OPU5 Planned Order Scheduling
Hi, I'm having a problem with my detailed planning scheduling.
It is set for backward scheduling in config OPU5.
Yet in the dropdown menu I can only choose between capacity requirments and Current date.
Br matthias
Please check OPJN setting
Similar Messages
-
Collective Planned orders Scheduling for lower level orders with reference to the Superior order
Hi All,
Collective planned order scheduling.
I have been trying to reschedule the superior planned order and i was expecting the lower level planned orders to reschedule based on the superior planned order.
My problem is
when i try to reschedule the superior planned order the system is not rescheduling the lower level planned orders.
For example if i change the basic finish date of superior planned order as 30/09/2014 and reschedule the planned order it is only scheduling the header planned order and the lower level planned order is not scheduling.
Could some one tell me why this is not happenning at planned order level.
As the rescheduling of collective order will work at production order level but for some reason it is not happening at planned order level(as there is no option available to do so).
Please give your thoughts on this asap.
Mahee.Hello Mahee
Please observe that your system is working as designed. Planned orders are scheduled independently, even when they are part of a network/collective order. Note 152319 explains the planned order scheduling in detail and it provides the following information:
* No scheduling of overall networks is executed although a directly manufactured component is assigned.
Note that no scheduling of the overall network is executed for planned orders. For the components requirements dates are determined. In order to cover them, planned orders are created in the next MRP run. Since the requirements are not managed using the exact time, the results of the planned order scheduling and of a scheduling of the overall network of the converted collective order can differ.
BR
Caetano -
Planned orders scheduled on Non working days
Hi,
Planned orders scheduled on Non working days no Planning calnder assigned to the MaterialHi
Just go to transaction code MD26 and check the what calender is assigned to plant and validity period of the calender. If the calender is not valid in the MRP run period then also planning may differ
Krishna -
Planned Order Scheduling - No Valid Routing Selected
Hi Friends,
I am trying to create planned order and then trigger lead time scheduling for it.
I have maintained BOM, Routing, Production Version, and Scheduling Parameters for Planned Order as Detailed Scheduling with Scheduling Horizon as 50 days, and gactivated scheduling anf enerate capacity requirements in OPU5.
My Production Version is valid through 12/31/9999 and also validity in terms of order qty is correct.
I face problem of routing not being selected beyond the 70 days horizon.
I could not understand why the scheduling horizon considered is 70 days tough i have maintained 50 as scheduling horizon in OPU5.
Waiting for your valuable help and pointers
Regards,
MayurDear Maulik and Dhaval,
Good morning, Hope you remember me.
In my material master I have 28 days as inhouse production time but even aftre changing it to 0 there is not change in the leadtime scheduling result. I still get the message that no valid routing found.
Dhaval,
For the selection ID routing status matches. My problem is, If my Planned Order has a basic start date on or before 30-Apr-2009 when I try to schedule order it successfully fetches routing but when i give basic start date as 1-May-2009 it results in message no valid routing found.
I though it might be because i have maintained detailed scheduling horizon as 50 days but 30-Apr-2009 is 70 days from now, so I am confused where to check for. My material even do not use production shceduling profile.
Thanks for replying.
Looking to see some clue
Mayur... -
Hi,
I want to create a planned order which is planned automatically and be visible in CM01..How can i do this?
ThanksHi Ellen,
1.if you run the MRP run (MD02)for material with lead time scheduling indicator(scheduling =2) , u can see the palnned orders in CM01.
Before that, u have to define capacity data under capacity view of work center that involved in planning.
And also ensure " scheduling & generate capacity reqs" check box has been selected for your plant and order type combination in OPU5
regards
pradeep -
Planned order scheduling in mrp
hi
iam trying to run MRP at my client place
facing problem in planned order dates
i choosen tequirement type BSF and strategy group as 11
in md 61 pir was given in a month of june2008(monthly)
after mrp run at modo4 iam getting planned order with
execption message 64 called order date in past
means iam getting planned order START DATE AND END DATE IN THE MONTH OF JUNE
where as i need to my planned order satar date in MAY MONTH and
end date must be 1st of june
means i given PIR which is my start of my june month
checked scheduling parameters which says backword scheduling, and i choosed planning mode 3 and leddtime scheduling
plz suggest which setting effects the planned order start and end dates??
regards
sasikanthhi
i selected schedule margine key with 0 flots (key000)
and chossed *LEED TIME SCHEDULING (in mrp controll parameters :-scheduling 2 at MD02 )
how the reduction strategy helps in this case ,casue i am doing lead time scheduling system has to consider only routing time ??? right ??
plz suggest how to arrest message 64
regards
sasikanth
message 64 diagnosis enclosed
64: Production finish after order finish (P4)
Message no. MD427
Diagnosis
The production finish date calculated using the routing lies after the order finish date that was calculated using the in-house processing time in the material master record.
