MICs duplicated in COA (Certificate For Analysis) for Finish Product.

Hi, Champions,
I have problem in printing COA:
We are using TL type "Q" inspection plan.
         Operation:1 Chemical Test
                       MIC:0010 Test-1
                       MIC:0020 Test-2
         Operation:2 Physical Test
                       MIC:0010 Test-1
                       MIC:0020 Test-2
                       MIC:0030 Test-3
Manageing individual COA profile for each Material.
We have customized COA report.
When we are trying to take printout from it, it is printing the COA for all the Operations two times. Means one more time then it is there in the Task List.
The parameters for the COA Profile are as below.
      1. Level for Result Selection: - Summarized
      2. Origin of the Characteristic Result on the Certificate: - Inspection Result.
      3. Origin of Characteristic Short Text: - Master Inspection Charecteristic.
      4. Origin of Inspection Specifications: - Inspection specfication from QM.
      5. Output Strategy for Skip Characteristics: - Text from text element of function group.
Pls let me know, where is the possibility of cause for this descipancy in COA.
Regards,
Shyamal

Hi Craig,
Thanks for your involvement.
The layout that is generated by QC21 was no where meeting the requirement. So layout was configured. Then data was there in big number of verity hence all the detrails was requried to be fatched from Inspection plan itself. Not from MICs (QS21,,as STD report does).
These were the circumstances. And it was propoerly tested and is working fine also.
But recently we had SAP GO LIVE for, two more mfg facility(Plant) and it is showing this bug overhere only.
But any ways thank you all for kind support.
Regards,
Shyamal

Similar Messages

  • Quality Certificates for Finished Goods

    Dear Friends,
    Please guide me to map in SAP for the below Scenarios of Quality Certificates.
    There are two types of Certificates for Finished Products
    1.     Permanent Certificates
    We have certifications from some Institutes for Finished products.
    e.g.  TUV: IEC 61215 Ed.2, IEC 61730 & UL1703
    These Certificates are sent to customers only on Demand.
    I want to create all these certificates in SAP and assign materials to them. Print should come manually.
    2.     IV Testing Report (Certificates for each Product).
    Each Product is tested by a machine for its efficiency and power. A Current-Voltage relationship Graph is produced by the Machine. We call it IV TESTING REPORT. Each product has its IV Testing Report and it is sent with the product to customers.
    Print of this certificate should come automatically with each Billing Invoice in SD.
    Regards
    Prashant Atri

    These requirements can all be handled by the standard SAP COA process.  You simply have to create a couple of different SAP script forms.  One for the stand COA where you report out the values where you actually test the product via your machine, (requirement 2). 
    For the frost requirement, you need to reproduce and send copies of outside certifications.  I assume you actually have a paper copy of these and that these are for specific products.  For these, you create separate COA outputs, one for each cert type.  You create a SAPscript form for each.  These forms will be identical with but one exception.  In the form, instead setting it up for reporting characteristics and product info, you create it with one frame that is a bitmap.  (your programmers should be familiar with doing this for putting on company logos on various forms).  Instead of displaying a logo in those frame, you display the bitmap image of the cert you want to use. So the SAPcript is very easy, just a single bitmap along with anything else you decide you want to include on the form.
    All your certs can then be sent automatically at time of delivery just like any regular COA.
    FF

  • Creation of Production order for FInished Product through Project

    Hi,
    Pls clear me on how we can create a Production Order for finished product.  
    If we confirm the production orders in PP, cant the same be confirmed in PS.. Should we consider the same activity types in both PS and PP
    Pls clarify

    hi srikanth,
    your answer has been very helpful... but could u clarify  why MRP is run in MD51 for WBS element and in MD02 for network..
    Pls clarify...  My scenario is like this ...                                                                               
    A
                            B                                                                                C
                    D  E F G H I                                                                                J K L M N O
    I have  a Assemblies B and C which are always delivered in sets.. under assemblies B and C,  we have 6 sub assemblies which has its own components.  I am assigning sub assemblies to differenet WBS elements 01 and 02. so, initially these sub-assemblies are produced to stock. this should happen in PP i.e., through production orders generated in MRP run ( MD51 ). In the next phase i will assign Assemblies B and C to another WBS element.  Again system should generate two Production orders thru MRP for this. Here the 6 sub-assemblies produced earlier will be consumed in confirmation of the production order...
    What i am doing is this correct...
    and the procurement for the components is happening thru the purchase requisition generated via MRP. the components themselves are not directly assigned to the project..
    Pls advise and clarify?

