Material block for sale in plant-storage location level

Dear experts,
Please help me how to block a material to sale in plant-storage location level.
Thank you.
Regards,
Badruddoza

The standard sales block (MVKE-VMSTA) in material master is valid for sales organisation / distribution channel combination (VKORG, VTWEG) - this means you cannot do it for Plant / SLoc combination,
What does it mean to block it at plant / sloc level? Generally in SO you do not specify the storage location. Or you are speaking about MRP also? In this case you could use SLoc-MRP (with proper availability check in delivery) for your material but the problem is that a plant might be assigned to several sales area and this SLoc would be hidden for them also.
Could you please specify what would you like to achieve, what sales block means according to you?
Regards,
Csaba

Similar Messages

  • Report on QI, Blocked, Returned Stocks at Plant & Storage location level

    Hi,
    Would like to know any reports which gives QI, Blocked, Returned stocks at Plant & Storage location level.
    Regards,
    Vengat

    hi,
    What do you exactly mean say by "Returned  stock"..
    Also go through by MMBE tcode ...
    Regards
    Priyanka.P

  • Help required -for MRP Run at storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
      I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
      Pls need your input on this. Any help will be highly appreciated .
       Thank you in advance.
        Regards,
        Krish.

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • Material block for sales orders

    Hello, people.
    How can I block a given material only for inputting sales orders?
    Regards,
    Adriano Cardoso

    hi 
    with reference to question i wil tel u exact answer.
    step1:  goto MM02->
    enter material  -> goto SALES ORG1 tab  , in this u have the option called  DCHAIN SPECIFICATION STATUS filed --- select the option   " sales not allowed".
    save the material.
    step2:  goto  img screen
    logistic general->material master->setting for key field->data relevant for SD->define sales status
    goto order option  select B-error.
    any doubt please reply i wil tel u
    regards
    murali
    Note:  without solving ur answer donot select option like my question is solved option.

  • ATP check at sales order by storage location

    Can I do an ATP check against a plant/storage location level during sales order entry?  Basically, for a particular plant, if I have 2 storage location with the following quantities:
    0010 = 100ea
    0020 = 150ea
    Can I create a sales order for 110ea, specify the storage location 0010, and have the ATP come back as saying that I will be 10ea short?

    Hi Sandip,
    I think this is Standard SAP, you can put Storage location in sales order and then ATP will check only in that storage location.
    You dont need any special configuration for this. The only thing to be careful is what other documents like PO, Delivery you are using for considering in ATP.
    Otherwise if a  storage location is mentioned in the sales order ATP will happen only in that storage location.
    Regards,
    Abhishek

  • Physical Inventory at Storage location level

    hi.,
    Environment  ECC 6.0
    Our suggestion on Physical inventory at the client site was as per SAP
    "If the flag for posting block is set then no movements can be posted for that material. Note that the inventory document should be created at a material / plant / storage location level so as to not block that material at other storage locations. If a block is not required then do not flag the “Set posting block” indicator. It is always prudent to restrict the amount of materials being counted and to clear the count results quickly so business is not interrupted"
    CLIENT feedback: " Like wise we asked the client to make the selection by Plant = 1000, SLoc = 100, and WBS =2312-344-332 and checked Posting Blocked.
    My understanding was that this selection would block only the 1000/100/WBS location.
    Client is having a problem is that people trying to transact in a SLoc other than 100 (200, 300, 400)  are experiencing the “Blocked” warning.
    I know I heard that we can inventory a Storage location in SAP and lock it and the rest of the sites could continue without interruption.
    Any suggestions on how we can achieve this.
    Tx

    Hi,
    Are you setting teh posting block at the time of creation of physical inventory document or by running MI32 later?
    If you are running MI32, then ensure that you enter teh storage locations correctly, else the material irrespective of storage locatioons may get blocked.
    Hope this helps

  • Number range purchase requisitions at storage location level

    How can I define a number range for purchase requisitions at storage location level? I have one plant with several storage locations and I want a number range for purchase requisitions per storage location.

    what is the background to this request?
    I guess that the requestor can easily identify their own requisitions among many.
    I dont think that this is necessary with SAP, do not put to much importance in numbers, there are many other options to meet the users requirements.

