Need suggestions for Sales Order ATP for Material STO in from other Plant

Our client does not want to stock inventory at either the DC or the Manufacturing Plant.  They receive a Sales Order at the DC and the ATP check is set up to check Stock at the DC (likely none); inbound Stock Transport Orders (likely none) and then resort to the Replenishment Lead time.
The Replenishment Lead time for externally procured materials (F) with Special Procurement key (STO it in from the manufacturing plant) is the Planned Delivery Time in the Material Master.  The problem is the Planned Delivery time is just the 5 days it takes to get the stock from the manufacturing plant to the DC.  If the Manufacturing plant has no inventory (which is very likely since we don't maintain PIRs to stock it prior) we will promise the customer delivery in 5 days which is much too soon.
We cannot inflate the Planned Delivery time to be the 5 days of transit plus the 30 days of total procurement and manufacturing time at the manufacturing plant because then the MRP signal will tell the manufacturing plant to buy and make much too soon.
They don't want to ship goods directly from the manufacturing plant; they must be shipped from the DC.
I realize that this is not a good business process but is there a solution for this?
Edited by: AnnHustis on Jan 21, 2012 6:26 PM
Edited by: AnnHustis on Jan 21, 2012 6:35 PM

Ann,
This is a common practice, and I don't think that the business process is unreasonable.
1.  Remove the special procurement key from the RWHS Material Master
2.  Change Material Master in the RWHS to X procurement.
3.  Set your RWHS Material Master 'Total Replenishment Lead time'
Next step assumes that the company codes are the same between RWHS and Manufacturing Plant.
4.  Create Purchase Info Record for the RWHS material, that points to the vendor of the Manufacturing plant
5.  Create quota arrangement in which 100 percent of the quota comes from the Manufacturing Plant Purchase Info Record, and is MRP relevant
6.  Insert a step after the RWHS MRP run where the Planned orders are immediately converted to Purchase requisitions.
Business process:
a.  Sales order is entered.  ATP checks RWHS stock and excess inbound.
b.  If inadequate supply, then ATP confirms to Total Replenishment Lead time (and not planned delivery time).
c.  MRP runs; creates a planned order for the shortage.
d.  New step in MRP job converts the Planned order to a Purchase req.  Purchase req is sourced via the quota arrangement
e.  Purchase Req requirement (Manufacturing plant) is offset by the Planned delivery time to accommodate transit duration.
f.  Purchase req demand now places a requirement on the Manufacturing plant, with dates and quantities that will support the Sales order in the RWHS.
g.  Convert the Purchase Req to a STO once the stock appears in the Manufacturing Plant.
Best Regards,
DB49

Similar Messages

  • Goods receipt for sales order (sample for inspection)

    Hi Experts
    Is it possible to enter goods receipt for a sales order?
    This process is required for collecting sample from customer for carryingout testing of the sample.
    Please suggest the doc types and process steps.
    warm regards
    ram

    Hi Lakshmipathi
    Thanks for your reply.
    This is a sample received from a client for carrying out analysis and furnishing the laboratory test results as a Quality certificate
    So, the sales order is for execution of service (Testing service).
    The sample to be received in ref with the sales order and test result to be delivered to customer.
    Please suggest the best possible process
    warm regards
    ram

  • Need to create service order in one system with SO from other sys

    Hi,
    i need to create a DTO program to copy service order from one system to other system. Both systems are SAP systems.
    My requirement is to create service order with same number as it was in the existing system.
    Service order type : SM03
    Now standard SAP automatically create a service order of type SM03 when i add repair qty within the repair tab of IRPA line within a RAS order.
    Can you please let me know if there is a way by which i can change the service order number while creating it from a RAS order??
    Thanks,
    Willban

    Hi!
    In the customizing, you have to set its numbering to
    external in the receiver system for the SM03 order type. And of course you have to set its range the same, as in the sender system. 
    It's working fine here.
    Regards
    Tamá

  • Requisitions for sale order stock

    Requisitions for sale order stock that are generated directly from the
    sales order are not passed to SRM but requisitions that are created
    manually for sales order stock are passed to SRM.
    Why is the sourcing of a requisition for sales order stock where the
    requisition was created directly from the sales order not supported?

