Operation wise cost through production order

Hi Experts,
Is There any standard report to get Operation wise cost through production order.if it is there please provide the details.
Thanks & Regards,
Prabhakar

HI,
I don't know a standard report but table CKIS contains the costing details line item wise with the corresponding operation number (CKIS-VORNR).
So a query/quick view using KEKO + CKIS should be sufficient.
Best regards, Christian

Similar Messages

  • Operation wise Report of production order

    Dear Experts,
    I am having total 4 operations in production order .I want operation wise report ( For example ,I am having production order of 10 quantity , I want a report through which I can check how much quantity is lying in operation 10 ,20 30 & 40 )
    waiting for inputs.
    Warm Regards,
    Satya

    hi,
    Work Center
    CRHD Workcenter Header Data
    CRCA Workcenter Capacity Allocation
    CRCO Workcenter Cost Center Assignment
    CRHH Hierarchy Header
    CRHS Hierarchy Structure
    CRTX Workcenter Text
    KAKO Capacity Header
    KAZY Intervals of Capacity
    Routing
    PLPO Routing Operation Details
    PLKO Routing Header Details
    MAPL Routing Link to Material
    PLAB Relationships - Standard Network
    PLAS Task List - Selection of Operations
    PLMZ Component Allocation
    PLPH CAPP Sub-operations
    PLFH PRT Allocation
    PLWP Maintenance Package Allocation
    PLMK Inspection Characteristics
    Bill of Material
    STPO BOM Item Details
    STPU BOM Sub Items (designators)
    STKO BOM Header Details
    MAST BOM Group to Material
    STZU BOM History Records
    STAS BOM Item Selection
    STPF BOM Explosion Structure
    Thanking you

  • Operation wise confirmation in Production order

    Hello,
    I want to make a new order type where operation wise confirmation is possible in Production order scenario Presently the std order type PP01 is used , where the user is doing the confirmation at order header level but now user want to go for operation wise confirmation by using CO11.
    I know we can put the confirmation parameters in OPK4 , but not aware exactly where we need to define about the operation wise confirmation.
    Waiting for the reply
    Regards,
    Ravindra

    Dear Ravindra,
    The general control key settings are
    PP01 - Inhouse manufactured or for the operations which are processed internally
    within the shop floor or company.
    PP02 - Externally processed operations.
    PP03 - Auto - GR,where in no need to carry out MB31.
    For each control key,you can also set whether confirmation is a mandatory or
    confirmation is possibel but not required.Check in OPJ8.You can get a better
    understanding.
    Regards
    Mangal

  • Operation wise costing report.

    HI friend,
    i want to know if we want a report which requires operation wise cost analysis over a period of time for production orders.
    let me know the tables which will be useful for this requirement.
    Daniel.

    HI,
    you can get all confirmation related details from table AFRU. Operation details -AFVC.
    Regards,
    Krishna Mohan

  • Actual Labour Costs against production order

    Hi,
    I am currently getting some production orders with no labour costs coming through. We use Activity Types maintained within Routings to capture the labour cost.
    I have checked that the Activity Type and Routing details are linked correctly. But when i view the cost analysis in the production order the "Total actual Costs" field is blank.
    When i view the "operation" details in the production order and look at the tab "Qty/Activities" i can see the actual labour confirmed in hours but the "Activity Type"field in this tab is empty. I'm assuming that this is why there is no labour cost in the cost analysis view.
    The order has been confirmed correctly and the Activity Type is valid with the correct values. The work centre is maintained in the Routing and the same work centre is used in the production order.
    I would appreciate any help.
    Many Thanks
    Nisar

    There are 3 cost variants in play that calculate labor costs- each with their own rules (ususally very similar)
    there is the Variant for the cost estimate (with qty structure)
    there is a production order PLAN variant
    there is a production order ACTUAL variant
    For the production order the variants are visible on the Control data tab.
    Each of these variants has a "valuation variant" to define the method to caclulate activity
    Questions: 
    in the cost analysis, is the PLAN labor cost empty also?  If yes, then the activity is priced and and the Plan variant is working.
    Does the material have a released cost estimate and a labor component?  if yes then the activity is priced and the std valuation variant is working.
    If you get one or two yeses - someone needs to review the other valuation  variants (OPN2)
    If there are no yes, someone in CO should be reviewing their masterdata, activity pricing and valuation configuration.

