New Extractors GL with ECC 6.0

All,
Currently we have ECC 5.0 system and we have 0FI_GL_10 extractor providing us the reports based on P&L and Balance Sheet. The major issue with it is that it brings in 51 times the number of records because we have 16 periods and 3 currencies.
We are planning on upgrading ECC system in near future. We want to have our GL base reports coming out of the new extractors. I have heard that the new extractors make it much better with ECC 6.0. We have our blance sheet and Detailed P&L reports coming out of current extractor.
Can anyone who has implemented new extractor help on explaining which new extractor can best replace this functionality?
Thanks in advance.

Hi,
Go through the links
http://help.sap.com/saphelp_nw70/helpdata/en/e2/f16940c3c7bf49e10000000a1550b0/frameset.htm
http://help.sap.com/saphelp_erp60_sp/helpdata/en/29/830e405c538f5ce10000000a155106/frameset.htm
http://help.sap.com/saphelp_nw70/helpdata/en/e6/f16940c3c7bf49e10000000a1550b0/frameset.htm
Re: New GL cubes 0FIGL_V10, 0FIGL_V11
Note 1070629 - FAQs: New General Ledger Migration
Cost Elements:Cost Element ( KSTAR ) should be available in the extract structure ( FAGL_EXTSTRUCT_LEAD ) of 0FI_GL_10.Append the structure to get cost element, activate , uncheck the hidden tab.
Features of the Extractor
Extraction method: F1 (function module (complete interface))
Extractor: FAGL_GET_TT_DATA_LEAD
Extraction structure: FAGL_EXTSTRUCT_LEAD
If you include your own fields in the totals table of the new General Ledger using transaction FAGL_GINS, these fields are not included in the extraction automatically. You first have to include them under the same name in an APPEND to extraction structure FAGL_EXTSTRUCT_LEAD. The fields of the APPEND structure are then filled automatically.
Santosh

Similar Messages

  • Does the new macbook pro 15inch come with ecc memory?

    Exactly as the title says, does the new macbook pro the sandybridge ones come with ecc memory?

    No.
    2 - 204-pin PC-10600 (1333 MHz) DDR3 SO-DIMM Slots.

  • Advantages-New usage Options of ECC 6.0 with regard to PM module -reg

    Dear Friends,
    Can any one let me know  the advantages and new usage options available with ECC 6.0 Version  with regard to SAP-PM module .
    How  can it be more explored to address business process over 4.7 ee
    earliest reply is highly appreciated
    regards,
    MADHU KIRAN

    hi
    kindly refer the following link
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/43/4d212fde9657bfe10000000a155369/Chap%2016%20PM%20Plant%20Maintenance.pdf
    regards
    thyagarajan

  • SAP SRM 7.0 with ECC EHP 4 components to execute scenario

    Hi All,
    I am new to SAP SRM 7.0.Could you please let me know that what are all the components needs to be in place to execute the technical scenarios and business scenarios.I had an hands on experience on SAP SRM 5.0 with ECC 6.0 backend.
    Some where i read that there are lot of configuration  changes when we integrate SRM 7 with ECC EHP 4.Do we need to have PI 7  for executing Centralized contract and plan driven procurement scenario?Please guide me to have some exposure towards higher version.Thank you in advance.
    Best Regards,
    praveen

    Hello,
    You can refer the INSTALLATION AND UPGRADE INFORMATION , Master guides etc maintained at the below mentioned location which will answer all your query's here.
    Goto URL http://service.sap.com/srm-inst and then navigate to SAP SRM --> SAP SRM Server 7.0 .
    Best Regards,
    Rahul

  • SRM 5.0 as an Add on with ECC 6.0

    Even i have the same question on how we would manage the distibution model when the SRM System is installed as an add on with ECC. Since being on the same client here are some of the Questions. I have also opened a new thread on this.
    1.) How would the distribution model be distributed when on the same client?
    2.) How would the Documents flow between two different systems?
    3.) In an SUS-MM scenario, how would this be handled when installed on the same client?
    4.) How would material and vendor replication facilitated?
    Any thoughts would be highly appreciated !!
    Thanks,
    Sundeep

