Number convention for Secondary cost element

Hi,
Anyone can guide me how to check the number convention for secondary cost element being set up in SAP?
thank you

Hi,
The best way so far i have experienced is:
Start the numbering with two digits from your company code and then cost element category and then the numerics.  If you have too many Cost elements, better to have 10 Digit numbering system.
Assumption: You have multiple company codes
For Example you company code is TP01
Activity Type Cost element:
TP43000001 - Labour Hours
TP43000002 - Machine hours
and so on
This is easy for identifying either from the consultant point of view of the end user point of view
Best Regards
Surya

Similar Messages

  • OKB9 for secondary cost element

    Hello all,
    Does anyone know a way to rederive cost center for secondary cost element posting? We have a need to re-derive the cost center of a production order at the time of settlement. I tried OKB9 and OKC9 and it didn't work.
    Any help will be greatly appreciated.
    Thanks,
    Cassandra

    Hi,
    I am not sure if i understand your scenario. However, if you want to control the settlement to Cost Center on Cost Elements, you can use the Source Structure which will be assigned in the settlement parameters for the Production Order.
    Kind Regards
    Umapathi G

  • Table For Secondary Cost Elements

    Dear Folks,
                  Please Help me for getting details (TABLES)  of Secondary Cost elements Actual Line items Date wise and Cost Center wise
    Thanks in advance
    Regaards
    ASHOK K

    check this might help you..
    Tables to be refered for secondary cost element.
    Regards
    Kumar

  • Posting for secondary cost element

    Hi All,
    After running KSU5 (cost centre settlement, we have small balance in secondary balance. Could you please advise how we can post entries between secondary cost element.
    Regards
    Deepak

    KSU5 is used for cost center assessments (settlements are a type of allocation for internal order/WBS elements/networks/etc). Once you define the rules for the allocation, SAP will follow those rules and post the appropriate entries. You cannot post manually/directly to secondary cost elements. SAP cannot get "out of balance" during an allocation. When you say "small blance in secondary balance", I am not sure what you mean. Are you saying there is a financial balance remaining in the Sender cost center? More info is need to properly address the issue.

  • Tables For Secondary Cost Elements

    Dear Folks,
    Please Help me for getting details (TABLES) of Secondary Cost elements Actual Line items Date wise and Cost Center wise
    Thanks in advance
    Regaards
    ASHOK K

    Hi Ashok,
    some important Costing tables
    COEP  - Line Items (by Period) 
    COEJ  - Line Items (by Fiscal year 
    COKA  - Control Data for Cost center wise
    COEJT - Line Items for Prices  
    COEPT - Line Items for Prices
    CSKA Cost Elements (Data Dependent on Chart of Accounts)
    CSKB Cost Elements (Data Dependent on Controlling Area)
    CSKS - Cost Center Master Data
    CSLA Activity Master
    COBK  - Document Header       
    COEJL - Line Items for Activity 
    COEJR - Line Items for SKF
    COEPL - Line Items for Activity
    COEPR - Line Items for SKF  
    COKL  - Control Data for Activity
    COKP  - Control Data for Primary
    COKR  - Control Data for Statics
    COKS  - Control Data for Secondary 
    AUSP - Characteristic Values       
    A132 - Price per Cost Center             
    A136 - Price per Controlling Area      
    A137 - Price per Country / Region        
    COSC - CO Objects: Assignment of Original 
    CSSK - Cost Center / Cost Element       
    CSSL - Cost Center / Activity Type      
    KAPS - CO Period Locks -  
    regards
    Gokul

  • Reports for display secondary cost element

    Dear SAP consultant
    After run settlement cycles we going to display reports for secondary
    cost elements but it is return zero balance, i know that when i am trying
    to drill down it will get the whole data. but it is not practical because
    the huge amount of data that transferred to this report. In the other
    hand it will display the data with +/- sign which is not be helpful.
    Is there any report to display the result from settlement run on the
    secondary cost elements.
    << Moderator message - Everyone's problem is important. But the answers in the forum are provided by volunteers. Please do not ask for help quickly. >>
    Edited by: Rob Burbank on Jan 12, 2011 4:12 PM

    hi
    goto S_SL0_21000007 > select as per your requirement > give Cost Element Group for Sec CE and execute
    Kkumar

