Secondary cost element........

Hi,
Is it necessary to create number of activities = to number of secondary cost element.
or
only one cost element is enough for all activities for posting to cost center.
Regards,
Imran

Dear,
Secondary Cost Element
When cost element carries cost with in CO, then they are called secondary cost element.
Example.... - Take Product Costing
On manufacture of the goods the cost of the above product (production order) is arrived at accumulating material cost + operational cost + overheads (%), additive cost if any.
The cost of operation is accumulated in cost centre be it production / production service / service cost centres, while booking FI entries.
Those operational cost has to be allocated to production order based on operational activities carried on and its cost involved in it. Those operation activities in CO are termed as activity types and has to link the same in KP26 with rates and cost centre (ie., sender cost centre and receiver production order).
In order to find the production order cost, the allocation of cost from sender cost centre to production order for the operational activities carried on and its cost associated with it, have to be loaded, hence in CO the cost centre allocate that portion of operational cost to production order, and this cost is carried by a cost element (since there are no FI involvement and entries are flowing within CO by crediting sender cost centre and debiting receiver production order a cost element has to be created.... say "Operational Cost - Activity" the entry will be
Operational Cost - Activity (Production Order) Dr Rs.XX
To Operational Cost - Activity (Cost Centre) Cr Rs.XX
The entries are with in CO. And the cost element created is secondary since it does not has an link with GL Account in FI correspondingly.
In CO the production order and cost centre are co object including but not limited to.
and further notes and configs see below link.
http://www.copacustomhelp.state.pa.us/infopak/nav/finance/controlling/301/index.htm
Hope clear to you.
Regards,
R.Brahmankar

Similar Messages

  • Line item report on secondary cost element (cat - 21)

    Hi Gurus,
    Secondary cost element with category 21 is used for internat settlement from order to wbs or wbs to cost center. But can we see line item report on this cost element. Or we cannot see any line item report on this cost element. it is just used for internal settlement purpose.
    Please clear this doubt. thank you

    Hi Mohit,
    I hope you can have line item report @ order and WBS element stright away...
    for orders use: KOB1 transaction code for actual line items, where you have the facility of entering CE or CE group to find the vaues related to particular cost elements in the order. If you are flexible with CEs related to 21, give there otherwise create a CE group specific to 21 category and enter the group and find the results you want.
    same way for WBS elements/projects: we have transaction code CJI3 for actual line items, here also we can enter CE or CE groups
    Not only for actual line items, we have the option of viewing plan line items, budget line items, and commitment line items @ both order and WBS level with different transaction codes other than mentioned above, like KOB2, KOB3, CJI4, CJI2 etc
    I hope it helps a lot if I understand your query right
    Regards..
    Jose

  • Secondary Cost Element Values doesn't display in Profit Center Report

    Hi everyone,
    I'm having a problem with our Profit Center plan/actual/variance reports wherein it doesn't display the postings I made to the Secondary cost element when I executed an assessment cycle (KSU5). I already set in the configuration that all postings to be done in the cost centers, should have a parallel posting to the profit center assigned to it. I can see the postings in my cost center reports, but not in my profit center report. Could I have missed out on any procedure to enable the secondary cost element parallel posting in my profit centers? Any help would be appreciated. Thanks!

    it might be the configuration of the library or some parameter in the report (record type should be 0 and 2 for actual values, where 2 stands for distributed values and 1 and 3 for planned values)
    but it also might be that the reconciliation is done between different CC and same PC
    - check your CC organisation asignment
    - if sender cost center and receiver cost center have tha same PC it is probably the reason
    - I had that problem my self and didn't solve it
    cheers
    matej