    Hi Sundeep,
    I have answered for vendor replication here :
    One Client Solution
    For product category, material and material type replication, this is same process through activation of relevant objects in table mdsv_ctrl_opt_a
    Then you have to trigger the replication through mds_load_cockpit
    For SUS, you have to select SUS_ONE (instead of EBP_ONE) in table bbp_backend_dest
    That all what i know so far
    Kind regards,
    Yann

  • Kanban issue - Setting for new Kanban functionality in ECC 6.0

    Hi, I am facing a problem while recieving stock from a production order. The system does not create a transfer requirement or a TO.
    Let me give you a brief background.
    This is a new functionality introduced in ECC 6.0 for working with kanban in WM.
    Supply area is created for WM location.
    Control cycle is created for material, supply area. Warehouse, storage type and Bin is maintained in control cycle record. When the GR is done for production order material is recieved in this bin.
    1) Now when the Kanban is set empty a production order is automatically created.
    2) Once the production order is confirmed the material automatically shows up in the bin.
    A material document is created which shows IM movement type 101 and WM movement type 103. Also in material document Immediate auto TO checkmark is blank.
    3) PROBLEM - System does not create a TR or a TO. the material automatically shows up in the Bin. How can we enable an auto TR and TO creation.
    Following are the settings which I have already checked:
    1) In IMG, WM movement type 103 has auto TO indicator set.
    2) IM-WM interface for 102 movement type and 103 movement type is maintained.
    The main problem is: Although the material document displays WM movement type 103 and the stock lies in WM bin, System never created a Transfer requirement or a Transfer order.
    I would really appreciate if anyone can help me in this.
    Thanks

    Hello,
    I am not sure about your settings, please refer below sap link
    [Kanban Replenishment |http://help.sap.com/saphelp_47x200/helpdata/en/95/e81fa4f57011d194aa0000e83dcfd4/content.htm]
    Regards
    Pradeep Kumar

  • No Business Partner generated for new employee transfer from ECC to SRM

    Hi All,
    I am working on SRM 5.0 with ECC 6.0 backend. The HR structure is replicated from ECC using ALE, message type:HRMD_ABA.
    When I am trying to replicate a new employee from ECC to SRM, I run the O-insert first, then the S-insert and then the P-insert using PFAL transaction.
    The Org structure was already in place in SRM, so it just adds the new position to it by A003 relation. The S-insert generated idoc shows status as '53' in both ECC and SRT with the relation A003, B007 and A008. But, when I check the table HRP1001, the A008 entry is missing. Due to this, no CP is generated for this position and also no business partner is generated for this user.
    When I run the P-insert for this employee, the idoc is posted in ECC. But, the status of the idoc in SRT is '52' and the message shown is "The Parameter Country Has Not been Entered During Naming Format Check" Message No. R11206.
    I checked the Name Format for this employee, and it is maintained as 2.
    Where am I going wrong? Why is no CP person generated even when the idoc status is 53? Why isn't the new employee getting transferred to SRM server?
    I have checked the SAP notes related to HR-ECC Org transfer, but I am unable to figure out the reason for this problem.
    Could anyone help me out in this?
    Regards,
    Ancy

    Maintained the name format tables (SA13)on ECC and SRM side.

