Only 0 EA of material available ( Strange Situation)

Hello Guys,
I have two Materials 
Available Stock is Material A(QTY 10)  and Material B(QTY10).
Now i have created sales order of each material with 1 qty.
E.G
Material A  qty 1
Material B qty 2
i have saved the document and then i have created delivery successfully.
Now i have repeated the same step created sales order with Material A and Material B with 1 Quantities each now this time in delivery i deleted Material B and save the delivery document
then i changed the delivery document(VL02N) and again add the Material B which i have deleted but i get this error "Only 0 EA of material available" although i have enough stock. I am using item requirement 202 Order w.indep.item
Need help

I have deleted Material B then again add the same 1. Below are some examples.
Available Stock MAT A (QTY 20) and MAT B(QTY 20)
Here
Scenario 1
Sales Order:
Material A qty 1 plant 1000 storage 2000
Material B qty 1 plant 1000 storage 2000
Delivery(WRT SO)
Material A qty 1 plant 1000 storage 2000
Material B qty 1 plant 1000 storage 2000
Now sales order created with ref to delivery(VL01N) without any issue
Scenario 2
Sales order:
Material A qty 1 plant 1000 storage 2000
Material B qty 1 plant 1000 storage 2000
Delivery(WRT SO)
Material A qty 1 plant 1000 storage 2000
I have deleted MAT B this time and saved the del doc, now I realized that I have to add Mat B in same Delivery DOC again
Material A qty 1 plant 1000 storage 2000
Material B qty 1 plant 1000 storage 2000 ---> when I try to add the same material I got error.

Similar Messages

  • Only 0EA of material available

    Hi Gurus,
    Can anybody please throw some light on the error. "only 0EA of material are  avialable" We are trying to send a returns PO to a vendor. The stock is now sitting in blocked stock. The delivery is created but the delivery quantity and the picked quantity is all zero on the delivery and it says only 0EA of material is available. As per our configuratiuon we do not inclue blocked stock as avaialble stock in MD04. Availalbe stock is only unrestricted and quality inspection stock. What could be the reason for this error messagfe. Also the the delviery date on the PO is 7/12/2011. Since all the stock that we want to send to the vendor is in blocked stock, why is the delivery not able to look at that stock and pick them up. And also in MD04 there is no other requrieemtns that could be eating away the stock, again this goes back to our config that the stock in blocked stock is not shwoing up in MD04 becuase we do not consider it. Help is greatly appreciated
    Thanks
    Anusha

    Hi Anusha,
    Can you please check this link http://help.sap.com/saphelp_erp60_sp/helpdata/en/dc/edbd3f793511d295d000a0c930e04c/content.htm, the bottom most part and confirm whether your steps are in line.
    Also you can refer this link.
    http://help.sap.com/saphelp_40b/helpdata/en/12/085cf8470311d1894a0000e8323352/content.htm
    From what I can understand, you have received some stock and is faulty, it is lying in blocked stock, you are now creating a return delivery referencing the GR material document?
    Is my understanding correct.
    Regards
    Shailesh

  • Delivery cannot be created (only 0 qty of material available )

    Hello All,
    I have created a sales order for material A on plant B for  one qty. The delivery date is 29.12.10 but the system has confirmed the schedule line with a delivery date of 3.1.11. The material availibilty date is  28.12.10.
    But when I create the delivery, the system gives message, "Delivery cannot be created (only 0 qty of material available )".
    I have checked MMBE and CO09 , there is a stock of qty 2 for material A for plant B. Also there is no other sales order consuming the stock in CO09 for material A in plant B.
    The schedule line catergory is CN(not relevant for MRP)  in sales order and that is why I cannot see sales order requirement in Md04/Co09. But in any case since the stock is available, the system confirmed the schedule line for 3.1.11 in sales order as said above.
    While creating delivery, we are giving a delivery date of 28.12.10 (equal to material availibity date ). I have not checked the availibilty check group but even if checking group= no check, still I think ,the system will confirm schedule line since stock is available and it has confirmed stock in sales order as said above
    But still we cannot create delivery and receives the error, "Delivery cannot be created (only 0 qty of material available )"
    Pls help.
    regds
    Pamela

    Hi Pamela,
    It seems that material A is not available in plant B on 28.12.2010 even if the stock is shown as 2 qty in MMBE
    Please go to MMBE place the cursor on storage location and the check the Warehouse stock for that material.
    It may be that material qty 2 which is currently shown in stock overview is lying in interim storage type 916 against some goods movement (601) issued against some other sales order.
    Also check whether negative stock are allowed in that storage type. In your case , I think they are not allowed.
    I hope this helps
    Br,
    Tushar

  • Error:only 0KG of material 12345 200000256 available.