As the system uses the order finish date in the planning run, this situation may lead to material shortages if production is not finished until the production finish date calculated by the system.
System Response
This exception is displayed in the MRP list and in the current stock/requirements list.
Procedure
Check the times in the material master record and in the routing.
Check whether the order has to be rescheduled in. -
Planned order scheduling mass update
Hello all,
Is there a way I can change the scheduling dates for the planned orders collectively. (not MD16) ?
ThankyouHi,
check the following
Mass Changes of Planned Orders (Action Control)
Use
You can use this function to execute one or more actions for a large number of planned orders simultaneously. This is possible both within the SAP System and over an interface from an external assembly control system.
Features
SAP supplies the function module MD_SET_ACTION_PLAF for action control.
This function module includes the following actions:
Explode BOM
Explode BOM, check availability
Check availability, only explode BOM in the case of a requirement
Check availability, do not explode BOM
Reset availability
Change planned order data
Schedule planned order
Delete planned order
Confirm planned order (in repetitive manufacturing)
Firm planned order data
Firm planned order components
Print component overview
In connection with an action, you can always change planned order data, for example; order quantity, dates or production version.
The function module also enables you to program further customer-specific actions.
You can execute the actions for several planned orders simultaneously.
You can create action chains, that means, have the system execute several actions in a single operation.
Activities
Define your own actions and program a report that includes these actions. As an example of this, the transaction MDAC Execute action for planned order (MRP ® Planned order ® Execute action) is available.
In this example action, you can use actions only for individual planned orders. Nor can you form action chains, only simple action transitions are possible.
Determine an action key and action controls in Customizing for MRP in the IMG activities Define action key and Define action control. An action key describes the actions that can be executed for a planned order. Action controls determine which actions are allowed and in which sequence they are to be executed.
Assign the key for the respective action control to the materials in the material master (MRP 4 view).
Regards,
nandha -
Scheduling of planned order and Production order
Dear PP gurus,
I have run MRP , after running MRP, system has created planned order. These planned order dates are schedule by the system in 2015....I am not able to understand. how? . When i double click on
planned order order and try to convert it in production order those dates get copied into production order.
DO i need to change the dates thr? or keep the same dates which the system is giving>
I m going wrong somewhere. please tell me where and what is config for scheduling for planned order and production order?
Please tell me step by step procedure
Regards
Edited by: Aadi1981 on Apr 1, 2010 9:02 AMThanks for replying,
I have done the below setting for shceduling. Kindly check and let me know any setting needs ot be changed or incorect
FOr scheduling production order , i have configured below settings in OPU3
In OPU3 ,
Detail scheduling tab
Scheduling and Generate cap req tab is checked.
then
adjust scheduling , adjust dates tab, : adjust basic dates , adjust dep , reqt to operation date is selected
scheduling type is backward.,
Automatic scheduling tab is checked.
In OPU5
Scheduling of PLanned order
Scheduling and Generate cap req box is checked (selected)
Adjust scheduling
Sheduling level: via detail scheduling
adjust dates: adjust basc dates , adjust dep reqt , req to operation dates
For capacity scheduling ; always basic dates, dep reqts to operation dates
scheduling type ; backwards
apart from this do i need to do update ca96/ ca97?
best Regards
Edited by: Aadi1981 on Apr 3, 2010 7:42 AM -
Problem with scheduling planned orders in MRP
There is a problem with scheduling planned orders in MRP. SFG is assigned to the BOM of FG. No inhouse production time maintained in the material master of SFG & FG. routing maintained for both . In OPU5 scheduling & capacity reuiremnts tickmarked for detailed scheduling. Scheduling level - via detaied scheduling. Scheduling type - backward. Adjust basic dates , adjust dep. req. to order start set. In MD02 , scheduling is via ' lead time scheduling'.
My problem is the start date & time & finish date & time is same for planned orders of FG & SFG in the detailed scheduling tab of the planned orders. (Duration is same because of same capacity requirements on the same work centre. But how is the finish date same for both SFG & FG?)
