Hi Friends
System :SRM 7.0 Extended Classic scenario.
Scenario: We never copied our Dev Client fro Production. Recently our Dev ECC system has been copied from Production
But ,because of memory constraints we cannot do the same to SRM system.
Also our Org is replicated from ECC to SRM.
Objective: 1 Need to synch up the Org of ECC (Dev) to SRM(Dev)
Query 1: How do we overwrite the entire org setup of SRM .
Query2 : Can we make use of concept of Plan version here so that we end up doing wrong ,so that we could switch back to
the earlier version)
(Any inputs on how can we make this possible)
Query 3: Is it possible to transport only the Org structure from either Production (SRM) or Develepoment (ECC).
While doing all this we have a major issue
Issue1: We could figure out that the number ranges setup in our Dev org structure of SRM are totally differnt from ECC Dev.
Ex: Postion number are 65XXXXXX in ECC where as 60XXXXXXX in SRM.
So when we perform PFAL ,it fails .
Any kind of inputs for us to brainstorm on this.
Regards
Sarath

Hi Sarath,
If we are using active version then change the number ranges in OONR against 01$$
Check the IDOC settings for message type HRMD_ABA. it must be transafer IDOC immediately.
Get the all active organization unit (O) from HRP1001 table in SAP and run PFAL in update mode for object (O) and let me know the  result. It will replicate all orgnaization unit and position which fas assigned to above
Regards
Dayal

Similar Messages

  • Can we use NWBC with both SRM and ECC

    HI
    Can we use NWBC both SRM and ECC . or do i have to use EP .
    Thanks,
    Pooja

    Hi
    Hope this will answer your question
    ECC Transactions in NWBC Browser SRM 7.0
    Thanks,
    Ashish

  • Link between SRM and ECC invoice

    Dear gurus,
    I need to find the link between SRM and ECC invoice number, can you please provide me the related tables?
    Thank you in advance for your collaboration.
    Regards,
    Fuffo

    i don't have access to the system now but i guess will be table BBP_PDBEI.
    or you can go tcode BBP_PD, check in item level.
    cheers.

  • Mapping between SRM and ECC long text

    Hi Experts,
    Please advise if anyone know where SAP do mapping of long texts of SRM and ECC objects. I found it in one program in my last project but forgot the name.
    Regards,
    Kamal

    Hello Kamal,
    You can use BBP_LONGTEXT_BADI for mapping SRM text to ECC text.  SRM needs mapping rules to map SRM text into ECC text.
    For details check BBP_DPO_TO_BAPI_MAP that executes the mapping ( text_copy_rules_be_get ).
    Hope this helps.
    Thanks
    Ashutosh

  • SRM-Synching company code description between SRM and ECC

    Hi,
    I have two questions:
    1. Is company code descriptions and other details are stored in SRM (like T001 in ECC)?
    2. If yes, how can we synch the company code description in SRM and ECC? What is the program name to synch both system
    Jit

    Sanjeev,
    Thanks for the reply. But still there is description difference in SRM - frontend and backend system.
    The SRM backend is correct but when we log ninto the SRM portal (frontend), the company code description are missing some characters. Can you pl let me know where is the frontend is picking the Company code description in SRM?
    Jit

  • SRM AND ECC

    Dear all,
    Iam new to SRM.pls explain brief about SRM.
    I have installed ECC 6.0 ABAP STACK only hp-ux,db2 9.1.
    pls tell me 1.whether we need to install abap+java stack in srm or only java is enough.
    2.pls tell me brief explanation about how to go about that.
    3.how to link srm and ecc 6.0.whether srm

    Dear Rajesh,
    SRM is a e-procurement solution and it's web based procurement. If you are having MM knowledge then you can understand very easily or Even if you knew sap-abap then you can understand quickly SAP-SRM.
    Please go thorugh the below link then you can understand very easily.
    http://help.sap.com/saphelp_srm50/helpdata/en/8d/f6a93e08503614e10000000a114084/frameset.htm
    If you require more clarifications then let me know.
    Thanks
    Ravi

