MRP PR issue

Hi Experts,
Can anybody help me on our issue?
Problem:
MRP generated PR had item category "L" when we click the PR components icon "NO COMPONENTS"message. So they manually keyin the components tru ME52N and save.
Issue is, once it was saved we are not able to find who change the PR.
We already check the CDPOS and CDHDR, no data changed.
Is this acceptable?
thanks in advance
Maia

Hi,
The changes display are the release strategy only. There is no BOM for this material initially but the User do it manually in PR instead of creating a BOM. Our problem is we want to know who do it manually since this is not the propert way, but there is no traceability. i already check the Changes.
Any other idea on this?
regards,
Maia

Similar Messages

  • Project Based MRP run issue

    Hi Friends,
    There is one issue reg. Project Based MRP Run as below :
    We are running MRP through MD51 (Project based MRP run). For this we are assigning FG material code under respective WBS Element which generates Network reservation with movement type 281Q  which is base of MRP run in MD51. After MRP run we get planned order generation and then convert it to Production order and execute Production Order to receive Project Stock after GR.
    After receiving Project stock and then selling it through Post Goods Issue through SD cycle, project stock is consumed but network reservation is not getting closed which results in again generation of planned order if MRP is run again. 
    I need your valuable inputs if we are missing any configuration setting which can set Final issue indicator in reservation while Posting Goods Issue (PGI) in SD because FI indicator checking will only ensure reservation doesnu2019t take part in planning again.
    Your earliest reply will be highly appreaciated.
    Regards,
    Tejas

    Hi Vivek,
    Thanks for your reply. Actually my issue has got resolved the way suggested by Mario Adler.
    Hi Mario,
    Thanks for your solution. PGI through Project is working fine for me.
    Hi Krishna,
    Follow the procedure as suggested by Mario which will resolve your issue.
    Once again thank you all for spending your precious time to respond my query.
    Regards,
    Tejas

  • MRP-PS Issue

    Dear Experts
    Scnrio:
    MRP runs starts from the tcode MD51 where a material xyz is required for Qt 20 as internal activity. After MRP run system makes reservation of xyz material for Qt.20 with appropriate parameters & supplying plant.
    MRP also creats a MRP-PR for Account assignment category "Q" for the Quantity of 20 minus project stock of xyz material .This PR is not required. What is the configuration steps to avoid this PR only resrvation is enough.

    Hello
    check the reservations
    manual reservation and automatic reservations
    in automatic reservation system creating against mov type 261.
    if your issuing the stock with 311 move type you have to create the manual reservations
    Si kindly chek the automatic reservation setup. if creating the reservations automatic check the movement types. if system taking the mov type 221 ?
    laxman

  • MRP list issue

    Hello,
    I am having issues when I run MD05 MRP list for a material. It gives me the below error.
    "No MRP list exists"
    This is a material just extended to a new plant with no stock. Is this issue because there is no stock for it and/or because its a newly extended material?
    Same material in a different plant does give me the MRP list view when I run MD05.
    let me know how it works.
    Thanks
    SAP Fans...

    Have you had an MRP run after the creation of this material?
    If not, then it is obvious that an old MRP run does not know anything about a material created after this event.

  • MRP List issue(MD05)

    Hello,
    I am having issues when I run MD05 MRP list for a material. It gives me the below error.
    "No MRP list exists"
    This is a material just extended to a new plant with no stock. Is this issue because there is no stock for it and/or because its a newly extended material?
    Same material in a different plant does give me the MRP list view when I run MD05.
    let me know how it works.
    Thanks
    SAP Fans...

    Dhaval and All,
    Thanks for the Response. I want to confirm one thing.
    "MD05 is for displaying MRP Result.Once you run MRP for that material then only you will find the result in it unless you will find that " NO MRP list exists" message."
    The above statement you made (no MRP list exists) is true only in the case of a newly created/extended material for which MRP was never run.
    For material which already exists it would still show data in the MRP list from the last MRP run. Isnt it?
    Let me know
    Thanks
    SAP Fans....