  • Blocking material for sale at plant level

    Hi,
    Can you please help me whether we can block the material for sale at plant level.
    We can block the material in sales organization view --> DChain-spec. status as BLOCKED FOR SALE , but it wil block sales of the material for all the plants in the sales organization.
    Please help whether we can go ahead at plant level.

    the posting block for goods issues can already be reached with a material status, so no phyiscal inventory document necessary.
    What you could try is to control the usage by a userexit.
    E.g.  you define a sales status AND a material status, just as table entry without any customizing in detail.
    and in the userexit you check for the combination of sales status and material status, and if your material has this combination then send a error message to the user.

  • Block Material for sales by plant

    Hello Guys,
    I want to block the material for sales by plant, i have the material A created in 6 different plants and want to block the material for sale in one plant, i know about all the material blocks in Basic Data1 which is a global block and block on Sales Org1 will block it across the sales organization and block in Purchasing View, MRP view and costing are relevant to block the material for procurement in a plant.
    All sales orders are created in CRM 4.0 and will replicate to R/3
    Any development ideas will be appreciated.
    Thanks
    Regards
    Uday

    Hi Uday,
    In that case, if you want to block for sales only a specific material or materials from a particular Plant within a Sales Organization, you may not have any standard options available. However, you may want to work with your ABAP colleagues on an userexit to achieve your objective during your sales order processing.
    The following userexit may be useful for your purpose to define your rules for sales by Plant for specific materials within a sales Organization
    User-Exit in program MV45AFZB -
    USEREXIT_SOURCE_DETERMINATION
    You can use this user exit to determine which plant will be used for the delivery. In the standard system, the delivering plant is copied from the customer master or the customer-material info record. If you want to use a different rule, then you must enter it in this user exit.
    As per another update here in your forum, if you plan to stop sales completely from a particular Plant for ALL materials in a Sales Og, then you may want to de-link the Plant assignment to the Sales Org, if possible.
    I hope this information helps you in your work.
    Best Regards
    Sitaraman

  • Physical Inventory Movement Block not Rest at Storage Location Level

    Hi,
    We are facing a typical problem in our Production System and the issue is as follows:
    1. We have created a Physical Inventory Document for a material with Freeze Book Inventory and Posting Block indicators.
    2. We completed the count and entered the same with reference to the PI Document.
    3. We reconciled and posted the differences in the system.
    4. We still find that in Material Master the Physical Inventory block for material movements was not reset automatically at the Storage Location stock view.
    Please help us urgently as all our Goods movements for this material are held up.
    Thanks

    Hi,
    I am able to see 4 PIDs in MI22 for my material.
    2 docs pertaining to the latest Annual Physical Inventory in 2010.
    These documents are for the same material in the same plant but for different Storage Locations. Out of which when i see the Material Master - Storage Location view, i see that the Physical Inventory Block "X" is set for one of the Storage Locations.
    The PID for the Storage Location with this Physical Inventory Block for Movements indicator, is already settled (Count done and no differences in physical and book stock in this storage location).
    The problem persists and i need to remove the posting block which was not reset.

  • MCHB,MARD - Stock available at plant level and storage location level

    Hi ,
    How to determine how much stock available at Storage location level and Plant level. (Lot is not maintained).
    In MCHB-Stock at lot level is shown.
    In MARD-Stock at Storage Location level is shown lncluding
    the stock maintaned at the lot level.
    If i want to know the stock which is not maintained in Lot, i.e, Stocks directly maintained at Storage location / Plant.
    Do I need to subtract the MCHB Value from MARD Value ?
    Is there any other way available to find the stocks which is not maintained at lot level.
    Regards
    Prasath

