OM17 for Product Location

Hi All,
I am running product Location consistency in OM17. In the results I got few inconsistencies. In the result system does not give product/location name instead it gives pegging area ID. for E.g. "IVLIV57s0h}X0800Av4pk0". I would like to know how can I find for which product/location there is inconsistency from pegging area? Is there any table where this relationship is maintained?
Regards,
Harshil Desai

Thanks a lot every one for all your help but I am not able to get details for pegging area that I am getting in OM17.
I tried in /sapapo/pegkey
/sapapo/ac05
/sapapo/om16 but no entries found.
OM17 results giving details,
for E.g.
Planning Version:000
Message Text: Entry only in Live Cache
Pegging Area: IVX0r0q30VNX0800Av4pTG
Return Code: 0
Regards,
Harshil Desai

Similar Messages

  • APO Constrained and unconstrained Forecast for a Product, Location

    Hi Gurus,
    Please let me know the simple ways to get the constrained and unconstrained forecast for a product / location. I am new to APO, so please help me to send the detailed information. I would really appreciate it.
    Thanks in advance for your wonderful help.
    Best regards
    Nagarajan

    Nagarjan,
    When you run the fortecast in DP you consider the sales history. Now, this sales history is actual sales. While forecasting all that is considered are these values of the past and not the present and future capability to actually meet this forecast. Its just plain statistically generated numbers. Now suppose based on your sales you generate the following forecastL
    Jan 1000
    Feb 1000
    Mar 1500
    This is then released to SNP. Use the TX /sapapo/mc90. The idea is now to EVALUATE THIS FORECAST AGAINST OUR CAPABILITY TO SUPPLY, IN OTEHR WORDS CONTRAINTS!
    After releasing to SNP you can do a finite planning taking into consideration constraints such as Capacity, vendor capabilities, procurement constraints etc... Its almost always the case that the exact numbers cannot be met and thats whgy we do all the replanninga and levelling and rescheduling etc etc...
    In SNP you can run an unconstrained pla., You can then level this using SNP capacity levelling. Remmeber this process may span certain levels like DC- > FG Plant -> SFG Plant etc...
    After considering supply capcbilities you can come up with a REVISED forecast:
    Jan: 800
    Feb: 1000
    Mar: 1600
    Note that for March you are able to take an increased volume. You can now release this plan to DP back again to tell it that this is the demand I can meet and this is what should be planned. This can be done using Tx /SAPAPO/SNPFCST or /SAPAPO/LCOUT
    Hope this clarifies.
    Abhi

  • CONTRIBUTION MARGIN (PLAN) CALCULATION FOR PRODUCTS (PER UNIT, LOCATION WIS

    Requirement of a Report to calculate Contribution Margin (Plan) - For Calculating Contribution Margin.
    2 Key figures need to be arrived (per unit/cv of product, locationwise) are Net Sales Realisation (NSR) and Total Variable Cost (TVC).
    a) To arrive at NSR (Plan), all the combinations of upcoming discounts and Free Goods schemes which are going to be in force for the coming month for a product, need to be adjusted in the Net Sales Value to get NSR value per unit of Product (SKU / CV), locationwise
    The NSR is the result of adjusting Discounts, Excise and Schemes to the List price of a product.
    b) TVC is the result of adding Total Material Cost(TMC) + [(LabourPower) conversion cost]Freight.
    Calculation of material cost takes into account the LCC (Landed cost chart) price of the materials, which is a future price.
    The Total variable Manufacturing Cost (TMC+Conversion cost) can be calculated using Costing Run (CK40N), using LCC price.
    In COPA Reporting the values like List price, Discounts, Excise, Free Goods Schemes and freight flows from Billing Documents (SD) because of condition types mapping in to value fields in COPA, which are components for calculating NSR (Actual), based on the Actual sales.
    We want to understand how do the Plan values (List price, Discounts, Excise, Free Goods Schemes and freight) per unit of Product, location wise, flow to the Value fields in COPA Planning,  so that the Contribution Margin (Plan) can be calculated for each product per unit , location wise.
    Contribution Margin = NSR u2013 Total Variable Cost.

    Then you hit a bug in your version of Oracle. You may want to investigate and update to a newer version. I get the following error when trying to register your schema in 10.2.0.1
    ORA-31154: invalid XML document
    ORA-19202: Error occurred in XML processing
    LSX-00246: invalid QNAME "***_voting_flag"
    This error is consistent with Spy 2008 as well (I didn't try Xerces but I've got two that agree so it's good for me).