  • Data Guard - MRP stuck issues on a physical standby database

    Hi,
    Oracle 11.2.0.3 DG running. When i do a switchover the physical standby database has error with following error
    ARC0: LGWR is actively archiving destination LOG_ARCHIVE_DEST_2
    ARCH: Archival stopped, error occurred. Will continue retrying
    ORACLE Instance <primaryDB> - Archival Error
    On standby DB
    SQL>select process, thread#, sequence#, status from v$managed_standby where process='MRP0';
    PROCESS THREAD# SEQUENCE# STATUS
    MRP0 1 548 APPLYING_LOG
    So according to Oracle support link i executed following
    SQL>recover managed standby database cancel;
    SQL>recover automatic standby database;
    The above seems to resolve the issue. What is causing is this?

    Hello again;
    Those both look perfect. I combed through my notes and found nothing like this for your version.
    Yes, I would open an SR since it appears you have done everything correct.
    ORA-600 [3020] "Stuck Recovery" [ID 30866.1]
    The "Known Bugs" section of the above has a few 11.2.0.3 entries.
    Generally the MRP gets stuck because data Guard thinks there's a GAP, you run out of room in the FRA on the Standby, or redo logs are too small and the system is switching very fast.
    Best Regards
    mseberg
    Later
    Never asked you but this "log_archive_max_processes" can be set as high as 30.
    Edited by: mseberg on Jul 16, 2012 8:01 PM
    h2. Still later
    Found this which is closer :
    Bug 13553883 - Archiver stuck but no ORA-19xxx error in alert log (messages need changing) [ID 13553883.8]

  • MRP REGEN Issue

    Hi All
          Could you guys help me to solve out this issue will be grateful
              In my client there are two plants, let us consider plant A & plant B. In both the plant we are running the MRP REGN job weekly with the parameter set-up as following.
    Plant:                Plant A.
    Processing Key:     NEUPL.
    Create Purchase Req:     2 [Purchase Requisition in Opening Period].
    Delivery Schedules:     3 [Schedule lines].
    Create MRP List:     1 [MRP List].
    Planning Mode:     2 [Re-explode BOM and routing].
    Scheduling:          2 [Lead time scheduling and capacity planning].
    Plant:                Plant B.
    Processing Key:     NEUPL.
    Create Purchase Req:     2 [Purchase Requisition in Opening Period].
    Delivery Schedules:     3 [Schedule lines in the opening period].
    Create MRP List:     1 [MRP List].
    Planning Mode:     2 [Re-explode BOM and routing].
    Scheduling:          2 [Lead time scheduling and capacity planning]
    As per the above set-up we are facing a problem in REGEN job for PLANT A as, When ever the REGEN job runs, it kills all the open purchase req and recreates the purchase req with same qty for non account assigned requirements [Purchase Req].
    In PLANT B- REGEN job is working fine as we expected like that, It wonu2019t kills the open purchase req.
    My issue is PLANT-A whenever the MRP REGEN jobs,it should not kill the open purchase requisitions.
    What are all the steps I need to proceed to avoid the killing of open purchase req and regeneration of new one with the every run.
    Thanks in Adavance.

    Hi Rajesha Vittal,
                       We are running NETCH & NEUPL in our plant, so NETCH & NETPL are more are less same.
    I am looking forward the solution to solve out the REGEN [NEUPL] issue.
    Please help me..........
    Thanks in Advance

  • MRP related issue

    hi dudes,
    i am having crucial problem that our process had been configured according to MTS scenario and having manual batch management where the batches for materials created in such a way that will represent the variants of that material.
    we are not planning planned independent requirements though we are giving 40 strategy and from sales order requirements we are getting planned orders on WB(weekly lot size).
    here problem is batch no is giving in sales orders in order to identify characteristics of material and MRP will not plan batches stock. so any one suggest how can we modify slightly our current process in order to use normal MRP process.
    thanks i advance...

    hi vijay,
    here we are having one client having the process which is suitable for variant configuration. but due to some reasons we gone for batches for individual materials to define variants of that material according to grade, colour like characteristics..initially we set manual production order creation according to sales information. now as client requires the process faster and simple, we are trying set MRP, but MRP look at total stock but at not batch level.
    so we can not set MRP at batch level, but we have to think to do something regarding with the process to be suitable with MRP.
    can you give some idea.......