  • Query for Finished Product in Production

    Dear All
    I require a query for  Finished Product in Production. 
    Product       Opening Balance                 Receipt                  Issued Quantity                  Closing Balance
    Can anyone help me on this??
    Thanks,
    Pratap

    Hi Pratap,
    You may check this first:
    http://scn.sap.com/thread/1631705
    Thanks,
    Gordon

  • Pallet sheet for finished products printed in the not expected printer

    Hello to all,
    I have an issue right now with a user printing pallet sheet for finished products in Z602 printer.  The user wanted it to be printed in printer Z630.  I have checked transaction SU01 and found that the output device assigned to the user is Z630.
    What would be the cause of the documents coming out in Z602? 
    Just to add, the user print the document via transaction CO02, if the person needs more palette sheet then he prints by transaction LT01, and LT16 is just to cancel.
    Many thanks.
    Regards,
    Patvin
    Message was edited by:
            patvin

    Hi Patvin,
    You can try using T.code Co04 and after giving parameter got to Print and do print setting.
    If it solve reward and close this issue
    Thanks
    Bala

  • Material Valuation for Finished Product in Production Scenario

    Dear SAP Gurus,
    Kindly recommend appropriate Material Valuation Control for Finished Product in manufacturing scenario. SAP recommends pricing control 'S' (Standard), but my client's buying nature is not periodic(varies), they buy material on requirement basis (On actual material consumption ) which is very frequent. Pricing for each buy also changes due to the market conditions. You are requested to suggest me appropriate Material Valuation Control (either S / V) for Finished Product along with reasons, advantages & disadvantages for the same.
    Thanks,
    Shantanu

    Hi Alll
    Well one disavantage in material with 2/V for production consumption is in case of incorrect goods receipt, incorrect price for example, all your consumption will be wrong.
    For correction you would have to reverse all production posting, correct the goods receipt and repost the production confirmation.
    If you were using 3/S configuration, all consumption would be done in standard price and at month end material ledger would calculate the actual price for price revaluation. People from MM would have time to correct the entries during the month.
    Regards.

  • Purchase requisition generate for alternative bom use for finished product

    i hav alternative BOM for finished product in which different raw material component in both BOM of same finished product.But when i RUN MRP that time only one raw material requisition generate another alternative bom raw material requision not generate.
       Is there any option when i RUN MRP that time we select one of the alternative bom component of  raw material for generation purchase requisition.
    Thnaks in Advance

    Dear ,
    MRP will select the BOM based on the MRP4-BOM Explosion tab -Selection Indicator .It can eitehr of these ways :
    1.Maintain Production Version with  different Alternative BOM  and keep Selection Indicator -3 .So sysetm will look into only the Valaidty  and lot size of the Production version and select the correct BOM to explode  and generate PR for depednts based on stock situation
    2.If you maintain Blank -then it will look into order qty and select the BOM according ly
    As in your case , selection methods 3 will fit  and you need to maintain PV with correct validity and lot size in MMR-MRP4-PV option .
    Try in sand box with different lot size and validity with indicator-3 .Create Order and run MRP-MD02-1,,3,3,3,2
    Check and revert
    Regards
    JH

  • Palette sheet for finished products not printed in expected printer

    Hello to all,
    I have an issue right now with a user printing pallet sheet for finished products in Z602 printer. The user wanted it to be printed in printer Z630. I have checked transaction SU01 and found that the output device assigned to the user is Z630.
    What would be the cause of the documents coming out in Z602?
    Just to add, the user print the document via transaction CO02, if the person needs more palette sheet then he prints by transaction LT01, and LT16 is just to cancel.
    Many thanks.
    Regards,
    Patvin