  • How to CIF product locations for many parts from R/3  to SCM SPP

    We are trying to CIF product locations of 2500 parts. We are able to take only 10 parts
    in one transfer. Can anyone help us with this. How do we transfer all these parts in a single attempt.

    Thanks for your answer.
    In the product selection screen in CFM1, there are limited no of rows that can be copied in one go. The next set of rows have to be added by scrolling down.This becomes very manual if we have to do it for 2500 parts.
    Can u suggest a better way of doing this activity?

  • New Document Series for different locations for Production Orders

    Hi Experts,
    I have came across a scenario where we have to setup different Document Series for Different Locations. Actually the Company is having 2 units . First one is the factory itself and the second one is Subcontracting Unit to which the company sends the job work order . But there it wishes to track the productions processes and the Stock tracking Warehouse Wise for
    this Second unit also . As Such I have created 2 locations and one warehouse for (RM,SFG,FG) for both the units.
    The obvious requirement here is to maintain different Document Series for Productions orders for both the units .
    Please guide me about how to overcome this scenario.
    Thanks and Regards,
    Pooja Singh.

    Hi Pooja,
    Yes. You can maintain different document series for production Order or any documents depending upon your business scenario.  Let's say, you need to maintain Production orderu2019s of job work and sub contracting.
    You can define this under Administration>System Initialization> Document numbering.
    Select Production orders--> let say Factory first number 1, last number 199999, select current period indicator and update. Similarly for the subcontracting, in the name field, "work order", first number as 110001 or the way you desire, and then the last number.
    Reards,
    Senthil Maruthappan.

  • Tlanes not being created for all locations for one product

    Hello Experts - I need some advice on the following situation:
    We have a set of products where tlanes are only being created for 3 locations out of many.  What would cause the tlanes to not be generated for all locations if all master data elements are present?  We have a valid inforec, mrp views, etc.  I can't see anything different with the 3 locations that are working correctly.
    Any help would be much appreciated.
    Thanks!

    Thank you for your resopnse:
    To answer your questions, yes, we have done all of these things and the tlanes are still not being created.  We have been using SPP for 6 months and this is the first time we've seen this problem.  Do you have any other suggestions or is there any more information I can provide you that would be helpful in solving.
    Thanks in advance for your advice.
    AAF1999

  • Office 2013 - Excel 2013 - "This action is only valid for products that are currently installed."

    I had Office 2010 starter and Outlook 2010 installed.  I recently purchased the Office 2013 click to run version (paid monthly subscription) and installed Office 2013.  After installing 2013 I noticed that when I opened up Excel files they would
    still open in Office 2010.  I uninstalled Office Starter 2010 and uninstalled Outlook 2010.
    I then manually fixed the file associations for Word, PowerPoint, Publisher and such, however I could not manually fix the Excel file association. 
    Excel documents show the correct icon however when I double click on them the following error appears "This action is only valid for products that are currently installed."
    I have used the Office 2013 repair process, I have uninstalled and reinstalled Office 2013, I have manually uninstalled office 2013 using KB 2739501 (
    http://support.microsoft.com/kb/2739501/en-us ) and I still can not open Excel documents. 
    Recently I found that I can not do mail merges either using Excel documents as the data source and I believe the two items are related.
    Any suggestions?

    Hi,
    Please try to turn off compatibility mode and then check the issue again. To do this, please follow:
    1. Open this folder location:
    For Windows 32-bit: C:\Program Files\Microsoft Office\Office15
    For Windows 64-bit: C:\Program Files (x86)\Microsoft Office\Office15
    2. Find Excel.exe, right-click it, and choose Properties.
    3. Click on the Compatibility tab and ensure that all of the boxes are
    un-checked.
    For more information, please refer to this:
    http://support.microsoft.com/kb/2674519/en-us
    Thanks,
    Steve Fan
    TechNet Community Support