  • MRP Area issue

    Hi Experts,
    I have the following business scenario. My sales order are created based on contracts. After I activate my MRP area functionality, notice that my MRP run was not working anymore. After making some analysis I noitce that my Sales Order are being created with some MRP area that can be checked on the availability check on the sales order VA03 transaction.
    It seems that this MRP area is coming now from the contract, the fact is that I cannot understand why this kind of behavior, since the material is not activated by MRP area and since the MRP area is different from the plant, then the MRP run did not work.
    Please, could anyone help me on that?
    Kind regards
    Oliver F

    Hi
    Kindly check your settings from the following link
    http://www.sap123.com/showthread.php?t=57
    Thanks

  • MRP-jobs issue

    Hi All,
    I am in need of you guys help in understanding the MRP-REGN job [NEUPL]
    Please help me.........
    Here are the following statement I read in help.SAP
    During regenerative planning, all materials are planned for a plant. This makes sense when you are carrying out the planning run for the first time as well as later during production if data consistency cannot be guaranteed due to *technical error.*
    In the above statement they mentioned about Technical Error
    What does it mean ?
    when it will occur?
    Can you guys could give me some examples of Technical Errors?
    How can we get ride of the Technical Error without running MRP-REGEN [NEUPL].
    Other statement I came across on help.SAP
    If you have changed the settings of an MRP type, a lot-sizing procedure or a purchasing department processing time in Customizing, the materials that are affected by these changes thus have no planning file entry and are not included automatically in the net change planning. To enable the changes made to take effect, you choose regenerative planning in the initial screen of the planning run or make an entry manually in the planning file.
    Material Master and all power users will frequently use to
    change based on their need on MRP type and Lot -sizing , then If we change frequently then we have to run MRP-REGEN regularly?
    or MRP-NETCH will take care .
    my next question is
    If we have a demand or any goods movement automatically planning file entry will be created for the material then why in the above statement they asked us to create a Planning file entry. If planning file entry will be created- MRP type changeor lot-sizing or purchase department processing time change will be taken care by MRP -NETCH job? or we need to run MRP-REGEN?
    Thanks in Advance

    Hi,
    Please refer this,
    [MRP planning|Regarding Netch, neupl;
    Hope it will help you.
    Regards,
    R.Brahmankar

  • MRP - Stock transfer PO

    Dear PP gurus
    I have one MRP related issue . Right now i have configured in such a way  that if stock is there , all stock transfer PO's are not considerd for MRP run. But if enough stock is not there for stock transfer PO then system will create extra Planned orders .
    My requirement is eventhough enough stock is not there , system should not considerd my stock transfer PO's for MRP run. 
    Can anybody can guide me how to configure this .
    Regards
    Prabhakar

    Look at MRP type configuration. For ROP related ones you can decide to consider or not STO.
    Regards, Jose Oyon.

  • Subcontracting POs -- planning components with MRP

    Hi!
    I would really appreciate getting your help to resolve the following issue.
    Ex: We use subcontracting to get our vendor to produce Part X with components A, B and C that we supply (we may have the components in stock or we may need to buy them externally).  We use subcontracting BoMs.
    When MRP runs, it creates a purchase req for Part X -- which is what we want.
    But it doesn't create requisitions or reservations for components A, B and C.
    MRP creates reqs or reserv. ONLY when I issue my purchase order for Part X.
    How can I get MRP to issue requisitions or reservations for components A B and C while Part X is still at the requisition stage.
    Thank you!