    Hi Patvin,
    You can try using T.code Co04 and after giving parameter got to Print and do print setting.
    If it solve reward and close this issue
    Thanks
    Bala

  • Long Text Missing In COA(Certificate of Analysis) Report

    Hi Friends,
    We have a case where Long text entered in the results recording is missing  in the COA Report for only certain Batches .
    For same MICs and COA Profile,the Long text is displayed correctly in the report for the different batches.
    I have investigated this and text element been used in the MIC is 0024 Code short text with results long text.
    We have checked the COA Profile for this MIC and material has been assigned ,so profile find to be correct.
    The SAP form used for COA Print is a standard and MIC is of Qualitative.
    Could you please help on this .
    Thank you.
    Regards
    Siddartha

    No idea really but look at this:
    Any chance the user was logged in with a differnt language when they created the long text?  If they logged in as ES for instance, the long text might be stored as ES.  But the COA is bring printed in EN so the ES long text is not found.
    Do you see an entry in table STXH for the long text for the batches that don't display it?  (Text ID is QMEP).
    I'd compare the entries in STXH for a long text that prints and one that doesn't and see if you notice any differences.
    Craig

  • COA Requirement for 'Assembly' products

    Dear Experts
    We are in process of Implementing SAP QM using ECC 6.0 and we have one requirement for our "Toll Manufacturer" (Third Party Producers for us). These toll manufacturers produce chemical products for us and do the Quality Checks and Ship to customer. They have their own tool (non SAP) to monitor/record Production Data and Quality Details. During the implementation of QM in our own production facilities globally, we also migrate these toll manufacturer from the existing QM tool they are using to SAP QM.
    The need for COA in our own facilities have been meet, but for toll manufacturing sites, the requirement is as below to address:
    These toll manufacturers currently generate COAs on “Assembly” products.  What this means is that the test data can be pulled from multiple products and then combined on the “Assembly” COA.  For example in their current legacy system , toll manufacturers uses “ Assembly ” functionality  to capture results for any Component (say C1) and this result is used in various Assemblies (Finished Goods, say F1 and F2). Now while printing COAs they refer the batch / lot result for the C1 to print in Assemblies (F1 , F2) . Is there any such functionality available in SAP Qm or can you please advise how to address this requirement prefrably using standard SAP system?
    Thanks

    If you are batch managed and have a batch-where-used history set up in SAP yes.. that functionality is there for COA's.  To create a proper batch-where-used history you have to have used the production/process orders to consume the various components into the each assembled product until the final assembly is done.
    In your case, I'm not sure how SAP would know what went into what since you get the final assembly delivered to you and have no assembly information.  I have heard of people adding info to the batch where used table directly but I have never done it.  You would need to create material masters for all the sub-components where the various results might come from.  I think it would be a lot of work to accomplish.
    Why not just have the tollers send you the final product COA resutls?
    Craig

  • Actual Cost for Finished Products

    Hi All,
    For Finished Goods calculation will use Semi finished Goods and Raw Material, while calculating the Finished Goods in cost object controlling system is picking the Standard Price Multiply Actual Quantity of semi finished goods.
    My Client requirement is to calculate the Finished Goods based Actual Quantity Multiply Actual Price.
    Is there any standard settings available or not?
    Regards
    Srinu

    hi..
    If you do not want to activate ML then all materials defined as price control "V" and Price deetermination as "2"
    kkumar

  • Third Party for finished product

    normally I sell a product and it is maintained as a Finished product.
    But now I dont have the enough Inventory for that product.
    So I have asked my Vendor to supply that material to the customer.
    In this case I cant maintain this product as the Trading good.
    how should i configure this scenario.
    regards,
    sheetal

    Hi
    there is no need to maintain a thirdparty material as trading goods. you just maintain as a standard finished product.
    and in VOV4 maintain a TAS(thisrd party) as manual item category for your standard item combination (lets say ORNORM-+- = TAN TAS)....
    <b>when processing a sales order just change the item category to TAS whenever you need a thisrd party order,.............</b>
    Hope this will resolve your problem  
    Reward points if helpfull
    Muthupandiyan