  • Operation wise costing

    How to track operation wise costing during confirmation. i.e, how to findout the cost involved related to raw material , labour,overhead costs etc for each operation wise.

    Check the costing report S_ALR_87013127
    for Ind Order Check KKBC_ORD
    Edited by: Abhijit Gautam on Oct 19, 2011 3:37 PM

  • Function module for calculating planned and actual cost of production order

    Hi ,
    Do we have any standard function module for calculating planned and actual cost for production order?
    i need to implement this in a Z-report.
    Thanks
    Srini

    Hi,
    try below function module
    CRMCO_GET_PLAN_ACTUAL_COSTS
    CO_IH_GET_PLANNED_COSTS_TOTAL
    Regards,
    Sankaran

  • Actual cost of Production Order settled to Fixed Assets

    Dear all,
    My client is doing in-house production of moulds (internal order suggestion is not accepted by the client) for which
    they have the following
    1. BOM
    2. Machine hour
    3. labour
    4. overhead etc
    5.plan value
    6. actual value
    Can i settle the actual cost of production order to Fixed Asset ?
    If yes
    what are process kindly give me if any process other then the below
    1.production order created
    2. settlement profile - FA is settlement optional
    3. allocation structure
    4. Asset created
    5 define asset in settlement rule
    Kindly give me your valuable input
    regards
    elango

    Hi,
    Although i am not CO expert , please check with your FICO consultant who are expert before make the final call.
    During settlement to a G/L account or a fixed asset, the system ignores additional account assignments that were manually specified in the distribution rule.
    Based on what i know .
    you can stipulate that settlement may be made to cost centers and orders, but not to fixed assets.
    The Settlement profile is something that you need to create a settlement rule to settle the actual costs of a sender object.
    About the Settlement rule is something that  contains the distribution rules for the sender. It will define how the way to settle the cost.
    Allocation Structure
    In the settlement structure you combine the primary and secondary cost elements into groups, in which debits are then posted to the sender objects. For each group, you specify whether (for settlement to a given receiver type) settlement is performed
    by cost element or using a settlement cost element.
    For example, you might use settlement cost elements:
      To document the purpose of an order (such as, repairs or maintenance)
      To reduce data volumes (you can combine a number of debit cost elements
    under one settlement cost element).
    TQ

  • To see the cost of production order  after settlement to header material

    hello guys,
       In make to stock,we settle the total cost of prodution order on header material,right(if we keep as the default rule( distribution rule in order type)?
         If i want to see that cost of production order which we settled against the header material,where should i check it?should i check in material account or somewhere else?
             Thanking you guys in advance.

    Dear,
    There is a little missunderstanding in your thought.
    If the material of price control S, When you do the GR, the STD cost of material is deducted from production order cost, then when you settle the production order, the variance is settled to variance account/PD account. hence the production order cost balance is zero.
    Example- Production order cost is 60000
    After GR the production order cost balance is 60000-50000 = 10000.
    After settlement production order cost balance is zero.
    Now your question is where can i see the production order cost?
    You can see the production order cost in the production order itself.
    In the production order...cost disply option just filter the origin with test settlement and GR.
    Then total up the cost, then you can see the cost as 60000.
    please come back if you need more help.

