Pending Routing or BOM material list with material in MARA table

I want to tally the material codes in MARA table with the materials without routing and BOM . i.e. pending Routing or BOM material list with material in MARA table.
Before MRP run How we will get this list ?
Pl' give reply.
Thanks .
Regards.

Hi Kishore,
SAP does not have any standard reports to suite your requirement. What i would suggest is to take couple of data extract from table to validate.
1. First dowload all materials which should have "BOM" and "Routing". This you can do by extracting "MARC" table data where field "BESKZ = 'E' or 'X' ".
2. Now you can extract the data from "MAST" for BOM and "MAPL" for Routing details.
Now do VLOOK up in excel to find the mismatch data.
This can also be done by a customised program, which i dont think it is required since it is going to be used only once.
You could also try SQVI with table joins
Hope this helps...Reward your points if so,
Regards,
Prasobh

Similar Messages

  • ALV list with count of the table

    Dear all,
    My requirement is i want display the output as alv list along with the count of the table .
    i got the count  but unable to diplay the  below the list.
    please suggest me.
    Thanks& Regards,
    RP

    If you are using a custom control on the screen and then a custom container you can easily do this.
    Create a screen(Size 200 x 240), place a custom control on the screen and make it to the max size  200 x 240. Now in the attributes of the custom control, check the Resizing option for both horizontal and vertical, with some minimum numbers there.
    Now, your ALV grid automatically occupies all the space available on the screen irrespective of the size if the screen and you will have only one scroll bar.
    Regards,
    Ravi
    Note - Please mark all the helpful answers

  • SQLite - populating a list with records from a table

    I'm fairly new to FB and AIR but have run myself through some tutorials regarding event handling and code structure. I have made some progress with an app for my Android 'phone which uses and SQLite database.
    I've created the DB and stored it under assets.
    I can open and read from it and store the records from a table in the DB to an array and then put the records into an arraycollection.
    via the list dataprovider I then can assign the records to the list and they show up at runtime in the list.
    I then presumed that the list changehandler event would allow me to assign the selecteditem in the list to a label control. Unfortunately the label control just gets 'object object' displayed when a list item is selected - almost a sif the list were empty.
    I cannot work out how to paste the code into this forum message but any advice on either of these problems would be greatly appreciated.
    Thanks

    I'm fairly new to FB and AIR but have run myself through some tutorials regarding event handling and code structure. I have made some progress with an app for my Android 'phone which uses and SQLite database.
    I've created the DB and stored it under assets.
    I can open and read from it and store the records from a table in the DB to an array and then put the records into an arraycollection.
    via the list dataprovider I then can assign the records to the list and they show up at runtime in the list.
    I then presumed that the list changehandler event would allow me to assign the selecteditem in the list to a label control. Unfortunately the label control just gets 'object object' displayed when a list item is selected - almost a sif the list were empty.
    I cannot work out how to paste the code into this forum message but any advice on either of these problems would be greatly appreciated.
    Thanks

  • Purchase Order With Sub Item Component List for BOM material..??

    Hi MM Experts,
    We want to create PO with a component list that should be appears under the main item.
    The component list is a mterial BOM.
    Ex:- bom MATERIAL - CATALOG1 (Non Stock Materials)
    COMPONENT 1 :-ABCD
    COMPONENT 2 :- XYZ.
    WHEN I ENTER THE BOM MATERIAL:- CATALOG1 IN /ME21N . Higher-Level Item-
    Automatically botom line should be appear component 1 , 2 as a Sub Item.
    how to configur this issue..?? Its a standard Ponot Subcontract
    Thanks,
    NAR.

    Hi!
    If you have correctly maintained the BOM in CS01, make sure that in ME21N you enter "L" as the item category, and then, in the field "material", enter the finished product (the header material in your BOM). Then, enter all other required fields.
    When all mandatory data has been completed in ME21N, go to the "Material Data" tab. Here you will see an icon named "Components". If you click this icon, the materials in your BOM will be listed here.
    So, please, do not expect the BOM to be displayed with mother and daugther segments in the item overview of ME21N. Instead, consider that you will only be able to see the components if you click the "Components" icon under the "Material Data" tab at item detail level.
    I hope this helps!
    Esther.

  • Material List with ABC indicator

    Hi,
    I want the Material List with ABC indicator with Monthly Consumption.
    How can I capture that data.. Any Transaction in SAP.
    Thanks..