(Capacity requirements are being generated.)
What could be the problem ?Dear,
By scheduling the routing and maintain lot size dependent time in material is best practice and result of scheduling will be consistent.
If you want SFG before FG you need to define lead time offset in BOM or need to maintain the floats before production.
Hope clear to you.
Regards,
R.Brahmankar -
Need Automatic Lead-time scheduling in Planned Order using MD11
All,
Our users have a requirement that when they create a planned order using MD11, they would like system to do automatic lead-time scheduling based on the "basic finish date" entered by the user. Currently the system is taking 3 days from the in-house time maintained in material master to calculate the basic start date. But users want to use the 100 days that have been maintained in the routing.
Currently users have to click on "manual scheduling" on the planned order for system to pick up 100 days from routing which is an additional step for the users. Hence users want an automatic way in which system would do lead-time schedule when they enter the basic finish date.
Thanks,
SwapnilDear Swapnil,
In my understanding it is the standard SAP behaviour even if you have made the necessary settings in OPU5 for the planned
order type.
If my understanding is correct, then as per this setting the MRP behaves for the particular plant and order type combination.
Whenever you create a planned order manually you have to do a detailed scheduling and then you get the production dates
for the planned order.(This might be because generally when a planned order is converted into production order the system
carries out a lead time scheduling.- Check the same and correct me if I'm wrong)
Even if you update the material master through CA97,you will not get the detailed scheduling done along with the production
dates.So you have to perform this manual activity during MD11.
What is the reason of setting the in-house production time as 3 days,if the exact production time is going to be more?
Check and revert
Regards
S Mangalraj -
REM scheduling in planned order
Hi,
I am using repetetive manufacturing. I have maintained Forward scheduling in transaction OPU5 and selected the selection ID 02 for rate routing for detailed and rate based scheduling.
Planned orders are created from MRP. When I check the planned order deatails, in the Det.Scheduling tab it shows scheduling type Forward and in the Production rates tab it shows backward scheduling. I have maintained Forward scheduling in OPU5. So the production rates tab shows different scheduling type. How?
can any one explain this.
thanks and regards
murugesanHI
Check the entry parameters for the planning table in OS80 .
check and revert
Regards
Anupam Sharma -
When I choose leadtime scheduling in MRP RUN then system does forward scheduling always.
Then in planned order change mode when i do manually do scheduling then it does backward scheduling as per settings in OPU5.
How to get backward scheduling in MRP.??Dear,
MRP do the backwordscheduling but The system always determines the basic dates for planned orders using backward scheduling.
The system automatically switches to forward scheduling if the determined start date lies in the past.For this you have to maintain 2 settings.
1)In OPPQ - Plant parameters maintain the indicator for start date in the past allow. 2) In OPU3 for your plant & order type , maintain the no. of days for start date in the past.
Hope clear to you.
Regards,
R.Brahmankar -
BAPI or FM for scheduling a planned order (like MD11 or MD12)
Hi guys.
We are working with a group of materials and planned orders, in order to modify and create new planned orders depending on the stock per each material. So we use MD12 to 1) modify the quantity in the order, and MD11 to create new planned orders for the rest of stock for this material.
For process of creation we don't have problems (BAPI_PLANNEDORDER_CREATE makes its work well ), but when we want to schedule the new planned order created before via FM or BAPI, we cannot see any results in MD12.
I mean, when a planned order is scheduled via menu button, a new tabstrip appears in the transaction with dates. So this similar action we've tried using CX_PLANNED_ORDER_SCHEDULE or CX_CRP_PLANNED_ORDER_SCHEDULE but there was no change. If we execute the Schedule button action, in table PLAF (master of planned orders) apears a new number in field PLAF-BEDID related to MRP.
So guys, could you please help us how to get this issue? As last option is BDC, but BDC's and me are not good friends because its performance. So please, any suggestions?
Thanks in advance!
Raul RomeroHi guys...
Sorry for the long time without an answer, which I'm sharing you now:
1. In order to perform the proccess of scheduling, you have to record the steps from menu bar in your batch input. I mean: (1) set values into fields CRHARBPL-LOW () and CRHWERKS-LOW
PERFORM set_batch USING: 'X' 'RCCRY000' '1000',
space 'BDC_CURSOR' 'CRHARBPL-LOW',
space 'BDC_OKCODE' '=PLNG',
space 'CRHARBPL-LOW' p_arbpl,
space 'CRHWERKS-LOW' 'PR01'.