  • Display of secondary cost elements in KSB1

    Hi
    One of our customers wants to delete the view of Secondary Costs to a particular cost center in Actual View of Cost Line Items (through T Code KSB1). The costs flow to the secondary cost elements based on the activity type carried out. The system is calculating the total cost and then deducting the secondary costs again from the total cost as a result of which the overall costs are in the negative. The customer wants to display the total costs only and not the flow to the secondary cost elements, even, though the data is posted for the current fiscal year for the said cost elements.
    Some transaction data already exists for the secondary cost element. We tried to changed the settings in allocation cost settings to Allocation Type 4, Manual Entry, no allocation for a future date, but still the costs are flowing to the cost element. Pls suggest a way out.
    Would assign points if the problem is sorted.
    regards
    Sanil Bhandari

    Solved

  • Difference between type of Secondary Cost Element Category?

    Hi,
    I checked the system, and during the secondary cost element (CE) creation, I can select some of the CE category as follows:
    21 Internal settlement
    31 Order/project results analysis
    41 Overheads
    42 Assessment
    43 Internal activity allocation
    50 Project-related incoming orders: Sales
    51 Project-related incoming orders: Other
    52 Project-related incoming orders: Costs
    61 Earned value
    My question, what kind of report that I can read entries with these kind of CE?
    Reason: I want to check what has been posted to these secondary CE.
    Or
    Could anyone explain the use of above-mentioned CE category in brief?
    Thanks.

    Cost element that is used to allocate costs for internal activities.
    Most often used categories are
    21 Internal settlement
    (When ever an order is settled e.g internal order settling to cost center through this type of cost elements)
    31 Order/project results analysis
    (WIP in production orders are calculated and posted using this category)
    41 Overheads
    (Used in costing sheet to do an overhead allocation)
    42 Assessment
    (whenever cost is allocated between cost centers through allocation method - Assessment)
    43 Internal activity allocation
    (found in production orders when a routing activity is confimed the charge goes to the production order through this cost element)

  • Reports for display secondary cost element

    Dear SAP consultant
    After run settlement cycles we going to display reports for secondary
    cost elements but it is return zero balance, i know that when i am trying
    to drill down it will get the whole data. but it is not practical because
    the huge amount of data that transferred to this report. In the other
    hand it will display the data with +/- sign which is not be helpful.
    Is there any report to display the result from settlement run on the
    secondary cost elements.
    << Moderator message - Everyone's problem is important. But the answers in the forum are provided by volunteers. Please do not ask for help quickly. >>
    Edited by: Rob Burbank on Jan 12, 2011 4:12 PM

    hi
    goto S_SL0_21000007 > select as per your requirement > give Cost Element Group for Sec CE and execute
    Kkumar

  • In controlling secondary cost element cost is considerble for financial rep

    in controlling secondary cost element cost is it considerble for financial reporting requirment. In controlling for pm orders based on planning in kp26 they are booking man hours  activity price. when at time of confirm of the order planning converted to actual.
    Client is giving activity price based on primary cost, when we plan the activity price It will double booking what we incured in primary cost. let me clarify for financial report requirment can we consider secondary cost or not

    Hi,
    Secondory cost is a re allocation of Primary cost. It should not be considered if you are considering primary cost. Secondary cost is used for analysis and should not be confused with Primary cost
    Ex. Cost gets collected to cost centers, The activity is a carrier which carries cost to Process/ production order. So that doent mean that the cost is gernerated twice once you book the financial and second when you acutally allocate the cost.
    In controlling we allocate the cost in a more meaningful way to get the required analysis which will support the decision.
    So both the cost should not be considered
    This may be useful
    Regards
    Shantanu

  • Secondary Cost Element data in CO-PA

    Hi,
    I have a doubt in CO-PA, regarding the flow of secondary cost element costs.
    I want to report the costs flowing through the Secondary cost elements (activity costs) in Profitability Analysis.
    Can someone advise me on process to do this.
    Thanks in Advance,
    Safi

    Hi,
    Please define a group for Secondary cost elements or identify the secondary cost elements and define an Assesment cycle using KUU5 in that go to Extras-Cycles-Create and define the cycle and attach segment in cycle with appropriate sender and receivers and then execute the cycle to see the values flown into COPA
    Regards
    Balaji

