MD04 - Subreq - Storage location MRP area

Hi all,
I have an issue of Subreq in MD04 which is not assigned to the the good MRP area.
I'm explaining :
Business process
   -> I work with a subcontractor
        case 1 : either I buy raw material to be processed and delivered it directly to my subcontractor
        case 2 : either I send raw material from my physical stock to my subcontractor
   -> I create subcontracting purchase order with indication as components, the raw material.
   -> In case of the components are already in my subcontractor (case 1), the reservation (Subreq) should not consume my physical stock.
   -> In case of the components are in my physical stock (case 2), the reservation (Subreq) should consume the physical stock.
Solution choosen
Then I decided to create a storage location MRP area : "EXTERN" as External.
I assigned a storage location "EXT" to this MRP area.
I assigned this MRP area to the material in MRP1 / MRP Area.
In the purchase order, in the components popup,
  For case 1 :  I assigned "EXT" as Prod.Stor.Loc and Supply area
  For case 2 : nothing special is filled
Issue
For the case 1, althought I assigned the storage location "EXT", the Subcontractor Requirement is not attached to the good MRP area.
WHY?
Remark : I didn't use the subcontracting MRP area because I would like to have 2 cases : case 1 & case 2.
Thank you in advance for your help about this problem which make me nervous !

Hello Catherine
Your system is working as designed. The following note explains the system design in more detail:
503497 - Subcontracting and MRP areas
Take a look on the relevant information provided by this note below:
Reason and Prerequisites
The most important point to understand the system behavior is the fact that the withdrawal of the (subcontracting) component is generally carried out during the goods receipt for an SC procurement proposalfrom the subcontractor stock that is managed at plant level from an inventory management point of view and that has no reference to a storage location at all.
This causes that subcontractor requirements can never enter a storage location MRP area, since you can later not post the withdrawal from this MRP area.
Thus SC-requirements always enter the SC segment of the plant MRP area or the SC-MRP area.
The SC MRP area in turn is supplied by stock transfer reservations from the plant MRP area or via third-party order processing through procurement proposals with goods receipt directly to the subcontractor. A supply through the materials planning from a storage location MRP area is not possible.
For the above reason, SC-requirements do also not carry any storage location, since the storage location does not have any control function at all for SC-requirements:
You cannot and you should not determine a storage location MRP area (see above), and the subcontractor MRP area is determined via the vendor of the procurement proposal, thus it is independent of the storage location.
See also Note 376050 on this topic that makes a modification available which prevents the deletion of the storage location in the subcontractor requirements, so that you can use, for example, customer-specific reports to analyze the storage location.
Please observe that the mentioned modification note 376050 only makes the storage location available on table RESB, so that you can use it on custom report. This modification will not make the storage location to be considered by MRP or on MD04.
BR
Caetano

Similar Messages

  • APO Consolidation location  for Storage Location MRP Area

    We are using Storage Location MRP Area .
    Our Scenario is like ->
    1 Plant -> n MRP AREA -> n Storage Locations
    We are using consolidation location determination rule .
    But actually we observed SO requirement is appearing at plant level in APO instead of MRP level although stock confirmation is done is MRP Storage location level only .
    Things are working fine if we dont use consolidation location rule . We also observed that confirmation sub-item in SO doesnt show confirmed Sub-location for consolidation location . Transportation lanes are also maintained but requirement should pass to MRP location which is actually not happening .
    Please help , thanks .

    HI Srinivas ,
    ya GATP check is configured at sublocation level only .
    While in case of consolidation location only comfirmed orders are appearing at Plant level  .
    Also Stock transport requisitions are not getting transfered which is also a pain .