(2) After you ordered your list of planned orders or production orders, loop your internal table and per each order record these commands (these simulates the popup option to select the order you want for scheduling and mark it in the dynpro you are processing):
LOOP AT gtd_tabofplan INTO gvc_tabofplan.
PERFORM completa_bi_campos USING: 'X' 'SAPLPLAT' '4000',
space 'BDC_OKCODE' '=Z021'.
PERFORM completa_bi_campos USING: 'X' 'SAPLCY19' '0120',
space 'BDC_CURSOR' 'CYMARK-VALUE(02)',
space 'BDC_OKCODE' '=BACK',
space 'CYMARK-VALUE(02)' gvc_tabofplan,
space 'CYMARK-MARK(01)' space,
space 'CYMARK-MARK(02)' 'X'.
PERFORM completa_bi_campos USING: 'X' 'SAPLPLAT' '4000',
space 'BDC_OKCODE' '=SL25'.
ENDLOOP.
(3) Set the SAVE operation.
PERFORM completa_bi_campos USING: 'X' 'SAPLPLAT' '4000',
space 'BDC_OKCODE' '=SAVE'.
Hope you' ve succeeded in this task, let me know if you've another questions. -
BAPI for Scheduling Planned Order
Hi,
Please tell me if there are any BAPIs for Scheduling a Pllaned Order and for Deleting a Planned Oredr.
Thankes & Regards,
RahulBAPI_PLANNEDORDER_CHANGE Change planned order
BAPI_PLANNEDORDER_CREATE Create planned order
BAPI_PLANNEDORDER_DELETE Delete planned order
BAPI_PLANNEDORDER_EXIST_CHECK Planned order existence check
BAPI_PLANNEDORDER_GET_DETAIL Get details for planned order
BAPI_PLANNEDORDER_GET_DET_LIST Get detailed planned order list
All bapi's related to planned order processing
BR
Manthan. -
Dedicated scheduling of a planned order having a fixed activity
Hi Gurus,
We're using PP/DS Optimizer with Total Delay Costs objective function, following a Backwards Scheduling strategy in order to Reduce Premature Scheduling. Order activities are then scheduled as close as possible from the requirement dates. However we would wish to apply a forward scheduling strategy to the orders having a fixed activity, but starting from the existing order planned start date instead from the system date, i.e:
Requirement X due on 18.01.2012
Output firmed planned order Y with 3 activities (A1, A2, A3), A2 beeing fixed
Optimization result with a Backward scheduling strategy:
A1 09.11.2011
A2 18.11.2011
A3 17.01.2012
Optimization result when Backward scheduling setting is unchecked
A1 NOW
A2 18.11.2011
A3 17.01.2012
The business requirement we d'like to achieve
A1 09.11.2011
A2 18.11.2011
A3 19.12.2011
It is not foreseen to fix A1 to bypass the problem, above example is only a basic example whereas there're multiple activities in between A1 & A2 in our real material PDS. Is there any way (even with another optimization run, or using in combination a Production Planning Run...) to achieve such a scheduling strategy?
BR,
Pascal.Hi,
To add further and to more precise, the issue is:
In CM01[or in any capacity evaluation tcode], In a particular maonths load[Period] the opeartion from different month is showing up.
For example: if Period[month] 06 is veiwed of a Workcenter load, a line[load appears], whose earliest date is in 7th month[01.07.2014].
I expected to see, only Workcenters scheduled in 6th month to show up in the load evaluation.
Please look at the screen shot.
Regards,
Avinash
Maybe you are looking for
-
Java code to create a new .txt file in FTP server --- Help
Hi, I wrote a standalone java app which creates a .txt file in my local machine and transfers it to FTP server. But my requirement now is to create a new .txt file with the same content in FTP server itself instead of creating locally with basic java
-
Third party ISP and SMTP settings for outlook
HI, we've recently sifgned with BThome because the connections speed where we live is much better than it was with demon. however... I can't semm to make a configuration for my outgoing email settings. i'm receivin my incoming messages from a third p
-
I need a little help!
-
Can i stream hd movies on time capsule to my ipad or TV
would appreciate if anyone can help
-
What's the deal with Podcasts??
I would really like to purchase an iPod touch, coming from a 1st Gen Nano but I have some serious reservations do to what I've heard about Podcasts not syncing correctly?? Are most of the issues resolved by re-configuring iTunes? ...or are there "kno