  • Update Functional Area on Secondary Cost Element

    Hi gurus,
    I'm trying to update Functional Area on Secondary Cost Element. I've created a LSMW to make it but when I run the bacthinput the system give me a message in order to inform me that this changes might need a lot of time because there are several internal changes to do.
    The problem is that no functional area is updating, and I'm trying with just an item and the system needs a lot of time to update just one Funcional Area, more than a hour!
    So, I don't know if some of you already had the same problem or is a problem with performance of system, because in Develop System I didn't have any issue to update this information.
    Is there any form to update this information than LSMS or Individual transaction?
    Kr
    Jorge

    Hi Jorge
    I was trying to change it manually in KA02 and there are tasks the systems does before confirming.
    This is the root cause.
    "Field changes to field Functional Area lead to
    complicated tests of the data involved, which
    may take some time. Do you really want to change
    the field online? "
    There is an option to change it in background.
    Regards

  • Report on Secondary cost elements

    Hi all,
    Can any one tell me how to see line item report on the secondary cost element that are used in asessment cyles and also how to display the documents that are generated for these secondary cost elements after running the asessment cycles.
    Thanks

    Hi MKR,
    I am assuming that your assessment cycles are tied to cost center as senders, so even though you don't look by assessment cycle you could use transaction S_ALR_87013611. Set the selection criteria for the Controlling Area, month year/period combination and version you need, leave the cost center fields blank and enter as cost element the secondary cost element(s) of your cycles. After executed, double click on the total actual cost amount associated individually to each cost element and an additional screen would be displayed, from where you can select the option to display actual line items report. The list of line items is displayed. If you have the ALV functionality additional columns can be added in the display to segregate the information based, transaction type, origin, etc.
    Hope it helps , if it does please award points.
    Thanks,
    GG

  • For financial report requirment can we consider secondary cost element cost

    For financial reporting requirment can we consider secondary cost element cost to profit and loss a/c

    In our senario _ cost is booking cost centers and revenues booking concern profit centers .
    for Financial reporting requirment can I include secondary cost to profit and loss a/c
    what is the impact on the report
    exp: salary booking in primary cost,than Per hour man hour cost computed by costing dept for allocate to concern department
    it is cost center activity price we specify in kp26 at the time of pm order confirm it will confim the activity quandity price will from planning area only,  so for salaries in primary g/ls already captured, if we consider secondary it may double booking
    srinivasa reddy

  • Creation of secondary cost element

    Hai SAP Gurus
    Could any one please let me now how to create secondary cost element in SPRO.
    Thanks.

    You can create secondary cost elements in KA06. There is no pre-requisite of creating GL accounts.
    Cost elements describe the origin of costs. Cost elements are defined as either
    primary and secondary. Primary cost elements arise through the consumption of
    production factors that are sourced externally. Secondary cost elements arise
    through the consumption of production factors that are provided internally.
    The Chart of accounts contains all general ledger (GL) accounts belonging to
    Financial Accounting.
    Expenses and Revenue accounts in Financial Accounting correspond to
    Primary Cost and Revenue Elements respectively.
    Secondary Cost Elements are used exclusively in CO to identify internal cost
    Flows such as assessments or settlements. They do not have corresponding
    General ledger accounts in FI and are defined in CO only.
    When you create a cost element, you must assign a cost element category. This
    Assignment determines the transactions for which you can use the cost element.
    You can create cost elements automatically by making default settings that are used
    To specify the cost element, or cost element interval that you wish to create.
    You can create cost elements manually in bulk with the help of LSMW or BDC.
    Primary Cost Element Categories:
    1 - Primary costs / cost-reducing revenues
    3 - Accrual / deferral per surcharge
    4 - Accrual / deferral per debit = actual
    11 - Revenus
    12 - Sales Discounts
    22 - External Settlement
    Secondary Cost Element Categories:
    21 - Internal Settlement
    31 - Order / Project results analysis
    41 - Overhead Rates
    42 - Assessment
    43 - Internal activity allocation
    50 - Project related incoming orders: Sales
    51 - Project related incoming orders: Others
    52 - Project related incoming orders: Costs
    61 - Earned Value
    Regards,
    Ravi

