Need info on BOM(Bill of Material)

Hi All,
Can some one tell me which table has info regarding BOM Number,BOM Description,BOM USAGE,LIST_PRICE and condition type details.
Thanks,
Udaya.
All helpful answers will be rewarded.

STKO - BOM Header
STPO - BOM Item
You can use the field STLTY to specify the type of BOM (Material BOM, Order BOM, WBS BOM etc.)
Also, look at:
MAST - Material Link To BOM
KDST - Sales Order Link To BOM
PRST - WBS Link To BOM

Similar Messages

  • How to create BOM(Bill Of Material) item data from flat file?

    I have two flat files one is BOM(Bill Of Material) header data and BOM item data. BOM header is already created, now I want to create BOM item data with reference to the header data. Is there any standard direct batch input method in LSMW or Is there any standard BAPI or Is there any standard BDC report program to do the task? CS01 is the TCode to create BOM.

    Hi,
    The DI program works for create step CS01 and not for CS02.
    Perhaps this ( adding items in header by Tx: CS02 ) could be achieved by a Recording step in LSMW.
    Best Regards, Murugesh

  • What is BOM(Bill Of Material) In Material Management(MM)

    Hi,
    i am part of Data Migration Project involving SAP And Peoplesoft Systems. We are doing Data Mapping Activity SAP as Target System And PeopleSoft as source system Now we are continuing with BOM (Bill Of Material) in MM Module. I have few doubts regarding Functionality of BOM Any one please Explain me what is Bill Of Material And What kind of Things it Deals WIth. Who Bills for the Material. Explain me some basic Things Abt BOM as i am a Technical Consultant i am totally Unaware of the Functionality Thanks in Advance.
    Thanks
    kiran.B

    Hi ,
          Bill of material (BOM)
    A list of all of the items that make up a product or assembly. The list has a formal structure and states the name, quantity, and unit of measure for each component. A comprehensive product life-cycle management solution should offer support for the following categories of BOM: feature and requirements structures, material BOM, document structures, equipment BOM, functional location BOM, sales order BOM, and work breakdown structure BOM. 
    Defining Bill of Materials
    Use
    Use the procedure to add and view Bill of Materials.
    Procedure
           1.      Choose Production ® Bill of Materials.
           2.      On the Product No. field, press TAB to choose the item, which you want to define as a parent item, from the list of the Item Master records. You can also choose New on Choose from List to create a new master record.
    If the parent item already has a Bill of Materials, the components are displayed. However, you can still create a new Bill of Materials for that parent item.
           3.      Select the relevant BOM type from the list as described in Bill of Materials Types.
    Choose the Production type to be able to include the product in the MRP run and to process standard production orders.
           4.      Enter data for the finished product and the components. For details, see Bill of Materials Window.
    If the BOM contains more than one component with the same serial or batch items; combine the items in a single component with the appropriate increased quantity. This will prevent possible errors in the batch or serial quantities.
           5.      Choose Add to save the Bill of Materials.
           6.      Choose OK.
    Sometimes production gives rise to waste. If, for example, you manufacture the table, this process gives rise to sawdust.
    You add sawdust as an additional component (by product). Enter a negative value in the Quantity field of the sawdust component.
    When you complete and confirm the production of the desk, this component is put into stock. On the contrary, the rest of the components are removed from stock when you complete and confirm production.
    Please reward if useful.

  • BOM (Bill of Material) Master Data  in Business Content?????

    Hi all,
    Any idea about standard business content data source which contains the BOM - bill of materials data.....
    Best Regards,
    Navin

    Hi Navin,
    Check these links:
    Re: Extract BOM data from R/3 to BW
    Re: Loading Bill of Material
    Bye
    Dinesh

  • Need help - Real time Bill of Material Cost

    Dear MM Experts,
    I would like to know how to generate real time Bill of Material Costs for FG products. As per the limited knowledge I have, this can be done only by running CK40N Cost Estimates. Is there any way to get this information for all FG-Products through tables without running the Standard Cost Estimate?
    Look forward to your feedback.
    Mihir