  • Compatible versions with ECC 6.0

    Hi,
    We are planning the upgrade of our SAP installations:
    - R3 4.6C, 4.7 --> ECC 6.0
    - BW 3.1, 3.5 --> BI 7.0 (NW2004s)
    - SRM 2.0 --> SRM 5.0
    - CRM 4.0 --> CRM 5.0
    Of course we can't do all the upgrades at the same time, so, in order to decide in which order we make the upgrades, we must be sure that the new versions will be compatible with the old ones.
    In the quicklink "service.sap.com/r3-plug-in", menu option "SAP R/3 plugin --> Integration of SAP R/3 / Enterprise, ERP and SAP Components" there are some tables where we can analyze the compatibility between all the BW, SRM and CRM versions and R3 versions prior to ECC 6.0 (4.6C, 4.7, ECC 5.0), according to the plug-in version. From 2005 there seems to be a strategy change in the integration interfaces:
    "SAP ECC 6.0 and subsequent releases will automatically contain all integration interfaces that so far have been contained in the SAP R/3 Plug-In and that ensured the technical integration with other SAP Components."
    As I understand, ECC 6.0 will automatically contain all the integration interfaces and there will be no more R/3 Plug-In versions. How can I check the compatibility between ECC 6.0 and the other BW, SRM and CRM versions? In the quicklink there are integration matrix available for R3 Enterprise and ECC 5.0 but there is no information for ECC 6.0. Are the versions compatible with ECC 5.0 too compatible with ECC 6.0? As ECC 6.0 seems to "automatically contain all integration interfaces that so far have been contained in the SAP R/3 Plug-In", does it mean that the integration matrix available for ECC 5.0 is too valid for ECC 6.0?
    We have found a specific note (931020 "SRM connection to an ERP 2005 (ECC 600) backend") for the integration between ECC 6.0 and SRM but we didn't find any note regarding BW or CRM.
    How can we check wich versions (BW, SRM, CRM) are compatible with ECC 6.0? Can we use the integration matrix available for ECC 5.0 in the quicklink "service.sap.com/r3-plug-in", are there specific notes like the one available form SRM (931020)?
    We need to be sure as soon as possible that after the upgrade of our R3 4.6C and 4.7 versions to ECC 6.0 they will be compatible with our actual BW (3.1, 3.5), SRM (2.0) and CRM (4.0) versions.
    Thanks in advance!!