  • Unit of Measurement is comming **** in SRM and ecc system

    Hi All,
    I create new Unit in CUNI and replicated in my system but now if i see all the old PO's in SRM and ECC.....All units of measurement are comming '****' in place of unit of measurement but when i create a new Sc and PO replicated in ECc that vlaue is comming perfectly fine .  Please tell me how i can fix this bug.
    Regards to all,
    Smriti Arora

    i check translation it is availabe in english.But how could this happen to all the UOM.......i check in ECC and SRM ie coming ****.
    Smriti Arora

  • Logical systems assignment when SRM and ECC are on 2 different servers

    Hi SRM guru's,
    What is the standard practice for Logical system creation and assignment when  ECC and SRM are on 2 different servers.
    I could not able to find which i created a logical system  in SRM server which i created in ECC
    Same for the ECC also.
    how do i assign logical system of SRM to ECC
    vice versa.
    your prompt response is appreciated.
    Regards

    Hi Sai,
    Logical System Naming/Creation procedure is not dependent on the servers but it is just a logical representation of a system.
    As you are trying to name logical systems for ECC & SRM, please follow the below procedure which is usually recommeded by SAP and followed.
    Logical System : <SID>CLNT<Client Number>
    For Example if you have a client 300 in system DE0 (also called SID), the logical system name will be DE0CLNT300. And it will be same for SRM system.
    You can refer the below document which eplains the creation of logical system and RFC destinations etc
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/CABFAALEQS/CABFAALEQS.pdf
    Note: Only while configuring the RFC Destination, the servers will play a crucial role.
    Regards
    Kathirvel

  • How to synchronise SRM and ECC for purchase groups?

    HI,
    recently we created two purchase groups in ECC. But these purchase groups did not replicate to SRM.
    the table in ECC T024 has those purchase groups but the table in SRM HRT5500 does not have those purchase groups.
    How can we make them in sync. Please guide me.
    Thanks,
    Nandan Upasani.

    Hi,
    Thatu2019s correct that you cannot establish to replicate Porg and pgrp to SRM. So better you perform following creation and assignment in SRM PPOMA_BBP Tcode as u2013
    1.     Create purchasing group in SRM by copy any existing Pgrp and change the details as you created in ECC.
    2.      You have to select a purchaser whom you are going to do purchasing assignment.
    3.     Do the  purchasing assignment to the purchaser's position.
    You have to do this process for all the pgrps you added.
    Regards,
    Atul

  • SRM and ECC integration

    Hi Gurus,
    We are in a phase of integrating SRM with ECC, so that any master data created in ECC should be replicated in SRM etc...
    Can any one provide me detail step by step configuration required to integrate SRM with ECC?
    Any material witll be helpful.

    Hi sanju,
    see these links
    https://www.sdn.sap.com/irj/sdn/articles-community?prtmode=print&startindex=261 - 38k
    https://www.sdn.sap.com/irj/sdn/articles?startindex=21 - 46k
    www.sap-press.com/product.cfm?account=&product=H2900 - 34k
    thanks
    karthik
    reward me idf usefull

  • Audio and Video not in synch?

    Hello, I recently bought my Vado HD, on first using it the video and audio are not in synch on the playback. The video runs slower than the video. I am wary to upgrade the firmware because it seems a lot of people on this forum have gotten more problems since they upgraded...
    Any ideas why my audio/video synch is off and how I can fix it would be greatly appreciated.
    Thanks in advance,
    Jack.

    try this link for prior discussion:
    http://forums.creative.com/creativelabs/board/message?board.id=vado&message.id=63&query.id=42920 #M63

  • Photos and thumbnails not in synch

    I have deleted photos, but their thumbnail still shows up. Also, other deleted photos show up but there is no thumbnail under "Event" for the event.
    It seems that deleted photos are not in synch with their thumbnails. is there a way to resynchronize the index file?

    download iPhoto Library Manager - http://www.fatcatsoftware.com/iplm/ -  and use its rebuild command - this creates a totally new library so if you are not happy with it you can just go back to the current one
    LN