    Hi prashant,
    What do u mean by stock maintained at SL level without batch level.  Do u mean that some materials are subjected to batch management and some or not?
    If that is the case, for all batch managed materials, u can see the stock at batch level and also same is summed up at SL level.  But still what ever u are getting from MARD table isstock at SL level only.
    If u have activated batch management for any material, it will always be shown at lot level also.
    hope this clarfifies query
    award points if found useful

  • Material deletion flag at storage location level is not working

    I have a material that is created in some plants and also in some storage locations within each plant. If I mark the deletion flag at plant level I am not able to create a PO -> Me051 error message appears. Whereas if I mark the deletion flag at storage location level nothing appens. I am able to create a PO and also to create to goods receipt. Is there any customization that I should do in order to get the error message?
    Thanks in advance.

    storage location level deletion flag is not checked at order creation.
    it is assumed that you can change the storage location when you do the receipt.
    MRP run is at plant level, so the requirement is valid even the storage location view is flagged for deletion.

  • Stock transfer between Plant/Storage location to Plant/Storage location

    Dear Experts,
    This is a MM component of SAP Retail.
    We have 4 brands ( Plants of type B, Plants of type C etc) that needs inventory from the same Distribution center (Plant A) for some common products. Here the direction is to prioritize the inventory per brand. The requirement is one brand should not take the inventory of the other brand.
    To overcome this problem , the solution proposed is to have different storage location for different brands in the same DC.
    When we run replenishment  planning for the brands and do a ATP check, the availability check should consider only the one issuing storage location in the DC which we allocated for the brand.
    I do see the following set up in SPRO and I have done the following.
    Step1: Activate Stock Transfer between Storage Locations
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations-> u2018Activate Stock transfer between storage locationsu2019
    Step2: Assign Delivery Type and checking rule according to storage
    SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations->Assign Delivery Type and Checking Rule According to Storage
    Step3: Define Shipping Data for Stock Transfer between Storage Locations
    SPRO ->Material Management ->Purchasing ->Purchase Order ->set up stock transport order ->set up stock transport order between storage locations -> Define Shipping Data for Stock Transfers between Storage Locations

    Step4: Define Rule for Determination off Shipping Point
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations -> Set-up Storage-Location u2013dependent shipping point determination->Define rule for determination of shipping point
    Step5: Shipping Point Assignment According to Storage Location
    SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations-> Set-up Storage-Location u2013dependent shipping point determination-> Assign Shipping Points According to Storage Location
    Question.No:1- After completing the above set up  in me21n, the issuing storage location field is greyed out. I am not able to enter any value here. Can you please help.
    Question.No:2
    I do see the following setting.
    Under IMG ---> Material Management ---> Purchasing --> Purchase Order --> Set up Stock Transport Order -->Business Add-In for Determination of Issuing Storage Location
    Display the IMPLEMENTATION
    Double click on the method GET_SUPPLYING_SL
    Click the Execute button
    Click the detail button on IF_EX_MD_EXT_SUP
    Execute GET_SUPPLYING_SL
    There is a prerequisite for this BADI .I have done those things.What i dont understand is where to force the combination of supplying site/issuing stor.loc/receiving site/receiving stor.loc
    Kindly provide your inputs.
    Thanks,
    Vasanthan

    Dear,
    Have You configure MRP in second plant (where you want to transport the Material).
    Please try with this and do again Po for stock transport.
    Regards
    Piyush Patel

  • Help required !! For MRP at Storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
    I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
    Pls need your input on this. Any help will be highly appreciated .
    Thank you in advance.
    Regards,
    Krish.