    Dear Jayaraman,
    If you want to give multiple materials as the input,then you can use T code CK40N,and
    execute the first 4 steps,and dont go for Marking & Release.
    That's 1.selection (we select the product for which we want to do costing),
    2.Structure Explosion.
    3.Costing(the system sums up the materials cost and operation cost and the other Cost).
    4.Analysis,Where here you will get the Standard Cost for multiple materials
    and you can analyse the same.
    Once if it's marked and released then Cost Rollup can't be carried out using CK40N or
    CK11N,so you have to reorganise the cost estimate using CKR1.
    Check & Revert back.
    Regards
    Mangalraj.S

  • Distributing Variant BOM (bills of material) with ALE

    Hi all,
    we need to distribute variant BOMs from one client to another in the same system. But in SAP standard it's not possible to distribute variant BOMs with ALE.
    Has anyone an idea, how we could manage it?
    Best regards!
    Heike

    Have you tried message type : MATERIALBOM_CREATEBOMGROUP ,but i think you need to create custom program.
    Anurag

  • Need info on Billing Outputs

    Hello,
    I need info abt billing Outputs - The language is maintained in Bill to party (Customer master), Its maintained in Condition record, It can be changed while creating the invoice.
    Now my question is, which of the above three cases has got highest priority.
    Could some one provide me some info on this?
    Regards,
    Krishna

    By default, we will maintain language in Bill-to-Party & also Condition record. But if required, it can be chaged at Invoicing level while taking output. Priority will be Bill-to-party, followed by Condition Record.
    Regards,
    Rajesh Banka

  • Bills of material[BOM]

    Dear all,
    hi, i have got a dought in bills of material, i shall be very much pleased if some one helps me out of this.
    using the transaction code CS01, i have created the 'BOM' for the material 'computer' giving the components as 'keypad' and 'CPU'. after creating the required thing i have saved the data.
    later on when i tried to creat a sales order using this data, the components are not getting displayed in the sales order.
    what i have to do to get the components displayed in the sales order.
    please do help me out.
    Regards,
    Sushmitha.

    Susmitha,
    below is whole process for sales BOM-
    Sales BOM Implementation 
    A bill of material (BOM) describes the different components that together create a product. A BOM for a bicycle, for example, consists of all the parts that make up the bicycle: the frame, the saddle, wheels, and so on.
    Process Flow
    When you enter the material number of a bill of materials that is relevant for sales order processing, the system displays the material that describes the whole bill of materials as a main item. The individual components are displayed as lower-level items.
    There are two ways to process a bill of materials in Sales. Once you have entered a bill of material in a sales order, the system runs pricing, inventory control, and delivery processing at:
    - Main item level if the material is assembled, or 
    - Component level if the material is not assembled
    The type of processing used by the system is determined by the item category group that you enter in the material master record for relevant materials.
    Processing at Main Item Level 
    If you want the system to carry out pricing, inventory control, and delivery processing at main item level, enter ERLA in the Item category group field of the Sales: sales org. 2 screen in the material master record of the finished product. This means that the components only function as text items and are not relevant for delivery. The following graphic shows how a bill of material is processed at main item level.
    Processing at Component Level
    If you want the system to carry out pricing, inventory control, and delivery processing at the component level, enter LUMF in the Item category group field of the Sales: sales org. 2 screen in the material master record of the finished product. In this case, only the components are relevant for delivery. During processing the system automatically creates a delivery group. The latest delivery date among all the components becomes the delivery date for the entire delivery group.
    REWARD IF U FINDS THIS AS USEFUL...
    Regds
    MM

  • I cannot purchess movies on my apple tv. i keep getting a message that says i need to update my billing info. i have done this and i still get the message. help help help

    i cannot purchusse movies on my apple tv. it keeps telling me that i need to update my billing info. i have done this and i keep recivimg the same message!!! help!!!

    You don't.  the ipad is not a backup/storage device.  it simply mirrors the selected content of your computer.  The sync is one way - computer to ipad.  The only exception is itunes purchases.
    Did you fail to maintain a backup copy of your computer?
    If so, not good.
    You may be able to purchase  a third party program, not supported by Apple, to get the other music.

  • PM - Equipment BOM VS Maintenance Bills of Material

    Hi,
    In Materials planning,  Using maintenance bills of material have  advantage , know that there's Equipment BOMs
    & Functional location BOMs.
    When & How to use the Functional Location BOM ?
    When & How to use Equipment BO?
    Can we use normal production BOM (CS01) replace all this equipment BOM / FL BOM?
    TQ.