    to followed unicode rules.
    ABAP Development under Unicode
    Prior to Unicode the length of a character was exactly one byte, allowing implicit typecasts or memory-layout oriented programming. With Unicode this situation has changed: One character is no longer one byte, so that additional specifications have to be added to define the unit of measure for implicit or explicit references to (the length of) characters.
    Character-like data in ABAP are always represented with the UTF-16 - standard (also used in Java or other development tools like Microsoft's Visual Basic); but this format is not related to the encoding of the underlying database. 
    A Unicode-enabled ABAP program (UP) is a program in which all Unicode checks are effective. Such a program returns the same results in a non-Unicode system (NUS) as in a Unicode system (US). In order to perform the relevant syntax checks, you must activate the Unicode flag in the screens of the program and class attributes.
    In a US, you can only execute programs for which the Unicode flag is set. In future, the Unicode flag must be set for all SAP programs to enable them to run on a US. If the Unicode flag is set for a program, the syntax is checked and the program executed according to the rules described in this document, regardless of whether the system is a US or a NUS. From now on, the Unicode flag must be set for all new programs and classes that are created.
    If the Unicode flag is not set, a program can only be executed in an NUS. The syntactical and semantic changes described below do not apply to such programs. However, you can use all language extensions that have been introduced in the process of the conversion to Unicode.
    As a result of the modifications and restrictions associated with the Unicode flag, programs are executed in both Unicode and non-Unicode systems with the same semantics to a large degree. In rare cases, however, differences may occur. Programs that are designed to run on both systems therefore need to be tested on both platforms.
    Other Changes 
    1.     Bit Statements
    2.     Adding Field Sequences
    3.     Loops with VARY and VARYING
    4.     Creating Subroutines
    5.     Saving Programs
    6.     Assigning Types for GET/SET PARAMETER
    7.     Unreachable Statements
    8.     Function Modules with Incorrect Parameter Names
    1. Bit Statements
    Previously, the system checked for the bit statements SET BIT i OF f [TO g] and GET BIT i OF f [INTO g]whether the field f is character-type; X fields, X strings, and flat structures are usually regarded as character-type. For Unicode programs this is no longer useful, because the types X and XSTRING no longer count as character-type and the bit by bit access to character-type fields or structures is no longer platform-independent. Therefore, with these operations in Unicode programs, the field f must be type X or XSTRING.
    For the bit mask operations f O x, f Z x, and f M x you could previously use all number-type and hence all character-type types for the left operand f. In Unicode programs, the f operand must now be type X or XSTRING.
    2. Adding Field Sequences
    When adding field sequences, restrictions apply to the following statements in Unicode:
    ADD n1 THEN n2 UNTIL nz [ ACCORDING TO sel ] GIVING m ...
    ADD n1 THEN n2 UNTIL nz TO m [ RANGE str ].
    1.     The operands n1, n2, and nz must be type-compatible with one another.
    2.     The distance between nz and n1 must be an integral multiple of the distance between n2 and n1.
    3.     A syntax or runtime error occurs if the fields n1, n2, and nz are not in a structure. This structure must be recognizable statically or its valid area must be marked explicitly using the RANGE addition.
    4.     At runtime, the system ensures that the RANGE area is not left.
    ADD n1 FROM i1 GIVING m [ RANGE str ].
    1.     Field n1 must be within the structure. The structure must be explicitly defined using the RANGE addition if it is not recognizable statically.
    2.     For this variant, the system also checks at runtime whether n1 and the addressed values are within the structure.
    3. Loops
    Loops with the VARY or VARYING addition are also problematic in Unicode, since a type-a access to memory contents cannot be ensured and memory can be overwritten inadvertently.
    DO ... VARYING f FROM f1 NEXT f2.
    For this statement, the fields f, f1, and f2 must be type-compatible with each other. To prevent memory contents being overwritten, a RANGE for valid accesses is introduced implicitly or explicitly for the following statements:
    DO ... TIMES VARYING f FROM f1 NEXT f2 [ RANGE f3 ].
    WHILE ... VARY f FROM f1 NEXT f2       [ RANGE f3 ].
    A syntax or runtime error is caused if f1 or f2 are not included in f3. If the RANGE addition is missing, it is defined implicitly from FROM f1 NEXT f2 as follows:
    1.     If both f1 and f2 are statically recognizable components of the same structure, the valid RANGE area is defined from the smallest structure that comprises f1 and f2.
    2.     A syntax error is triggered if it is recognizable statically that f1 and f2 are not part of the same structure.
    3.     A valid area must be defined explicitly using the RANGE addition if the connection between f1 and f2 is not recognizable statically.
    If you specify a deep structure as the RANGE addition, the system checks for every loop pass that there are no field references, object references, tables, or strings in the area read.
    4. Creating Subroutines
    When automatically generating subroutines using the statement GENERATE SUBROUTINE POOL itab NAME name, the generated program inherits the content of the Unicode flag of the generating program.
    5. Saving Programs
    When automatically generating programs using the statement INSERT REPORT prog FROM itab, default values are set for the TRDIR entry as before. Amongst other things, this statement has the new addition UNICODE ENABLING uc, with which the Unicode flag of the inserted report receives the value of uc. If this addition is missing, the following applies:
    1.     A Unicode program creates a Unicode program.
    2.     A non-Unicode program in turn creates a non-Unicode program.
    3.     A non-Unicode program becomes a Unicode program if it is overwritten by a Unicode program.
    4.     A Unicode program remains a Unicode program if it is overwritten by a non-Unicode program.
    6. Assigning Types for GET/SET PARAMETER
    For the statements GET PARAMETER ID pid FIELD f and GET PARAMETER ID pid FIELD f, f must be character-type. You can use the EXPORT and IMPORT statements for storing non-character-type fields and structures.
    7. Unreachable Statements
    In Unicode programs, unreachable statements cause a syntax error. In non-Unicode programs, there was previously only a syntax warning.
    8. Function Modules with Incorrect Parameter Names
    In Unicode programs, calling a function module, whose parameter names are specified statically as a literal or constant, causes an exception that can be handled if an incorrect parameter name was specified. This only applies to function modules that are not called via Remote Function Call. In non-Unicode programs, an incorrect name was previously ignored.

  • Is it possible to use XSS 2005 on EP7 with ECC 5.0 ?

    Hi all,
    I have an ECC5.0 and I want to upgrade my EP6 to EP7. I'm using XSS 2004 on EP6 and I want to use XSS 2005 on that EP7. I've seen on different notes that it is not possible to use XSS 2005 with ECC 5.0 as a back end.
    Is there any solution to connect XSS 2005 to ECC 5.0 ??? Please I really need a positive answer
    Thanks,