  • Video and audio not in synch after 11.6 update

    Ive updated to the 11.6 version flash player several times and this out of synch issue has happened every time. In the past I just went back to older version. Now the sites I use (youtube, letmewatchthis.com...ext) wont let me use the older version at all. So once again I updated, and of course I have the same problem. The audio appears normal, but the video is dragging, going into a slowmotion kinda thing. Im using Mozilla Firefox, my cpu is a desktop windows XP service pack 2 Pentium 4 1500 MHz 1.50 GHz 512 MB of RAM (yes I know its a pretty pathetic desktop by todays standard, but its all I got for the moment) Ive went down the list on the troubleshooting page and did all that I could. Deleting browsing history, removing flash cache, disable hardware acceleration. Im all out of ideas. If someone could help that would be splendid.

    Can you try out latest 10.3 build to see if that works for you?  It should work on most sites.
    Where can I find direct downloads of Flash Player 10.3 for Windows or Macintosh?

  • SRRELROLES TABLE COMPARISION BETWEEN SRM AND ECC

    Hi all
    i would like to compare both tables SRRELROLES  in ecc and srm for any one of SRM Business objects and linked ECC Business Objects for ALL the records not one records.
    how .any clue is appreciated.
    i followed peter methid but not works for me
    the relations are stored in the tables SRRELROLES (this consist the documents) and BBP_PDBINREL (this consists the links):
    In the table SRRELROLES are all of the the documents listed (SC, PO, BID...). Each line of the SRRELROLES consist a ROLEID. If you call the table BBP_PDBINREL with this roleid, as a result you will get the link (ROLEID_A or ROLEID_B) to the related documents.
    Whit this ROLEID just call the table SRRELROLES and you will get the related document.
    I tried in development box . it did not work. let me try other environment
    Regards,
    Peter
    muthu

    Sanjeev,
    Thanks for the reply. But still there is description difference in SRM - frontend and backend system.
    The SRM backend is correct but when we log ninto the SRM portal (frontend), the company code description are missing some characters. Can you pl let me know where is the frontend is picking the Company code description in SRM?
    Jit

  • Tolerance in SRM and ECC (BE R/3)

    Hi,
    During posting of invoice in SRM, why only TOG tolerance will be used for checking tolerance?
    As per my understanding, ECC tolerance will not be checked during SRM invoice posting.
    Is it correct system functionality in SRM?
    regards,
    Rahul Mandale

