MRP for plant/storage location

Dear all,
I have a question regarding MRP extension for plants and materials.
There is one plant (8000). Company has recently got two locations u201Cxu201D and u201Cyu201D in different states. MRP has to be run for u201Dxu201D  for sales orders and PRu2019s generated should be directed to the main plant 8000 which then triggers a TO for u201Cxu201D.
My question is since u201Cxu201D and u201Cyu201D are not yet maintained in SAP, Please advise whether to maintain them as plants or as storage locations and also the main steps to be followed for this process. Also, Please advise is there any config to be done so that PRu2019s are directed to plant 8000 and automatic TO/STO are triggered to u201Cxu201D
Suraj

Hi
you have to create  both X&Y as plants.
Then the procedure to be followed in multi plant planning.
The following link can be followed.
http://help.sap.com/saphelp_erp60/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
Regards
YMREDDY

Similar Messages

  • Help required -for MRP Run at storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
      I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
      Pls need your input on this. Any help will be highly appreciated .
       Thank you in advance.
        Regards,
        Krish.

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • Material block for sale in plant-storage location level

    Dear experts,
    Please help me how to block a material to sale in plant-storage location level.
    Thank you.
    Regards,
    Badruddoza

    The standard sales block (MVKE-VMSTA) in material master is valid for sales organisation / distribution channel combination (VKORG, VTWEG) - this means you cannot do it for Plant / SLoc combination,
    What does it mean to block it at plant / sloc level? Generally in SO you do not specify the storage location. Or you are speaking about MRP also? In this case you could use SLoc-MRP (with proper availability check in delivery) for your material but the problem is that a plant might be assigned to several sales area and this SLoc would be hidden for them also.
    Could you please specify what would you like to achieve, what sales block means according to you?
    Regards,
    Csaba

  • RLM MRP execution at storage location

    Hello Friends,
    Need help - I am configuring RLM with MRP - need help with below:
    Requirement: I need to run MRP at the main storage location first (requirement is from Plant Maint order), followed by another MRP run at secondary storage locations. I want to deplete stock in the main storage location before using up stock at secondary storage locations.
    This is not for re-order point planning (VB) for both storage locations, I know that I can plan MRP separately at storage location levels, but that only works with re-order point replenishment.
    Is MRP area configuration my only option?
    If possible I want to avoid MRP area configuration - I hear once it is configured we can revert back!

    Hi Joe,
    As per your client requirement, you need to run MRP at Main storage location, and want to avoid performing at storage location, here you can define the supply chain derivation via plant Mainteniance order by using using item category and transport requistion in RLM Configuration. you have option to select the order type order type item category  ( ), item category change rule ...( newer change item category) & direct prourement type ( SAP Std ).
    Yes MRP Area is the only option, the MRP first as plant level is the option, check in setting ie Step-3 Supply process derivation via plant ( supply type PD).
    The parameters for the RLM Supply Process are a combination of the following:
    · Material requirements planning (MRP) type at the requesting plant or storage location (the plant making the request for materials)
    · MRP type at the supplying plant or storage location (the plant or storage location supplying the material)
    · Special procurement type at the demanding plant or storage location.
    For more information pls check this link..
    http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_oil472/helpdata/en/83/496c3a411aab70e10000000a114084/frameset.htm
    BR
    Satish

  • Turn off ATP for a Storage Location

    Hi,
    I want to turn off ATP for a Storage Location.
    I am aware of a setting on IMG where we can have this done but not able to find the right node.
    Can someone help me with it?
    availability check NOT TO CHECK the stock at the storage location level
    Thanks,
    Mike

    Availability checks can be triggered either automatically or manually:
    The availability of components in an order can be checked automatically during order creation and/or order release. You specify in CustomizingOPJK per order type and plant whether the availability should be checked automatically. In addition, an automatic availability check can be carried out when the order is saved.
    You can always trigger a manual availability check
    The checking scope is defined via the Checking Group (in the material master) and the valid Checking Rule (in Customizing).
    They define:
    Which MRP elements are taken into account in the check
    Which inventory categories are taken into account
    Whether the replenishment lead time is taken into account
    Whether the check is also to be carried out at storage location level
    In Customizing (checking control) you specify which quantity is used to check the availability of a material. You can choose between the following:
    Availability Check Against Planned Independent Requirements
    In the check against planned independent requirements, the system only checks the open planned independent requirement quantities created for the components. This means that the ATP quantity is not included in this availability check nor are receipts or stocks.
    This type of availability check is most useful:
    if assembly planning or phantom assembly planning is used to plan the components
    if quick statements about the availability situation are required and the results from this check are precise enough
    The system uses the open planned independent requirements quantity at component level to determine a committed quantity and this quantity is copied to the planned order header in the Committed quantity field. As opposed to the availability check according to ATP logic, however, the committed quantity is not recorded in the dependent requirements. The planned independent requirements of the components are not consumed by the committed quantity but by the complete dependent requirements quantity. In availability checks that follow, the system can only commit quantities for the amount of planned independent requirements that have not yet been consumed.
    In the availability check against planned independent requirements, the following dates/quantities are not calculated:
    overall commitment date
    partial commitment date/quantity
    ATP quantity
    In the check according to ATP logic, the system checks whether the dependent requirements of each component are covered by specific receipt and issue elements or by stock. This check is carried out dynamically, that is, each time you carry out the check, the system recalculates the current situation. If a quantity can be committed for the requirement date, the system enters precisely this quantity as the committed quantity in the dependent requirements and the ATP quantity for the components is reduced by the committed quantity. Therefore, in the next availability check, dependent requirements can only be committed for the amount of the remaining ATP quantity.

