Planned Order Scheduling - No Valid Routing Selected

Hi Friends,
I am trying to create planned order and then trigger lead time scheduling for it.
I have maintained BOM, Routing, Production Version, and Scheduling Parameters for Planned Order as Detailed Scheduling with Scheduling Horizon as 50 days, and gactivated scheduling anf enerate capacity requirements in OPU5.
My Production Version is valid through 12/31/9999 and also validity in terms of order qty is correct.
I face problem of routing not being selected beyond the 70 days horizon.
I could not understand why the scheduling horizon considered is 70 days tough i have maintained 50 as scheduling horizon in OPU5.
Waiting for your valuable help and pointers
Regards,
Mayur

Dear Maulik and Dhaval,
Good morning, Hope you remember me.
In my material master I have 28 days as inhouse production time but even aftre changing it to 0 there is not change in the leadtime scheduling result. I still get the message that no valid routing found.
Dhaval,
For the selection ID routing status matches. My problem is, If my Planned Order has a basic start date on or before 30-Apr-2009 when I try to schedule order it successfully fetches routing but when i give basic start date as 1-May-2009 it results in message no valid routing found.
I though it might be because i have maintained detailed scheduling horizon as 50 days but 30-Apr-2009 is 70 days from now, so I am confused where to check for. My material even do not use production shceduling profile.
Thanks for replying.
Looking to see some clue
Mayur...

Similar Messages

  • Planned orders scheduled on Non working days

    Hi,
           Planned orders scheduled on Non working days no Planning calnder assigned to the Material

    Hi
    Just go to transaction code MD26 and check the what calender is assigned to plant and validity period of the calender. If the calender is not valid in the MRP run period then also planning may differ
    Krishna

  • Collective Planned orders Scheduling for lower level orders with reference to the Superior order

    Hi All,
    Collective planned order scheduling.
    I have been trying to reschedule the superior planned order and i was expecting the lower level planned orders to reschedule based on the superior planned order.
    My problem is
    when i try to reschedule the superior planned order the system is not rescheduling the lower level planned orders.
    For example if i change the basic finish date of superior planned order as 30/09/2014 and reschedule the planned order it is only scheduling the header planned order and the lower level planned order is not scheduling.
    Could some one tell me why this is not happenning at planned order level.
    As the rescheduling of collective order will work at production order level but for some reason it is not happening at planned order level(as there is no option available to do so).
    Please give your thoughts on this asap.
    Mahee.

    Hello Mahee
    Please observe that your system is working as designed. Planned orders are scheduled independently, even when they are part of a network/collective order. Note 152319 explains the planned order scheduling in detail and it provides the following information:
    * No scheduling of overall networks is executed although a directly manufactured component is assigned.
    Note that no scheduling of the overall network is executed for planned orders. For the components requirements dates are determined. In order to cover them, planned orders are created in the next MRP run. Since the requirements are not managed using the exact time, the results of the planned order scheduling and of a scheduling of the overall network of the converted collective order can differ.
    BR
    Caetano

  • Planned order scheduling in mrp

    hi
    iam trying to run MRP at my client place
    facing problem in planned order dates
    i choosen  tequirement type BSF and strategy group as 11
      in md 61 pir was given in a month of june2008(monthly)
    after mrp run at modo4 iam getting planned order with
    execption message 64 called order date in past
    means iam getting planned order START DATE AND END DATE IN THE MONTH OF JUNE
    where as i need to  my planned order satar date in MAY MONTH and
    end date must be 1st of june
    means i given PIR which is my start of my june month
    checked scheduling parameters which  says backword scheduling, and i choosed planning mode 3 and leddtime scheduling
    plz suggest which setting effects the planned order start and end dates??
    regards
    sasikanth