    Hi
    Have you maintained the same configuartion data both in R/3 as well as SRM system for the Tolerance group ?
    Which SRM scenario you have maintained ? Whci SRM System release you are using ?
    <b>I guess, ECC will be checked only based on the EBP Scenario yo have maintained for the system. But the BAPI call checks the configuartion data in SRM as well as R/3 before posting the Invoice.</b>
    <u>Here is the detailed reasons behind the same -></u>
    Set Tolerance Checks
    In this activity, you define the tolerances for value or quantity overruns for deliveries, invoices, or order confirmations. Quantities or values of deliveries, invoices, or purchase order confirmations may vary up to these tolerance values. This allows deliveries or invoices to still be posted or data to be transferred from the order confirmation to the purchase order. For the definition of these tolerances, use tolerance groups to which you assign tolerance keys with different values and quantities. In this way, you can assign the same tolerances to different users.
    Example
    You assign the tolerance key DQ to the tolerance group M (manager), define an upper limit of 1000 for the value-based limit and activate the value limit. You also assign the tolerance key DQ to the tolerance group E (employee), define an upper limit of 100 for the value-based limit, however, and activate the value limit.
    Standard settings
    You can assign the tolerance group to a user group via the attribute TOG (tolerance group). For example, you assign the value M to user Manager 1 in the user attribute TOG for the user group Manager. If a user is logged on, the system always uses his TOG. If the user is not logged on, (BAPI is being used), the system uses the TOG of the vendor (business partner master record).
    You can create tolerance groups by checking the quantity against the purchase order and the price (value) against the confirmation.
    If you do not define any tolerances, this means that it is not possible to enter a delivery/incoming invoice in EBP where quantity or value has been exceeded.
    The tolerance can be specified as a value, percentage, days, depending on the tolerance key. Two differently structured tolerances exist for value variances (DA for cumulated values, PP or PR for single values).
    Percentage and absolute limits
    If you define both a percentage and an absolute limit in a tolerance key, then you cannot post an invoice or automatically transfer data from the first purchase order confirmation received into the purchase order, if either one of the tolerances is exceeded. An absolute limit always has priority.
    Example (with respect to invoice verification): You have defined a percentage upper limit of 5% and an absolute upper limit of 10. You wish to enter an invoice with the amount 1000, that exceeds the order value by 30. Although the percentage  upper limit of 5% is observed, the absolute limit is not. The invoice exceeds the tolerance and can therefore not be posted.
    Tolerances for deliveries/invoices
    You can assign the following tolerance keys:
    CF: Over/underdelivery in the confirmation
    You use this tolerance to check how the confirmation deviates from percentage limits for overdelivery and underdelivery. First, the system checks in the confirmation against the tolerances created in the purchase order. If none exist, the system checks against the tolerances in the relevant tolerance group (for example, the tolerance group of the vendor). If you select the value Unlimited , no tolerances apply. The system displays a controllable message when a tolerance is not reached or is exceeded (see Influence Message Control).
    DA: Exceed value (cumulated)
    You use this tolerance both for confirmations and invoice entry. You can either define an actual value or a percentage for the upper limit. The system checks whether the cumulated invoice value (that is the value of all previous invoice documents + current invoice documents) exceeds the order value. The check is always made against the purchase order. If a confirmation is expected for an order item, a second tolerance check is made to determine whether the cumulated confirmation value (value of the previous confirmation documents + current confirmation) exceeds the order value.
    DQ: Quantity variance (converted to currency amount)
    You use this tolerance both for confirmations and invoice entry.
    If a confirmation is expected for an order item and has already been posted, the system multiplies the net order price by (quantity invoiced - (total quantity delivered - total quantity invoiced)). If no confirmation is expected, the system multiplies the net order price by (quantity invoiced - (quantity ordered - total quantity invoiced)).
    The system compares the outcome with the absolute upper and lower limits defined.
    This allows relatively high quantity variances for invoice items for small amounts, but only small quantity variances for invoice items for larger amounts. You can also configure percentage limits for the quantity variance check. In this case, the system calculates the percentage variance from the expected quantity, irrespective of the order price, and compares the outcome with the percentage limits configured.
    LA: Amount of limit purchase order
    You use this tolerance both for confirmations and invoice entry.
    The system calculates the sum of the value invoiced so far for the order item and the value of the current invoice and compares it with the value limit of the purchase order. It then compares the difference with the upper percentage and absolute tolerances defined.
    LD: Limit purchase order; time limit exceeded
    You use this tolerance both for confirmations and invoice entry.
    The system determines the number of days by which the invoice is outside the planned time interval. If the posting date of the invoice is before the validity period, the system calculates the number of days between the posting date and the start of the validity period. If the posting date of the invoice is after the validity period, the system calculates the number of days between the posting date and the end of the validity period. The system compares the number of days with the absolute upper limit defined.
    PP: Price variance (value variance from expected value)
    You only use this tolerance for invoice entry.
    The variance from the expected value is checked here, based on the preceding document (purchase order price or confirmation value).
    The system determines by how much each invoice item varies from the product of quantity invoiced multiplied by the order price. It then compares the variance with the upper and lower limits defined (absolute limits and percentage limits).
    TX: Tax variance
    You use this tolerance exlusively for invoice entry. You define tolerances for tax amounts that are used with the tax calculation.
    Tolerances for purchase order confirmations
    SAP Enterprise Buyer uses the tolerances that you define here for the automatic data transfer from the purchase order confirmation to the purchase order and also for the manual data check in the vendor information. If the tolerances are exceeded, the system issues I messages.
    You can assign the following tolerance keys:
    PM: Quantity variance (converted to currency amount)
    If a confirmation is expected for a purchase order item, the system calculates the purchase order confirmation net price multiplied by the purchase order confirmation quantity. The system compares this sum with the defined upper and lower limits. You can also define percentage limits for the quantity variance check. Then the percentage variance from the expected quantity calculated - independent of the purchase order price - and this is compared with the defined percentage limits.
    PZ: Time overrun compared to purchase order
    The system determines how many days the delivery date has exceeded the planned time interval by. If the delivery date of the purchase order confirmation is earlier than the delivery date of the purchase order, the system takes the purchase order date - the confirmation date; If the delivery date of the purchase order confirmation is later than the delivery date of the purchase order, the system takes the purchase order confirmation date - the purchase order date. The system compares the number of days with the defined absolute upper limit.
    PR: Price variance (value variance from expected value)
    Here the variance between the purchase order confirmation and the purchase order price is checked. The system determines for the items the price variance as the product of the quantity in the purchase order confirmation multiplied by the price in the purchase order confirmation, and it compares this variance with the defined percentage and absolute upper and lower limits.
    Automatic transfer
    Enterprise Buyer automatically takes the data from the first purchase order confirmation to be received, however, the following conditions apply:
    Data transfer is only possible if no contract exists for the purchase order item.
    All existing tolerances (quantity, price and delivery date) are adhered to and/or the purchase order confirmation data matches that of the purchase order exactly.
    If the purchase order confirmation consists of multiple items, then the system transfers the data as follows:
    The sum of all quantities
    The highest available price
    The latest available delivery date for materials or the maximum period for provision of services and limit items
    ( The system does not take any tolerances into account when data is transferred manually from the purchase order confirmation.)
    The system does not automatically transfer any data from other purchase order confirmations. This prevents the original data of the purchase order being changed repeatedly by several purchase order confirmations one after the other when tolerances are exceeded.
    Activities
    1. Create a tolerance group and select it.
    2. Assign one or more of the defined tolerance keys to the tolerance group.
    3. Enter an upper and/or a lower limit. If you do not make an entry, the check is made against the value zero.
    Further notes
    The following table shows the existing assignment possibilities(X) for upper limits (UL) and lower limits (LL) :
    Key Absolute Absolute Percentage Percentage Percentage Day  Day  
    LL UL LL UL unlimited  LL UL 
    CF   X X X 
    DA  X  X
    DQ; PM  X  X
    LA  X  X
    LD; PZ      X X
    PP; PR X X X X
    Hope this will help.
    Please reward suitable points.
    Regards
    - Atul