    Hi Krish,
    Go to following IMG path and check out your settings -
    IMG>>>Production>>>MRP>>>Master Data>>>>MRP Areas>>>
    (1) Activate MRP for MRP Areas    -
      Is that activated?
    (2)Define MRP areas>>>> Do setting s as per Storage Location
    Then run MRP.
    MRP Areas
    In this IMG activity you define whether MRP is to be carried out with MRP areas. In addition, you define the MRP areas for each plant in which you would like to carry out this type of materials requirements planning.
    The MRP area represents an organizational unit which carries out materials requirements planning independently. The results of the planning run are displayed specifically for each MRP area. An MRP area can include one or several storage locations of a plant or stock with a subcontractor.
    You can assign a material to various MRP areas.
    Basically, there are three types of MRP areas:
    Plant MRP Area
    Initially, the plant MRP area includes the plant with all its storage locations and stock with subcontractors. When you have defined MRP areas for storage locations and for subcontractors and you have assigned the materials, the plant MRP area is reduced by exactly this number of subcontractors and storage locations, as they are now to be planned separately.
    MRP Areas for Storage Locations
    You can define an MRP area that consists of a particular storage location by creating an MRP area and assigning the storage location to it. Material requirements for this storage location are then planned separately from the rest of the plant. You can also group several storage locations into one MRP area by creating an MRP area and assigning the storage locations. These storage locations are then planned together.
    MRP Areas for Subcontractors
    You can also define an MRP area for each subcontractor. Using an MRP area, it is possible to plan the components to be provided in subcontracting, by defining an MRP area for each subcontractor and assigning the components to be provided. You can therefore plan the requirements to be provided for these components for one subcontractor separately from the usual requirements.
    Up to now, MRP at plant level had been carried out. The various requirements were combined in the planning run and procurement elements were created for these pegged requirements with unknown sources.
    The introduction of MRP areas enables you to carry out material requirements planning and know the source of the pegged requirements and to be able to distinguish between them. The source of the pegged requirements can be, for example, production on a particular assembly line or a subcontract order.
    Material requirements planning for each MRP area allows you to have specific control over the staging and procurement of important in-house production parts and purchased parts for each shop floor and assembly area.
    Hope this will give you more idea about the same.
    Satish

  • Define Shipping Data for Stock Transfers Between Storage Locations

    Hi Guru,
    Can i know what is the purpose to maintain Customer, SHipping data for each storage location for the STO between storage location?
    Purchasing --> Purchase Order -->
    Set up Stock Transport Order-->
    Set Up Stock Transfer Between Storage Locations-->
    Define Shipping Data for Stock Transfers Between Storage Locations

    The Sales org, Distribution channel, Shipping point, Vendor and Customer are maintained to created the delivery.
    It is for the transfer of stock between storage locations with any movement type.
    Eg: When you do a 311 movement type from Sloc A to Sloc B, then it will create a inbound delivery with the Vendor specified for Sloc A and an outbound delivery from Sloc B with the Customer specified assuming the customer and the vendor as the Plant.
    You have to create a internal Vendor and Customer.
    Hope it helps.

Maybe you are looking for

  • 3 Creative Cloud packages all fail on Launch with Error 16

    Hi, I am using creative cloud packager to create applications to deploy using SCCM, which I have successfully deployed in the past. I created 3 new creative cloud packages this week, Edge Animate, After Affects and Premier Pro, for the 64bit platform

  • Is there any way, to create with Adobe Muse HTML-Mail Templates?

    Is there any way, to create with Adobe Muse HTML-Mail Templates? or to convert the createt page to only html content? any other tool like an website copyer? tanks for help!

  • Aperture vs Adobe Camera Raw

    Hey, So, lately I've been shooting in RAW and have finally found some time to process some of the images. I am a Mac user, so I have the option of using either Aperture, or Adobe Camera Raw (Lightroom). Can someone please explain to me the main diffe

  • Is System Restore the only way to sort out the 11.1.4 install problem?

    After everything else, went for system restore to get 11.1.3 back. Apple owe me two hours of my life!

  • Update problem with my podcast

    I have submitted a new (french) podcast last week and it doesn't seem to be updating in iTunes. It does appear in the browser's list if you suscribe the podcast for the first time and if you check at the XML, but if you "update" manually the podcsat