    Hi,
    We need same requirement, we found only PR's with item category "5"(Third party ) created from sales are transfered to SRM.( It is hard coaded in ECC).
    Let us know if you are able to resolve your issue.
    Thank you
    Sreedhar Vetcha

  • Update KOMV-KBETR field for sales order and billing

    I would like to update the KOMV-KBETR (condition amount or percentage) under condition tab for both Sales order and billing.
    example:There are two condition types ZA00 and ZB00 and need to get the KBETR value from ZA00 and add it to KBETR value of ZB00 and update the sum in KBER value of ZB00.
    1. creation of sales order & billing.
    2. Change of sales order & billing.
    3. For single & multiple line items in both sales order & billing.
    4. during updation of price in the change mode of sales order & billing.
    5.When user click on Update button in the condition tab(i.e., when clicked on Carryout new pricing)
    I tried with the VOFM routine but as the routine is triggering multiple times the sum is calculated again and again.For that I set flags also.It is working for sales orders but for billing creation the field XKOMV-KBETR is cleared after this routine.
    So I would like to know are there any EXITS for this scenario or any one entountered the similiar issue which I am facing.

    Hi Brad,
       It is an Client requirement.So need to do the addition of that condition types.
    Can you please let me know the configuration point where we can do it and the condition type which we need to update the Rate/Amount value.ie., KOMV-KBETR is and Price list value and not the subtotal one.
    Thanks,
    Srilakshmi Lagisetty.

  • Steps for sales order to MRP Run

    Dear all,
    Could you please explain what are the steps to process after creating sale order to run MRP and delivery?
    Regards
    Rajasekaran

    Hi Rajaseshekhar,
    Following will be detailed end-to-end process steps.
                     Create Sales Order Entering Finished Goods Material
                     Master
    Auto Generate Alert(E-mail) to Production Planner
                    Create ‘Order BOM’ by Copying Finished Goods BOM (Sales
                     Order Item). Amend by deleting/adding Items in Order BOM at all levels
    Auto Generate Alert(E-mail) to Product Cost Controller
    Recalculate 'Sales Order Costing' to reflect changes to ‘Order BOM’
    Auto Generate Alert(E-mail) to Production
    Run Sales Order MRP
    Convert Planned Order to Production Order
    Capacity Leveling
    Release Production Order
    Pick Components (Picking List)
    Confirm Assembly Activities
    Post Goods Receipt (Production Order)
    Delivery Processing for Sales Order
    Create Invoice
    Hope ite helps,
    Jatin

  • Sales Orders Blocked For Delivery

    Hi,
    Do we have T-Code for Sales Orders Blocked For Delivery other than VA14L,Because Customer name is not there in VA14L list.
    Thanks,
    NAG

    Hi naga sudhir
    Go to T-code--VA14L
    In that  go to menu-SettingsLayout--Current/Choose
    In this layout u can choose fields what u want to appear in that row.
    Any quries revert back to me
    Regards
    Srinivas.

  • GATP/ATP Check for Different Order Types for same material

    Hi :
    I have a material code X for which 2 different type of Sales Order (Say A and B )needs to be created.
    For Sales Order Type A the atp check needs to be done in APO through GATP for material code X.
    For Sales Order Type B the atp check needs to be done in SAP R/3 ECC 6.0 through availabilty check functionality for same material code X.
    It is not possible to create seperate material codes to carry out atp/gatp check seperately in R/3 and in APO.
    In real time the atp and cumulative atp position should be same in R/3 and in APO.
    Please let me know solution for this issue.
    With Regards
    Ashish Gupta

    Hi Ashish,
    Can you share with us as to how you were able to solve this issue. I have a similar issue like yours and I am totally clueless as to what needs to be done..
    My scenario goes this way:
    I have to modify the Schedule line dates for a GATP material according to a newly created date which I calculate based on the Route Schedule id (VL51, VL52) and display the same in the Sales Order schedule line items.
    Also can I get a new set of schedule line dates from the APO system for a date which I calculate based on the Goods Issue date - VALW-AULWE in any exit using a FM or a BAPI?? so that I can get these dates and populate the same in the Sales Order Schedule line??
    Thanks in advance,
    Susanth