Maybe you are looking for

  • Downloading and Installing JDK and JSDK

    I just got the book instant javaserver pages and it tells me to install JDK 1.2 for Linux and JSDK. Well I'm useing windows 98 and use IE6 mainly for a browser, so should I still download and install JDK for Linux? And the most resent version I could

  • DB Trigger in Apps

    Hi, I am trying to create a DB trigger on AR_RECEIVABLE_APPLICATIONS_ALL table to update the custom table when the above table column attribute1 is updated through the form DFF. But I am getting the following error when I save the changes. FRM-40735:

  • ItemRenderer for DataGrid

    Here's a nice problem Please test the code below. As you will see, it works fine! The scores (7) are presented neatly. That's because in the itemRenderer for column 2, I bind the text property to data.item2.score. BUT In my application, I DON'T KNOW

  • Photo stream query - Where are my pictures.

    Hi I have an imac, ipad (3) and iphone 5. When I take a picture with my iphone or ipad then the photo's appear in each others photo stream. However, they do not appear in the photo stream of the imac.  I have checked in settings in all cases and they

  • Account Row ID field

    Hello All, A small question, We noticed that first four letters of account Row Id is always fix for all account records, i.e. AAPA followed by hyphen. Can we assume, this prefix will be always fixed and only suffix will change? Please suggest. Thanks