    hi
    i selected schedule margine key with 0 flots (key000)
    and chossed *LEED TIME SCHEDULING (in mrp controll parameters :-scheduling 2 at MD02 )
    how the reduction strategy helps in this case ,casue i am doing lead time scheduling system has to consider only routing time ??? right ??
    plz suggest how to  arrest message 64
    regards
    sasikanth 
    message 64 diagnosis enclosed
    64: Production finish after order finish                                                                  (P4)
    Message no. MD427
    Diagnosis
    The production finish date calculated using the routing lies after the order finish date that was calculated using the in-house processing time in the material master record.
    As the system uses the order finish date in the planning run, this situation may lead to material shortages if production is not finished until the production finish date calculated by the system.
    System Response
    This exception is displayed in the MRP list and in the current stock/requirements list.
    Procedure
    Check the times in the material master record and in the routing.
    Check whether the order has to be rescheduled in.

  • Planned order scheduling

    Hi,
    I want to create a planned order which is planned automatically and be visible in CM01..How can i do this?
    Thanks

    Hi Ellen,
    1.if you run the MRP run  (MD02)for material with lead time scheduling  indicator(scheduling =2) , u can see the palnned orders in CM01.
    Before that, u have to define capacity data under capacity view of work center that involved in planning.
    And also ensure " scheduling  & generate capacity reqs" check box has been selected for your plant and order type combination in OPU5
    regards
    pradeep

  • Planned order scheduling mass update

    Hello all,
    Is there a way I can change the scheduling dates for the planned orders collectively. (not MD16) ?
    Thankyou

    Hi,
    check the following
    Mass Changes of Planned Orders (Action Control)
    Use
    You can use this function to execute one or more actions for a large number of planned orders simultaneously. This is possible both within the SAP System and over an interface from an external assembly control system.
    Features
    SAP supplies the function module MD_SET_ACTION_PLAF for action control.
    This function module includes the following actions:
    Explode BOM
    Explode BOM, check availability
    Check availability, only explode BOM in the case of a requirement
    Check availability, do not explode BOM
    Reset availability
    Change planned order data
    Schedule planned order
    Delete planned order
    Confirm planned order (in repetitive manufacturing)
    Firm planned order data
    Firm planned order components
    Print component overview
    In connection with an action, you can always change planned order data, for example; order quantity, dates or production version.
    The function module also enables you to program further customer-specific actions.
    You can execute the actions for several planned orders simultaneously.
    You can create action chains, that means, have the system execute several actions in a single operation.
    Activities
    Define your own actions and program a report that includes these actions. As an example of this, the transaction MDAC Execute action for planned order (MRP ® Planned order ® Execute action) is available.
    In this example action, you can use actions only for individual planned orders. Nor can you form action chains, only simple action transitions are possible.
    Determine an action key and action controls in Customizing for MRP in the IMG activities Define action key and Define action control. An action key describes the actions that can be executed for a planned order. Action controls determine which actions are allowed and in which sequence they are to be executed.
    Assign the key for the respective action control to the materials in the material master (MRP 4 view).
    Regards,
    nandha

  • OPU5 Planned Order Scheduling

    Hi, I'm having a problem with my detailed planning scheduling.
    It is set for backward scheduling in config OPU5.
    Yet in the dropdown menu I can only choose between capacity requirments and Current date.
    Br matthias

    Please check OPJN setting

  • Alternative bom and routing selection in planned order

    hi
    how i can config the system so that while creating planned order
    system has to select the alteranative SEQUENCE and alternative routing ?
    at opl8 we do this for production orders what about the planned oreders
    in scheduling parameters of planned orders we can give only selection ID
    WHAT about alternative SEQUENCE .
    IN the same way how the system selects the alternative BOM with date in planned order
    iam not creating production versions
    plz suggest
    sasikanth

    Hi,
    If you r using Prod Version then system pick ups the BOM attached in first valid production version.
    So, normally put more frequently used BOM in your first Prod Version.
    You have more options to use:
    - lot size (defined in BOM header)
    - production version (several option you have: lot size, manually assign a PV to a planned order)
    - you can use explosion date (OPPP, Logistcs > Production > MRP > Master Data > BOM by date)
    MRP 4 (in material master) > 'BOM explosion/dependent requirement' tab > you can set selection method according to your wish.
    Details:
    http://help.sap.com/saphelp_46c/helpdata/en/f4/7d2b1144af11d182b40000e829fbfe/frameset.htm
    Regards,
    Sankaran