    Hi Gurus,
    we have created one STO with 2 line items. in that line 10 has been deleted,and line 20 is valid.
    and we have created delivery already.
    problem is when we have created the batch split or batch determination system prompted   the error message is :only 0KG of material 12345 200000256 available.
    Why does system prompted 0kg when there are stock in the system:
    so further where we need to cehck. please advise me with your valuble inputs.
    thanks in advance.
    Regards,
    sss
    Edited by: sss on Jun 23, 2010 12:19 PM

    available stock is something different than stock in unrestricted use status in MMBE transaction.
    available stock is the unrestricted use stock minus the reservation or deliveries that have this stock already allocated.
    Use CO09  or MD04 to see how much stock is available at a certain date and which MRP element is consuming your unrestricted stock.

  • Only 0 KG of material available

    Dear Experts
    we are having stocks in supplying site stock also commited but unable to create the delivery for my STO
    The errors showing
    "Only 0 (zero) KG of material available" along with
    "An item with no delivery quantity is not permitted. Item will be deleted"
    Regards
    Sudha

    Error: "5501247331 000030 Only 0 KG of material 850000610 available"  (STO of delivery in VL10F)
    OSS Reply :
    In transaction ovz9, please uncheck "Include sales reqmts" for
    Availability Check 02 & Checking rule B.
    In transaction OVL3
    Shpt plnt SC SLoc
    3130 3130 50 -> please change SLoc from 50 to 30
    3130 3130 01 50 -> please change SLoc from 50 to 30
    3130 3130 02 30
    Regd
    Sudha

  • Only 0 quantity of material available..

    can any one of you plz suggest , i try to do a test run of sales process.
    I have posted enough stock for a material , but when i try to deliver , the system prompts. Only 0 quantity of material available.

    Satish,
    Though you posted stock and raised the sales order , pls check when is the mat. availale date. If the confirmed quantity is zero which means you should first check the system calculated mat. availabily date .
    In VA01 (sales order) click on "Procurement Tab" check the Mat.Av.Dt for the line item. In the same row check if there is any route determined where it shows the Loading date.
    Check in VOV8 what are the lead time in days.
    System calculates ATP quantity by taking Warehouse stock plus planned receipts minus Planned issues. ATP quantity = Warehouse stock + planned receipts – Planned issues.
    Planned receipts: Planned orders, Production orders, Purchase requisitions, Purchase orders, Stock in transfer, Stock in transit, Stock at inspection, etc.
    Planned issues: Sales orders, Deliveries, etc. (Check if any open orders are there or the material)

  • Only 0 material available

    I am trying to create a delivery for a standard order. Material type is Trading goods.
    We have stock in the plant and storage location. Checked using MMBE.
    We have created a copy of the std order OR for the spare parts ZSP.And ZLF for the ZSP. When i create a sales order and try to do delivery, i get the error, stating "Only 0 material available". Would any one know what is missing here?

    Hi Susan,
    Pl check the Storage location in your sales order, this may be different from the storage location of stock you maintained.
    Maintain Storage Location for the plant in Item Data -> Shipping tab.
    Check you maintained the stock for that same stor. Loc.
    Coz I also got the same error, then again I maintained some more stock in the other storage location, then the problem is gone.
    Hope this will help
    REWARD IF HELPFUL
    Regards,
    Praveen

  • Cannot create Delivery - Only 0 ea material is available

    Hi experts,
    We recently migrated SAP to global environment.  Our SD settings for AV check is same in the local system & also in the global SAP system.
    In sales we use AV check 02 with Check rule A & have unticked the "With reqmts qty".  In delivery we use AV check 02 with Check rule B & also untick
    the "With reqmts qty".
    I have created a Sales order for 6 pcs for material ABC & in sales order under scheduled lines 6 pcs are already confirmed on the requested delivery date.
    On hand stock also we have 6 pcs.  But when I create Delivery the delivery qty is NOT auto picked, more over it says "Only 0 ea of ABC available".*From MD04 I can see the qty to be detected for this sales order on the requested delivery date mentioned in the order.
    Kindly do let me know if this more to do with ATP check or something else.
    Regards,
    Pri

