MRP - Transaction WC27 Batch Run for MRP

Each day we run WC27 as a background program.  We have it configured to define the scope of planning (all of the plants that we want MRP to run).  We also have a user exit key.  The user exit parameters, is a set group of specific MRP controllers.  Materials (part numbers) that have this specific MRP controller should run the MRP control parameters for Scheduling = 2.
The other parameters are as follows:
Processing Key = NETPL
Create Purchase Req = 1
Schedule lines =3
Create MRP list = 1
Planning Mode = 3
We currently see each day, materials (part numbers) that the routing was changed to a different work center using CEWB.  However, when the background job runs for MRP (WC27), it does not update the planned orders with the new routing work center change for the material (part number) that has an MRP controller specific for the scheduling parameter set to 2.  Why would our MRP run not change the planned order?  If, I run MD02, it does update the planned orders.  So why is not changing it in the batch run?  It is causing issues with our end users running CM25 for a specific work center.

Hi,
a.     Please check if the material in question has the Planning file entry u2013 through MD21
b.     If the planning file entry is not seen, create Planning file entries using MD20 or MDAB
c.     Run MRP (MD01 or WC27) with Planning mode as 3 or 2, and check if your changes have got effected into the Planned orders.
When we use Net-change planning at the Plant level, the system checks for the presence of Planning file entriesu2026 and whichever material has undergone some changes relevant for MRP, and thus having the planning file entries are covered during the MRP run.
Workcenter or Routing changes do not result in creating Planning file entry.
At the same time, when we execute planning for the material level (MD02), the planning run does not refer to the Planning file entry and hence the planning run changes the Planned order master data.
Kindly refer to the definition below..
u2018In net change planning only those materials are planned for which the net change planning indicator in the planning file has been set as a planning file entry. The system usually sets the indicator automatically as soon as a change is made to the material that is relevant to MRP.
The following changes cause an entry in the planning file to be made:
u2022     Changes to stock, if these change the stock/requirements situation of the material
u2022     Creation of purchase requisitions, purchase orders, planned orders, sales requirements, forecast requirements, dependent requirements or reservations
u2022     Changing to fields that are relevant to the planning run for these receipts and issues or in the material master
u2022     Deleting receipt or issue quantities
u2022     If you have changed the settings of an MRP type, a lot-sizing procedure or a purchasing department processing time in Customizing, the materials that are affected by these changes thus have no planning file entry and are not included automatically in the net change planning. To enable the changes made to take effect, you choose regenerative planning in the initial screen of the planning run or make an entry manually in the planning file.
Please refer to the links u2013
http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
Thanks
Senthil

Similar Messages

  • Trigger mail to MRP controller if Scheduled job for MRP fails

    How to configure Triggerring of mail to MRP controller if Scheduled job for MRP fails ?

    Dear Feby,
    Check this links to create a distribution list and to assign the same during background job scheduling in SM36 for the program
    RMMRP000.
    Re: Settings to be done for sending mail to external system
    Re: problem in background run
    Regards
    Mangalraj.S

  • MRP - firming Purchase Order dates for MRP run

    We are using demand management and MRP to create purchase requisitions for external procurement. It works fine and creates purchase requisitions based on the monthly demand entered in MD61. However, if I have a purchase order with a delivery date of a few months in the future, MRP always asks me to reschedule the order to meet current demand. i.e. it reduces the quantity on a requisition because it expects the rescheduled PO to meet the demand. In addition, it creates a requisition for the full demand a few months out, even though I have a PO delivery on that date (as it expects me to move the PO to the current date) See example below
    Does anyone how to get MRP to treat a PO delivery date as fixed or firmed and create requisitions based on this?
    We are using MRP type PD,  a planning strategy that looks only at LSF in demand management and KSL in SD requirements.
    Thanks
    Donal
    Scenario:
    Current Stock:               500 KG
    Safety Stock Level:        1000 KG
    Demand:
    Aug: 1500
    Sep: 2000
    Oct: 3000
    PO del date 01.10.08 : 750 KG
    When I run MRP it proposes the following
    01.08.08 Requisition: 1250 KG. Aug demand (1500) + deficit below safety stock (500) = 2000 less PO that it is saying I should move to July (750). (I want this qty to be 2000)
    01.09.08 Requisition: 2000 KG. Sep demand (2000) - OK
    01.10.08 Requisition: 3000 KG. Oct demand (3000). Doesnu2019t look at PO dated 01.10 at all. (I want this qty to be 2,250)

    OMDW
    rescheduling horizon days fixes this.

