be done to fix this.  My phone is an iPhone 4S.

    I am unable to sync all my selected songs to my iphone.  The error message is that the computer is not authorized.  However, I have authorized the computer and iTunes confirms that.  Any ideas what can be done to fix this.  My phone is an iPhone 4S.

    Were some of the songs purchased from a different itunes account?

  • Need of Tables names that link Purchase Order and the Confirmation Number

    Hi All,
    Can any one help me please regarding EBP tables. I am new to EBP so not aware of data flow in the EBP data dictionary.
      Please can anyone explain the tables which link the Purchase order number and the Confirmation(Goods Receipt).
    Please do the needful.
    Thanks in advance.

    Hi,
      You can query the tables BBP_PDHGP and BBP_PDIGP to get teh refernce doc no for PO and then use FM BBP_PD_CONF_GETDETAIL to get the details fo a particular confirmation.ALso you can search confirmations by "Reference Document", use BBP_PD_CONF_GETLIST, with parameter I_REF_DOC_NO, and then use BBP_PD_CONF_GETDETAIL for the found confirmations.
    HTH.
    BR,
    Disha.
    PLs reward points for helpful answers

  • Invoices, Customer Statements and Order Confirmation

    If one customer wants these things sent to three different places how and where do I look to configure this. i.e. They want their invoice to arrive in an office in Indiana, and the confirmation in Michigan.
    Any help would be great.
    Thanks
    Justin

    Hi Justin
    Here is the link from SAP help on the EDI settings for invoice and order confirmation
    http://help.sap.com/saphelp_47x200/helpdata/en/f0/4228f2a97311d2897a0000e8216438/frameset.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/4b/ad4ecb17fd11d28a360000e829fbbd/frameset.htm
    But all this should be setup in co-operation with the EDI consultant.
    Thanks
    Ashok
    Award points if this is useful

  • UCM Administration Applets request the user and password confirmation

    I want to ask if someone has experienced in the UCM Administration Applets, that request the user and password confirmation for each time the applets are executed,
    Is there any configuration in the UCM that activates this behavior?
    I’m trying to reproduce this behavior in the development environment but with not much success
    The UCM version is 10.350
    Thanks for your support.

    Is there any configuration in the UCM that activates this behaviorNo. It's more likely that you are accessing the applets via a URL that does not match the one you originally used to log in to the Content Server.
    For example, you logged into "http://myserver/cs" or "http://<ip address>/cs". However, your HttpServerAddress variable is defined in Content Server as "http://myserver.mydomain.com". (Any absolute links to the applets use the variable to build the URL.) The browser "thinks" this is a new domain, and doesn't forward credentials to the different address. So the applet must prompt again for credentials. (Are you using a load balancer by chance? Does your HttpServerAddress variable in Content Server match the DNS entry being used for the load balancer?)
    I've also seen some versions of the Sun client JRE do this by design as a security "feature". If you using IE, make sure your server address is in the "trusted" or "intranet" security zone.

  • Inventory load using 561 movt type and auto confirm TO in MB1C using 561 movt type

    Hello All,
    I am doing the inventory load using 561 movt type in MB1C. Then the material is in 998 storage type and bin "AUFNAHME". my requirement is that i want to confirm the TO, when i do the MB1C itself for the 561 movt type. Is there a way in the SAP, where i can trigger the TO confirmation in the background automatically, when i use 561 movt type in MB1C.
    Right now my thought processing is that as below,
    i create the inventory load using 561 movt type in MB1C and use the LT10 and move the stock to a different bin and confirm the TO.
    In the above step, i am using LT10 as a extra step for confirming the TO, which i am trying to decreasing my configuring in such as way for the movt type 561, so that it will automatically confirm the TO in the background, while doing the MB1C.
    My 2nd question is, when i have 5000 different materials, which are inventory loaded using 561 movt type and MB1C. I am trying to auto confirm the TO in the background, when doing the MB1C for 561 movt type itself.Secondly, if it doesn't work, then i can goto LL01 and pick the unconfirmed TOs and mass confirm the TO's.
    On the whole, my questions are is there any std config in SAP to auto confirm the TO for movt type 561 in MB1C. If it is not possible, then i need the best way to mass confirm the TO's in  SAP.
    Thnks,
    Kapil