  • Scheduling of planned order and Production order

    Dear PP gurus,
    I have run MRP , after running MRP, system has created planned order. These planned order dates are  schedule by the system in 2015....I am not able to understand. how? . When i  double click on
    planned order order and try to convert it in production order  those dates get copied into production order.
    DO i need to change the dates thr? or  keep the same dates  which the system is giving>
    I  m going wrong somewhere. please tell me where and   what is config for scheduling for planned order and production order?
    Please tell me step by step procedure
    Regards
    Edited by: Aadi1981 on Apr 1, 2010 9:02 AM

    Thanks for replying,
    I have done the below setting for shceduling. Kindly check and let me know any setting needs ot be changed or incorect
    FOr scheduling  production order , i have configured below settings in OPU3
    In OPU3 ,  
    Detail scheduling tab
    Scheduling and  Generate cap req tab is checked.
    then
    adjust scheduling , adjust dates  tab,    :  adjust basic dates , adjust  dep , reqt to operation date  is selected
    scheduling type is backward.,
    Automatic scheduling tab is  checked.
    In OPU5
    Scheduling of PLanned order
    Scheduling and  Generate cap req box  is checked  (selected)
    Adjust scheduling
    Sheduling level: via  detail  scheduling
    adjust dates:     adjust basc dates , adjust  dep reqt , req to  operation dates
    For capacity  scheduling ;  always  basic dates, dep reqts to operation dates
    scheduling type ; backwards
    apart from this do i need to do update  ca96/ ca97?
    best Regards
    Edited by: Aadi1981 on Apr 3, 2010 7:42 AM

  • PLANNED ORDER CREATION FROM SALES ORDER SAVING (REQUIREMENT CLASS 200)

    Dear All,
    By using requirement class 200, assembly type 4 (dinamic planned order) Iwould like that at sales order registration the planned order for the sales order material is created.
    I have two problems.
    The system doesn't schedule the planned order, even if the scheduling parametres are entered for planned order type (relation between routing id and planned order type).
    So I have a planned order in which i have to manually schedule it.
    The second problem is that the planned order is firmed at creation. I would like that it was not firmed to adjust by MPS procedure the components from BOM modification. Infact at the creation of the sales order The complete BOM is not defined, and I don't want to unfirm the planned order so run th mps procedure.
    Can anyone answer to these questions?
    Thank's in advance
    Luca Pastura

    Hi Luca Pastura,
    For Scheduling
    1. You need to Give the appropriate check mark ( 1 or 2 ) In the capccity check of the requirement class configuration (ovzg)
    For Firming
    1. Since youare using dyanamic processing ""During dynamic assembly processing, you can not change the quantities and deadlines"
    2. kindly refer the F1 help for the assembly type inthe OVZG.
    Check and confirm
    Reg
    Dsk
    1.

  • Order Type: LA , when Planned Order --- Prod Order

    In STD SAP, In MD04 when we convert planned order to prod order, a new screen comes
    where we mention planned order ---> prod order,
    In the above screen, ORDER TYPE :LA is mentioned (Bottom Right end corner)
    As far to my understanding goes
    In CO40, Order type PP01 which controls/holds
    the production orders are being generated 
    (pickup from MRP parameters, under Planned order --> prod order (Tcode: OPPQ))
    Then how does, ORDER TYPE: LA is being used & from where the system is pulling the order type LA
    Please clarify

    Hi Eswer,
    Please check with SPRO t.code OMDD
    Order profile is linked with  Order type & Procurement type & SP type&  Acct assisnment cat at OMDD.
    When u run the MRP based on MRP view settings the Ordetype is selected For EX inhose porduction order type = LA.
    When u create planned order manually, u have to select the Order profile manually.
    Regards
    Pradeep