  • STO between plant and storage location MRP area

    Dear PP/DS experts,
    For some business requirements, I want to model stock trnasfer order scenario from plant to storage lacation MRP area but the system only make stock trasnfer reservation.
    In my EPR system, I maintainted storage location MRP area material with special procurement 45, then the transportaion lane is created between location 1200(location type 1001) to MRP area 1300(location type 1007).
    My question :
    1) Is it possible to make stock transfer order scenario instead of stock transfer reservation between plant and MRP area ?
    2) If possible, Is there something to do more in master data maintenance except mentioned above in ERP ?
    Thanks in advance for your help.
    Regards,
    Lee, Seung Won

    Hi,
    Yes you can perform intracompany STO (Plant to plant) and STO at Storage location level at the same time,
    We are using same for our client.
    http://www.architectsap.com/blog/sap/how-to-setup-stock-transport-order-between-two-storage-locations/
    Regards,
    Gopala.S

  • Storage location MRP clarification

    this option gives you the ability to plan a storage location separately or exclude it completely from MRP. I am confused why the sloc mrp indicator is given at material master level in MRP4 view? it should be at storage location level right?
    also could some one explain in what scenarios do people use this seperate storage loc mrp and exclude storage loc mrp with an example?
    Edited by: SCM0925 on Feb 19, 2011 4:24 AM

    this option gives you the ability to plan a storage location separately or exclude it completely from MRP. I am confused why the sloc mrp indicator is given at material master level in MRP4 view? it should be at storage location level right?
    Dear,
        This setting is applicable for storage location only, if you given storage location while entering in material master, then only this screen in MRP4 will appear otherwise won't.
    While running MRP system need to consider this setting, thats the reason the storage location data is considered in MRP 4 view
    also could some one explain in what scenarios do people use this seperate storage loc mrp and exclude storage loc mrp with an example?
    if you want reorder point planning for that storage location sepeartely, then you can use separate storage location MRP
    & also, you can exclude the storage location during MRP, for this particular material., if you set in config, it will applicable for all material
    Edited by: Sundaresan . E. V on Feb 19, 2011 8:59 AM

  • Storage Location - MRP

    Hi Experts,
    1. I have excluded a storage location ( say SLoc001) in the SPRO config : "Storage Location - MRP -> Storage location stock excluded from MRP"
    2. In the Scheduling agreement (ME31L) i am giving the excluded storage location (SLoc001) as the 'Storage Location"
    3. Now, when I am running MRP for a material (say Mat001) for the plant (say Pnt001), it is generating the Schedule lines with delivery schedules for the excluded plant (SLoc001), which should not happen ideally. Ideally I have to receive the message "SLoc001 StLoc : not plnd" in the MRP Planning Result. But this is not happening in my case.
    Please advise if i have missed any thing.This is very urgent.
    Thanks,
    Manju

    Hi Manju
    Your material code was already extended to the SLoc.
    You have excluded Sloc from MRP now.
    In this case to MRP4 view and change the Storage location MRP indicator to '1'
    This activity have to do for all materials now.
    Going forward your customisation will take care of this thing for newly created or extended material codes.
    Regards
    Rajesh
    Do reward if your issue is resolved..

  • 'Storage location MRP indicator'

    hi;
    what is the table name for fetching 'Storage location MRP indicator'  specified with material number  and storage location
    thanks in advance

    Hi,
    See Table MARD there is field  DISKZ - Storage location MRP indicator
    This table contains   MATNR-Material Number   as Well AS   LGORT-Storage location   field.
    Regards,
    Sachin

  • Storage Location MRP - transfer reservations

    We have this set up and are creating 311 reservations to transfer SLOC to SLOC.  Is there any way to set this up to use a 2 part process (like 313, 315)?  We need one location to "issue" when they post and the other location to be able to "receive" post.  It's a problem that posting the 311 moves the goods immediately to Unrestricted.  We'd also be open to any process that would automatically move the goods to blocked stock when the 311 was posted with MB1B.  Any help would be appreciated.  Thanks in advance.

    Hi,
    You cant create 2 reservation in the system for stock transfer b/w slocations.
    Automatic reservations are only created using Mvt type 311,not 313 and 315.
    For your second query,you cant post the stock to blocked because 311 is one step procedure and from URS tyo URS.For that to happen use 343/344 mvt types for your business scenario.
    Regards,
    Deepak.

  • How can I include the minimum stock of storage location in the mrp run.