  • Block the Material at Item level in Sales Order automatically for delivery

    Hi!
    My business scenario needs a material to be Ckecked for Inspection after raising the Sales Order by thirdparty person. So, I need to block that particular material at Item level automatically for delivery and rest of the line items can get delivered. I can do this by selecting the reason for Block at Item level manually, but I want the system to get detemine this block. And one more thing is that there is NO Quality Management module for this. So, let me know what I need to configure for this effect.   Thank you.....

    hi,
    pl check the user exit " userexit_save_document_prepare" or "userexit_save_document".
    Take the help of your abaper to see if the logic written here can affect the item level block in the sales order for inspection. Create new reason for the item level block and have it triggered with this exit. Instead of hard coding which might require regular intervention of abaper for code changes for the business to be able to manage it, maintain a master data in the material master against some field with a key.
    now use that key to identify if these materials require to be blocked at the sales order level for inspection. To release this item again the user has to go in VA02 mode to release the block. Let this be done after the inspection of that material.
    regards
    sadhu kishore

  • Userexit to update sales order no for packaging material during PGI

    Hi,
    Scenario is like this:-
    1.Sales order will be created for material X
    2.Delivery will take place and packaging of material X will take place.
    3.The packaging material will come as a line item and we do PGI by picking the quantity.
    4.Now when we see the accounting document for PGI,we get the sales order reference for X.
    5.We are not getting the reference of Sales order no for packing material while seeing the accounting document in  PGI.
    6.Since the packing material is not maintained in Sales order thats why the sales order no is not getting updated in the accounting document.
    7.NOW I WANT TO UPDATE THE SALES ORDER FIELD FOR PACKING MATERIAL ALSO ONCE THE PGI IS TAKING PLACE.
    Can any one suggest me if there is any userexit to update the sales order field for accounting document of packing material once PGI happens.
    regards
    Somnath

    Hi,
    Since packging material is not sales order item so it can't be accounted in PGI packging material is aour internal stock and not sellable stock.
    Reward points if helps.
    Thanks & Regards
    Sasikanth.Ch

  • User exit in ATP Check for sales Order to trigger notification

    Hi All
    please let me  know is there any user exit after ATP check or in ATP check for sales order to trigger a notication mail.
    Regards
    Kishore

    Hi,
    User Exits For Availability Check are given below:-
    The user exits named here are planned for projects that are to be carried out in agreement with SAP development as they may only be used in consultation with SAP.
    USEREXIT_PLANT_SELECTION in program RV03VFZZ is an exception to this rule (see below).
    User exits in program FV45VFZZ
    USEREXIT_ADD_FIELD_TO_HEADER
    USEREXIT_ADD_FIELD_TO_LINE
    User exits in program FV45VFZY
    USEREXIT_DELIVERY_GROUPS
    USEREXIT_MVERF_INIT
    USEREXIT_QUOTA_KEY_VALUE
    User exits in program RV03VFZZ
    USEREXIT_AVAILABILITY_IN
    USEREXIT_AVAILABILITY_OUT
    USEREXIT_DARA_REFRESH
    USEREXIT_PLANT_SELECTION
    This user exit is used to adjust the flow during plant transfer. A list of permitted plants, where this material is created, is determined and checked in the standard R/3 delivery. A dialog box appears where you can select the plants. The user exits allow you to modify the plant table so that plant selection takes place in advance for every flagged selection and a dialog box becomes unnecessary.
    regards
    Vivek.

  • Error reading material cost estimate for sales order (KE292)

    Dear All,
    I have an issue with billing. we are posting july month transactions, the material cost is maintained through MR21. When releasing billing document for accounting we are getting error message like"Error reading the material cost estimate for sales order "11"
    Message no. KE292
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate item 000010 of sales order 11 by reading the corresponding product cost estimate.
    However, no product cost estimate could be found for this sales order item.
    The system accessed product costing for product AMLFP011011XX00P using costing key YB3 as defined in the
    CO-PA Customizing settings.
    System Response
    The system cannot process the document any further.
    Procedure
    Check your Customizing settings."
    We cross checked with other client as a current date and we ran cost estimate through CK40N with same material. and we posted entries. Here it is working fine. but in above process it is not working. Can you pls guide me where i missed.
    Regards,
    Nagaraju,