  • Instance where Secondary Cost Element Linked to GL also

    Hello Gurus,
    What are the instances where secondary cost element is a GL also.
    Regards
    Rohit

    Dear Rohit,
    You will not find any instances were secondary cost element is linked to GL.
    Secondary cost element can be use within co. Linking cost element to GL means integration between FI and CO.
    That can be possible only for General Ledger (FI) and Primary cost element (CO)
    Rupesh Kumar Singh

  • Posting for secondary cost element

    Hi All,
    After running KSU5 (cost centre settlement, we have small balance in secondary balance. Could you please advise how we can post entries between secondary cost element.
    Regards
    Deepak

    KSU5 is used for cost center assessments (settlements are a type of allocation for internal order/WBS elements/networks/etc). Once you define the rules for the allocation, SAP will follow those rules and post the appropriate entries. You cannot post manually/directly to secondary cost elements. SAP cannot get "out of balance" during an allocation. When you say "small blance in secondary balance", I am not sure what you mean. Are you saying there is a financial balance remaining in the Sender cost center? More info is need to properly address the issue.

  • OKB9 for secondary cost element

    Hello all,
    Does anyone know a way to rederive cost center for secondary cost element posting? We have a need to re-derive the cost center of a production order at the time of settlement. I tried OKB9 and OKC9 and it didn't work.
    Any help will be greatly appreciated.
    Thanks,
    Cassandra

    Hi,
    I am not sure if i understand your scenario. However, if you want to control the settlement to Cost Center on Cost Elements, you can use the Source Structure which will be assigned in the settlement parameters for the Production Order.
    Kind Regards
    Umapathi G

  • Number convention for Secondary cost element

    Hi,
    Anyone can guide me how to check the number convention for secondary cost element being set up in SAP?
    thank you

    Hi,
    The best way so far i have experienced is:
    Start the numbering with two digits from your company code and then cost element category and then the numerics.  If you have too many Cost elements, better to have 10 Digit numbering system.
    Assumption: You have multiple company codes
    For Example you company code is TP01
    Activity Type Cost element:
    TP43000001 - Labour Hours
    TP43000002 - Machine hours
    and so on
    This is easy for identifying either from the consultant point of view of the end user point of view
    Best Regards
    Surya

Maybe you are looking for

  • How do I unmute the audio on a clip in Imovie trailer.

    I am using a Mac Book Pro brand new 2014.  I am using the latest version of Imovie and I am creating a trailer.  I have tried to un-mute the clip from the volume icon on the clip and through the modify menu.  I have when into the "adjust" menu but th

  • RFC LOOKUP Problem

    Error while lookup Plain exception:Problem when calling an adapter by using communication channel LookupChannel (Party: , Service: R/3 System Service, Object ID:xxxxxxxxxxxxxxxxxx) Check whether the communication channel exists in the Integration Dir

  • Default outgoing email address for multiple emails

    How do I set up one of my many email addresses on my I-phone to be the default outgoing email for all of them?

  • Proxy to File transfer using the GZIP file transfer

    Hi Sdn, I have requirement where I need to convert the file to GZIP extension and keep it at Application layer. Can any one please help me how to convet the file to GZIP in file adaptor? Thanks Naresh N

  • Need help with barcodes

    Can you please help me with the solution for bar codes in xml publisher? If possible step by step. The demo "bill of lading" is broken in the following page. http://www.oracle.com/technology/products/applications/publishing/index.html Thanks in advan