    Hi all,
    I have in plant 1030 storage location 1001 and 1006.
    MRP1  Lot Size = EX
               MRP type = PD
               Reorder Point = 5
    MRP2  Safety Stock = 5
    MRP4 for 1001 is not filled
    MRP4 for 1006 Sloc MRP Ind = 2
                             Reorder point = 2
                             Replenishment qty = 3
    If no stock and I run the mrp I get
    a PurRqs for 8 with a automatic MtlRes of 3 going to storage loc 1006
    If I create a reservation in 1006 for 10 units and run the MRP again
    a PurRqs for 15 with a MtlRes of 10 going to storage loc 1006.
    I want the result to be PurRqs for 18 with a MtlRes of 13 going to storage loc 1006.
    10 for the reservation and 3 to fill storage loc 1006 with the replenishment qty.
    How can I acheive this?
    Best Regards!
    Curtis

    Hello Curtins
    Please observe what is stated on question 6 of FAQ note 550954, regarding storage locations planned separately:
    6. Question:
        A storage location should be planned separately. Is it possible to
        consider external requirements?
        Answer:
        No. The storage location MRP is a very simple reorder point planning
        procedure, during which only reorder point and replenishment
        quantity are defined. More complex settings can be implemented via
        storage location MRP areas.
    Therefore, I'd suggest you to use MRP areas to map this scenario.
    Best Regards
    Caetano Almeida

  • Help required -for MRP Run at storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
      I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
      Pls need your input on this. Any help will be highly appreciated .
       Thank you in advance.
        Regards,
        Krish.

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • Help required !! For MRP at Storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
    I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
    Pls need your input on this. Any help will be highly appreciated .
    Thank you in advance.
    Regards,
    Krish.

    Hi Krish,
    Go to following IMG path and check out your settings -
    IMG>>>Production>>>MRP>>>Master Data>>>>MRP Areas>>>
    (1) Activate MRP for MRP Areas    -
      Is that activated?
    (2)Define MRP areas>>>> Do setting s as per Storage Location
    Then run MRP.
    MRP Areas
    In this IMG activity you define whether MRP is to be carried out with MRP areas. In addition, you define the MRP areas for each plant in which you would like to carry out this type of materials requirements planning.
    The MRP area represents an organizational unit which carries out materials requirements planning independently. The results of the planning run are displayed specifically for each MRP area. An MRP area can include one or several storage locations of a plant or stock with a subcontractor.
    You can assign a material to various MRP areas.
    Basically, there are three types of MRP areas:
    Plant MRP Area
    Initially, the plant MRP area includes the plant with all its storage locations and stock with subcontractors. When you have defined MRP areas for storage locations and for subcontractors and you have assigned the materials, the plant MRP area is reduced by exactly this number of subcontractors and storage locations, as they are now to be planned separately.
    MRP Areas for Storage Locations
    You can define an MRP area that consists of a particular storage location by creating an MRP area and assigning the storage location to it. Material requirements for this storage location are then planned separately from the rest of the plant. You can also group several storage locations into one MRP area by creating an MRP area and assigning the storage locations. These storage locations are then planned together.
    MRP Areas for Subcontractors
    You can also define an MRP area for each subcontractor. Using an MRP area, it is possible to plan the components to be provided in subcontracting, by defining an MRP area for each subcontractor and assigning the components to be provided. You can therefore plan the requirements to be provided for these components for one subcontractor separately from the usual requirements.
    Up to now, MRP at plant level had been carried out. The various requirements were combined in the planning run and procurement elements were created for these pegged requirements with unknown sources.
    The introduction of MRP areas enables you to carry out material requirements planning and know the source of the pegged requirements and to be able to distinguish between them. The source of the pegged requirements can be, for example, production on a particular assembly line or a subcontract order.
    Material requirements planning for each MRP area allows you to have specific control over the staging and procurement of important in-house production parts and purchased parts for each shop floor and assembly area.
    Hope this will give you more idea about the same.
    Satish

  • Need Help on MRP Storage Locations

    Hi
    I'm having an issue with APO MRP areas.
    The scenario is, I have SMI (supplier managed inventory) and client managed inventory in two storage locations with different stocking types in ECC. The two storage locations are physically separated but they are under same plant. If I have to plan this in APO I have to create 2 MRP areas to distinguish b/w SMI and client storage location. When I Cif this storage locations to APO it will be treated as separate location with location type 1007. When there is a requirement from Client and when I run the planning run STR are generated (since I have maintained transportation lanes b/w them) against SMI and I need to send this STR's to ECC and do the execution. So my query is how ECC will consider this STR's that are generated from the planning run , and how execution will take place. Mean to say how the goods movement happens in ECC. Is there any setting need to be done apart from setting MRP area storage locations, MRP area materials, Creating Integration model, activating integration model. Setting up transportation lane b/w client location>>SMI location.
    Regards
    Sharath