    Hi
    Run the tcode MC40,with necessary input parameters.
    Inside the report you will be seeing the list of materials with their old as well as new ABC indicators .Now select the material and click on the double-line item .Here u can see the consumption quantity and value for the input period
    Regards
    Sandeep

  • MD04 issue with BOM Material

    HI
    We have a scenario where Sales order is Created with BOM Material. Sales order has been saved, delivered and Billed.
    But still the BOM Material is shown in MD04, we tried running the Correction program SDRQCR21, but still the BOM Material shown in MD04.
    Can anyone help on this issue.
    Thanks

    hi,
    please check,
    whether TECO has been done for production order from PP perspective.
    after this the requriment from MD04 should disappear and finally refresh it.
    you are requested to search the FORUM sir.
    regarsds,
    balajia

  • While creating SO with BOM material, plant is getting grayed out.

    Hi,
    I am trying to create a sales order with BOM material.
    As soon as I give the material, sub items are getting added but I am not able to modify the plant for main item, fields such as plant, item category are gettinh grayed out.
    Is this related to item category or any other setting,
    Please help me.
    Thanks,
    Pramod.

    Hi,
    The field is getting greyed, because you created BOM for perticular plant and it's unique.
    Second is about to item category, when explode bom in sales order then main item become HIGHER LEVEL ITEM,and all other are child or sub item,once it is at higher level it is in display mode,
    Kapil

  • Regarding list with material no and material class per product

    Hi All,
    Could you please tell me ,Is it possible to create a list with material no. and which material class is linked to each product?
    E.g.  7510555 (plant DK10 - sales org. DK01) Class type Z01 - ESTORE and SATTSTORE + class type 001 - CHEMICAL PRODUCT and DK_FD_SALG.
    Can you inform me in which table I can find the information.
    thanks in advanse!
    With regards,
    Pritee.

    Try transaction CL30N, CL31, CT10, CT12.
    Best Regards, Dirk

  • Material list with mrp datas

    hi,
    My requirement is material list with MRP parameters (i.e Maximum level,Reorder points) I have checked by using T-Code MM60 but the required parameter is absent. Waiting for your help.
    Thanks
    Muthuraman.D
    Edited by: muthuraman d on Sep 15, 2010 4:03 PM

    Use tx SE16/SE16N and table MARC.
    Regards,
    Nick

  • Problem with MATNR in greying out sub-items of a BOM material in VA01

    Hi All,
    I'm trying to grey out the fields material number, quantity and UoM in VA01 for a sub-items of BOM material using the user exit USEREXIT_FIELD_MODIFICATION in the include MV45AFZZ.
    CHECK vbap-pstyv EQ 'TAE'.
    IF screen-name = 'RV45A-KWMENG' OR
    screen-name = 'VBAP-MATNR' OR
    screen-name = 'VBAP-VRKME'.
    SCREEN-INPUT = 0.
    ENDIF. " IF screen-name = 'RV45A-...
    Now, the problem is that the fields Quantity and UoM are greyed out but not the Material number field. I've also tried using the enhancement "V45A0003" the same problem still persists

    i think the field name is MABNR not MATNR for material number
    Message was edited by:
            Naresh Reddy

  • Routing for configurable material

    Hello PP gurs,
    I want to create Routing for Configurable Material in SAP PP-PI or PP industries. How the object dependency is defined applied ?
    This requirement is for Make TO Order scenario for Configurable Material.
    At present I am working with resources only.
      I want to create in such away So that while creating Production order  system should ask select BOM & routing.
    How can I define the Super BOM & Super Routing in Order?
    Is it possible to calculate cost for this kind of requirement?
    Please Give your Contribution from Whatever  the Questions above....
    Thanks & Regards,
    Bhavik Dangi.

    Dear,
    In can explain youn w/ example
    Let us say you have to manufactur CAR's(matyerial no in SAP is CAR). The coonfiguration options are - Paint, and tyre
    Create a char inn CT04 as piant and tyre with value as below(data type = char)
    Paint - white, red, blue and black
    Tyre - Redial, Normal
    Create materials like White-paint,  Red-paint,  Blue-paint,  black-paint, Tyre-redial, tyre-Normal, Engine
    Create a class in CL01 called CAR-CLASS , clas type 300 and assign the above Char to this class
    Assign this class to Material CAR.
    Create BOm with following items
    Engine
    White-paint
    RED paint
    Blue-paint, 
    black-paint,
    Tyre-redial,
    tyre-Normal,
    Create a object dependency in CU40 type - selcetion condition to selcet red-paint material when in Sales order select paint red. and like this all others.
    Selection condition for red paint is as below
    Paint = 'red'
    Like this for all others
    Paint = 'white'
    Paint = 'black'
    Paint = 'blue'
    Tyre = 'Normal'
    Tyre = 'Redial'
    Assign this object dependency to BOm items
    Engine
    White-paint -
    >Paint = 'white'
    RED paint -
    >Paint = 'red'
    Blue-paint,  -
    >Paint = 'blue'
    black-paint, -
    >Paint = 'black'
    Tyre-redial, -
    >Tyre = 'Redial'
    tyre-Normal---->Tyre = 'Normal'
    Now create a configuration profile
    When you create a Sales order, system will pronmpt to enter the vlaues for piant and tyre
    if you have selceted piant as red and tyre as normal, then the BOm will look like as below
    Engine
    RED paint
    tyre-Normal
    This is the configured BOM...what you have cretaed is supre BOM.
    It is available in PP
    For nmore information see blow
    http://help.sap.com/saphelp_47x200/helpdata/en/92/58d455417011d189ec0000e81ddfac/frameset.htm