    Hi
    Have you selected dependent requirements in Material master (MRP view).
    please check whether BOM explosion selected for MRP in IMG.
    also please check
    http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d2a8f44af11d182b40000e829fbfe/content.htm
    regards
    Srinivas

  • MRP WORKBENCH에서 소숫점을 잘못 계산하는 문제의 해결

    제품 : MFG_MRP
    작성날짜 : 2004-05-20
    MRP WORKBENCH에서 소숫점을 잘못 계산하는 문제의 해결
    ===================================
    PURPOSE
    MRP Workbench의 수량정보가 잘못 계산되는 문제가 발생하며,
    그 Issue의 해결책을 기술하고자 한다.
    Problem Description
    (1) PO RECEIPT을 소숫점으로 받는 경우
    MRP Workbench에서 PO의 남은수량과 INV nettable 수량을 잘못 계산하는 문제
    ex)
    PO : 4949 EA에서 Receiving qty : 4454.1일 경우
    PO 잔량 : 494.9 INV onhand수량 : 4454.1 임.
    MRP수행 후에 PO잔량을 494.899994로 인식하여 planned order가 발생
    Nettable onhand 수량을 4454.1000002로 인식함.
    (2) Inventory 수량이 소숫점인 경우
    MRP Workbench에서 INV nettable 수량을 잘못 계산하는 문제
    Workaround
    Solution Description
    PO 소숫점 문제 : fix by patch#1685834
    INV소숫점 문제 : fix by patch#2392160
    Reference Documents
    BUG#1685834 , #2392160

  • MRP usages in PS module

    Please can anyone help me to provide the info regarding the usages of MRP in PS.
    Thank You.

    Dear,
    MRP used in procuring and fulfilling Project stocks. Remaining detailed info you can find through and net search. Also check the below links:
    http://help.sap.com/saphelp_sm40/helpdata/EN/4c/f1c80e056a8644a061ac3e762fca03/content.htm
    MRP-PS Issue
    http://www.scmfocus.com/projectsystems
    http://www.sap-img.com/production/difference-between-mrp-vs-mps.htm
    http://wiki.sdn.sap.com/wiki/display/PLM/AssemblyProcessinProjectSystems
    Regards,
    Syed Hussain.

  • Kanban - External procurement with multiple vendor

    Hi Gurus,
    We are working on implementation of Kanban for external procurement (Scheduling agreement) in my organisation. As per the business requirement, some of the components are supplied by more than one vendor. As per the standard process, Kanban supports automated processfor single vendor only & not multiple vendors
    Has anybody come across this issue? Could you plese share your experiene & any possible workaround or solution to this isuue
    Thanks
    Kariya

    Hi,
    This is how KANBAN works. Since sourcing is automatic.
    You could do a couple of things; first, have more than one control cycle, one for each vendor. Drawback is that you also need to have separate kanban containers for each cycle/vendor. But in the case where you have more that one supply area for a material this is not so bad.
    Another way could be working with internal demand area, in such a way that Kanban creates a stock transfer reservation. Then you need to process the requirements with MRP, and issue orders to multiple vendors (maybe using quota arrangement).
    To ilustrate the solution: your supply area is geting replenishment from the main warehouse, not directly from the vendor. These are two different storage location or plants...
    Regards,
    Mario

Maybe you are looking for

  • How do i transfer songs and photos from an ipod to an iphone5

    If anyone can help me that would be great in having a really hard time!

  • SAPFGBES and exit!!

    while using the transaction pc00_m99_cipe (posting tom payroll) ...the error that appers ..doesnt show the required line item correctly and i am suppose to get the line item detail displayed their and using exit need to modify the content of the line

  • ]TMG 2010 SP2 Rollup 5 - None Available Worker threads

    Hi Guys, We're experiencing some problems with our TMG 2010 Array (SP2 Rollup 5 ),and the first thing I can see is that the "Available Worker Threads" are 0 many times during the day. How can debug further this issue to know the root cause?' Best Reg

  • Siri can not download required information from server

    siri can not download required information from serve

  • Icon on intel macs

    1. I made an icon in CS2. 2. it worked on my Powermac, Dual 2gig G5. 3. I copied the folder with new icon to a friends MBP desktop 4. I tried to copy the icon from the folder to a file on his MBP and it would NOT let me. any thoughts or ideas is this