  • Delivery Schedules not created after MRP Run for MRP Type PD

    HI All,
    I have created Schduling Agreement, maintained Source List with MRP Relevant - 2 option and maintained Vendor as Fix, maintained info record.
    I have created a material with MRP type as PD and lot size as EX, and strategy group as MTS. Now when i enter requirement through MD61 and do MRP Run through MD02, system is generating PR instead of Del Schdule line inspite of schduling agreement.
    But If i change MRP type to VB and maintain reorder point and maintain min lot size, then system generates Del Schdule lines for the same material.
    What could be the reason. I want delivery schedules based on MRP Type PD.
    Where I am wrong in MRP Views or in any cutomization. It seems that purchasing part is fine since it creats scudles line so no problem in SA or in Source List.
    Please help
    Regards,
    Vikas

    Hi Vikas,
    Go through this link you will able to customize correctly
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/3b/66596eda7b11d1b6330000e8a738dc/frameset.htm
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d2da044af11d182b40000e829fbfe/frameset.htm
    Cheers
    Kris

  • Costing run for MRP-MPN set

    Hai,
      I am using MPN concept in my process.
      Here I am getting one problem while going for Costing Run.
      1.  In BOM component for FERT is maintained as leading part. on which there is no Inventory maintained or no value for this material in Material Master so in costing run it is taking that value.
      2. How costing run consider the MPN materials for Costing.
    Thank & regards
    KM

    Hi,
    Normally while creating the material master, we will maintain some approximate value in the accounting view. Then later while running the cost estimation, it will explode the BOM, routing it will calculate the BOM item component costs and the activity costs and the same it will update in the costing 2 view. This is the concept of standard cost estimation.
    MPN material is the manufacturer part no. While procuring the component or while supplying the components to the supplier we need to supply the material as per their material no we need to supply them or procure them. But for our easy handling or to follow our own system we will me maintain the different material no. This 2 things we need to link MPN profile and the MPN material no. When u order your own material, the system in turn will create a purchase order with the vendor material no. This is the MPN material logic.
    regards,
    V. Suresh

  • MRP can be configured not to run for a line item

    Hi Folks,
    I have a question... Scenario is like this:
    We are getting a Sales Order in SAP from a Portal which is exposed to external customers. The Sales Order has say 10 line items. Usually this will kick off MRP for each of these line items right away. Now we do not want MRP to kick off as we do not know as yet the line items in there are valid or not. There is  another application which will confirm if the line item is valid or not. Once it confirms if the line item is valid the MRP will run for only those items which are valid and rest of the line items will be rejected.
    Question how we can stop the MRP to not to run for the for the line item once the sales order is created. Creating a Delivery block is not going to help in stopping MRP run...
    Looking for some out of the box solution without any customization.
    Thanks and Regards
    Roger

    Hi,
    Check your requirements class via transaction OVZG. Do they have automatic planning set? Is No MRP Set?
    Regards

  • SAP HANA as accelerator (secondary DB) for MRP process

    Hellow all.
    Can we use SAP HANA as accelerator (secondary DB) for MRP process? Or HANA for MRP usefull only as primary Database?
    We can't opportunity to change our curent DB, but want to improve speed of MRP.

    To my understanding, MRP on HANA is available only as primary db and not in side car scenario

  • Turn off Spool Printing for MRP Batch Job run

    Hi Experts,
    Please tell on how to turn off the printing of a Batch Job which is an MRP Batch Run. Can this be done while creating the Job? We really don't need the prinout for this job. Thanks.
    Points will be awarded.
    Regards,
    LM

    Yes, this can be done while scheduling a job. When creating a job step (transaction SM36) there is a button "Printer specifications". Select any printer there and option "Send to SAP spool". Spool request will be created but it won't be printed out.
    If you are using RMMRP000 program, you also might want to uncheck "Display material list" checkbox on the selection screen. If using other program, see if there is an option to disable the log.

  • Sale Order MRP Run for All Order Line Items

    Greetings...
                     I have One Sales Order , in which i have ten different Line Items .
    Now I have to Run the MRP on basis of Created sales Order so that all Line items wi get consider insingle MRP Run on sales order base MRP Run.
    How to take MRP Run of One Sale Order for all Line Items.???
    In MD50 , we can have sales Order with Item..