  • Giving BOM material as free good in Sales Order

    Hi,
    I have a business requirement.
    I want to give a free good in Sales Oreder which is a BOM material.This should be possible by manually changing Item category for the line item in the Sales Order just like how we can change TAN to TANN in normal circumsatnces when we add free good material for any NON BOM material.
    In standard functionality,the item category determined for this BOM material is TAQ but this item category field in Sales Order is non editable because of which I can not include the BOM material as free good in my sales order.
    I have already defined one z Item category for free goods for this BOM material & want to use it in Sales Order.
    Can you please suggest how this can be handled ?
    Or is there any other work around by which will allow me to include BOM material as free good in my Sales Order ?
    Thanks in advance
    Regards,
    BM

    Hi,
    Thanks everyone for the feedback.I agree with Samir Danish.It is a standard functionality of SAP which does not allow free goods for BOM material.
    However, can someone suggest work around to deal with this issue.I mean if any one has been doing any work around for this issue then please let me know.It s becoming critical for me.
    Regards,
    BM

  • Unable to enter multiple Schedule lines for BOM material in Sales Order

    Hi All,
    We have a Sales Order where in which we cannot add additional schedule lines for BOM material.
    The schedule lines are greyed out, user was able to add schedule lines earlier.
    I have checked all assignments in VOV6, VOV7 and everything seems to be fine and no changes have been made to item category being used.
    Please provide a solution for this.
    PFB link in which similar situation posted in this community but the final resolution method is not discussed.
    http://scn.sap.com/message/13201504#13201504
    Regards,
    Samiksh

    Hi Samiksh,
    Pls check for that particular customer, only complete delivery allowed(c) is set in the CMR or CMIR. If so, you can't enter multiple schedule lines for that customer.. it would be grayed out in the sales order schedule lines except confirmed line.
    or check the problematic sales order at item level shipping tab if the par del/item is set to 'C'
    With regards
    S.Siva

  • Delivery in Make to Order situation for BOM Material

    Hi,
    I have the BOM material which is exploreing in the sales order 11005 as
    follows -
    LineItem Railing 10 (Top Material)
    01 A01 10
    02 A02 10 (Sub items)
    03 A03 10
    04 A04 10
    05 A05 10
    At the time of sales order level, we are sending the requirements to
    PPC for the top material Railing, at the time produciton stage PP run
    the MRP and do the production for Sub items A01 to A05. When doing the
    production confirmation for A01 to A05 materials, system is confirming
    the stock against the sales order number 11005 with item no 01.
    In our business purpose we are maintaining the stock for top material
    and also sub itmes because of Excise purpose. For Top material we are
    uploading stock manually with MB1C with Special Stock E and in PPC
    doing the produciton of sub items.
    At the time of crating the delivery system is not checking stock of sub
    items and its showing the stock as 0 because the proudction is
    confirmed at line item 10 for sub items a01 to a05.
    Reply ASAP
    Regards
    Goutham
    +919891936656

    Hi Friends,
    Can you please provide the solution for my problem and its slight urgent.
    Regards
    Goutham

  • Goods Receipt of BOM material- cost centre required for components

    I have created a subcontracting PO with a BOM material.
    When trying to post a Goods Receipt the components of the BOM material are required to have a cost centre assigned to them.
    The profit centre for the BOM material and components are the same. The BOM material does not require a cost centre to be entered in the Goods Receipt as the Profit Centre is allocated to account assignment tab.
    Why does the profit centre assigned to the components not default in the account assignment, why is the system asking for a cost centre?

    I receive this error when trying to post the material document:Field Cost Ctr is a required field for G/L account 1000 7023000200
    Message no. F5808
    Diagnosis
    The value for field "Cost Ctr" in the interface to Financial Accounting is an initial value but you are required to make an entry in the field selection for G/L account "7023000200" in company code "1000" linked to the field selection for posting key "81".
    System Response
    Error
    Procedure
    It might be an error in the configuration of the G/L account field selection. The initial application, used to call up the interface must otherwise define a value for field "Cost Ctr". If this is the case, contact the consultant responsible for the application used to call up the interface or get in contact with SAP directly.

Maybe you are looking for