    Hi Senthil,
    I appreciate for your quick response. From your reply you mean to say that the MRP Areas storage locations will be identified as separate Locations in APO. Is that what you mean?
    I agree. And I have modelled this in my system. Two storage location under the same plant are defined as two MRP areas in ECC and then I have CIFed these MRP areas to APO which are identified as two separate locations. I have maintained Transporation Lanes b/w this.When I created forecast(200 ea) manually in Product view for Location 1 (which is our company storage location) and when I run the Heuristics a purchase requisition for 200 quanity is created for SMI location 2. When again if I run the heuristic or save the results a Stock Transfer Reservation is generated. This is the expected results from APO planning.
    My question is when i generate the STR's in APO, how this STR's will get executed in ECC (How goods movements happen). ECC team says that they cannot use STR's for executing the goods movement. Is that right?
    Since SAP has provided  MRP Areas Storage Location functionality in SAP APO there should be a way to execute this STR's in ECC. Can you please give any valuable recommendations.
    ****I have a new issue for now. When I'm  trying to transfer the STR's from APO to ECC the STR's are not getting CIFed to ECC. I have selected the Manual reservation as the section criteria and my intergreatrion model is active with no CIF errors. Can anyone tell me if I'm missing any CIF/Master data setting.
    Regards
    Sharath
    Edited by: Sharath on Feb 11, 2009 4:43 AM
    Edited by: Sharath on Feb 11, 2009 4:45 AM

  • MRP Area Wise Run for Sales Requirenment

    Greetings..
                                I have two raw material (Trading).....in MRP view i defines these material under MRP area ...(Respective setting done in SPRO)
    Now i created sales order for these Raw material .
    Now in MD04 ...i m getting requirement but under plant....if i choose MRP area i m not getting Requirement...so if i try MD01 ...under MRP i m not getting Result of MRP..
    I need two Run MRP only for MRP area which assigned to Raw material in Material Master
    i m using Startegy 40..
    What else setting i have to do for getting Run with MRP area (MD01)

    1) Convert planning file entries - you must first convert the existing planning file entries at plant level to MRP area level in the planning file  (OM0F)
    2) Activate MRP for MRP areas (Production ->MRP -> Master Data -> MRP areas -> Activate MRP for MRP areas)
    3) Define MRP areas
    4) Assign material to MRP areas in Material master MRP1 view
    The allocation to a storage location MRP area is made using the storage location that the system determines during the planning run. This is determined on the basis of the storage location entered in the BOM (BOM item), in the work center (production supply area), or in the production version or in the material master. This storage location must be included in the MRP area that you have assigned in the material master. In addition, it is necessary that the view "Storage 1" or "Storage 2" exists for this storage location in the material master.
    Sales orders are assigned to a MRP area depending on their storage location (the issue storage location in the shipping screen of the item details).

  • Problem with MRP area

    Gurus,
    I had activated MRP area for exisitng client.
    The scenario is,
    Within a plant i have two MRP area. One is plant level (A) and the other one is storage location level (B)
    A finished good and its components belongs to both the MRP areas. (A and B) I created a Planned Independent Requirement for finished good at storage location MRP area (B) and run MRP via MD02 for MRP area B, i got a planned order at MRP area B. But the dependent requirements for the components are created at MRP area (A) plant level.
    My requirement is to get the dependent requirements at MRP area B for pegged requirements of MRP area B.
    Suggestion to this isue is highly appreciated.
    Thanks,
    Aravind

    Hi pravin,
    Thank you for the reply.
    Initially my client was not activated for MRP area. So when i activated MRP area, throughout my client for each of  the existing plants an MRP area is created by default. So, all the materials that belongs to the plant, by default belongs to the plant MRP area.(A)
    I created one more Storage location level MRP area (B) and assigned that to MRP 1 view of the finished good and all of its components. I also created a planned independent requirement for the finished good at MRP Area B. that is i can see the requirement in MD04 screen only with the MRP area B and not in MRP area A.
    Then i ran MRP for the finished thru MD02 for MRP Area B. I got a planned order in MD04 of MRP area B.
    As you are aware MD04 screen is specific for particular MRP area.
    This planned order is not displayed in MD04 screen of MRP Area A. But the dependent requirements for the components are not displayed in MD04 screen of B. But the dependent requirements are seen in MD04 Screen of MRP area A.
    As per my understanding the dependent requirements of components should be displayed in MD04 screen of B as my pegged requirements are from MRP area B.
    Kindly suggest and please let me know if any thing is not clear.
    Regards,
    Aravind