    In MD50 you can give only one item at a time.
    Its a standard transaction meant to accomodate changes relevant for MRP after plant level MRP run  related to specific sales order Item.
    so either you need to do it multipal times by changing material or you need to go for MD02.
    Please explain bussiness case in detail why you want to restrict your MRP run for items in a specific sales order.
    Regards

  • Batch management activation- mrp run

    Hi, activated batch management for raw materials and stock of 10 qty uploaded with mb1c 561 mvt type, during this it generated batch number. craeted sales order for fert material for which these raw materials maintained as components. note that ici for raw materials are 2 (collective) in mrp4 view. now run mdbt and observed that mrp generated pr's for raw materials even though stock exists. pls advise how to ensure that system considers the existing stock even with batch no. thank you.

    Hi,
    Batches don't play a role in MRP. So, my guess is that your problem is somewhere else.
    Check all the material MRP definitions, FERT, and components, and see that SO is generating requirements.
    Mario

  • MRP RUN for the more than one line item in sales order.

    Hi ,
    In the sales order nuber of line item are , i will have to take MRP RUN for selected line item .
    So plz suggest what development will require?
    Abhay
    Edited by: abhay patil on May 30, 2008 8:52 AM

    HI,
    U can write separate prog. Which will ask sales order no. and from to line item or multiple line item of sale order. Then in loop internally pass the each line item no to MD50 prog. Which will run in background.
    I will give u sample prog. Which I had created for running MRP for all the lines items of given sales order in one go.
    *& Report  ZPRG_PP_001
    REPORT  ZPRG_PP_001.
    tables vbak.
    data: begin of it_vbap occurs 1,
            vbeln  type    vbap-vbeln,
            posnr  type    vbap-posnr,
          end   of it_vbap.
    DATA: P_MODE   TYPE    C.
          Batchinputdata of single transaction
    DATA:   BDCDATA LIKE BDCDATA    OCCURS 0 WITH HEADER LINE.
    selection-screen begin of block b1 with frame title text-001.
      parameters :   p_vbeln  like  vbak-vbeln obligatory.
      selection-screen skip.
      parameters :   p_fore   radiobutton group mode,
                     p_back   radiobutton group mode default 'X'.
    selection-screen end   of block b1.
    at selection-screen.
    Check Sales Order
      if not p_vbeln is initial.
        select single * from vbak
          where vbeln eq p_vbeln.
        if sy-subrc <> 0.
          message e499(sy) with 'Invalid Sales Order no.' p_vbeln.
        endif.
      endif.
    start-of-selecTION.
    Get Sales order items
      select vbeln posnr from vbap
        into table it_vbap
        where vbeln eq p_vbeln.
    Set BDC mode
      if p_back eq 'X'.
        p_mode = 'E'.
      else.
        p_mode = 'A'.
      endif.
    Process MD50 BDC
      LOOP AT IT_VBAP.
        perform bdc_dynpro      using 'SAPMM61X' '0160'.
        perform bdc_field       using 'BDC_CURSOR'  'RM61X-TRMPL'.
        perform bdc_field       using 'BDC_OKCODE'  '/00'.
        perform bdc_field       using 'RM61X-KDAUF'  IT_VBAP-VBELN.
        perform bdc_field       using 'RM61X-KDPOS'  IT_VBAP-POSNR.
        perform bdc_field       using 'RM61X-BANER'  '1'.
        perform bdc_field       using 'RM61X-LIFKZ'  '3'.
        perform bdc_field       using 'RM61X-PLMOD'  '3'.
        perform bdc_field       using 'RM61X-TRMPL'  '1'.
        perform bdc_dynpro      using 'SAPMSSY0' '0120'.
        perform bdc_field       using 'BDC_OKCODE'   '=XBAC'.
        CALL TRANSACTION 'MD50' USING BDCDATA MODE P_MODE.
        CLEAR BDCDATA.
        REFRESH BDCDATA.
      ENDLOOP.
    end-of-selection.
           Start new screen                                              *
    FORM BDC_DYNPRO USING PROGRAM DYNPRO.
      CLEAR BDCDATA.
      BDCDATA-PROGRAM  = PROGRAM.
      BDCDATA-DYNPRO   = DYNPRO.
      BDCDATA-DYNBEGIN = 'X'.
      APPEND BDCDATA.
    ENDFORM.
           Insert field                                                  *
    FORM BDC_FIELD USING FNAM FVAL.
      CLEAR BDCDATA.
      BDCDATA-FNAM = FNAM.
      BDCDATA-FVAL = FVAL.
      APPEND BDCDATA.
    ENDFORM.
    Ajay P. Nikte

  • Linkage of Sales Order with OPM Batch automatically through MRP run

    Hi Friends,
    Can anyone please suggest me of how the Linkage of Sales Order with OPM Batch can be created automatically after running OPM MRP.
    Thanks in advance.
    Thanks & Regards,
    Bharathram N.