    Hi,
    Production BOM will have the Materials in Header as well as in Item level. Even BOM usage will be defined as Production.
    In Equipment / FL BOM, BOM will be created against the Technical Objects. These BOMs will be used in Maintenance Orders. In these BOMs, components of the Equipments (For example, equipment will be motor. Components may be capacitor, rotor, casing, etc.,) will be mentioned with the qty.
    Based on the type of motor, components can be different type. So BOMs will be maintained by the MDM people. Maintenance Planner will create the Maintenance Order & BOM will enable him to select the right component (There may be different type of rotors in Material Master, but based on Motor type, rotor should be selected in Maintenance Order).
    As Maintenance Planner will not aware of the type of component, BOM will help him to select the right component.
    Regards,
    Maheswaran.

  • I need to change my billing info and set up a busi...

    I need to change my billing info and set up a business account.

    Hello matthew1405tallai,
    I have linked an article that will walk you through the process of updating your payment information:
    iTunes Store: Changing your payment information
    http://support.apple.com/kb/ht1918
    Thank you for contributing to Apple Support Communities.
    Cheers,
    BobbyD

  • Bill of Material (BOM) for any Material

    Dear all,
    I want to fetch the BOM Components for any material.
    can any body tell me the Flow of tables with link between them for finding the bom.
    Thans in advance
    Regards,
    Anshuman

    Use the FM
    CS_BOM_EXPL_MAT_V2 (BOM explosion for material) or
    CS_BOM_EXPLOSION (General BOM explosion)
    Hope this helps!!
    Regards,
    Prashant

  • Hide all the components in bill of material for all the transaction

    Hi experts
    I have requirement where my client does not want to share the bill of material details across the organisation. Hence they would not like to see bill of materials components details for particular set of materials.
    Also, when any material documents or any other related transctions are posted in those production order, they want that only authorized user should view those components of BOM.
    Please help me in this regards
    Let me know if my question is unclear.
    Thanks

    yes.. particular set means a group of materials but they do not have a common material group assigned to them in the material master.
    And as you mention, i need to do something in the mentioned transaction. How to do that..
    because there should not be any loop holes for any users to get the information to identify BOM.
    Regards

  • Production - Multiple Bills of Material for a FG Product

    Hi,
    In SAP B1 - It is not possible to create multiple Bills of Materials for a FG product.
    Is there any workaround to address this issue?
    At our location we have multiple alternative combinations of components which can be used to create the same FG product.
    One alternative is to create Special Production Orders (but with no BOM). Is there a better option?
    Regards
    Manish
    Edited by: Manish Chaturvedi on Apr 1, 2009 12:51 PM

    HI  Manish,
    Your Bill of material is dynamic so just try to solve this by alternative items(Raw Material). i hope it will work.
    But in SAP B1 standard there is no work arround. you have to change the BIll of material every time. or make one udf in the title level with the name version 1,2,3 ..... and save it in the system. and pick the BOM which you will needed at the time of Production.
    I hope it will solve your question.
    Ashish Gupte

  • Ship to Parties In Bill of Material

    Hi,
      I have a scenario where in I am using LUMF as the item category in the material master for my header material and then I have maintained the Sales Bill Of Material for the same material. Let this header material be Mat 1. and the item materails be Mat 2 and Mat 3.
      Once I use  the same material in the sales order, then I have the Sold to party (let it be 101).The same is the Ship to party at the Header Level. Here my requirement is that when I come to Item level, Once I change the Ship to party for Header material i.e., Mat 1 to 102 then i want the same to be applied to the sub items i.e., Mat 2 and Mat 3.
      Is there any standard way of doing this ? Please reply to me if I am missing any standard things and If I can achieve this through standard.
    Thanks in Advance,
    Rakesh Tummala.

    HI Anjaneyulu,
                Thanks for the reply. But the problem is I have many items (Many BOM's) in the sales order . I need this to be effective only for particular BOM combinations but not for all the items in the sales order. Any more solutions please?
    Thankyou,
    Rakesh Tummala.

Maybe you are looking for