  • Error while doing Good Issue for Production Order using BAPI

    Hi All,
    I am facing an error like 'u2018Content of order 1011907: MDT218AJ10 transferred to interface (IMSEG): T-86410-71".
    I have written the code as below. Please let me know what is missing when using the BAPI 'BAPI_GOODSMVT_CREATE'. What is the cause of this error ?
    *Action in Transaction (GM_CODE)
    *GM Code for Goods Issue for Production Order is 03
      gs_gmcode-gm_code = '03'.
    *Header Data
    *Posting date
      gs_header-pstng_date = sy-datum.
    *Document date
      gs_header-doc_date   = sy-datum.
    *Item Data
    *Material
      gs_item-material  = zptp_s_rf_migo_261-matnr1.
    *Movement Type
      gs_item-move_type = '261'.
    *Movement Indicator
      gs_item-mvt_ind   = 'F'.
    *Stock Type
      gs_item-stck_type = 'F'.
    *Plant
      gs_item-plant     = gv_plant.
    *Storage Location
      gs_item-stge_loc  = gv_str_loc.
    *Quantity
      gs_item-entry_qnt = zptp_s_rf_migo_261-menge2.
    *Unit
      gs_item-entry_uom = gv_uom.
    *ISO code for unit of measurement
      gs_item-entry_uom_iso = gv_uom.
    *Order Number
      CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
        EXPORTING
          input  = zptp_s_rf_migo_261-aufnr
        IMPORTING
          output = gs_item-orderid.
    *Reservation Number
      gs_item-reserv_no = gv_resv_num.
    *Reservation Item
      gs_item-res_item = gv_resv_itm.
    *Reservation Type
      gs_item-res_type = gv_resv_type.
      APPEND gs_item TO gt_item.
    Calling BAPI_GOODSMVT_CREATE to create the Material Document Number
      CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
        EXPORTING
          goodsmvt_header       = gs_header
          goodsmvt_code         = gs_gmcode
        IMPORTING
          goodsmvt_headret      = gs_headret
        TABLES
          goodsmvt_item         = gt_item
          goodsmvt_serialnumber = gt_serial
          return                = gt_return.
    Thanks in Advance.

    hi,
    did you look at message ?
    System says, there are differences between the interface data and the order data. It can be anything. I think you should check
    data in the interface . 
    this is the long explanation of your message :
    Diagnosis
    When calling the function module MB_CREATE_GOODS_MOVEMENT or the BAPI GoodsMovement.CreateFromData (BAPI_GOODSMVT_CREATE) to post a goods receipt for a production order, there are differences between the interface data and the order data.
    Example: The order was created for plant 0001, but plant 0002 is passed on in the interface.
    The system checks this for the material and the order item.
    System response
    Due to this difference, the system cannot post the goods receipt.
    Procedure
    Check the data in the interface (IMSEG-WERKS, IMSEG-AUFNR). If necessary, correct the plant or the order number in the interface.
    << Moderator message - Point begging removed >>
    Edited by: Rob Burbank on Feb 6, 2012 11:24 AM

  • User Exit/BADI for Production Order Availability Check

    Hi PP experts,
    Is there any user exit or BADI which can be used for Production Order Availability Check during order creation/release or while running collective availability check (COMAC) to include additional check conditions such as do not commit quantity (commitment qty = 0) if storage location for a component is missing in the production order due to storage location is not maintained/specified for that component in the material master.
    Note: In this case the availability check is set (configured)  to check at the storage location level.

    Dear ,
    Availablity Check is not Plant Specific or Storage Loaction spefic .ATP does not check the stock for any particualar stock in storage loaction rather it cheks various stocks based inward and out ward movement time through PR/PO/Dependent /Planned Order /Stock Type  irrespective of any Storage Location .
    BAPI which can be used :
    1.BAPI_PRODORD_CHECK_MAT_AVAIL
    can we exclude materials of prod order in availability check
    what is availability check concept  how it is used in SAP
    Check the above if it is useful
    Regards
    JH

  • Best practice - material staging for production order

    Hi Experts,
    could any of You pls, support me with some hints of best practice how to handle material staging WM-PP interface in a certain case?
    Up till now we had a system, where production had no separate location in IM, but one location existed including raw material wh and production. In the same time in WM we had separate storage types for production and raw materials u2013 hence we did material staging transferring goods only inside one IM location between different WM storage types. The material staging should be done based on separate prd. orders.
    Now this need to be changed and separate location need to be handled in IM for production u2013 which means the staging should be done between different IM locations and WM administration also need to be handled.
    Up till now we used LP10 for staging, then LB13 for TO creation etc. We can keep going like that, but if do so, there is another step required in IM u2013 movement 311, where material numbers and qty need to be added manually to finish the whole procedure. I would like to avoid this u2013 which makes the administrational procedure quite long.
    I have been checking the following possibilities:
    1.     Set released order parts-staging at control cycle and use MF60 for staging u2013 but I can not select requirements based on pro ordders here (only able to find demand if component including into selection)
    2.     Two step transfer 313/315 u2013 but this not a supported procedure u2013 313 TI /TO / 315
    3.     Try to find solution how to create 311 movement based on TO or based on WM stock at certain storage type / dynamic bin.
    I have failed.
    So, could any of You pls, support me with some useful ideas, how to handle material staging where 311 included and definetly the last step of procedure, but administrator does not need to enter items manually one by one in MIGO.
    All answers will be appreciated