    For this material we need to create Delivery & post goods issue. This is our requirement.
    Only for this material, in VL01N, in menu "Environment" under "Availability" the "With reqmts qty" in ticked.
    This is does not happen for other materials.  Please do let me know where is this setting in Customising.
    I think this cumulates all the requirement qty & since the qty is lesser, eventhough there is sufficient stock for the Sales Order it does not allow to create Delivery as it accumulates qty.
    F1 for "With reqmts qty" shows the customising is under the path,
    Basic functions -> Availability Check and Transfer of Requirements -> Availability Check -> Availability Check According to ATP Logic and Against Planning -> Define Checking Groups
    But do not know how to untick the check box in delivery.
    Please help.
    Regards,
    Pri

  • Issue in STO process-"only 0 MT of material available".

    Hi All,
    I am facing this issue during STO processing using mvt scenario 15 & 16. Let say that i have 5Mt of material stock left at plant A(dispatch plant). When create the load ticket(mvt-15) for the same qty , the ticket is created successfully. Now when i do the unloading ticket(with mvmt 16) the delivery doc gets created with the following error message-"only 0 MT of material available".
    I have checked the stock, and the stock is available for at the dispatch plant. Am i missing some configuration settings ?
    regards
    srinivas

    Hi Srinivas,
    Have you tried pegging the two line items or even "Auto Pegging"?

  • Message VL150 only & of material & available

    HI
    When i create order say for 50 qty for the material Test123, when stock is avbl only 25 at the time of delivery creation system gives a log Message VL150 only Test123 of material 25 available.
    Can some one pl explain me from which program system is picking up this message?
    Its happening only for few order types for other order types program is not throwing this message i mean system allwoing me to create delivery for complete qty even though when stock is there for few qty only.
    Reg
    Shan1242

    Dear Shan1242
    Defining Incompletion Procedure is OVA2 and you are assigning this incompletion procedure to your sale order type in VUA2.  So go to VUA2 and compare with other document types.
    thanks
    G. Lakshmipathi

  • Material Availability check during work order creation and Release

    Hello All,
    We are checking material availability at creation as well as release
    Say we have Material XYZ=100 in stock MMBE
    Now XYZ =100 is say at normal storage location =75
    and scrap storage location=05 and serviceable =20
    Currently when availability check is performed it checks for 95 (It excludes scrap storage location 05 )
    but we want  Availability check to be only for normal stock =75 and not for Serviceable and Scrap location
    how to do this in configuration or via exits
    Since if the material is under Scrap location it is not counting in Availability check at work order creation this logic is working fine but I do know from where this control is put that when the material is in the stock of scrap it is not counting in Availability check for work orders.Same thing I want to extend it to Serviceable stock .
    Why not it is consider it for Scrap storage location , what is config or any MM enhancement
    So that when Availability check run it will not consider Materials at SCRAP as well as SERVISABLE storage location also.
    Please have your views on this
    Regards
    pratap

    Hello
    There are two option for your requiement
    1. Changing the status of the servisable storage location stock to restricted use stock . You can include or exclude this stock status material in OPJJ. This solution is not storage location dependent. It is stock status dependent.
    2. Please refer the enhancement for the storage location determination. I am not sure about this funtionality:
    For production orders the following enhancement is available:
    PPCO0005 enhancement for storage loc. determination/backflushing
    You can use this enhancement to change the storage location and the indicator 'backflushing' in the reservation.
    The enhancement PPCO0005 contains the following enhancement components:
    Function exit
    EXIT_SAPLCOSD_001 storage location determination/backflushing
    You can find the description in modification text of the function exit.
    You can find an example of the user exit in the function group XC01 in the include LXCO1F05.
    warm regards
    Ramakrishna