    Hello Kapil,
    Let me explain the process step by step
    Assumption/mandatory criteria-  The process is applicable only in case you do not have storage unit management active  This process is warehouse transfer w/o WM transaction. This method is based on principle of MB1A- 711/712 movement type.
    (1) Use OMJJ and create new movement type by coping 561 for ex- "Z61". In field selection (flield selection from 201) double click on WM and make the entry "WM storage bin and storage type as required entry from suppress.
    (2) Now use MB1C with above customised movement type. At the end of this transaction,system will take you to the screen to  make an entry in storage type and storage bin. Post the entry.
    That's it. Your stock would be in warehouse as well as IM stock would be in sync. There is no TR/TO. You can create LSMW to upload the data by this method. If you have SUT defined then you can follow the same process as above. But after that do not forget to update LQUA-LETYP field with respective SUT. However, you can not use this method in case you have SU management active.
    My view with this upload process-  Please use other data uploading method which are not at all time consuming. In more than 90% of most of the business scenarios, storage unit type is used. Hence you will have to perform additional activity of updating LQUA-LETYP-storage unit type field. If this is the case, then why cant you use other uploading method?.
    Thanks,
    Milind

  • Work center design and operation confirmation

    Hi All,
    In my scenario im grouping the similar m/c to a work center
    say for ex. 4 lathes m/c into a single work center as LatheALL and also the indiv cap as 4
    my customer wants the traceability in which m/c the job is done
    So i had designed in such a way that
    1 LatheALL -4 cap(this will be additional wc)
    2. lathe1 - 1cap
    3.lathe2 - 1cap
    4.lathe3-1cap
    5.lathe4-1cap
    in the routing only latheALL will be given., this will help customer in planning
    when going for operation confirmation i will give confirmation for that operation and will confirm as lathe1or lathe2  or etc.. this will help prodn dept for traceability in which m/c the work is done
    this is method i have informed to client .,
    pls advice is this approach is correct ?
    also suggest by giving confirmation for another work center will the capacity for the original work center will be reduced
    Regards
    Anand Srinivasan

    Hi Anand,
    this is method i have informed to client .,
    pls advice is this approach is correct ?
    yes, during confirmation time to enter the orginal actual work center, this suitable for your client requirement, do the settings for OPK0 - change the confirmations parameters (0410 or 0420)
    Regards,
    Sankaran

  • Invoice and Order Confirmation automatic Print

    Hi everyone,
    The user wants the following configurations:
    Automatic printing of Invoices and Order Confirmations to the following printer: #$%$#%#%u2026.this printer is located on the following server: $%$#%$#
    Thanks for prompt response
    Nick

    Hi,
    Try this method and see.
    Ask your Basis to set the LOCAL Printer in SAP.
    Then go to that users computer and set the Default Printer of that Machine to the printer: #$%$#%#%.
    Then once Invoice is saved, SAP will send it to LOCAL Printer in SAP, Then from there it'll automatically direct to the Default Printer of the machine.
    So, for each user you can set the default printer as required.
    We do same when we need to get a PDF output of Invoice. What we have asked was to set the user computer default printer as PDF Writer as & when they want PDF format of the Invoice.
    Same way as mentioned above, it sends to LOCAL, & then to machine default printer (PDF Writer), where you can save the PDF.
    Try and see !
    Best regards,
    Anupa

Maybe you are looking for

  • Curve 9360 slow performanc​e

    My blackberry is so slow at times! It just randomly freezes for like 20-30 seconds and it seems to take like 10 seconds to do anything on it. Whenever I reboot it, it will work fine for about 2/3 days but then it will start freezing again. Does anyon

  • HT3702 I was charged for a free app update. How do I get my money back?

    I recently downloaded a free app update for Instagram. After it was complete, I checked my card balance and about $6 was takin out because if the update. I was not prepared for that charge and now I don't know how to get my money back. Can anyone hel

  • Shared Apple ID has become a problem and I can't figure out how to be unshared.

    Originally, there was iTunes and the iPod.  We had one computer with the music on it, and the iPods were all connecting to that single iTunes account, all with a single Apple ID.  Then came the iPhone, which needed an iTunes account to set up, update

  • Rotating Image with Fade Effect

    Ok looking to rotate an image with a fade effect; below is a rotating image code. (Wanting this effect to be transitional and smooth. Transparency? Opacity?) <script language="JavaScript"> <!-- function adArray() { for (i=0; i*2<adArray.arguments.len

  • Updating Read-Only Field

    All, We have some read-only fields (configured @ the page layout settings) in OnDemand edit form As per the business rule, the values for these fields has to be set externally using a weblink in the same form We are able set back the externally selec