    Hi Joseph,
    I have gone thru same problem in my last project but my situation was little different.
    Actually Business Package of ESS/MSS has two components:
    1. Portal Objects (iView, Roles, Pages etc )
    2. XSS - The Java WebDynpro Code (which in turn contain 3 component SAP_ESS, SAP_MSS, PUSIC_GP)
    Also the prerequisite is that we should have SAP_HR (will give HR functionalities in ECC) and EA_HR (contains RFC, structure required for XSS).
    Now the restriction imposed by SAP is that SAP_HR, EA_HR and XSS should be on same version and patch level. Make sense also. However there are situation where you can deviate from above restriction. (I will explain the same below).
    So what you can do is to install the Portal objects(iView, Roles, Pages etc ) on EP 7.0 (can be installed on EP 6.0 and federated to EP 7.0), install XSS 2004 on EP6.0 (having JAVA 640) and connect the same with ECC 5.0.
    You are looking to install Portal Objects, XSS 2005 on EP 7.0 and connect with ECC 5.0. This is possible but NOT recommended. Actually XSS 2005 WebDynpro will look for enhanced structures, RFC in ECC, which XSS will not find and will throw dumps (sometime java and sometime SAP dumps). You can fix the problem by manually installing the new functionality but believe me it is VERY cumbersome task and will make your system highly unstable.
    What I would advise you is to look into your requirement once again and educate your end client with the problem and take appropriate action accordingly.
    Do let me know if you need any further help.     
    Cheers,
    AB

  • Compatability of ESS/MSS ERP 2004 with ECC 6.0

    Hi,
    I was using ERP 2004 ESS/MSS on EP 7.0 SP 8. My backend was ECC 5.0.
    Recently we upgraded our backend to ECC 6.0. But after the upgradation the ESS/MSS packege is not working on the portal. Its showing the below error.
      <b>com.sapportals.portal.prt.core.broker.PortalApplicationNotFoundException: Could not find portal application com.sap.portal.appdesigner.api_framework
        at com.sapportals.portal.prt.core.broker.PortalApplicationItem.prepare(PortalApplicationItem.java(Compiled Code))
        at com.sapportals.portal.prt.core.broker.PortalApplicationItem.prepare(PortalApplicationItem.java(Compiled Code))
        at com.sapportals.portal.prt.core.broker.ExternalApplicationItem.prepare(ExternalApplicationItem.java:180)
        at com.sapportals.portal.prt.core.broker.SAPJ2EEApplicationItem.prepare(SAPJ2EEApplicationItem.java:232)
        at com.sapportals.portal.prt.core.broker.SAPJ2EEApplicationItem.start(SAPJ2EEApplicationItem.java:192)
        ... 8 more</b>
    Is ERP 2004 ESS/MSS comapatbile with ECC 6.0 or there are any steps to be performed after upgradation from ECC 5.0 to ECC 6.0?
    Any suggestions??
    Regards
    Debasish

    The new Business Packages meant for ECC 6.0 are based on Webdynpro for Java ....which have a different and better look and feel ....these are based on a RoadMap(Floor Plan Manager)  which let the employees/managers to go from Overview(dislay the data),edit (to change) ,Review(to review) and Confirmation (To Confirm)....
    Hope it helps.
    Shikhil

  • Clariffications in MM SUS Scenario with ECC 6.0 backend and SRM 5.0

    Dear Team,
    We are implementing MM SUS Scenario with ECC 6.0 backend and SRM 5.0
    We need to following clarifications
    1 Once we create ASN in SUS, how to cancel the ASN. We are not able to see cancel button for ASNs
    2 When we create GRN in ECC against the inbound delivery and perform Return Delivery, this Return Delivery is getting updated in SUS. But the ASN status is not changing to canceled. We are not able to perform new ASN for this. Also invoice is being allowed for these ASNs. How to control the same.
    Request your inputs please
    Regards,
    Ravi

    HI can you tell me how you get it solve?
    thanks in advance.

  • BC compatibility with ECC

    Hi,
    Could any one get me the SAP document for compatibility of Business Connector with ECC.
    Their help is highly appreciated.
    Regards,
    Gopinath Addepalli.

    hi,
    there's no new version/update of BC for ECC
    so you can only use the same interfaces
    as with R/3 (idoc, RFC)
    Regards,
    michal

  • Implementing MSS in EP 6.0 with ECC 6.0 as back end.

    hi,
        I am implementing MSS in EP with ECC 6.0. what are the configuration should I have to do in ECC 6.0 to implement MSS. Please provide me details as to what are the steps for configurations.
    Thanks & Regards,
    Ramesh