  • Material Availability date differs in R/3 & APO

    Hi,
    We are facing Issue with Material Avaialbility date for Planner order/Manufacturing Order in R/3 and APO.
    We are using a Master Recipe for PDS Creation in APO which consists on 9-10 different operations, out of which only inbetween operation 4-5-6 is scheduled in APO.
    So in APO Other Operations are not availble in PDS and hence not considered for scheduling as required. Also GR Processing Time is maintained on Product Master for which infinite Capcity Handling resource in created in APO.
    When we schedule Operations in APO, the Scheduled dates for Operation 4-5-6 is sent back to R/3 and for other Operations based on relationship maintained takes addistional 1-2 Days.
    In R/3 Availability Date for Planner Order/Manufacturing Order is calculating by adding a GR time after Operation 10 end time, while in APO as ony operation 4-5-6 is available a GR time is added after Operation 6, which is resulting in Differnet availability date for Order in R/3 and APO.
    Kindly suggets a way to same date in R/3 and APO, if anyone has faced same Issue.
    Thanks for your Help !!!

    Hi Senthil,
    I completly understand, that APO Material Availability date is GR end Date while in R/3 its a Process Order end date.
    But Problem is not that.
    Problem is not all operation of Process order are in APO, so assume u have 5 operations in Process order out of which only first 3 are relevant for schedulilng in APO. So APO schedules these 3 Operation and adds the GR time to Show the avaiablity date.
    While in R/3 GR Time is added after end of Operation 5 which is right, so GR end date in R/3 and APO dont match.
    Let me know if you think some more on this...!!!
    Thanks and Appreciated !!!

  • Material availability check be switched off for during dispatching of order

    Hi All,
    Material availability u2013 can the material availability check be switched off during  dispatching of production order but kept when order is created? 
    Is there any implications on availibilty check.
    How can we do this?
    Regards,
    Vidyasagar

    Dear
    If you want to do Material Availablity Check only at the time of order creation , please choose Availability Check Business Function 1  with your order type  /plant combination .Keep No Check  in Capacity  and do not assing  the Overall Capacity Profile Here .
    Where as keep the Capacity Overall Profile for Production Order Type with Availablity Check  -2  and Mark No Check to material availablity  option in the same .
    In OPKP -make sure that you have Capacity Profile assinged and do not mark Confirm Partial Available Qty .
    How ever , in capacity requirement , material availablity is the intregrated part  and while dispathcing production order with in the available capacity of any operation in work centre , system tries to make sure the materials are available for processing just before actual operation starts .
    Check in CM21-Setting-Strategy -Dispatch Control -Check if you have option to un-check the Material Availability .
    Regards
    JH

  • PR Creation from Main Order based on Material Availability Check

    Hi Experts.
    I have activated material check for maintenance order, and system is checking material availability. But system is not generating purchase requisition if material not available.
    PR creation from main order is feasible in case I will select item category as Non Stock - N; but system is not creating PR for stock item IC - L.
    Can u further guid me, how system will generate PR for material assign in maintenace order, but required stock not available.
    Thanks in advance....
    Rgds,
    Dipen

    Hi,
    As Venu told, for the Item Category L, system will create the reservation. While running MRP for that item, system will check the stock qty & required qty, then it will create the PR for the unavailable qty.
    Only for item category N, from maintenance order, PR will be created.
    Maintain the MRP type in Material Master.
    Regards,
    Maheswaran.

  • Program to update Delivery dates of STO based on Material availability

    Hi,
    We have requireement in which, we need to material availability check for the materials on daily basis. This is only for Stock Trasnfer orders.
    Suppose there is STO ( Stock Transfer Order) 1 that has been created for material M1 for qty 20. The scheduled delivery date for the material is tomorrow. Now I create another STO 2 today for the same material and same quantity. The scheduled delivery date that was proposed was 7 days from today.
    Some one deletes the STO 1. Now Material M1 with qty 20 is avaiable to use. I then go in the system, open STO 2 in change mode. Select the line item and click on Material availability check. When I do this, the new delivery dates are proposed.
    This is standard sap functionality.
    We have required to do this programmatically. Is there any standard SAP program which will check all the STO's by there creation date and do the material avaibility check automatically and re-set STO dates.
    Regards,
    Shahu

    Instead of all that, you could just use stock transport scheduling agreements.  MRP can update those automatically during its processing.

Maybe you are looking for