    Hi,
    Storage location control should be able to take care of your problem.
    If you want to stage the material to a different IM location then the WM location then make the following settings
    If location xxxx is your WM location and location yyyy is your Production location.
    You have defined Production storage type ZZZ for production storage location YYYY and have maintained the supply area for the same
    In WM configuration - For interfaces - IM interface-Control of Assignment "Plant / Stor.Loc. - Whse Number"
    Assign location XXXX as the Standard Location. Maintain entry donot copy sloc in TR for location YYYY
    In WM configuration - For interfaces - IM interface-  Storage Location control for WH
    This entry ensures that there will be a WM tarnsfer Posting between your WM and Production storage Location automatically when you confirm your TO. You can have this done via a btach job also if you want cumulative posting. (schedule job RLLQ0100)

  • Control cycle for production staging SAP WM

    We currently have control cycle for kanban purchase orders. Do I need to create new control cycle production staging. Actually I will be using fixed bin for production consumption. Kindly confirm whether existing control cycle of purchase order can be used.

    Material Staging Indicator for Production Supply
    The material staging indicator defines the method of how needed materials can be supplied for production with the assistance of the Warehouse Management system.
    As with the location coordinates (warehouse number, storage type, and storage bin), the system files this indicator in the control cycle.
    The following staging types are supported:
    "1": Pick parts
    These materials are picked according to the required quantity specified in the production order.
    "2": Crate or kanban parts
    These materials are always removed from the warehouse in full cases. These can be ordered, for example, as soon as a case of needed parts is emptied in production.
    "3": Release order parts
    Release order parts are scheduled individually and the quantities are supplied manually to replenishment storage bins based on the requirements of production orders and the stock levels in the scheduled production supply areas.
    "4": Manual staging
    Materials are staged manually. For example, you can transport individual components using manually created transfer orders, or you can use the bypass method to transport them directly from the goods receipt zone to production. In goods receipt posting, postings are made to the production storage bins from the control cycles.
    "0": Not relevant to WM-PP
    These materials are not relevant to WM staging. They cannot be requested using the WM system.

  • Multiple indesign files for product brochure one data merge file

    I have multiple indesign files for product brochure and there are price changes for various products.
    attached is a screen shot of the folder where all the indesign files are located as you can see each one has been laid out as a spread.
    Rather than opening each individual indesign file to amend prices can i quickly? or is there a way of compliling all documents into one file and quickly updating the price with the data merge file.
    thanks in advance.

    Absolutely not.
    (1)     PDF/VT-1 files must also be PDF/X-4 files. The “create PDF via distillation of PostScript” method precludes this since PostScript supports neither live transparency nor color management.
    (2)     The efficiencies of PDF/VT-1 require use of Forms XOjects and Image XObjects in the PDF file. That requires direct PDF creation that you get from PDF export. This is not available via any route that uses stink'in PostScript as an intermediary.
    (3)     Adobe most strongly endorses PDF creation from InDesign via the export function, not printing to PostScript and distilling. Such PostScript is optimized strictly for printing and not for PDF file creation.
              - Dov

  • Transfer Order not created while performing GR for Production order

    Hi, I am facing a problem while recieving stock from a production order. The system does not create a transfer requirement or a TO.
    Let me give you a brief background.
    This is a new functionality introduced in ECC 6.0 for working with kanban in WM.
    Supply area is created for WM location.
    Control cycle is created for material, supply area. Warehouse, storage type and Bin is maintained in control cycle record. When the GR is done for production order material is recieved in this bin.
    1) Now when the Kanban is set empty a production order is automatically created.
    2) Once the production order is confirmed the material automatically shows up in the bin.
    A material document is created which shows IM movement type 101 and WM movement type 103. Also in material document Immediate auto TO checkmark is blank.
    3) *PROBLEM* - System does not create a TR or a TO. the material automatically shows up in the Bin. How can we enable an auto TR and TO creation.
    Following are the settings which I have already checked:
    1) In IMG, WM movement type 103 has auto TO indicator set.
    2) IM-WM interface for 102 movement type and 103 movement type is maintained.
    The main problem is: Although the material document displays WM movement type 103 and the stock lies in WM bin, System never created a Transfer requirement or a Transfer order.
    I would really appreciate if anyone can help me in this.
    Thanks