  • Secondary Cost Element data in CO-PA

    Hi,
    I have a doubt in CO-PA, regarding the flow of secondary cost element costs.
    I want to report the costs flowing through the Secondary cost elements (activity costs) in Profitability Analysis.
    Can someone advise me on process to do this.
    Thanks in Advance,
    Safi

    Hi,
    Please define a group for Secondary cost elements or identify the secondary cost elements and define an Assesment cycle using KUU5 in that go to Extras-Cycles-Create and define the cycle and attach segment in cycle with appropriate sender and receivers and then execute the cycle to see the values flown into COPA
    Regards
    Balaji

  • Secondary cost element report

    Hi experts,
    i just looking for secondary cost element reports ?
    regards,
    Sanju M S

    HI,
    Go to T.code : S_SL0_21000007 and,
    Go to bellow link
    http://wiki.sdn.sap.com/wiki/display/PLM/SettlementandCostElementReports
    http://help.sap.com/saphelp_46c/helpdata/en/a9/ab76ce414111d182b10000e829fbfe/content.htm
    Thanks,
    Raviteja

  • In controlling secondary cost element cost is considerble for financial rep

    in controlling secondary cost element cost is it considerble for financial reporting requirment. In controlling for pm orders based on planning in kp26 they are booking man hours  activity price. when at time of confirm of the order planning converted to actual.
    Client is giving activity price based on primary cost, when we plan the activity price It will double booking what we incured in primary cost. let me clarify for financial report requirment can we consider secondary cost or not

    Hi,
    Secondory cost is a re allocation of Primary cost. It should not be considered if you are considering primary cost. Secondary cost is used for analysis and should not be confused with Primary cost
    Ex. Cost gets collected to cost centers, The activity is a carrier which carries cost to Process/ production order. So that doent mean that the cost is gernerated twice once you book the financial and second when you acutally allocate the cost.
    In controlling we allocate the cost in a more meaningful way to get the required analysis which will support the decision.
    So both the cost should not be considered
    This may be useful
    Regards
    Shantanu

  • For financial report requirment can we consider secondary cost element cost

    For financial reporting requirment can we consider secondary cost element cost to profit and loss a/c

    In our senario _ cost is booking cost centers and revenues booking concern profit centers .
    for Financial reporting requirment can I include secondary cost to profit and loss a/c
    what is the impact on the report
    exp: salary booking in primary cost,than Per hour man hour cost computed by costing dept for allocate to concern department
    it is cost center activity price we specify in kp26 at the time of pm order confirm it will confim the activity quandity price will from planning area only,  so for salaries in primary g/ls already captured, if we consider secondary it may double booking
    srinivasa reddy

  • Using Primay cost element instead of secondary cost element for expenses tr

    Hai  SAP Guru
    WE are developer company, so when a land is acquired we create the project under business development with nomenclature "BD/LG/01" with  corporate  profit centre linked to it (as we are not sure if the project takes of due to various issues.)
    When the project commences we create another project structure with nomenclature "BE/LG/01u201D  with new profit centre.
    So when we transfer the cost lying in u201C BD u201D  project to u201C BE u201C project by giving settlement profile, the cost get transferred using secondary cost element. when we see the statement through CJI3 report the cost would have get transferred but when we
    see the report through Finance Profit Centre report the cost would have not transferred.
    So in order to get the report in profit centre, can we use primary cost element instead of secondary cost element, if we use the primary cost element what the consequence and what care needs to be taken for settlement.
    Thanks.

    Thanks.

  • Secondary cost element........