  • Material cost in production order plan cost

    Dear all,
    -we are in sales order cost object with non-valuated stock...
    -we have created two production orders from MRP run. First one is for semi finished material and second one is for finished material.
    Issue-1
    Both production orders not showing material cost in production order plan cost...
    Issue-2
    When i consumed raw material against semi-finished material production order (261-E), system not gnerated any document and material cost not updated either in production order or sales order...
    where should i do changes in configuration to get updated material cost in the production order...
    Best regards
    Kishore

    Hi
    Issue 1 : Check Whether Standard cost is present for header material of prod order, and under control tab of order costing variant for plan is present.
    Issue 2 : Use 261 instead 261E.
    Rajneesh

  • Block Operation Number Change in Production order

    hello,
    How can i block the operation number change in production order if the operation status is CNF...?
    ie either disable the operation number cell or disable the entire row in the production order.
    rgrds
    Krishna.

    hi prashob
    i can't disable the column, as user need to insert operations in between
    AP, 
    I will check for this...
    regards
    Krishna

  • Add/change multiple operations on a released Production Order

    How can I add/change multiple operations on a released Production Order...I know how to add them manually one by one but is there a better way to add...like copy/paste since i am adding operations from an alternate route? Please advise?

    Hy Aziz,
    In process order go to operation screen go to Operation - Include Master recipe, then one pop up comes select required Master recipe and add operations of your interest.
    But there are some restriction which doesn/t allow it if Inspection Lot, Control Recipe are created..
    Regards,
    Dhaval

  • Costing the production order for the configured material

    We are trying to cost the production order for a configurable item.  But the system is not calculating any cost in the production order.  Sales order related to this configurable material is costed.  What additional setting I need to cost the production order for the configured material ?

    Hi Niki
    If your SO is costed, thats enough from a System's perspective... Planned cost will be the sales order cost estimate because SO saves the Chars required for the Configurable material
    Planned cost in Prod order depends on the Costing variant you have assigned in the order type... Check the error log if there is any error in cost calculation in prod order
    br, Ajay M

  • Relation between operation and component in Production order

    Hi All
    I am new to PP. I need to get the tables which gives relation between operation and components in Production Order. I need to display in smartform the components assigned.
    Thanks and regards
    Swetabh Shukla

    Hi,
    Try with AFVV Table.
    You need to get the Details of the Filed : AUFPL from AFKO.
    Hope this helps..
    Regards,
    Siva
    Hi,
    You can get the details from Table : RESB.
    Regards,
    Siva
    Edited by: Siva Kumar M on May 23, 2008 10:49 AM

  • How to see cost componentwise production order actual cost-not planned cost

    Hi,
    Can anybody tell me how to see cost componentwise production order actual cost ?
    Thanks,
    Bijay

    Hi,
    CO03->Goto-> costs-> Anlysis
    or use the std. report KKBC_ORD
    std. reoprt MCRI
    KVBI - Actual Costs
    Regards,
    R.Brahmankar

Maybe you are looking for

  • K9N Platinum and BIOS flashing

    New to MSI and this forum I have a K9N Platinum which I've had some problems with and also need to flash the BIOS. Problems are: Leadtek TV tuner card video problem watching TV (image and sound freezing) then my laser printer would not print through

  • Stop firefox from pausing a tab when going to another tab or window

    I am running firefox v5.0 and I have noticed that ever since v4 when I open another tab, the other tabs are paused and when I have an upload (ie: a video to youtube) going in another tab and I want to browse the internet using a new tab/window, it is

  • Itunes sound stops working after 20 mins on videos bought from iTunes store.

    On every video i've bought from the iTunes store the sound cuts out after approx 20 mins. I'm on windows 8.0 (completely up-to-date with all drivers up-to-date too) with the latest iTunes (11.1.3.8) and Quicktime (with enhancements switched off). PC

  • A question about authorization of "me29n".

    I have a question about authorization of "me29n". In the screen of me29n, after I choose "cancel release" option,  there are several button I can use, such as "delete","lock","unlock" and so on.    now I want the "delete" button become unavailable af

  • Create vendor as returns vendor

    Hi All, I have on the system around 1000 vendors. I need to make these returns vendors which means when I tick the 'vendor return' box it creates a customer etc. How can this be done on mass? can a partner function be added to do this??? Thanks Stuar