  • Priority in Planned order

    Can we define priorities to Planned order?? if so where should we define the same..
    Helpful answer will be rewarded.
    HT

    Dear HT,
    I have not understood "no concept of production order"
    Any planned order has to be converted to production order/process order or you have to use REM.
    Except in REM we use Co41 and COR8 for converting planned order to production order/process order.
    In case of REM system will take the planned order on the start date-fiirst *** first serve basis.
    Now in COR8 or CO41 there is a check box-Firm planned orders.
    You can firm the planned orders with high priority and select this check button and convert the planned orders.
    Please come back if you looking for some thing totally different

  • Planned order not selecting BOM and Routing.

    Dear All,
    I am runing LTP, but for all simulative Planned order system is not selecting Routing and BOM.When i change it manually its selecting the correct BOM and Routing.
    Please let me know what needed ....
    Regards
    Sathish

    Dear,
    First check the OPU5 setting for routing selection ID for your pant and order type?
    Check setting of OPJM fo the selection ID linked application?
    OS32 setting for alternative selection.
    BOM is selected by the system based on the setting in MRP plant parameters(OPPQ) and in material master MRP view BOM explosion type. I. e based on the validity date, lot size. so on
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Apr 3, 2010 11:11 AM

  • How BOM and routing is selected for Planned order and Production order?

    Hi,
    Can any1 plz tell me how BOM and routing is selected for a planned order and production order. ?

    Hello Mathisuthan,
    BOM and Routing selection for the planned order and production order through production version, If u have more than one BOM and more than one Routing then u can maintain this information as Production Version in the system.
    Production version you maintained
    MM01/MM02 -- MRP4--- Production version
    Or you can create Production Versions in Mass also with Transaction Code "C223"
    In the case no production version maintained/created  for the material, then system by default  will pick the first BOM and routing.
    I hope this information helpful to you.
    Regards
    Umesh Mali

  • Wrong routing selection in production order creation via MILL_OC

    Hi,
    We are using the order combination functionality (MILL_OC)
    We have a product with alternative routings.
    Situation is as follows:
    - Create 2 plan orders for the same material
    - Execute MILL_OC
    When I execute the MILL_OC transaction I get the request to choose the routing. If I select routing with groupcounter 2 for both orders, the combined order is created with routing X /groupcounter 1.
    I also tried using production versions but the situation remains
    even by forcing to "use always production version" = setting in the material master, I still get routing 1.
    It seems the combined order takes always the first routing, Any selection is not possible
    Did I miss a setting/customizing or is it a bug?
    Any help would be appriciated
    Regards
    Johan

    Hi Ayoub,
    All the 4 routings are valid from Oct.2014 to 31.12.9999.
    The Order date is from Apr.2015.
    I've made another test with 2 routings created with ECN and the order chose one without asking me what to choose. I don't know the criteria used in this functionallity.
    Thanks,
    Caio.

Maybe you are looking for

  • "Cannot send email from this device"?

    I recently purchased the Easy Release App from the ITunes store and when I try to email the release to my email address it says "Cannot send email from this device". Is it the app that is preventing the sending or is it something to do with the iPod?

  • Global, Local, Harmonised attributes.

    Hi, Could anybody explain me about the Global, Local, Harmonised attributes and how we should use them with Template project and Implementation project. Regards, Murali

  • Get data from a module pool

    Hello ABAP Experts, I am BW person, and looking to extract the data from the table display from one of the trasactions in R/3. tcode: fmderive i checked the the program it is : SAPMABADR (module pool) fields of hte table belong to: structure FMDERIVE

  • Installing the HP 812C Printer

    A friend has and Acer Laptop running Windows Vista.  She is trying to attach her old printer, an HP 812C model. So far we have tried to attach a USB cable from the printer to the laptop, but the computer doesn't recognize the printer. Also installed

  • Updating Sales document with new sub sequent sales document

    Hello All, I am creating one sales contract from one sales document through some user exits and batch jobs. After creating this new sales contract i want to update this doc number in Old Referenced sales document flow. Is there any standard function