    Hi,
    Is it necessary to create number of activities = to number of secondary cost element.
    or
    only one cost element is enough for all activities for posting to cost center.
    Regards,
    Imran

    Dear,
    Secondary Cost Element
    When cost element carries cost with in CO, then they are called secondary cost element.
    Example.... - Take Product Costing
    On manufacture of the goods the cost of the above product (production order) is arrived at accumulating material cost + operational cost + overheads (%), additive cost if any.
    The cost of operation is accumulated in cost centre be it production / production service / service cost centres, while booking FI entries.
    Those operational cost has to be allocated to production order based on operational activities carried on and its cost involved in it. Those operation activities in CO are termed as activity types and has to link the same in KP26 with rates and cost centre (ie., sender cost centre and receiver production order).
    In order to find the production order cost, the allocation of cost from sender cost centre to production order for the operational activities carried on and its cost associated with it, have to be loaded, hence in CO the cost centre allocate that portion of operational cost to production order, and this cost is carried by a cost element (since there are no FI involvement and entries are flowing within CO by crediting sender cost centre and debiting receiver production order a cost element has to be created.... say "Operational Cost - Activity" the entry will be
    Operational Cost - Activity (Production Order) Dr Rs.XX
    To Operational Cost - Activity (Cost Centre) Cr Rs.XX
    The entries are with in CO. And the cost element created is secondary since it does not has an link with GL Account in FI correspondingly.
    In CO the production order and cost centre are co object including but not limited to.
    and further notes and configs see below link.
    http://www.copacustomhelp.state.pa.us/infopak/nav/finance/controlling/301/index.htm
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Secondary cost element in KB11N

    Hello.
    I'm not allowed to use a secondary cost element in a reposting.
    What do I have to modify?
    Thank You

    Hello,
    You cannot use secondary cost element. You need to use primary only.
    Please go through the following:
    DISTRIBUTION =========== Distribution was created for transfer primary costs from a sender cost center to receiving controlling objects. During distribution, only cost centers or business process can be used as sender. A distribution receiver can be a cost center, WBS element, internal order, cost object, or a business process. You can restrict the number of receiver categories in customizing. Primary Postings (such as, energy costs) are collected on a cost center, and allocated at the end of the period by means of the user-defined key. You can only distribute primary costs. During this process, the original cost element remains the same. Line items are posted for the sender as well as for the receiver, enabling the allocation to be recorded exactly. You can reverse distributions as often as required. You use the Cycle-Segment method to define sender-receiver relationships. PERIODIC REPOSTING ================= Differences between periodic reposting and distribution are due to information content and performance. For periodic reposting, no separate credit record is written on the sender for the cost element in the summary report. Instead, the totals record for the cost element is reduced on the debit side, which means that the original debit amount can no longer be checked there (u201Cunclean creditu201D). However, during distribution, the system writes a totals record for the credit (u201Cclean creditu201D). The information on the receiver is the same for periodic reposting and distribution (u201Cclean debitu201D). Compared with periodic reposting, during distribution, the system also updates the partner in the totals record for the sender. This means that the partner can be displayed in the information system on the totals record level. As fewer totals records are written during periodic reposting, performance is better than during distribution. ASSESSMENT =========== Assessment was created to transfer primary and secondary costs from a sender cost center to receiving controlling objects. During assessment, cost center or business processes can be used as senders. The receivers for an assessment can be a cost center, WBS element, internal order, cost object, or a business process. You can restrict the number of receiver categories in customizing. Primary and secondary posting are allocated at the end of the period by the user-defined key. During assessment, the original cost elements are summarized into assessment cost elements (secondary cost element category = 42). As the system writes fewer total records, the assessment has a better performance than periodic reposting and distribution. The system does not display the original cost elements in the receivers. Therefore, assessment is useful if the cost drilldown for the receiver is not important. Similar to distribution, the partner is updated in the totals record during distribution You can reverse assessments as often as required. You use the Cycle-Segment method to define sender-receiver relationships. Regards, Ravi