  • MRP Area Setting

    Hi, expert
    I have the following scenario:
    I got a transit sloc 1510 where goods will be backflush to this location first, then use mvt 311 to transfer to 1530 (fg whse) and 1520 (fg whse), and we want to seperate the material planning for 1530 and 1520.
    So, we use MRP area to do this:
    I set up 2 storage location MRP area: 1530, 1520
    sloc 1530 assigned to MRP area 1530, rec loc 1530
    sloc 1520 assigned to MRP area 1520, rec loc 1520
    Item A MRP4 setting:
    Production Version: Issue storage location: 1910, rec sloc: 1510
    Already assigned MRP area 1530 to this item A
    I created a sales order for ITEM A, in sales order, I specific the sloc 1530. Then I run MD02 using MRP area 1530. When I view the result in MD04, the rec loc for plan order is 1530 instead of 1510 (seems like MRP 4 production version setting is ignored).
    I try to add sloc 1510 in MRP area 1530 in SPRO, and then run MD04, the planned order rec loc becomes 1510, and this is what I want. But the problem is when I assign 1510 to MRP area 1520, system prompt error that 1510 already assign to other MRP area, it seems that only 1 sloc can be assigned to 1 MRP area, but based on my scenario, both 1520 and 1530 sharing 1 transit loc 1510, and I want the planning to be diff for 1520 and 1530, how should I proceed? how to configure MRP area?

    I only want to have 1 transit sloc 1510, all the goods will backflush to this sloc first, then later distribute to diff sloc. If follow what you said, I need to create multiple dummy storage location for each MRP area, If I have 8 MRP area, means 8 dummy sloc need to be created, this is not very practical and very hard to maintain.
    Any better suggestion?

  • Transaction data in MRP areas in APO

    Hi,
    We are using storage location MRP areas in APO.In ECC we have a storage location  5000 under  plant 1000. We have defined storage location as MRP area and transferred to APO. Now we have two locations in APO one is 1000 and another location 5000 (with location type 1007).one material is existing in both these locations. We have a forecast in location 5000 and a Pur requisition is created for this material in 5000 after SNP heuristics. We are able to see the Pur Requisition in 5000 location in the product view.But when we are looking in 1000 location in the product view,we are not able to see the same purchase requisition.Is this standard functionality or am i missing any setting?
    In ECC we can see the same purchase requisition in both the MRP areas in 5000 and 1000 in MD04. But the same is not in APO? we are not able to see in 1000 plant in product view but could see in 5000 location in product view.
    Any one has this issue?
    Thanks
    Chandrakanth

    Hello Chandrakanth,
    Check if the storage MRP area is not been transfered to APO as Plant.
    Take a look on note 896482, perhaps it can helps in analyze how you are CIFing the MRP areas to APO.
    Hope it helps.
    Regards,
    Michel Bohn

Maybe you are looking for

  • CLM workflow parallel approval

    Hello Experts, Kindly need  help in achieving below workflow requirement. For each user account, we have maintained an extension field  'MANAGER1' and 'MANAGER2'. so if for a user if both the manager values are set we need to add them as approvers. t

  • Rounding to nearest half

    Using Crystal 2008 Dev Question on rounding, I have a formula that displays my running total number, I need to format the 1st decimal.  Basically if I have 2.3 I need that to round up to 2.5, or if I have 2.2 I want this to round down to 2.0.  I have

  • Mkdirs() creates read-only directories

    In my application I have a piece of code that creates directories with mkdirs(). So far, so good. But after that, I want to copy a file to one of the (sub)directories. However, the directories are all read-only, so I get a runtime error: java.io.File

  • Adobe form in pe51

    Hi guys, Is it possible to create and design a HRForm as an adobe form? Best regards Jon