    Dear Friend,
    Thanks for your update.
    I had the set ups already which you have specified. But I dont see in the action messages screen any sales order number for each action.
    My requirement is following..
    1. I will enter SO for an item called A.
    2. Run MRP.
    3. From Action Message Summary, I will release production batch.
    4. Now the batch been created should have the sales order number from which it came originally.
    Hence to achieve above, I need SO with MRP Link action message(backend or front end)..
    Hope the above scenario is clear to you..Plz let me know your thoughts..
    Thanks & Regards,
    Bharathram N.

  • MRP run for Material type

    Hi Gurus,
    I want to run MRP for particular material type say for all my raw materials or semi-finished.
    How it can be done?
    I have used to user exit in MD01, for running MRP for a particular MRP controller and also for MRP type like PD or VV etc.
    Srini

    Srini,
    in this same exit you can include the parameter for material type  "M61X0001" to able to select the materials based on a field like MRP type.
    In transaction SMOD you can check the documentation on this development.
    take help from your ABAP person.
    come back for further discussion.
    regards
    Ritesh

  • BOM Explosion in MRP runs for sub-contracting PO

    Hello Experts,
    We have sub- contracting Purchase order in business scenario.
    Subcontracting PO is required to be considered as demand for MRP. As I have checked PO is showing in MD04, after MRP run using transaction code
    MD02 subcontracting BOM not exploding.
    Sub contacting PO raised on “X” procurement type material, PR is required on BOM item “F” Procurement type 
    Please suggest what all special setting is required as master data & configuration data.
    Thanks in advance!!!

    Hi,
    In the header or parent material (the material that is being produced bu your subcontractor) you have to maintain the following data:
    Procurement type = F
    Special Proc Type = 30
    MRP Type = PD
    Lot Size, Minimum Lot Size, Rounding Value: Enter what is convinient for your business.
    Be sure you have a BOM (CS01)
    Create a Production version indicating the BOM (C223)
    Enter Selection Method 3 in the MRP4 view of the material master
    Create an Info Record (type Subcontracting).. (ME11)
    Create a Source List (ME01)
    Run the MRP and check MD04
    Kind Regards,
    Mariano

  • Open Purchase Orders not considered as requirement for MRP Run

    Hi ,
    We are facing a issue of Open Purchase orders not appeared in Stock requirements list and also it is not considered as requirement for MRP Run against reservation.
    As aresult for a reservation demand of 10 units we are ending with Open POs 10 units and a additional planned order 10 units.
    Material Type : ERSA
    MRP Type : PD (or VB)
    Lot size : EX (  HB if MRP Type is VB)
    Could you please throw some light to correct our settings to MRP to consider Open POs?
    Saravanan

    Can you check to see if there is a re-order point set up for this materia? That could be causing the problem too.

Maybe you are looking for

  • Will a apple superdrive support a macbook air running 10.5.8?

    Hi, I have recently purchased a macbook air 1.1 and the software it is running is 10.5.8 and in order to update further, I need to install a snow leopard dvd, however as I dont have a dvd drive I wondered if the superdrive would be compatible with my

  • Link in a report

    Hello, I want to create a link in a report with a html expression. But I don´t know who. I want to create a link to a page in the application. I don´t really know the syntax.. <a href="#f?p=' || &APP_ID. || ':4:' || &SESSION. || ">' || link|| '</a> T

  • Importing "24p Cinema" footage from Canon AVCHD camera ?

    Hi all, I have bought a CANON HFS10 Vixia AVCHD camera, I`ve made some footage using the "24p cinema" mode. When using media browser in PPCS5 and importing it, it still indicates (like in CS4) under "properties", that the footage is "29.97 fps", as C

  • My website won't display smartphone version on smartphone

    Hi All, As the title says, I've designed a website but it goes to the desktop version when I visit on my smartphone. FYI, I am not hosting this site with Business Catalyst - someone I know has his own server and he is hosting it for me. I have my own

  • Bank Infotype Subtype Not appearing in ESS

    Hello all,  I am working with a client who allows employees to create/maintain up to 3 bank accounts.  Our PA person has set up the following: Infotype 0009 with Subtype 0 as the MAIN bank Infotype 0009 with Subtype 1 as OTHER bank (can specify % or