  • How to run MRP on different storage location level ?

    Dear Experts,
    Need your valuable guidance to solve the below requirement form the client-
    1) My client want to enter a "safety stock level" for one spare part/ Material on the basis of individual storage locations.
               For sake of example: in SL01 he wants the safety stock for particular material set to 5
                                  In FS18 he wants the safety stock set to 2
                                  In FS15 he wants the safety stock set to 1
    Kindly tell me whether it is possible? & guide me how to do it.
    2) Also tell me how to run MRP on a storage location level?
               This is because after maintaining different safety stocks for one material in different storage locations,  is it possible to appear each storage location with their differing safety stock levels?
    I checked the MRP type maintained & its-1 (plant) & not as- 2 (storage location).
    Kindly guide me for the above issue
    Thanks in advance for your support.
    Regards,
    Mehul

    Hi Umashanker,
    Thanks for your suggession . Accordingly I have resolved the issue.
    Regards,
    Mehul

  • Planing via MD01 only for one storage location

    Hi!
    I have the following setup:
    Plant p1 has storage locations sl1, sl2, sl3, ... sl9
    In transaction mm43 (display retail material) I can see the following setup of the material:
    Dispositionsparameters:
    -MRP Type V2, ... and so on
    Behind Button MRP/Forecast Data I can switch to for example storage location sl3 and there I can see
    Storage Location MRP:
    -SLOC MRP indicator = 2
    -Reorder point = 50
    -Replenishment qty = 70
    I think its meant like the following: if the material in storage location sl3 is equal or below 50 then there will be a goods movement from the "main storage location" to the storage location sl3 with 70 pieces of the material. Afterwards there would be 130 in the sl3.
    Maybe its a good thing to run "the report" every day in the evening so that the sl3 location will be filled up every day if necessarily.
    Now the questions:
    Is the transaction MD01 "the report"? I have no chance of setting up the storage location there.
    Where can I check whats the "main storage location", the location where the replenishment comes from?
    Some of my colleagues mentioned the Transaction MB26 where they check the planed for replenichment materials. Is this at all usefull in this context? They told me the list is reacting very slow... so if they run out of stock of some material then "the list" recognizes this 2 or 3 days later.
    I am looking forward to your answers!
    Regards
    Manfred

    What you setup in OMIR will just be the default for a material master created after this customizing, when an existing material will be extented or a new material will be created.
    It does not impact the MRP run directly.
    You have to maintain the  MRP view in your existing  materials for the desired storage location as well. There you have to enter this MRP indicator manually or with MM17.
    However, the MRP will in general run per plant, for all locations, it will just plant the locations separatly if the indicator is set.
    If you really want an extra run per storage location, then you have to use the user exit (you see the 2 fields at the bottom of the MD01 screen).
    the user exit has to be customized in IMG > production > MRP > planning > user exit material seelection

  • Different safety stocks for differnt storage locations?

    Hi all,
    Can any one tell me if it is possible to set two different safety stocks for two diffetent storage lacations for one materila?
    If yes, How?
    Thank you,
    Utpal

    Hello UNP,
    Normally, planning is useally carried out at plant level, however you can do MRP at Sloc level as well.
    Safety stock is planning data which is defined for entire plant where as reorder level and replinishment quantity can be defined saperately for each storage location, but not safety stock.
    hope this helps.
    Regards
    Arif Mansuri

  • Can we block a material for particular storage location ?

    We can allow material to storage locations by MMSC. Can we block a material for particular storage location ?
    Please share ur view.