    Hi Mike,
    I do not know this function in SAP, so these are just my ideas:
    1.
    System does not create a TR or a TO. the material automatically shows up in the Bin.
    I think it's a normal SAP behaviour. If you do GR against a PO the quant(s) will appear in interim storage bin w/o TO. The TO is to move the quants from one bin to another, but in this case the quant comes from 'nothing' and arrives at the bin.
    If you make confirmation and consume the components refering to a PrdOrd, the components will disappear w/o TO from storage type 100 + dynamic bin, because there's no TO that could move them from dynamic bin to 'nothing'.
    So, these 'movements' are to change the WM stock level and TOs are not designed for this.
    2.
    There's difference between auto creation of TO and immediate TO creation. Please check what SAP help says in case of TOs for outbound deliveries:
    http://help.sap.com/saphelp_47x200/helpdata/en/c6/f8406c4afa11d182b90000e829fbfe/frameset.htm
    3.
    Now when the Kanban is set empty a production order is automatically created.
    So, if you remove the stock from the Kanban it triggers the creation of a PrdOrd. This is very logical in a Kanban system because it is a pull system. but your problem is not this, it's clear.
    If you just created an automatic TO and would remove the stock from Kanban-bin, a new PrdOrd would be generated, and so on. As many times you remove the stock a new PrdOrd is created and this might be the reason why no TO is crated automatically. In this case this would be a push system and not kanban system.
    I do not know this process but if we concentrate only on the pull system, maybe this Kanaban is to store the FG until an event (e.g. shipment) should trigger the stock removal from this bin. (just my assumption)
    Please try to mark the TR creation for the movement type w/o auto / immediate TO and tell us the result (whether you get the TR if you confirm the PrdOrd).
    Regards,
    Csaba

  • Goa for product category

    Hi experts
    I am creating a GOA with 2 items, one for product category and one for normal item, but an error occur 'No condition price exist for item 1', someone knows if it's normal?
    As a know there is no conditions for product categories.
    Thanks in advance
    Nilson

    Nilson,
      I am assuming you are getting that error on Product Category line.
    No, you need not provide any conditions for Product Category items.
    Do you see any conditions populated for that item? Try deleting the item and adding back.
    In IMG, do you have 'Activate Grouping logic for Locations in GOA?'
    SG

  • Material Withdrawal for Production

    Hello all,
    I'm using Pull list (MF60) to pull material for production supply Storage location.I'm not using PP-REM, but staging is a requirement in my scenario. While executing MF60 with reservation & MF65 to Goods Issue,the Goods Issue happns in one step in SAP, but physically it may take hours to transfer the material. Please suggest how to allign the physical & logical goods movement.
    Please note the material is batch managed & automatic batch determination needs to be done before GI
    Regards
    Mahesh

    Dear Friend
    I faced similar issue in a chemical implementation.Do not try to develop ABAP programs to address this.Try to align the physical practices instead.I am explaining what we did.
    We divided the physical storage location in two areas (Not in SAP).One area is demarketed with Green paint and called it a preparation zone.
    Based on Pull list and batch determination , orderwise we used to Pull out the material and put in preparation zone.Handout printout with Batch numbers to forklift operator and he will issue to production zone at designated places.He will tick the printout against each material and batch number on printed pull list.At the end of issuance , he will handover the pull list to stores officer who will then do the PGI.If managed properly there is a time lag of 30-45 minutes between staging and PGI update.
    This procedure ensures :
    1.Batch and quantity is double checked (By Forklift operator).
    2.The issuance and staging is at decided time.
    3.You need not modify SAP programs.
    This was accepted and appreciated by client.Please check this can be possible in your situation.
    I hope this is of some help.
    with regards
    Prakash Wagh

Maybe you are looking for

  • NFe 3.10 Devolução com mais de uma NFe referenciada

    Caros, Estamos realizando o teste para o cenário de Devolução utilizando o layout do XML 3.10 através da NF-e. O manual técnico (NT2013.005_v1.03.pdf), em sua página 46, dá a entender que podem ser refenciadas várias NFes a serem devolvidas em uma ún

  • Free Goods Condition Records Extraction.

    Hi All, Is there any standard Report or a Table from which extraction of Free-Goods condition records can be done based on Sales org and Customer. Thanks.

  • Unable to enter Acquisition & Accu Dep values in AS91 since fields are grey

    Hi Friends, I am not able to enter the acquisition & accumulated values in AS91 as the fields are disabled.My capitalization date i am entering is 01.01.09 which is prior to transfer date.I have done the following to ensure entry via t code AS91. 1.

  • Owsm jaas sso integration

    Hi, I'm not sure if it is possible to integrate Oracle Web Service Manager with Web Security (JAAS). We have a portal app with sso, and I'd like to know if the security context (jaas subject) is automatically propagated when I send a web service from

  • My emails include untitled attachments

    When I send an email with an attachment such as a PDF file, there is a file called "untitled attahcment" included.  How do I eliminate the "untitled attachment" file?