  • Daily Automatic delivery creation for Finished Products

    Dear All,
    As per my client requirement, they need automatic delivery creation when ever the finished products posted(Reached) in to the Finished Products Storage location with out time specification.
    Scenario is like this.
    1.Scheduling agreement will be created for one month or one year for the specific customer with specific products.
    2.After producing the material, from the production line finished products will taken in to the Finished product Storage location with some acknowledgement.
    3.When ever the acknowledgement happen(stock get added) automatic delivery need to be created for that acknowledged quantity with reference the scheduling agreement.
    4.There is no time specification When ever the finished products stock acknowledgement happen automatic delivery need to be created.
    5.There is no quantity specification also what is the quantity at finished products Storage location acknowledged for that quantity automatic delivery need to be created .
    6.If there is no production-->There is finished products -->No delivery should trigger.
    This will be applicable to specific customer and specific material only.
    Please give your valuable inputs as early as possible.
    Regards,
    Murali.

    Dear Rohit,
    1) Who creates the acknowledgement..
    -->Finished Products Storage location people will run this entry when they recieve the finished product from the production line.
    2) How frequently is this acknowledgement created..
    -->When ever receives the finished products from the production line,
    3) Is this acknowledgement a print out or a documetn type.
    -->It is not a print or document type, it is just an Transfer posting entry to add the Finished products qty to the existing stock at that particular storage location.
    4) If it is document type does it appear in document flow.
    -->No it will not come in the document flow.
    I hope it will clear for you,
    Regards,
    Murali.

  • SLED for finished product

    Hi
    Our finished product is batch managed, batch creation automatic at the time of order release. We have maintained SLED info in the material master, but during GR (mb31/migo) it is not asking for production date. We have to update it in the change batch screen.
    please help.
    Regards
    Abhishek Rai

    Thanks for the reply, in OMJ5 the check is there for the plant level, also it is working for GR for raw material. Only while doing GR for production orders its not asking for production date.
    regards
    abhishek

  • Upload update for Warehouse for finished product in BOM

    Hi everyone,
    Is there a way to update the warehouse for the finished product in BOM using DTW? I can only update the warehouse for the raw materials / components through DTW but not the warehouse for the finished goods, except by doing it manually one BOM after another.
    Thanks and regards,
    Derrick

    Hi Rakesh N,
    I changed the default warehouse then I noticed that only the newly added/uploaded BOM took the default warehouse are the warehouse for the finished goods. The earlier BOMs were not affected by the change in the default warehouse - the warehouse remain as they were when initially uploaded. Is there a way to update the warehouse for the earlier added BOM. we have quite a huge number of BOM and updating them one by one will take too long to complete.
    Thanks,
    Eric

Maybe you are looking for

  • USB: 1.1 yes, 2.0 no!

    My problem in short (mostly because I'm extremely tired and it's bedtime!): My iPod shuffle works wonderfully in each of my USB2.0 ports, as well as in my two USB1.1 ports. My new 5G Video iPod works in both USB1.1 ports. But when I plug it in to any

  • GL account statment in the below specified mentioned format only

    Hi My client required the following report in specific format and can any one tell which tables to look into to get the desored report? Travelling Expenses – Admin Date      Description     Reference     Debit     Credit     Balance 1 Apr 2007     Op

  • Can I "count" the number of rows excluding the header and footers

    I have some tables that consist of a different number of rows, as the number is part of an equation I need to know the number of rows excluding the header and footers. I have the work around in =ROWS(ColumnG)-3, but is there a tidier way? I want to b

  • Do we need SAPCCM4X for SMD?

    Gurus: I am not sure whether SAPCCM4X is needed for SMD. i have checked my SMD training material and only SMD/IS agent are mentioned. Would you please share your experience? Thanks!

  • Hide Unwanted Tabs in ESS/MSS

    Dear All, I want to hide the unwanted tabs in ESS/MSS. Thanks in advance.