    Hi,
    If you want a material to be blocked, go to the Basic data 1 view of the material,there in the genral data you have " X-plant material status ". Also in Cost estimate 1 view of the material you have Plant Specific Material status. Use the options available to block the material in these two views.
    Also u can goto MM06 where put material,plant,storage location.When u select enter just tick the check box of material,plant and storage location and save it.
    Pls reward if found useful.
    Regards,
    Indranil
    Message was edited by:
            INDRANIL BHATTACHARYYA

  • Block Customer for Particular Storage Location

    Hi.
    I want to Block a Customer for Particular Storage location.
    ie plant 1000(St Loc 01,02)
       plant 2000(St Loc 03,04)
    Block Customer XYZ for Plant 2000 & Sto Loc 03
    is this possible?
    Reg.
    Amol

    Through standard settings, this is not possible.  Try with USEREXIT_SOURCE_DETERMINATION (MV45AFZB) where you have to define the storage location and the customer code.
    thanks
    G. Lakshmipathi

  • Po list   for perticuler storage location

    dear sirs,
    is it possible to see the po list for perticuler storage location of perticuler plant ?
    Regards
    kailas ugale

    HI,
    Yes, it is  possible to see the Purchase Order list for particular Storage Location of particular Plant as follows.
    Using T-code ME2N - Purchasing Documents per Document Number, the input data to be given as follows.
    Plant : _______
    Scope of List : ALV
    Document Date : __________ to __________ (report require period)
    If the report input data Storage Location require, you have to select Dynamic Selection button(Red,Green,Blue color button) and shown 2 options are as follows.
    1) Purchasing Document Header
    2) Purchasing Document Item
    The above option, you have to click Purchasing Document Item shown Storage Location field double click and give input data  Storage Location  ______ (list of PO require Storage Location)  and execute the report. The particular Plant and the particular Storage Location  list of purchase orders displayed.
    Hope, it is useful for you.
    Regards,
    K.Rajendran

  • MRP Areas on storage location Basis

    Hi,
    I created some MRP areas for different storage locations, and assigned those MRP Areas to material(MRP 1 View). Every thing looks fine as of now.
    1)Now when I have seen some forums, I seen Convert planning file entries (SE38 program RMDBVM00), I never done conversion of planning files, can any one tell me what is the importance of it? I didn't done conversion of planning files, will that have any impact on MRP Run.
    Thanks
    Aplha

    Alpha,
    Can I convert planning files now, In D,Q and P, will that effect MRP Run?
    As expert Caetano has said repeatedly, of course it will affect the MRP run.
    The whole purpose of having Development, Quality, and Production systems is to ensure that any changes made in software do not disrupt your business.  In any sane environment, you first perform your changes (such as converting your planning file entries) in dev, and perform unit testing.  Once you have convinced yourself that the change is worthy of testing, you then move the changes to Qual, where typically your company performs Integration and User Acceptance testing.  Only after the business community and the IT community have tested and are satisfied with the results, should you then perform the changed process in Production.
    In short, you shouldn't be asking us in SCN when it is OK to perform the activity in the Productive system, you should be following your company's 'change management' processes, which usually involve, at a minimum, asking your company's user community if the change is acceptable to them.
    Best Regards,
    DB49

  • Needed config settings for automatic storage location

    hi,
    sap gurus,
    configuration settings needed for automatic storage location at sales order level.
    it is coming by using OVL3 at delivery document level.
    but we need it sales order level.
    regards,
    balaji.t

    Hi Balaji,
    In standard Storage location cannot be defaulted in Sales order. OVL3 is for determining the storage location in Delivery.
    However to map your requirement of having Storage location determination in the Sales order do the following:
    In the Plant Setting IMG> Enterprise Structure> Definition> Logistics - General> Define, copy, delete, check plant. Here select your plant and go to Address for this plant. Here in Search term 2 Maintain some alphabet say "A". Now ask your ABAPer to write a user exit for determining the Storage location if the Sales order has the same Plant used in it with search term as "A" then use table V_TVKOL (storage location determination table) and fetch the correct storage location based on Shipping Point + Plant + Storage conditions.
    Hope the same works for you!!
    Regards,
    Ajinkya

  • Can we maintain separate Profit center for each Storage location?

    Dear Friends
    My Org structure is like below:
    We have 10 profit centers, one plant and 5 storage locations.
    Now my requirement is these 5 storage locations belog to 5 different profit centers.
    Can we assign different profit center for each storage location?
    Regards
    Kiran A

    Dear Mehmet Gunenc
    It is not happening because the profit center area is defined as General plant parameters. It is denoting the Profit Center is at Plant level and not at storage location level.
    Please check it.
    Regards
    Kiran

  • Deactivate warehouse for my storage location

    hi,
       i am not created warehouse for certain materials ,but suddenly plant -1000,st.loc-0001,wm-001 in these combination all  materials have warehouse. i have to correct the problem plz guide me.
    regards
    muthruaman.d

    Hi,
    There is a configuration to link warehouse number to plant-storage location combination. I think its in SPRO --> Enterprise structure --> Logistics execution node. (Assign warehouse number to plant and storage location. If the the entry is deleted from that table, your problem can be resolved.
    Nikhil