  • Actual cost splitting - secondary cost element

    Hi All,
    My knowledge on actual cost splitting for cost centers are limited.
    Basically i am trying to use actual activity price calculation. In my splitting structure i have two different cost element group for two activities and i am using splitting rule 30 i.e., activity quantity. The system does the splitting perfectly based on the cost elements groups specified in splitting structure, but i am facing a strange problem. i have also allocated costs from different cost center to the prod cost center used for price calculation through assessment. But i havent used the secondary cost element in none of the cost element group for activities, but still the system is taking the cost of the allocated costs in secordary cost elements and allocates to both the activities in 50:50, which i am able to see in splitting showing as "division of activity-independed actual costs".
    Can anybody please let me know, is this the way it works or something has gone wrong.
    Thanks
    With Best Regards,
    GJ

    Portion of  http://help.sap.com/saphelp_47x200/helpdata/en/5b/d2200743c611d182b30000e829fbfe/frameset.htm
    ".....the actual costs are distributed on the activity types according to splitting rules. If you have not defined any splitting rules for a cost center, the R/3 System splits actual costs based on the <b>equivalence numbers</b> for the activity types. "
    Your case could construed to be a missing splitting rule, because the cost element group is missing the secondary cost element within the splitting structure. As a result, the system may use the equivalence number of the activity types and distribute.
    Check the <b>equivalence number</b> of your two activities, it  may be 1 and 1 for both activities; hence those costs getting divided equally.  I suspect nothing has gone wrong.

  • Line item report on secondary cost element (cat - 21)

    Hi Gurus,
    Secondary cost element with category 21 is used for internat settlement from order to wbs or wbs to cost center. But can we see line item report on this cost element. Or we cannot see any line item report on this cost element. it is just used for internal settlement purpose.
    Please clear this doubt. thank you

    Hi Mohit,
    I hope you can have line item report @ order and WBS element stright away...
    for orders use: KOB1 transaction code for actual line items, where you have the facility of entering CE or CE group to find the vaues related to particular cost elements in the order. If you are flexible with CEs related to 21, give there otherwise create a CE group specific to 21 category and enter the group and find the results you want.
    same way for WBS elements/projects: we have transaction code CJI3 for actual line items, here also we can enter CE or CE groups
    Not only for actual line items, we have the option of viewing plan line items, budget line items, and commitment line items @ both order and WBS level with different transaction codes other than mentioned above, like KOB2, KOB3, CJI4, CJI2 etc
    I hope it helps a lot if I understand your query right
    Regards..
    Jose

Maybe you are looking for

  • SharePoint 2013 Blog Site not showing current navigation(Left Navigation)

    I have created a blog site but blog pages are not showing my current navigation, it has got its own left navigation, Can i show left (current) navigation? I am trying to find the page layout being used for blog items but unable to find.

  • My Adobe Acrobat will no longer let me save PDF documents

    I own the Adobe Creative Suite 4 that comes with Adobe Acrobat, which for years has allowed me to save PDF documents. Last month I decided to test Adobe Acrobat Pro for 30 days to see how well it converted PDF documents, and have since decided agains

  • Why the Sales Order is still being processed?

    Hi, This process is done: Sales Order (RE - Return) --> Return Delivery (Goods receipt) --> Billing Sold-to party wrongly entered in the Sales Order, so they wanted to close the Sales Order. They did Cancellation for Billing (VF11) and reversed the G

  • "NOQUEUE: reject: RCPT from ... : Recipient address rejected" etc error

    I've got the following error in my SL Server 10.6.4 mail server log: Sep 4 17:22:06 myservername postfix/smtpd[74713]: connect from asmtpout028.mac.com[17.148.16.103] Sep 4 17:22:06 myservername postfix/smtpd[74713]: NOQUEUE: reject: RCPT from asmtpo

  • Forgot username 7 password for Isqlplus session

    I had logged in isqlplus few months back. And now i forgot the username and password for the same.I am not able to login. Please help me to change to a new user name and password or to know the older one; Thanks