    Hi Ramesh
    Implementation steps for MSS:
    1 - Deploy PCUI .sca to your J2EE Engine via SDM
    2 - Deploy MSS .sca to your J2EE Engine via SDM
    3 - Make sure you have a SLD available, or you can enable the local SLD on your Portal J2EE instance 
    via http://localhost:port/sld and login as Administrator or J2EE_ADMIN and run the auto import.
    4 - Define your ECC server in the SLD as a new WAS ABAP instance and define all the settings via the Wizard.
    5 - Use the WebDynpro explorer to configure the Jco destinations to use the new WAS ABAP instance in your SLD
    6 - Define the system definitions as per the MSS documentation for alias SAP_WebDynpro_XSS and
    others
    7 - Assign Employee role from PCD to your Portal user and assign the relevant profile to your backend user in ECC.
    8 - Use transaction pa30 to add a communications infotype entry to map your username to an employee in the hierarchy.
    MSS 60.1 config instructions:
    https://www2.iviewstudio.com/support_content/_17011/BP_MSS_ERP04_601_EN.pdf
    Hope this helps.
    Regards
    Yoga
    PS:Reward points for useful answers

  • Supplier Registration in ESourcing  ( Vendor integration with ECC or MDM )

    Hi All,
      SAP ESourcing has the functionality of Supplier Registration.  As per the functionality, Supplier will provide all the required information in the registration form. The Supplier form will go for approval to the Buyer / Purchaser. Once approved, the supplier will considered for RFx event. My questions are :
    1 :Is there OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system  with ECC so that system will automatically create new vendor in ECC.
    2 : Is there OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system with MDM (Master Data Management system ) .
    Please through some pointer on this ?
    Regards,
    Kalandi

    Hi Kalandi
    For your first question, if you deploy standard integration package provided by SAP  for e sourcing-ECC integration, you can replicate approved e sourcing vendor to ECC using  standard script (I think script name is  "Publish to ECC" ).
    In case you prefer a custom option,you can write a customized script to get a flat file (.CSV) download of  e sourcing vendor whcih can be used to update ECC
    As far as OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system with MDM (Master Data Management system ) is concerned, there is no standard solution provided by SAP but again since it is possible to get a CSV export of vendor field, it can be used to update MDM as well
    Hope this helps!
    Regards
    Mudit Saini
    Edited by: Mudit_UCB on Jun 28, 2011 1:20 PM

  • When I login to my bank, I get the message: 403 - Forbidden: Access is denied. You do not have permission to view this directory or page using the credentials that you supplied. Have new MacBook Air with Yosemite. How to solve this problem?

    When I try to login to the website of my bank, I get the following error message:
    403 - Forbidden: Access is denied.
    You do not have permission to view this directory or page using the credentials that you supplied.
    I have a new MacBook Air with OS Yosemite installed.
    What is the problem and how can I solve it?

    Some websites require a special client certficate for access. If you don't have that certficate, you'll have to contact the site operator to find out how to get one.
    Sometimes the problem is caused by a web server that is configured to request an optional client certificate. Safari treats the request as mandatory. In that case, other browsers such as Firefox and Chrome may be able to connect to the site, because they ignore the request.
    The first time you were prompted for a certificate, you may have clicked through a dialog that requested access to the Apple certificate in your keychain that is used to secure the iMessage service. In that case, you may be able to regain access to the site in Safari by doing as follows.
    Back up all data.
    Double-click anywhere in the line below on this page to select it:
    com.apple.idms.appleid.prd
    Copy the selected text to the Clipboard by pressing the key combination command-C.
    Launch the Keychain Access application in any of the following ways:
    ☞ Enter the first few letters of its name into a Spotlight search. Select it in the results (it should be at the top.)
    ☞ In the Finder, select Go ▹ Utilities from the menu bar, or press the key combination shift-command-U. The application is in the folder that opens.
    ☞ Open LaunchPad. Click Utilities, then Keychain Access in the icon grid.
    Paste into the search field in the Keychain Access window by clicking in it and pressing the key combination command-V. An item may appear in the list of keychain items. The Name will begin with string you searched for, and the Kind will be "certificate."
    Delete the item by selecting it and pressing the delete key. It will be recreated automatically the next time you launch the Messages or FaceTime application.
    The next time you visit a site that prompts for an optional client certificate, cancel out of the prompt. You may have to do this several times before the server stops asking.
    Credit for this idea to Christian Braukmueller of SAP.

Maybe you are looking for