    Hi,
    When the Costing Key is assigned to the material types in the COPA customizing, then system expects Cost estimation when billing is released to Accounts.
    If you dont run cost estimation but update the material master through MR21, system will not accept as in the Costing key configuration you must have selected the Current Standard price field for the valuation.
    Hence, try to run cost estimation and then do releasing.
    Thanks & Regards
    Ravi Kumar

  • Planned material price in case of production order for sales order (MTO)

    Hi,
    In case of production orders created for sales order, the planned price for a component (BOM) material gets picked as per following:-
    1. If there is no entry in EBEW for the component (that is, there is no previous GR for the component) for that sales order, then plan price is picked up on the basis of planned costing variant.
    2. In case there is an entry for the component in EBEW (there has been a previous GR for the component with reference to the sale order) then the plan price for the component is taken from the EBEW table (first GR price) and system ignores the costing variant.
    The above is as per my observation. Please validate if this is correct or not.
    The requirement is that even if there has been a previous GR for the component (there is an existing entry in EBEW) the system should take the plan price on the basis of costing variant and not from the EBEW table.
    How can this be achieved? Is there a user exit that can force the system to read the costing variant before looking into the EBEW table?
    BR
    Abhi

    Hi Ajay,
    Yes i had considered it but I'm not sure If it will help.
    Because the main problem here is that system is ignoring the costing variant itself and instead picking the price from EBEW table. So changing the costing variant (validation variant) may not help.
    Moreover i don't want to valuate with my own strategy. I want the plan price to be equal to standard price of material from material master. Basically MBEW instead of EBEW.
    Any clues?
    BR
    Abhi

  • Valuated sales order stock for configured material

    Hi All!
    I have a small problem   : I created a new type of material (OMS2) - a configurable one, managed on quantity and value basis. I work with valuated sales order stock for configurable materials but the account in the purchase requisition is determined by means of event key GBB insted of event key BSX.
    Where is my error?
    Any idea would be appreciated.
    Florina C

    Hi
    I think you are talking about Special Stock "E"...ie) Sale Order Stock...
    If my understanding is correct then,
    If you go and see the Table T156....For the
    Movement Type: 101,
    Special stock Indicator : E,
    Qty. Updation Checked,
    Val. Updation Checked,
    Movement Indicator : Against PO,
    Consumption Indicator: Sales Order Stock.....combination....the transaction Event Key....GBB only has been Assigned....these  settings you cannot change...
    This linkage you can view in OLMW-----> Account Determination -
    > Acc. Determination W/O Wizard -
    >Account Grouping....also
    Reward if useful
    Regards
    S.Baskaran
    Edited by: baskaran srinivasan on Dec 20, 2007 12:18 PM

  • Need code for sales order create report using bapi's

    need code for sales order create report using bapi's

    Hi,
    Go through below link
    http://www.saptechies.com/bapi_salesorder_createfromdat2/
    <b>Reward points if it helps,</b>
    Satish

Maybe you are looking for

  • Render file reappears in time line

    I have found playback of one section (about 3 sec) my time line does not reflect the actual clips...the playback reverts to what i imagine is an old render file of a different clip. I notice the blue render bar above the new clips. a workaround is to

  • Order of streaming images in iPhoto on the iPad

    I would like to know if there is a way to set the order of the photos in photo stream using iPhoto on my iPad. It seems the default view is to have them go from oldest to newest. With a 1000 photos that is a lot of scrolling and why I would want to s

  • Optimal screen resolution for Windows XP

    I'm using Windows XP at times, and it was installed for me when I purchased the computer via MacMall. The screen resolution is sat at screen: 1440 x 900 Color 32 BPP. Is this the desirable setting? I have not change it, as I'm wary to experiment too

  • IOS5 download not working

    Hi I've got iphone 3gs.  When I connect phone to laptop (not a mac) and open up Itunes, it says IOS5 is available to download.  It takes 2 hrs to download, counts down from 2 hrs to 0 seconds, then doesn't say anything, the progress bar on itunes jus

  • Where is the Lightroom database?

    I wonder whether it is correct that I have the following folders in my D:/drive: D:/Adobe - Lightroom 1.0 - Adobe Photoshop Lightroom - documentation D:/ My Pictures - Lightroom - Backups - Lightroom CatalogPreviews.Irdata - Lightroom Metadata.Irdata